CN106356856A CN201610828856.7A CN201610828856A CN106356856A CN 106356856 A CN106356856 A CN 106356856A CN 201610828856 A CN201610828856 A CN 201610828856A CN 106356856 A CN106356856 A CN 106356856A
Authority
CN
China
Prior art keywords
load
formula
section
adjustment amount
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610828856.7A
Other languages
English (en)
Other versions
CN106356856B (zh
Inventor
王毅
查国强
闪鑫
江叶峰
李雪松
杜浩
戴则梅
陆娟娟
彭龙
李刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Nanjing NARI Group Corp
Original Assignee
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Jiangsu Electric Power Co Ltd, Nari Technology Co Ltd, NARI Nanjing Control System Co Ltd filed Critical State Grid Jiangsu Electric Power Co Ltd
Priority to CN201610828856.7A priority Critical patent/CN106356856B/zh
Priority to PCT/CN2016/109168 priority patent/WO2018049737A1/zh
Publication of CN106356856A publication Critical patent/CN106356856A/zh
Application granted granted Critical
Publication of CN106356856B publication Critical patent/CN106356856B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/04Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
    • H02J3/06Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开一种基于分区负荷控制的安全校正计算方法,针对特高压交直流混联电网若发生直流闭锁引起大规模功率损失故障情况下无法通过机组出力调整恢复电网校正控制问题,充分利用负荷的可调节能力实现安全校正控制,满足调度系统安全运行的要求。本发明根据电网分层分区运行及调度系统按照分区负荷为目标统一执行负荷控制的特点,提出基于分区负荷控制安全校正计算方法,以分区切负荷量最小为目标,以分区负荷为控制对象,考虑系统潮流约束、分区可控负荷约束及稳定断面安全约束,采用连续潮流法与线路规划法相结合进行求解。本发明所提方法具有模型简单、易于求解、收敛性好的优点,可用于实际调度作为调度控制负荷的重要参考依据。

Description

一种基于分区负荷控制的安全校正计算方法
技术领域
本发明涉及电力系统潮流计算技术领域,特别是一种基于分区负荷控制的安全校正计算方法。
背景技术
随着特高压交直流建设及交直流混联电网的运行,电网运行特性发生了根本变化,若发生大规模失电或失负荷故障,则会对电网的安全稳定运行产生较大的影响,尤其是在特高压直流满功率运行时,若突发故障对电网安全稳定运行有较大的影响,引起电网潮流较大范围的变化,直接导致线路及稳定断面不满足热稳定极限。
为了快速消除潮流越限,传统仅仅依靠机组调整无法满足紧急状态下的电网校正控制要求,需要通过调度统一指挥进行快速负荷控制参与有功调节,因此负荷紧急控制是现有电网调整断面越限的重要手段。
随着电网规模的近一步扩大,特高压直流故障影响大,特性复杂,仅仅依靠调度员进行人工处置的方式已不能满足大电网安全运行的要求,调度运行人员必须能够确定负荷控制的详细控制方案,同时对负荷控制后电网的运行状态有更明确的掌握,现有调度系统采用负荷群控功能作为应急处置手段都是基于离线方式编制,实际控制的精度不够。因此为了满足电网在发生特高压直流故障后极端条件下的电网安全运行,需要能够提供基于负荷控制的安全校正优化调整策略,作为调度执行统一负荷控制的重要参考依据,使得电网能够快速恢复安全运行状态。
名词解释
电网中的稳定断面是指连接两地区之间的多条支路所形成的联络线族,断面潮流即为组成断面的各条支路的潮流之和,它清晰地反映了断面所连接的两地区之间的功率交换关系。监视、控制断面有功潮流可以保证单支路满足热稳定限制并保证地区电压稳定及系统暂态稳定,最终保证整个电网的安全。
发明内容
本发明要解决的技术问题为:根据调度系统按照分区负荷为目标统一执行负荷控制的特点,提出一种基于分区负荷控制的安全校正计算方法,以分区切负荷量最小为目标,以分区负荷为控制对象,考虑系统潮流约束、分区可控负荷约束及稳定断面安全约束,并采用连续潮流法与线路规划法相结合进行求解,以满足现有调度系统对负荷控制辅助决策的要求。
本发明采取的技术方案具体为:一种基于分区负荷控制的安全校正计算方法,包括以下步骤:
步骤一,获取电网参数,建立计算模型:
电网直流故障后的切负荷策略的求解是一个优化问题,对应的目标函数为:
m i n Σ k = 1 n d v ΔP d v k - - - ( 1 )
式(1)中ndv表示参与负荷控制的分区个数,ΔPdvk为分区k对应的负荷调整量;
等式约束即系统潮流方程为:
ΔP i = P i S P + ΔP g i - ΔP d i - V i Σ j ∈ i V i ( G i j cosθ i j + B i j sinθ i j ) = 0 ΔQ i = Q i S P - ΔQ d i - V i Σ j ∈ i V j ( G i j sinθ i j - B i j sinθ i j ) = 0 - - - ( 2 )
式(2)中,ΔPi,ΔQi分别为节点i的有功功率偏差量和无功功率偏差量,分别为节点i的初始有功注入功率和无功注入功率,ΔPgi为节点i的发电机调整量,ΔPdi,ΔQdi分别为节点i对应的有功和无功负荷调整量,Vi,Vj分别表示节点i,j对应的电压幅值,θij表示节点i,j之间的电压相角差,Gij,Bij分别表示节点i,j对应的支路互导纳的实部和虚部,j∈i表示与节点i相邻的节点j;
不等式约束包括负荷可调整量约束和稳定断面约束,其中负荷可调整量约束表示为:
&lambda; d v k &OverBar; < &lambda; d v k &le; &lambda; d v k &OverBar; , k = 1 , ... , n d v - - - ( 3 )
式中表示参控分区k的实时负荷占比系数,Pdvk表示参控分区k实时负荷,表示所有参控分区实时负荷总量,λ dvk 表示根据负荷占比系数人工设定可调上下限;
稳定断面约束为:
&Sigma; i , j &Element; T P i j &le; P T &OverBar; - - - ( 4 )
式中:P T ,分别是断面T的有功功率上下限,Pij是断面T中支路i-j有功功率,表示断面T的合功率;
步骤二,对电网进行潮流计算,判断稳定断面有功潮流是否越限,若否则输出潮流计算结果,此时无需通过负荷调整进行安全校正;若是则采用连续潮流算法进行分区负荷调整,直至稳定断面约束越限消除,然后输出连续潮流计算结果,转至步骤三;
步骤三,基于连续潮流计算的结果,对步骤一建立的计算模型采用基于灵敏度信息的线性规划法进行优化计算,步骤包括:
3.1计算稳定断面对分区负荷的灵敏度,公式为:
S d k j = &Sigma; i &Element; k S d i &CenterDot; P d i &Sigma; i &Element; k P d i - - - ( 7 )
式中,Sdi表示分区k第i节点负荷对第j稳定断面的灵敏度,Pdi表示第i节点实际负荷有功,表示第k分区统计总负荷,Sdkj为分区k对第j稳定断面的灵敏度;
3.2依据步骤3.1得到的灵敏度信息建立关于稳定断面的不等式约束模型,公式如下:
&Sigma; k = 1 n d v S d k j &Delta;P d v k &le; P j &OverBar; - - - ( 8 )
式中,ΔPdvk表示第k分区负荷调整量,表示第j断面安全限值;
3.3依据式(3)的不等式形成分区可控量约束模型,公式如下:
&lambda; d v k &OverBar; &CenterDot; &Delta;P d v k 0 < &Delta;P d v k &le; &lambda; d v k &OverBar; &Delta;P d v k 0 - - - ( 9 )
式中,ΔPdvi0为步骤二计算得到的分区k负荷调整量;
3.4建立关键断面等式约束模型:步骤二采用连续潮流算法进行分区负荷调整过程中,肯定有一个稳定断面为最后消除越限,且其潮流值临界于断面限值,将该稳定断面确定为关键断面,该关键断面满足如下公式:
&Sigma; k = 1 n v S d k t &Delta;P d v k = P &OverBar; t - - - ( 10 )
式中,Sdkt表示分区k对关键断面t的灵敏度,为关键断面安全限值;
3.5结合公式(1)、(8)、(9)、(10)建立线性规划模型,采用单纯形法进行求解,即得到分区调整安全校正控制优化策略。
本发明最终优化计算得到的分区负荷调整量即为供调度员参考的调整策略。
单纯形法是线性规划问题中一种多变量函数的寻优方法,其主要思想是先找一个基本可行解,判断是否为最优解,如果不是则找另外一个解,再进行判定,如此迭代运算,直至找到最优解或者判定其无界。上述步骤3.5中采用单纯形法进行线性规划问题求解为现有技术。
进一步的,本发明步骤二中,采用定步长连续潮流算法进行负荷调整,包括以下步骤:
2.1设定计算控制参数初始值,包括设定负荷单步调整量为ΔPiter,收敛门槛为ΔPthold
2.2根据负荷单步调整量初始值对系统总调整量进行初步调整修正;
2.3将当前负荷单步调整量ΔPiter叠加至系统总调整量ΔPdsum,以计算系统总调整量ΔPdsum
2.4根据系统总调整量对参控分区各负荷节点的负荷调整量进行计算,其中每个参与调整的分区按照实时负荷占比参与调整,则节点i的有功、无功负荷调整量计算公式如下:
&Delta;P d i = &Delta;P d s u m P d i &Sigma; j &Element; k P d i &CenterDot; &lambda; d v k , &Delta;Q d i = &Delta;P d i &CenterDot; Q d i P d i - - - ( 5 )
式中Pdi,Qdi为节点i实时负荷,为分区k实时负荷总量;
为了保持系统发电负荷平衡,需要各发电机组相应调整进行匹配,对于节点i的有功发电调整按照机组调整系数分摊,无功采用PV节点进行分摊,有功计算公式如下:
ΔPgi=ci·ΔPdsum (6)
式中:ci为节点i对应的发电机调整系数,是已知量;
2.5对式(2)定义的潮流方程采用牛顿法求解;
2.6根据式(4)稳定断面约束条件判断是否所有稳定断面皆消除越限,若未消除则按当前负荷单步调整量增加系统总负荷调整量然后转至步骤2.3,若已消除则转至步骤2.7;
2.7判断当前负荷单步调整量ΔPiter是否小于收敛门槛ΔPthold,若不满足则存在负荷过调,则恢复系统总调整量ΔPdsum至上一次修正后的结果,同时将当前单步负荷调整量减半,然后转至步骤2.3;否则计算结束,输出潮流计算结果并转入步骤三。
本发明的有益效果为:采用连续潮流法与基于灵敏度的线性规划方法相结合实现优化安全校正策略计算,模型简单,易于求解,具有很好的收敛性。具体具有以下的优点:
1.连续潮流法定步长迭代计算采用牛顿法进行求解,可以利用现有牛顿法技术,实现简单,收敛性好。
2.基于灵敏度的线性规划法可以利用连续计算结果计算灵敏度信息和建模优化模型,易于实现,同时单纯形法也保证了收敛性。
3.采用采用两阶段法进行计算,在优化计算不收敛情况下也可以用连续潮流法计算结果作为调整策略,保证了计算鲁棒性。
附图说明
图1所示为本发明方法流程示意图;
图2所示为本发明步骤二中连续潮流迭代法流程示意图;
图3所示为本发明步骤三中线性规划算法流程示意图。
具体实施方式
以下结合附图和具体实施例进一步说明。
结合图1至图3,本发明基于分区负荷控制的安全校正计算方法包括以下步骤:
步骤一,获取电网参数,建立计算模型:
参考图1所示,获取电网参数包括获取计算控制参数,获取实时数据断面信息,以及获取稳定断面安全约束信息,以为后续计算提供数据基础;其中计算控制参数,包括参控分区、参考机组及相关控制系数;获取实时数据断面信息即获取当前电网实时运行方式断面作为初始断面;稳定断面安全约束信息包括断面包含的设备元件及断面安全限值。
对于电网直流故障后的切负荷策略计算根本上是一个优化问题。
目标函数可表示为:
m i n &Sigma; k = 1 n d v &Delta;P d v k - - - ( 1 )
式中ndv表示参与负荷控制分区个数,ΔPdvk为分区k对应负荷调整量。
等式约束即系统潮流方程表示为:
&Delta;P i = P i S P + &Delta;P g i - &Delta;P d i - V i &Sigma; j &Element; i V i ( G i j cos&theta; i j + B i j sin&theta; i j ) = 0 &Delta;Q i = Q i S P - &Delta;Q d i - V i &Sigma; j &Element; i V i ( G i j sin&theta; i j + B i j sin&theta; i j ) = 0 - - - ( 2 )
式中ΔPi,ΔQi为节点i的有功、无功功率偏差量,分别为节点i的初始有功、无功注入功率,ΔPgi为节点i的发电机调整量,ΔPdi,ΔQdi为节点i对应负荷调整量,Vi,Vj表示节点i,j对应电压幅值,θij表示节点i,j对应电压相角差,Gij,Bij分别表示节点i,j对应支路互导纳的实部和虚部,j∈i表示与节点i相邻的节点j。
不等式约束主要包括负荷可调整量约束和稳定断面约束,对于负荷可调整量约束表示为:
&lambda; d v k &OverBar; < &lambda; d v k &le; &lambda; d v k &OverBar; , k = 1 , ... , n d v - - - ( 3 )
式中表示参控分区k实时负荷占比系数,Pdvk表示参控分区k实时负荷,表示所有参控分区实时负荷总量,λ dvk 表示根据负荷占比系数人工设定可调上下限。
稳定断面约束为:
&Sigma; i , j &Element; T P i j &le; P T &OverBar; - - - ( 4 )
式中:P T ,分别是断面T的有功功率上下限,Pij是断面T中支路i-j有功功率,表示断面T的合功率(有方向)。
步骤二,参考图2,首先进行一次基态潮流计算并识别是否有稳定断面越限,若没有则直接退出计算;若有,则采用连续潮流迭代法以固定分区负荷比例系数计算负荷调整量,同时采用定步长调整方式进行迭代计算,计算步骤如下:
2.1设定计算控制参数初始值,包括设定负荷单步调整量为ΔPiter,收敛门槛为ΔPthold
2.2根据负荷单步调整量初始值对系统总调整量进行初步调整修正;
2.3将当前负荷单步调整量ΔPiter叠加至系统总调整量ΔPdsum,以计算系统总调整量ΔPdsum
2.4根据系统总调整量对参控分区各负荷节点的负荷调整量进行计算,其中每个参与调整的分区按照实时负荷占比参与调整,则节点i的有功、无功负荷调整量计算公式如下:
&Delta;P d i = &Delta;P d s u m P d i &Sigma; j &Element; k P d j &CenterDot; &lambda; d v k , &Delta;Q d i = &Delta;P d i &CenterDot; Q d i P d i - - - ( 5 )
式中Pdi,Qdi为节点i实时负荷,为分区k实时负荷总量;
为了保持系统发电负荷平衡,需要各发电机组相应调整进行匹配,对于节点i的有功发电调整按照机组调整系数分摊,无功采用PV节点进行分摊,有功计算公式如下:
ΔPgi=ci·ΔPdsum (6)
式中:ci为节点i对应的发电机调整系数,是已知量;
2.5对式(2)定义的潮流方程采用牛顿法求解;
2.6根据式(4)稳定断面约束条件判断是否所有稳定断面皆消除越限,若未消除则按当前负荷单步调整量增加系统总负荷调整量然后转至步骤2.3,若已消除则转至步骤2.7;
2.7判断当前负荷单步调整量ΔPiter是否小于收敛门槛ΔPthold,若不满足则存在负荷过调,则恢复系统总调整量ΔPdsum至上一次修正后的结果,即在当前ΔPdsum中减去当前单步调整量ΔPiter,然后将当前单步负荷调整量减半,转至步骤2.3;否则计算结束,输出潮流计算结果并转入步骤三。
参考图3,本发明步骤三首先计算分区负荷控制灵敏度信息,然后采用线性规划法进行优化控制策略计算,最后生成控制计算策略;具体为:
灵敏度计算需要一个基态潮流断面,要从中读取节点电压和相角信息,基于步骤二计算结果采用基于灵敏度信息的线性规划法进行优化计算,优化目标函数模型即式(1),步骤如下:
3.1计算稳定断面对分区负荷的灵敏度,主要根据计算模型的负荷或等值负荷对稳定断面灵敏度计算出分区整体负荷灵敏度系数,计算公式如下:
S d k j = &Sigma; i &Element; k S d i &CenterDot; P d i &Sigma; i &Element; k P d i - - - ( 7 )
式中,Sdi表示分区k第i节点负荷对第j稳定断面的灵敏度,Pdi表示第i节点实际负荷有功,表示第k分区统计总负荷,Sdkj为分区k对第j稳定断面的灵敏度。
其中Sdi可以通过步骤二中最终潮流计算结果对应的潮流方程雅可比矩阵进行一次前推、回代计算得到。
3.2依据灵敏度信息建立关于稳定断面的不等式约束模型,计算公式如下:
&Sigma; k = 1 n d v S d k j &Delta;P d v k &le; P j &OverBar; - - - ( 8 )
式中,ΔPdvk表示第k分区负荷调整量,表示第j断面安全限值。
3.3依据式(3)的不等式形成分区可控量约束模型,计算公式如下:
&lambda; d v k &OverBar; &CenterDot; &Delta;P d v k 0 < &Delta;P d v k &le; &lambda; d v k &OverBar; &Delta;P d v k 0 - - - ( )
式中,ΔPdvi0为基于连续潮流法计算分区k负荷调整量。
3.4根据步骤二的潮流计算原理可知肯定有一个断面是关键断面,该断面满足潮流值临界与断面限值,为了防止优化计算时对分区负荷过切,必须对该关键断面依据灵敏度信息建立等式约束模型,计算公式如下:
&Sigma; k = 1 n v S d k t &Delta;P d v k = P &OverBar; t - - - ( 9 )
式中,Sdkt表示分区k对关键断面t的灵敏度,为对应断面安全限值。
3.5结合式(1),(8),(9),(10)建立线性规划模型,采用单纯形法求解该优化模型,进而得到分区负荷调整安全校正控制优化策略。最终优化计算得到的分区负荷调整量即为调度员参考的调整策略。
本发明对于系统负荷控制建立了以分区为控制对象问题的优化模型,可以简化优化模型中参控变量个数,提高优化计算的效率,并且与实际电网生产运行对负荷控制能够保持一致;
步骤(1)中所建模型采用连续潮流法与线路规划法相结合进行求求解,模型简单、易于求解、且具有很好的收敛性;
步骤(2)中连续潮流法采用定步长牛顿法迭代计算求解,实现简单,收敛性好,为优化计算能够提供准确初值,保证优化计算的收敛性;
步骤(2)中基于灵敏度的线性规划法可以利用连续计算结果计算灵敏度信息和建模优化模型,易于实现,同时单纯形法也保证了鲁棒性。
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明技术原理的前提下,还可以做出若干改进和变形,这些改进和变形也应视为本发明的保护范围。

Claims (2)

1.一种基于分区负荷控制的安全校正计算方法,其特征是,包括以下步骤:
步骤一,获取电网参数,建立计算模型:
电网直流故障后的切负荷策略的求解是一个优化问题,对应的目标函数为:
m i n &Sigma; k = 1 n d v &Delta;P d v k - - - ( 1 )
式(1)中ndv表示参与负荷控制的分区个数,ΔPdvk为分区k对应的负荷调整量;
等式约束即系统潮流方程为:
&Delta;P i = P i S P + &Delta;P g i - &Delta;P d i - V i &Sigma; j &Element; i V j ( G i j cos&theta; i j + B i j sin&theta; i j ) = 0 &Delta;Q i = Q i S P - &Delta;Q d i - V i &Sigma; j &Element; i V j ( G i j sin&theta; i j - B i j cos&theta; i j ) = 0 - - - ( 2 )
式(2)中,ΔPi,ΔQi分别为节点i的有功功率偏差量和无功功率偏差量,分别为节点i的初始有功注入功率和无功注入功率,ΔPgi为节点i的发电机调整量,ΔPdi,ΔQdi分别为节点i对应的有功和无功负荷调整量,Vi,Vj分别表示节点i,j对应电压幅值,θij表示节点i,j之间的电压相角差,Gij,Bij分别表示节点i,j对应支路互导纳的实部和虚部,j∈i表示与节点i相邻的节点j;
不等式约束包括负荷可调整量约束和稳定断面约束,其中负荷可调整量约束表示为:
&lambda; d v k &OverBar; < &lambda; d v k &le; &lambda; d v k &OverBar; , k = 1 , ... , n d v - - - ( 3 )
式中表示参控分区k的实时负荷占比系数,Pdvk表示参控分区k实时负荷,表示所有参控分区实时负荷总量,表示根据负荷占比系数人工设定可调上下限;
稳定断面约束为:
&Sigma; i , j &Element; T P i j &le; P T &OverBar; - - - ( 4 )
式中:分别是断面T的有功功率上下限,Pij是断面T中支路i-j有功功率,表示断面T的合功率;
步骤二,对电网进行潮流计算,判断稳定断面有功潮流是否越限,若否则输出潮流计算结果,此时无需通过负荷调整进行安全校正;若是则采用连续潮流算法进行分区负荷调整,直至稳定断面约束越限消除,然后输出连续潮流计算结果,转至步骤三;
步骤三,基于连续潮流计算的结果,采用基于灵敏度信息的线性规划法进行优化计算,步骤包括:
基于连续潮流计算的结果,对步骤一建立的计算模型采用基于灵敏度信息的线性规划法进行优化计算,步骤包括:
3.1计算稳定断面对分区负荷的灵敏度,公式为:
S d k j = &Sigma; i &Element; k S d i &CenterDot; P d i &Sigma; i &Element; k P d i - - - ( 7 )
式中,Sdi表示分区k第i节点负荷对第j稳定断面的灵敏度,Pdi表示第i节点实际负荷有功,表示第k分区统计总负荷,Sdkj为分区k对第j稳定断面的灵敏度;
3.2依据步骤3.1得到的灵敏度信息建立关于稳定断面的不等式约束模型,公式如下:
&Sigma; k = 1 n d v S d k j &Delta;P d v k &le; P j &OverBar; - - - ( 8 )
式中,ΔPdvk表示第k分区负荷调整量,表示第j断面安全限值;
3.3依据式(3)的不等式形成分区可控量约束模型,公式如下:
&lambda; d v k &OverBar; &CenterDot; &Delta;P d v k 0 < &Delta;P d v k &le; &lambda; d v k &OverBar; &Delta;P d v k 0 - - - ( 9 )
式中,ΔPdvi0为步骤二计算得到的分区k负荷调整量;
3.4建立关键断面等式约束模型:步骤二采用连续潮流算法进行分区负荷调整过程中,肯定有一个稳定断面为最后消除越限,且其潮流值临界于断面限值,将该稳定断面确定为关键断面,该关键断面满足如下公式:
&Sigma; k = 1 n v S d k t &Delta;P d v k = P t &OverBar; - - - ( 10 )
式中,Sdkt表示分区k对关键断面t的灵敏度,为关键断面安全限值;
3.5结合公式(1)、(8)、(9)、(10)建立线性规划模型,采用单纯形法进行求解,即得到分区调整安全校正控制优化策略。
2.根据权利要求1所述的方法,其特征是,步骤二中,采用连续潮流算法进行分区负荷调整,包括以下步骤:
2.1设定计算控制参数初始值,包括设定负荷单步调整量为ΔPiter,收敛门槛为ΔPthold
2.2根据负荷单步调整量初始值对系统总调整量进行初步调整修正;
2.3将当前负荷单步调整量ΔPiter叠加至系统总调整量ΔPdsum,以计算系统总调整量ΔPdsum
2.4根据系统总调整量对参控分区各负荷节点的负荷调整量进行计算,其中每个参与调整的分区按照实时负荷占比参与调整,则节点i的有功、无功负荷调整量计算公式如下:
&Delta;P d i = &Delta;P d s u m P d i &Sigma; j &Element; k P d j &CenterDot; &lambda; d v k , &Delta;Q d i = &Delta;P d i &CenterDot; Q d i P d i - - - ( 5 )
式中Pdi,Qdi为节点i实时负荷,为分区k实时负荷总量;
为了保持系统发电负荷平衡,需要各发电机组相应调整进行匹配,对于节点i的有功发电调整按照机组调整系数分摊,无功采用PV节点进行分摊,有功计算公式如下:
ΔPgi=ci·ΔPdsum (6)
式中:ci为节点i对应的发电机调整系数,是已知量;
2.5对式(2)定义的潮流方程采用牛顿法求解;
2.6根据式(4)稳定断面约束条件判断是否所有稳定断面皆消除越限,若未消除则按当前负荷单步调整量增加系统总负荷调整量然后转至步骤2.3,若已消除则转至步骤2.7;
2.7判断当前负荷单步调整量ΔPiter是否小于收敛门槛ΔPthold,若不满足则存在负荷过调,则恢复系统总调整量ΔPdsum至上一次修正后的结果,同时将当前单步负荷调整量减半,然后转至步骤2.3;否则计算结束,输出潮流计算结果并转入步骤三。
CN201610828856.7A 2016-09-18 2016-09-18 一种基于分区负荷控制的安全校正计算方法 Active CN106356856B (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610828856.7A CN106356856B (zh) 2016-09-18 2016-09-18 一种基于分区负荷控制的安全校正计算方法
PCT/CN2016/109168 WO2018049737A1 (zh) 2016-09-18 2016-12-30 一种基于分区负荷控制的安全校正计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610828856.7A CN106356856B (zh) 2016-09-18 2016-09-18 一种基于分区负荷控制的安全校正计算方法

Publications (2)

Publication Number Publication Date
CN106356856A true CN106356856A (zh) 2017-01-25
CN106356856B CN106356856B (zh) 2018-10-09

Family

ID=57858763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610828856.7A Active CN106356856B (zh) 2016-09-18 2016-09-18 一种基于分区负荷控制的安全校正计算方法

Country Status (2)

Country Link
CN (1) CN106356856B (zh)
WO (1) WO2018049737A1 (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107069708A (zh) * 2017-03-14 2017-08-18 国网湖北省电力公司 一种基于极限学习机的输电网线路有功安全校正方法
CN107294104A (zh) * 2017-08-02 2017-10-24 国网河南省电力公司电力科学研究院 一种电力系统的全分布式的分区潮流计算方法
CN108599223A (zh) * 2018-05-04 2018-09-28 华北电力大学 特高压直流受端电网紧急控制与校正控制在线决策的方法
CN108808738A (zh) * 2018-05-29 2018-11-13 国电南瑞科技股份有限公司 一种考虑约束优先级的电网安全校正控制方法
CN108879733A (zh) * 2018-08-06 2018-11-23 南瑞集团有限公司 一种改善直流闭锁后电网频率稳定性的协调控制方法
CN109038546A (zh) * 2018-07-10 2018-12-18 中国电力科学研究院有限公司 一种基于vsc-hvdc系统的交直流混联电网负荷恢复方法及系统
CN109301832A (zh) * 2018-06-08 2019-02-01 广东工业大学 一种基于n-1静态安全约束下的断面潮流优化控制方法
CN109818363A (zh) * 2019-03-13 2019-05-28 武汉大学 一种计及多种快速控制手段的综合安全校正方法
CN110556824A (zh) * 2019-08-23 2019-12-10 广西电网有限责任公司 一种基于母线分裂的输电能力提升方法
CN111900767A (zh) * 2020-03-25 2020-11-06 中国电力科学研究院有限公司 一种用于控制电力系统多断面有功潮流的方法及系统
CN113452012A (zh) * 2020-03-27 2021-09-28 南京南瑞继保电气有限公司 一种计及气象因素的电力系统暂态稳定计算方法
CN115276015A (zh) * 2022-06-27 2022-11-01 国网山东省电力公司临沂供电公司 一种计及新能源不确定性的电力系统优化调度方法及系统
CN116502843A (zh) * 2023-04-26 2023-07-28 国网黑龙江省电力有限公司齐齐哈尔供电公司 一种关于大数据的网络安全防护系统

Families Citing this family (61)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109031041B (zh) * 2018-07-06 2023-10-20 广东电网有限责任公司广州供电局 配电网电压监测装置布点方法与系统
CN109615248B (zh) * 2018-12-14 2023-02-10 浙江大学 一种考虑天然气系统影响的电力系统连锁故障估计方法
CN110021951B (zh) * 2019-03-27 2022-07-01 中国电力科学研究院有限公司 一种多直流馈入的受端特高压环网的安控设计方法及系统
CN110110409A (zh) * 2019-04-25 2019-08-09 国家电网有限公司 一种基于配电调度的电储热负荷建模方法
CN110365006B (zh) * 2019-04-26 2022-05-03 太原理工大学 一种基于nwbbo算法的电网分区方法
CN110048438B (zh) * 2019-05-09 2023-05-19 武汉龙德控制科技有限公司 一种基于模型预测控制的配电网馈线级负荷功率控制方法
CN110212558A (zh) * 2019-05-09 2019-09-06 宁波永耀电力投资集团有限公司 一种分布式储能系统的选址定容配置方法
CN110363678B (zh) * 2019-05-29 2023-03-28 国家电网有限公司 一种考虑强弱关系的输配电网协调规划方法
CN110247437B (zh) * 2019-06-17 2023-02-03 国网河南省电力公司 计及分区断面安全约束的大功率缺失下频率快速控制方法
CN110350595B (zh) * 2019-06-19 2023-10-27 国网河南省电力公司 事故状态下维持分区断面稳定的负荷快速决策控制方法
CN110264110B (zh) * 2019-07-08 2022-11-18 国网湖南省电力有限公司 基于配电网多应用场景的储能电站选址定容方法
CN110401188A (zh) * 2019-07-20 2019-11-01 国网天津市电力公司 一种分布式电源配电网供电能力的评估方法及评估装置
CN110518590B (zh) * 2019-08-05 2022-12-20 三峡大学 考虑负荷电压静特性的配电网线性潮流计算方法
CN110555785B (zh) * 2019-08-07 2022-08-05 国电南瑞科技股份有限公司 一种月度计划安全稳定校核方法及系统
CN110460095B (zh) * 2019-08-07 2022-12-02 武汉理工大学 基于电压灵敏度矩阵户用光伏并网逆变器分散式控制方法
CN110957742B (zh) * 2019-10-16 2022-07-01 中国电力科学研究院有限公司 基于深度学习的电力系统小干扰稳定辅助决策方法及系统
CN110854862B (zh) * 2019-12-03 2023-05-05 哈尔滨工程大学 一种含下垂特性电源的船舶电网潮流计算方法
CN111428922B (zh) * 2020-03-19 2022-04-05 云南电网有限责任公司 一种快速后验条件断面的电力市场出清方法及系统
CN111697579B (zh) * 2020-06-30 2022-11-29 广东电网有限责任公司梅州供电局 一种电力系统关键输电断面的确定方法、系统及介质
CN111952956B (zh) * 2020-07-02 2024-07-09 清华大学 一种考虑电压敏感负荷备用的电力系统调度方法
CN111723334B (zh) * 2020-07-03 2024-04-05 中国南方电网有限责任公司 一种基于安全距离灵敏度的发电计划校正决策方法和系统
CN111817306B (zh) * 2020-07-14 2023-11-24 上海电机学院 一种考虑可调控负荷的主动配电网重构方法
CN112003285B (zh) * 2020-08-14 2022-04-08 贵州电网有限责任公司 一种电网电压优化调控方法
CN112085274B (zh) * 2020-09-09 2024-04-19 重庆大学 一种计及融冰方式与系统调度运行的融冰协调优化方法
CN112366686A (zh) * 2020-09-29 2021-02-12 国网安徽省电力有限公司安庆供电公司 适应分布式光伏的低频减负荷分配方案的自动生成方法
CN112260283B (zh) * 2020-10-22 2023-08-22 云南电网有限责任公司 一种电力系统输电断面潮流调整方法及装置
CN112332408B (zh) * 2020-10-22 2023-05-26 云南电网有限责任公司 一种电力系统输电断面潮流调整方法及装置
CN112332409B (zh) * 2020-10-22 2023-08-22 云南电网有限责任公司 一种电力系统输电断面潮流调整方法及装置
CN112257274B (zh) * 2020-10-26 2022-04-26 上海交通大学 配电系统运行柔性的量化评估方法及系统
CN112421692A (zh) * 2020-11-10 2021-02-26 国网北京市电力公司 确定预警状态下功率校正模型的方法、装置
CN113078633B (zh) * 2021-03-22 2022-11-25 清华大学深圳国际研究生院 一种含可再生能源的输配电耦合系统恢复力提升方法
CN113381412A (zh) * 2021-05-10 2021-09-10 中国建材国际工程集团有限公司 一种浮法玻璃生产线的负荷计算方法
CN114914902B (zh) * 2021-05-14 2024-08-16 国网湖南省电力有限公司 一种站点电压赋值自动调节方法、系统、终端及可读存储介质
CN113346504B (zh) * 2021-06-17 2022-06-28 国家电网有限公司 基于数据知识驱动的主动配电网电压控制方法
CN113690897B (zh) * 2021-08-04 2024-10-18 国电南瑞科技股份有限公司 在线动态优化调整低频减载各轮次控制对象的方法及系统
CN113746104B (zh) * 2021-09-02 2023-08-22 云南电网有限责任公司 一种柴储供电模式的配电网协调控制方法及系统
CN113868589B (zh) * 2021-09-29 2024-05-17 山东大学 考虑应急资源调度的弹性配电网多点故障抢修方法及系统
CN114003988B (zh) * 2021-10-21 2024-09-06 许继电气股份有限公司 一种基于动态分区的管廊环境控制方法及装置
CN114123170B (zh) * 2021-11-12 2024-04-26 国家电网有限公司 一种洪涝灾害下的配电网故障恢复方法
CN114069634A (zh) * 2021-11-15 2022-02-18 国家电网有限公司 一种用于电力系统潮流计算的初值改善方法
CN114362141B (zh) * 2021-12-03 2023-10-31 国网北京市电力公司 启发式算法与粒子群优化结合的供电系统负荷恢复方法
CN114285090B (zh) * 2021-12-22 2024-07-19 国网江苏省电力有限公司盐城供电分公司 基于单站-分区-全网的新能源极限消纳能力评估方法
CN114336632B (zh) * 2021-12-28 2024-09-06 西安交通大学 一种基于模型信息辅助深度学习校正交流潮流的方法
CN114977154B (zh) * 2022-03-21 2024-04-30 武汉大学 一种电网调频的电解铝负荷与安稳系统相协调的控制方法
CN114937994B (zh) * 2022-03-24 2024-06-25 南瑞集团有限公司 一种交直流混联电网的直流闭锁后稳定控制方法及装置
CN114626748A (zh) * 2022-03-31 2022-06-14 三峡大学 一种交直流电网事故链的关键线路辨识方法
CN115036936B (zh) * 2022-04-26 2024-07-23 北京中泰华电科技有限公司 一种基于线损的风电集群参与电力系统调频方法
CN114841548A (zh) * 2022-04-26 2022-08-02 东南大学 一种配电网资源聚合方法、装置、设备及存储介质
CN114844052B (zh) * 2022-05-18 2024-05-14 国电南瑞南京控制系统有限公司 一种基于主动配电网的电压无功优化控制方法
CN114744686B (zh) * 2022-06-09 2022-11-01 阿里巴巴达摩院(杭州)科技有限公司 发电机组识别方法、装置、设备和存储介质
CN115224687A (zh) * 2022-06-13 2022-10-21 国网四川省电力公司天府新区供电公司 220千伏以下输变电设备停电检修安全校核方法及系统
CN115207916B (zh) * 2022-08-08 2024-10-15 国网湖南省电力有限公司 计及电压稳定的负荷中心网架结构和负荷转供优化方法、系统、介质及终端
CN115441461B (zh) * 2022-10-12 2024-04-19 中国南方电网有限责任公司 一种交直流系统电压稳定判据及负荷控制分析方法
CN115579967B (zh) * 2022-11-21 2023-04-28 中国电力科学研究院有限公司 一种大电网交直流多断面的功率调整方法及系统
CN115513952B (zh) * 2022-11-23 2023-02-28 中国电力科学研究院有限公司 一种区域电网发用电的安全校核方法、系统、设备及介质
CN115833101B (zh) * 2022-12-06 2023-11-14 北京百度网讯科技有限公司 电力调度方法、装置、电子设备和存储介质
CN116090072B (zh) * 2023-02-17 2023-10-03 广东省水利水电第三工程局有限公司 基于bim技术的工程施工模型导出系统
CN115995815B (zh) * 2023-03-23 2023-06-13 国网山西省电力公司电力科学研究院 一种基于多模块嵌套迭代的负荷故障恢复方法
CN116780629B (zh) * 2023-06-27 2024-02-20 武汉大学 一种含储能配电系统独立运行的平滑切换方法及装置
CN116632852B (zh) * 2023-07-13 2023-09-29 中国电力科学研究院有限公司 电网支路有功潮流越限校正控制方法、系统、设备及介质
CN118646008A (zh) * 2024-08-16 2024-09-13 国网浙江省电力有限公司杭州市临平区供电公司 冲击负荷影响下的区域级配网运行优化方法及装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102055191A (zh) * 2010-12-31 2011-05-11 重庆大学 一种考虑外网等值的静态电压稳定广域切负荷控制方法
CN103560547A (zh) * 2013-10-30 2014-02-05 南京南瑞继保电气有限公司 一种交直流输电线路中交流系统故障的处理方法
CN103746368A (zh) * 2013-04-10 2014-04-23 广西大学 一种电力系统静态安全稳定运行极限优化方法
CN104300568A (zh) * 2014-08-20 2015-01-21 华南理工大学 一种交直流混联系统的频率稳定控制方法

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102082434B (zh) * 2011-03-02 2013-01-30 国电南瑞科技股份有限公司 多目标断面潮流控制的最优决策及性能评估方法
WO2014164220A1 (en) * 2013-03-13 2014-10-09 Abb Technology Ag Method and apparatus for managing demand response resources in a power distribution network
US9964980B2 (en) * 2014-08-14 2018-05-08 Bigwood Technology, Inc. Method and apparatus for optimal power flow with voltage stability for large-scale electric power systems
CN104600695B (zh) * 2014-12-29 2017-09-01 国家电网公司 基于在线状态估计和实时调度计划的趋势潮流计算方法
CN105281320B (zh) * 2015-09-16 2017-11-03 河海大学 协调经济性及切负荷率公平性的紧急负荷控制优化方法
CN105226708B (zh) * 2015-10-15 2019-02-15 中国电力科学研究院 一种大规模电网调度计划等值协调优化方法
CN105391073B (zh) * 2015-12-24 2017-12-05 国网福建省电力有限公司 一种交直流混合系统的网损动态优化方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102055191A (zh) * 2010-12-31 2011-05-11 重庆大学 一种考虑外网等值的静态电压稳定广域切负荷控制方法
CN103746368A (zh) * 2013-04-10 2014-04-23 广西大学 一种电力系统静态安全稳定运行极限优化方法
CN103560547A (zh) * 2013-10-30 2014-02-05 南京南瑞继保电气有限公司 一种交直流输电线路中交流系统故障的处理方法
CN104300568A (zh) * 2014-08-20 2015-01-21 华南理工大学 一种交直流混联系统的频率稳定控制方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
TREVOR WILLIAMS ET DL: "Probabilistic Load Flow Modeling Comparing Maximum Entropy and Gram-Charlier Probability Density Function Reconstructions", 《IEEE TRANSACTIONS ON POWER SYSTEMS》 *
滕贤亮 等: "智能电网调度控制系统AGC需求分析及关键技术", 《电力系统自动化》 *

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107069708B (zh) * 2017-03-14 2021-01-15 国网湖北省电力公司 一种基于极限学习机的输电网线路有功安全校正方法
CN107069708A (zh) * 2017-03-14 2017-08-18 国网湖北省电力公司 一种基于极限学习机的输电网线路有功安全校正方法
CN107294104B (zh) * 2017-08-02 2019-12-13 国网河南省电力公司电力科学研究院 一种电力系统的全分布式的分区潮流计算方法
CN107294104A (zh) * 2017-08-02 2017-10-24 国网河南省电力公司电力科学研究院 一种电力系统的全分布式的分区潮流计算方法
CN108599223A (zh) * 2018-05-04 2018-09-28 华北电力大学 特高压直流受端电网紧急控制与校正控制在线决策的方法
CN108599223B (zh) * 2018-05-04 2020-12-08 华北电力大学 特高压直流受端电网紧急控制与校正控制在线决策的方法
CN108808738A (zh) * 2018-05-29 2018-11-13 国电南瑞科技股份有限公司 一种考虑约束优先级的电网安全校正控制方法
CN108808738B (zh) * 2018-05-29 2021-07-13 国电南瑞科技股份有限公司 一种考虑约束优先级的电网安全校正控制方法
CN109301832A (zh) * 2018-06-08 2019-02-01 广东工业大学 一种基于n-1静态安全约束下的断面潮流优化控制方法
CN109301832B (zh) * 2018-06-08 2022-02-11 广东工业大学 一种基于n-1静态安全约束下的断面潮流优化控制方法
CN109038546A (zh) * 2018-07-10 2018-12-18 中国电力科学研究院有限公司 一种基于vsc-hvdc系统的交直流混联电网负荷恢复方法及系统
CN109038546B (zh) * 2018-07-10 2021-08-06 中国电力科学研究院有限公司 一种基于vsc-hvdc系统的交直流混联电网负荷恢复方法及系统
CN108879733B (zh) * 2018-08-06 2022-06-03 南瑞集团有限公司 一种改善直流闭锁后电网频率稳定性的协调控制方法
CN108879733A (zh) * 2018-08-06 2018-11-23 南瑞集团有限公司 一种改善直流闭锁后电网频率稳定性的协调控制方法
CN109818363A (zh) * 2019-03-13 2019-05-28 武汉大学 一种计及多种快速控制手段的综合安全校正方法
CN109818363B (zh) * 2019-03-13 2022-08-30 武汉大学 一种计及多种快速控制手段的综合安全校正方法
CN110556824A (zh) * 2019-08-23 2019-12-10 广西电网有限责任公司 一种基于母线分裂的输电能力提升方法
CN110556824B (zh) * 2019-08-23 2024-08-23 广西电网有限责任公司 一种基于母线分裂的输电能力提升方法
CN111900767A (zh) * 2020-03-25 2020-11-06 中国电力科学研究院有限公司 一种用于控制电力系统多断面有功潮流的方法及系统
CN111900767B (zh) * 2020-03-25 2022-09-20 中国电力科学研究院有限公司 一种用于控制电力系统多断面有功潮流的方法及系统
CN113452012A (zh) * 2020-03-27 2021-09-28 南京南瑞继保电气有限公司 一种计及气象因素的电力系统暂态稳定计算方法
CN115276015A (zh) * 2022-06-27 2022-11-01 国网山东省电力公司临沂供电公司 一种计及新能源不确定性的电力系统优化调度方法及系统
CN115276015B (zh) * 2022-06-27 2024-09-17 国网山东省电力公司临沂供电公司 一种计及新能源不确定性的电力系统优化调度方法及系统
CN116502843A (zh) * 2023-04-26 2023-07-28 国网黑龙江省电力有限公司齐齐哈尔供电公司 一种关于大数据的网络安全防护系统
CN116502843B (zh) * 2023-04-26 2023-10-27 国网黑龙江省电力有限公司齐齐哈尔供电公司 一种关于大数据的网络安全防护系统

Also Published As

Publication number Publication date
WO2018049737A1 (zh) 2018-03-22
CN106356856B (zh) 2018-10-09

Similar Documents

Publication Publication Date Title
CN106356856A (zh) 一种基于分区负荷控制的安全校正计算方法
CN103715721B (zh) 交直流混合电网联合实时调峰方法
CN104882905B (zh) 一种考虑暂态安全约束的新能源接纳能力评估方法
CN105978016B (zh) 一种基于最优潮流的多端柔性直流输电系统优化控制方法
CN108418255A (zh) 一种适用于含高渗透率新能源的特高压直流外送电网规划方法及系统
CN108092324B (zh) 一种风电参与调峰调频的agc控制系统和控制方法
CN107947244B (zh) 新能源电站并网功率超前控制方法
CN105958496B (zh) 基于连续潮流的含vsc系统最大输电能力计算方法
CN102723721A (zh) 基于个体最优位置自适应变异扰动粒子群算法的电力系统无功优化方法
CN108173293A (zh) 计及电网运行约束的新能源有功出力最大值在线计算方法
CN107294131A (zh) 一种基于逆变器调相运行的新能源电站电压控制系统及方法
CN105811407A (zh) 一种基于分布式牛顿法的微电网一次调频控制方法
CN103972899B (zh) 一种statcom接入点电压补偿方法
CN102222919A (zh) 基于改进差分进化算法的电力系统无功优化方法
CN106992526A (zh) 一种分层分布式的光伏接入配电网电压控制系统及方法
CN103746388A (zh) 配电网无功电压三级协调控制方法
CN103795063B (zh) 基于源荷协同系数的线路过负荷紧急控制系统及其方法
CN106655202A (zh) 一种基于可中断负荷的多目标过载辅助决策方法
CN104915724A (zh) 交直流并联输电通道功率优化分配方法和系统
CN104485670B (zh) 孤立电网中电压敏感性工业负荷时变阻尼特性的控制方法
CN104538991B (zh) 互联电网联络线功率控制方法
CN105490282A (zh) 考虑微电源无功出力均衡度的微电网实时电压控制方法
CN107611979A (zh) 一种基于概率潮流计算的电力系统运行校正控制方法
CN111404192A (zh) 一种交直流互联电网两阶段随机优化调度方法
CN107039981A (zh) 一种拟直流线性化概率最优潮流计算方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20170116

Address after: High road high tech Zone of Nanjing City, Jiangsu Province, No. 20 210061

Applicant after: NARI Technology Development Co., Ltd.

Applicant after: STATE GRID JIANGSU ELECTRIC POWER COMPANY

Applicant after: State Power Networks Co

Applicant after: SGCC NARI Nanjing Control System Co., Ltd.

Applicant after: Nanjing Nari Group Corporation

Address before: High road high tech Zone of Nanjing City, Jiangsu Province, No. 20 210061

Applicant before: NARI Technology Development Co., Ltd.

Applicant before: STATE GRID JIANGSU ELECTRIC POWER COMPANY

Applicant before: SGCC NARI Nanjing Control System Co., Ltd.

SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant