CN106320521A CN 201610981857 CN201610981857A CN106320521A CN 106320521 A CN106320521 A CN 106320521A CN 201610981857 CN201610981857 CN 201610981857 CN 201610981857 A CN201610981857 A CN 201610981857A CN 106320521 A CN106320521 A CN 106320521A
Authority
CN
Grant status
Application
Patent type
Prior art keywords
layer
number
member
template
pipe
Prior art date
Application number
CN 201610981857
Other languages
Chinese (zh)
Inventor
朱方勇
Original Assignee
广州玮莱房屋建筑有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, or groups of buildings, or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake, extreme climate
    • E04H9/02Buildings, or groups of buildings, or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake, extreme climate withstanding earthquake or sinking of ground
    • E04H9/021Bearing, supporting or connecting constructions specially adapted for such buildings

Abstract

The invention discloses a pure part plate combined industrialized house assembling structure which can be rapidly erected. The structure comprises a basic layer, a first-layer wallboard body, a floorslab layer, a second-layer wallboard body and roof slabs. The basic layer, the first-layer wallboard body, the second-layer wallboard body and the roof slabs comprise multiple digital-analog plates spliced to form frames, C through tube connecting pieces, square through tube connecting pieces and embedded parts. Each digital-analog plate comprises a double-faced combined plate, a hollow layer, a first groove and a second groove. The cross area of each C through tube connecting piece corresponds to the cross area of each first groove. The cross area of each square through tube connecting piece is smaller than one half of the cross area of each second groove. The square through tube connecting pieces are mutually spliced on the left side and the right side between more than two digital-analog plates. The pure part plate combined industrialized house assembling structure is produced in a modular mode, is erected in an assembled mode, is flat in appearance and free of hole positions, saves a building space and is not needed to be decorated. In addition, a PU waterproof sealing effect is added.

Description

一种可快速搭建的纯部件板块组合工业化房屋装配结构 A rapid build pure composition industrialized housing plate member mounting structure

技术领域 FIELD

[0001]本发明属于房屋建筑领域,特别涉及一种可快速搭建的纯部件板块组合工业化房屋装配结构。 [0001] The present invention belongs to the field of housing construction, and particularly relates to a rapid build pure composition industrialized housing plate member mounting structure.

背景技术 Background technique

[0002]目前,市面上的房屋建造的技术仍然比较落后,其中基础的建造方式主要采用劳动密集型手工湿法施工作业为主。 [0002] Currently, the technology built houses on the market is still relatively backward, which based mainly labor-intensive construction methods manual wet construction work based. 因此,存在如下缺陷:(I)房屋建成后,需要对外墙进行二次装修,耗费大量的人力物力。 Therefore, the following disadvantages: after (I) house built, the need for secondary exterior wall decoration, spend a lot of manpower and resources. (2)对钢材的能耗大,影响周围的环境。 (2) large energy consumption of steel, affect the surrounding environment. 与发达国家的房屋建造相比,能耗是发达国家同类气象前提的3倍左右,钢材消耗高出10%_25%以上。 Compared with developed countries, housing construction, energy consumption in developed countries is about three times that of similar meteorological premise, steel consumption higher than 10% _25%. (3)随着城市化进程的发展,很多房屋包括建筑楼龄旧的房屋若被拆除后,会产生大量的建筑垃圾,可回收重复利用的部件极少。 (3) With the development of urbanization, many houses, including the old-old building houses if they are removed, will produce large amounts of construction waste, recyclable reusable components is minimal. (5)在房屋建造的钢结构中构建的连接都是焊接或螺栓连接,而且连接部位都是外露,不安全不美观,造成后期还要进行修饰。 (5) constructed in steel houses built in connections are welded or bolted, and the joints are exposed, unsafe unsightly, but also caused the latter modification. (6)传统房屋建筑的部件为了满足通用性均是以极小的尺寸为模数来大量生产,比如砖瓦、瓷砖等,造成安装速度慢,产业链的技术价值不高。 (6) a traditional house building components are based on commonality in order to meet the minimum size of the modulus to mass production, such as brick, tile, etc., resulting in slow installation speed, technology value chain is not high. (7)现有的预制钢结构和预制混凝土模块房屋的构件尺寸很大,没有特定的尺寸模数,生产及运输不方便。 (7) means the size of the existing prefabricated concrete prefabricated steel module housing and a large, no specific modulus size, production and transport is not convenient.

发明内容 SUMMARY

[0003]鉴于上述问题,本发明的目的在于提供一种模块化产生和装配式搭建,及外观平整无孔位的纯部件板块组合工业化房屋装配结构。 [0003] In view of the above problems, an object of the present invention to provide a modular assembly-type production and construction, and the appearance of smooth holes without pure composition industrialized housing plate member mounting structure.

[0004]为实现上述目的,本发明提供的一种可快速搭建的纯部件板块组合工业化房屋装配结构,其特征在于,包括基础层、在基础层上设有的第一层墙板体、在第一层墙板体上设有的楼板层和在楼板层上设有的第二层墙板体,及在第二层墙板体上设有的屋顶板。 [0004] To achieve the above object, the present invention provides one kind may be built, the combination of pure industrial housing plate member assembly structure comprising a base layer, a first layer on the base layer body wall is provided, in the first layer is provided on the body floor panels in the floor layer and the second layer is provided with a body wall layer and the second layer on the wall body is provided with shingles. 上述的基础层、第一层墙板体、第二层墙板体和屋顶板均包括多个拼接成框形的数模板、在数模板上下侧分别设有的C通管连接件、在数模板左右侧分别设有的方通管连接件,及在C通管连接件和方通管连接件上分别设有的预埋件。 Above the base layer, the first layer of wallboard, a second layer of body panels and roof panels each comprise a number of modules together into a plurality of block-shaped, C through the pipe coupling in the upper and lower sides are respectively provided with a number of templates, the number of template right and left through pipe connecting member are provided in the side, and the embedded member through the pipe connector and the C side through the pipe connecting member are provided. 数模板包括表面复合有装饰层的双面组合板、在双面组合板中间设有的中空层、在双面组合板上下侧分别设有安装C通管连接件的第一凹槽,及在双面组合板左右侧分别设有错位安装方通管连接件的第二凹槽;所述C通管连接件的截面积大小与第一凹槽的截面积大小相应;所述的方通管连接件的截面积大小是第二凹槽截面积大小的一半。 Number template comprising the double-sided surface of the composite layer composition decorative plate, the intermediate plate is provided with a hollow double-sided composition layer side of the double-sided board are provided compositions C through a first mounting groove connecting element, and in left and right side with a double-sided composite board mounting side through displacement of the second recess of the connecting element; the sectional area size of the cross-sectional area size of the connecting element C through the respective first groove; through the square tube sectional area of ​​the connecting member is half the size of the cross-sectional area size of the second recess. 两块以上的数模板之间左右两侧相互拼接有方通管连接件。 Between two or more number of modules to each other right and left side stitching through well-tube connections. C通管连接件下侧与基础层或者楼板层拼接,上侧与楼板层或者屋顶板拼接。 C through the pipe connecting the lower side of the base member layer or floor layer stitching, the upper layer of the floor or roof panel mosaic.

[0005]在一些实施方式中,基础层是通过多块相互并排的数模板和连接两个数模板之间的方通管连接件拼接形成的地板;所述地板设置有的C通管连接件沿侧边围成方框;所述数模板两侧设置有的方通管连接件分别与C通管连接件垂直连接。 [0005] In some embodiments, the base layer is formed by a floor side member through the tube connector splice between a plurality of mutually parallel connection of two numbers and the number of templates templates; said floor is provided some through-pipe connector C surrounded along the side block; the number of modules on both sides of some square pipes respectively connecting member C is connected through a vertical pipe connections.

[0006]在一些实施方式中,第一层墙板体是通过多块相互并排的数模板和连接两个数模板之间的方通管连接件拼接形成第一层楼的外墙。 [0006] In some embodiments, the body is formed by a first side wall layer between the plurality of templates alongside one another and connected to two the number of the number of modules through a first pipe connecting member joined to form floor facade.

[0007]在一些实施方式中,楼板层是通过多块相互并排的数模板和连接两个数模板之间的方通管连接件拼接形成第二层楼的楼板;所述的拼接形成楼板后的数模板上下两侧的C通管连接件分别与第一层楼外墙上数模板的C通管连接件连接。 [0007] In some embodiments, the second layer is a floor slab floor is formed by the pipe connecting member side through the splice between a plurality of mutually parallel connection of two numbers and the number of templates a template; After the splice is formed slab C through the pipe connecting member of the number of modules are connected to the upper and lower sides of the first layer outside the building C through the pipe connection wall number template.

[0008]在一些实施方式中,第二层墙板体是通过多块相互并排的数模板和连接两个数模板之间的方通管连接件拼接形成第二层楼的外墙;所述的拼接形成第二层楼外墙的数模板上下两侧的C通管连接件分别与第一层楼外墙上数模板的C通管连接件和屋顶板连接。 [0008] In some embodiments, the second layer is a second wall member is formed by a floor side through the external walls of the pipe connection between a plurality of splice alongside one another and the number of modules connected to the number two templates; said C through the pipe connecting member of a number of modules joined to form upper and lower sides of the second floor and C are outside the building facade wall layer through a first number of template pipe connections and roof panels are connected.

[0009]在一些实施方式中,屋顶板是通过多块相互并排的数模板和连接两个数模板之间的方通管连接件拼接形成平面形的屋顶。 [0009] In some embodiments, the roof panel side through a plurality of mutually parallel between the template and the number of the number of modules connected to two connectors through tube joined to form planar roof.

[0010]在一些实施方式中,屋顶板是通过多块相互并排的数模板和连接两个数模板之间的方通管连接件拼接形成三角形的屋顶。 [0010] In some embodiments, the roof panel side through a plurality of mutually parallel between the template and the number of the number of modules connected through two pipe connecting member joined to form a triangular roof.

[0011]在一些实施方式中,屋顶的数模板上设置有连接第二层楼外墙上数模板的屋顶板固定件。 [0011] In some embodiments, the connector is provided with a second layer of the wall outside the building roof panel member fixed number of template template number roof.

[0012]在一些实施方式中,方通管连接件内填充增强房屋整体稳固性和密封防水作用的HJ灌浆发泡。 [0012] In some embodiments, the tube is filled through the square enhance the overall stability and the waterproof seal HJ foam filling member within the connector housing.

[0013]本发明的有益效果是具有模块化产生和装配式搭建,及外观平整无孔位和环保的效果。 [0013] Advantageous effects of the present invention is a modular and fabricated to produce structures, the appearance of smooth and nonporous bit and environmental effects. 具体如下:(I)拼接房屋采用的数模板连接部分基本隐藏在方通管连接件和C通管连接件,及在预埋件上,并且数模板又有表面复合有装饰层的双面组合板组成,搭建完成后的房屋不但外形平整无孔,而且无需进行装饰。 As follows: the number of modules connecting portion (I) employed in Housing splicing substantially hidden side pass through the pipe connector and the pipe connecting member C, and double-sided member embedded in the composition, and the number of template and a surface of the composite with a decorative layer panels, not only to build houses the finished shape formation nonporous, and without decoration. (2)房屋中的数模板拆除后,可以二次回收再次利用,实现了环保的目的。 (2) the number of houses demolished template can be recycled again second, to achieve the environmental protection objectives. 还有数模板是模块化生产,搭建房屋时进行了模块化拼接,实现了模块化产生和装配式搭建的目的。 There are several templates are modular production, was set up when the modular splice housing, to achieve the purpose of generating and fabricated modular built. 模数标准统一,实现了工业化大规模生产,提高了建筑预工程化,具有一定的通用性。 Modulus of uniform standards to achieve industrialization and mass production, improve the pre-engineered building, has some versatility. 将搭建过程的建筑分为3个,实现深度集成化预制。 The building is divided into three build processes to achieve deep integration of prefabricated. I)板模块;2)连接杆件;3)楼梯。 I) panel module; 2) connected to the lever; 3) staircase. (3)抗震:杆件之间的相互连接构成“门式钢架桔构”,所发生的“群组”效应有效地进步了抗地震才能。 (3) Shock: interconnections between the rods constituting the "orange portal frame structure", "group" effect that occurs effectively progressed to earthquake resistance. (4)根底简略:纯部件板式墙体重量轻,对地基基础设计需求低,根底缔造更为简略。 (4) a simplified foundation: the wall plate member pure light weight, based on design requirements for the foundation, the foundation to create a more simplified. (5)运用面积:隐藏的梁柱杆件增加了室内实用建筑面积,比砖墙布局节约10%左右。 (5) use area: Hidden beams rods increase the practical interior floor space, saving about 10 percent over the brick wall layout. (6)搭建工期短:构件在工厂生产,现场只有组装、连接作业,安装效率高。 (6) Set up a short duration: plant members, only the assembly site, the connecting operation, a high mounting efficiency. (7)通用性高,所有的板材既可以做墙板也可以做屋顶也可以做楼板,节约了生产线。 (7) high versatility, can not only do all of the sheet metal roofing panels can also be done floor, saving the production line.

(8)节能:干法施工作业,是传统施工耗水量的10%。 (8) Energy: dry construction work, 10% of water consumption of traditional construction. (9)环保:所有部件均可二次翻新再利用。 (9) Environmental: all parts are secondary refurbished for reuse. 深度工厂预制,现场只有组装、连接作业,安装效率高,对现场影响小。 Depth precast factories, only assembled on-site, connection work, installation of high efficiency, small impact on the scene. (10)灵活:同样一种板材可以形成拼成多种户型。 (10) Flexible: spell the same kind of plate may be formed more units. (11)墙板楼板屋面板都是集成了装修,无需二次装修。 (11) wall decoration floor roof are integrated without re-decoration. (12)方便运输:模数按照运输的要求,最大化地利用空间,方便运输。 (12) for easy transport: the transport module as required, to maximize the use of space and easy transportation. (13)采用HJ灌浆技术,无缝连接,稳固,同时起到防水保温作用。 (13) using grouting techniques HJ, seamless, secure, also play a role in holding water. (14)安装完成后所有的连接部件都是隐藏的不会外露,安全美观。 (14) After completion of installation of all the connection members are hidden not exposed, safe and beautiful.

附图说明 BRIEF DESCRIPTION

[0014]图1为本发明的结构示意图; [0014] FIG. 1 is a schematic view of the structure of the present invention;

[0015]图2为本发明组合状态的结构示意图; [0015] FIG. 2 is a structural diagram of a combined state of the present invention;

[0016]图3为基础层连接的结构不意图; [0016] FIG. 3 is connected to the base layer structure is not intended;

[0017]图4为数模板与屋顶板连接的结构示意图; [0017] Fig 4 a schematic structural diagram of several roof panels and connecting template;

[0018]图5为数模板的结构示意图; [0018] FIG. 5 is a schematic structural diagram of several templates;

[0019]图6为屋顶板侧面的结构示意图; [0019] FIG. 6 is a schematic view of the side of the roof panel;

[0020]图7为屋顶板俯视的结构示意图; [0020] FIG. 7 is a schematic view of a top roof panel;

[0021 ]图8为墙防水的结构示意图; [0021] FIG. 8 is a schematic view of the waterproof wall;

[0022]图9为阳台固定方式的结构示意图; [0022] FIG. 9 is a schematic view of the structure of the balcony in a fixed manner;

[0023]图10为楼梯搭建的结构示意图。 [0023] FIG. 10 is a schematic structural diagram of stairs built.

具体实施方式 Detailed ways

[0024]下面结合附图对发明作进一步详细的说明。 [0024] The following drawings illustrate the invention in further detail binding.

[0025]如图1-10所示,一种可快速搭建的纯部件板块组合工业化房屋装配结构,包括基础层1、在基础层I上设有的第一层墙板体、在第一层墙板体上设有的楼板层3和在楼板层3上设有的第二层墙板体,及在第二层墙板体上设有的屋顶板4。 [0025] Figure 1-10 shows a rapid build pure composition industrialized housing plate member fitting structure comprising a base layer, a first layer on the base body wall layer I is provided in a first layer provided on the wall member 3 and a floor layer, layer 3 is provided on the floor panels of the second layer member, and a wall member on the second layer 4 is provided with a roof panel. 上述的基础层1、第一层墙板体、第二层墙板体和屋顶板4均包括多个拼接成框形的数模板2、在数模板2上下侧分别设有的C通管连接件、在数模板2左右侧分别设有的方通管连接件,及在C通管连接件和方通管连接件6上分别设有的预埋件5。 The above base layer 1, a first layer body panels, body panels and the second layer comprises a plurality of roof panels 4 to the frame-shaped splice template number 2, the number of modules 2 are provided with upper and lower sides of the connection pipe C through member, left and right side of the number of modules 2 are provided through the square pipe coupling, and C through the pipe connector and the pipe connecting member side through the embedded parts 6 are provided 5. 数模板2包括表面复合有装饰层的双面组合板、在双面组合板中间设有的中空层、在双面组合板上下侧分别设有安装C通管连接件7的第一凹槽9,及在双面组合板左右侧分别设有错位安装方通管连接件6的第二凹槽10;所述C通管连接件7的截面积大小与第一凹槽9的截面积大小相应;所述的方通管连接件6的截面积大小是第二凹槽10截面积大小的一半。 2 comprises a number of modules the decorative surface of the composite layer is a combination of a double-sided plate, the intermediate plate is provided with a hollow double-sided composition layer, the lower side of the plate are provided with a combination of a first double-sided mounting recess 9 C through the pipe connecting piece 7 and left and right side plates are provided with a combination of a double-sided offset mounting side through the pipe connecting member of the second groove 106; the cross-sectional area size of the cross-sectional area size C through pipe member 7 is connected to the first respective groove 9 ; the size of the square cross-sectional area through pipe 6 connecting member 10 is half the size of the cross-sectional area of ​​the second recess. 两块以上的数模板2之间左右两侧相互拼接有方通管7连接件6X通管连接件7下侧与基础层I或者楼板层3拼接,上侧与楼板层3或者屋顶板4拼接。 Between two or more number of modules 2 through the left and right sides of each well and spliced ​​connection pipe 7 through the pipe connecting piece 7 6X lower side of the floor or the base layer I splicing layer 3, the upper layer 3 and the floor or roof panels 4 splice . 基础层I是通过多块相互并排的数模板2和连接两个数模板2之间的方通管连接件6拼接形成的地板。 I is the base layer by a plurality of mutually parallel and the number of modules 2 connected between the two number of modules 2 connected side through the pipe member 6 formed splice floor. 地板设置有的C通管连接件7沿侧边围成方框。 Some floor C is provided through the pipe connecting member 7 is surrounded along the side block. 数模板两侧设置有的方通管连接件6分别与C通管连接件7垂直连接。 Any number of modules arranged on both sides of square pipe connecting member 6 through C respectively through the connecting pipe connecting member 7 vertically. 根据现场条件选用适当的基础形式,基础层顶部按户型的墙体模数化定位墙板固定件,基础层顶部和侧面设置预留管线孔,用于给排水、燃气、强电、弱电等管线连接室内外;基础侧面基础四周设置检修口和通风口,用于管线检修及通风换气。 The choice of appropriate site conditions form the basis, the base layer by a top wall modular wall units positioned fixing member, the top and sides of the base layer is provided reservation line holes for drainage, gas, strong, weak, etc. line indoor and outdoor connection; base side of the base and set around the access opening vent line for maintenance and ventilation. 第一层墙板体是通过多块相互并排的数模板2和连接两个数模板2之间的方通管连接件6拼接形成第一层楼的外墙。 The first layer is obtained by a plurality of body panels alongside one another and the number of modules 2 connected between the two number of modules 2 connected side through the pipe member 6 joined to form the external walls of the first floor. 上述建筑外墙是超轻的工业化板式墙板,内部预留了中空部位用于线管的安装和隔音。 Above are lightweight industrial building exterior wall plate, inside the hollow portion reserved for mounting and insulation of the conduit. 其外侧复合了保温层和防水层,其表面复合了装饰层。 The outer side of the composite insulation and waterproofing layer, which decorative surface of the composite layer. 其四周预留了凹槽,用于结构杆件互相连接。 Groove around it reserved for the structural member connected to each other. 外墙中预留了内空用于固定墙板上开窗101和墙板上开门102,在安装时只需把门窗与墙板连接即可,无需做多余的密封及装饰。 Exterior walls within the space reserved for the fixed wall 101 and the window 102 on the door panels, when installing the panels to only the windows without the need to make extra sealing and decorative. 在一些实施案例中,外墙中的层顶板4内空位置可以直接固定玻璃形成固定的玻璃橱窗。 In some embodiments cases, the external walls of the top plate layer 4 may be directly fixed position within the empty glass forming fixed glass window. 楼板层3是通过多块相互并排的数模板2和连接两个数模板2之间的方通管连接件6拼接形成第二层楼的楼板;所述的拼接形成楼板后的数模板2上下两侧的C通管连接件7分别与第一层楼外墙上数模板2的C通管连接件7连接。 Floor layer 3 is formed of the second floor slab by a plurality of mutually parallel and the number of modules 2 connected between the two number of modules 2 connected side through pipe 6 splice element; number of splice template to form said upper and lower slab 2 C through the pipe connecting member 7 on both sides with the first layer outside the building wall template number C 2 is connected through the pipe member 7 is connected. 上述楼板层是超轻的工业化板式楼板,与墙板模块构造基本一致。 Above floor layer is a lightweight floor plate industrialization, consistent with the panel module as configured. 内部预留了中空部位用于线管的安装和隔音。 Internal hollow portion reserved for mounting and insulation of the conduit. 其基材复合了隔热层和防水层,表面复合了装饰层。 Substrate composite which the insulating layer and the waterproof layer, the decorative surface of the composite layer. 左右2侧预留了凹槽,用于结构杆件互相连接。 2 left and right sides of the recess reserved for the structural member connected to each other. 根据不同的户型按照模数预留好孔位用于墙板的固定件穿透与地面基础相连。 Wall member for fixing according to the different units in accordance with the reservation modulus good penetration holes is connected to the ground base. 其天面和底面按不同户型的墙体模数定位墙板固定件,用于与固定墙板的预埋件连接。 Days of its wall and bottom surfaces of the positioning fixture according to the different size of the modulus of the wall, for connection to the fixed member embedded in the wall. 预埋件分为标准预埋件与屋顶预埋件:标准预埋件是墙板与墙板,墙板与基础,墙板与楼板,墙板与阳台楼板103,阳台板与楼板连接形成的必备部件,及阳台栏杆104是整个房屋互相连接的核心。 Standard embedded member embedded into the roof member and embedded parts: standard embedded member is a wall with wall, base and wall panels, wall and floor, terrace floor and wall 103, with a balcony floor plate formed by connecting essential member, and the core of the balcony railings 104 is interconnected housing. 其预埋于上述部件的侧面凹槽,两个板互相拼接时就隐藏了。 Its side grooves to the embedded member, when the two plates to each other hidden stitching. 屋顶预埋件是墙板与屋顶连接的构件,其一端预埋于墙板顶部,一端预埋于屋顶板的底部,连接时形成一个可以调节角度的铰链。 Embedded member is a roof with the roof wall panel connecting member, one end embedded in the top wall panel, embedded in the bottom end of the roof plate, forming an adjustable angle hinge connection. 第二层墙板体是通过多块相互并排的数模板2和连接两个数模板2之间的方通管连接件6拼接形成第二层楼的外墙;所述的拼接形成第二层楼外墙的数模板2上下两侧的C通管连接件7分别与第一层楼外墙上数模板2的C通管连接件7和屋顶板4连接。 The second layer is a second floor wall member is formed by a plurality of external wall alongside one another and the number of modules 2 connected between the two number of modules 2 connected side through pipe 6 splice member; stitching said second layer is formed C through the pipe connecting member 2 number of template building facade upper and lower sides respectively of the first layer 7 outside the building wall template number C 2 is connected through the pipe 7 and the roof panel 4 is connected. 屋顶板4是通过多块相互并排的数模板2和连接两个数模板2之间的方通管连接件6拼接形成平面形的屋顶。 4 is a planar shingle roof alongside one another a plurality of templates 2 and the number of connections between the two the number of modules 2 connected side through the pipe member 6 is formed by stitching. 屋顶板4是通过多块相互并排的数模板2和连接两个数模板2之间的方通管连接件6拼接形成三角形的屋顶。 4 is a plurality of roof panels alongside one another and the number of modules 2 connected between the two number of modules 2 connected side-pass pipe splicing piece 6 is formed by a triangular roof. 屋顶的数模板2上设置有连接第二层楼外墙上数模板2的屋顶板固定件8。 A second connecting layer provided on the wall outside the building roof panel 2 of the number of template holder 8 2 Number roof template. 阳台楼板是超轻的工业化板式楼板,与墙板模块构造基本一致。 Balcony floor is ultra-light industrial floor plate, consistent with the panel module structure. 内部预留了中空部位用于线管的安装和隔音。 Internal hollow portion reserved for mounting and insulation of the conduit. 其基材复合了隔热层和防水层,表面复合了装饰层。 Substrate composite which the insulating layer and the waterproof layer, the decorative surface of the composite layer. 在与普通楼板连接的一侧通过结构杆件从预留的凹槽穿过互相连接形成整体。 Connected on one side through the common floor formed integrally interconnected by a groove from the reserved structural member. 根据不同的户型按照模数预留好孔位用于墙板的固定件穿透与地面基础相连。 Wall member for fixing according to the different units in accordance with the reservation modulus good penetration holes is connected to the ground base. 其天面和底面按不同户型的墙体模数定位墙板固定件,用于与固定墙板的预埋件连接。 Days of its wall and bottom surfaces of the positioning fixture according to the different size of the modulus of the wall, for connection to the fixed member embedded in the wall. 楼梯106模块:由楼梯段、楼梯栏杆109、楼梯扶手110、楼梯固定件108组成。 Stairway module 106: a flight of stairs, stair railings 109, 110 staircase handrail, staircase fixing member 108 components. 楼梯段下端与板模块通过预埋件连接,上端与楼梯洞口105处的楼板平台的榫口107搭接,外侧螺栓连接;楼梯栏杆由栏杆立柱、栏杆、楼梯扶手组成,安装在楼梯段不靠墙一侧,栏杆立柱与楼梯段侧面,通过螺栓连接;楼梯扶手安装在楼梯段靠墙一侧的墙壁上,通过螺钉连接。 Flight of stairs and lower plate connected by a module embedded parts, and the upper end of the stairs the platform floor hole 105 of the tongue 107 overlapping opening, the outer connecting bolt; balustrade the balustrade posts, railings, banisters composition segment is not mounted on the stairs a side wall, and stair railing post section side, connected by a bolt; staircase handrail mounted on the side walls of a staircase wall segment connected by screws. 屋顶是超轻的工业化板式屋顶,其外侧复合了保温层和防水层,其底面复合了装饰层,其天面复合了装饰瓦。 The roof is lightweight industrial roof plate, which is a composite outer insulation and waterproof layer, the bottom surface of the decorative composite layer surface of the composite decorative tile day. 其左右预留了一边凹一边凸出的槽,用于屋顶板模块互相搭接咬合形成密封。 Left and right side concave side convex reserved slots, each for engaging roofing board modules overlap to form a seal. 方通管连接件6内填充增强房屋整体稳固性和密封防水作用的PU灌浆发泡111。 Square inner member 6 are connected through the pipe filled enhance the overall stability and waterproof seal housing 111 PU foam filling. 墙板(含楼板)安装之后形成的拼缝通过注入发泡材质,密封膨胀形成密实的固体,板与板直接互相咬合形成整体,起防水密封的作用。 Welds formed after the panels (including the floor) by injecting foam material is mounted, the seal expands to form a dense and solid, board and the board formed integral role in direct engagement with each other, since the waterproof seal. 对结构的连接起一定的增强作用。 Connection structure plays a role in the enhancement. 安装步骤:A、做好基础处理,预埋给排水管线,强弱电管线,暖通管线等;B、在基础上根据墙体定位,按设计的位置安装预埋标准件。 Installation steps: A, do basic processing, embedded to the drain line, the strength of the electric line, HVAC pipelines; B, according to the positioning wall, designed according to the position of installation on the basis of embedded standard. C、墙体上四周的凹槽内安装标准预埋件,完毕后墙体立入基础的预埋件内,其底部的预埋件与基础顶部的预埋件互相咬合,形成水平位置相同的连接环扣。 C, the groove around the wall mounting standard embedded parts, the inner wall member embedded into the base of the upright After completion, the top of the embedded parts and embedded parts of the base bottom thereof engaged with each other, formed in the same horizontal position connected buckle. D、一层墙体安装完毕后,从基础顶部即墙板底部的侧面穿入杆件2(C形),开口朝上。 After the D, one wall is installed, i.e., from the top of the base side of the bottom wall of the penetration rod 2 (C-shaped) opening upward. 连接杆件2形成地面的圈梁。 The connecting rod member 2 is formed of the ground ring beam. F、安装二层的楼板(含阳台楼板),并且楼板的天面及底面都按设计的位置安装标准预埋件,其底部的预埋件与一楼墙板顶部的预埋件互相咬合,形成水平位置相同的连接环扣。 F., Floor installation floor (including the balcony floor), and the mounting position of the standard surface and the bottom surface of embedded parts of days are by design of the floor, which is embedded in the top member and the floor member embedded bottom wall engaged with each other, forming a horizontal position connected to the same buckle. 从二层的楼板底部即一楼墙板的顶部穿入杆件2(C形),开口朝下。 I.e. top floor wall penetration rod 2 (C-shape) from the bottom of the floor slab, opening downward. 二层墙体四周的凹槽内安装标准预埋件,完毕后墙体立入二层楼板的预埋件内,其底部的预埋件与二层楼板顶部的预埋件互相咬合,形成水平位置相同的连接环扣。 Layer mounting groove wall around standard embedded parts, the inner wall member embedded into vertical story floor After completion of the embedded parts and embedded parts of the top floor slab bottom thereof engaged with each other, forming a horizontal position connected to the same buckle. 二层墙体安装完毕后,从二层楼板顶部即二层墙板底部的侧面穿入杆件2(C形),开口朝上。 After installation floor wall, i.e., from the top side of the bottom of the floor slab floor panels penetrate lever 2 (C-shaped) opening upward. 连接杆件2形成二层的圈梁。 The connecting rod member 2 consisting of two layers of the ring beam. 杆件1(矩形)从二层墙板的顶部穿入到基础的杆件I的C形开口内,依次连接一层墙板顶部的杆件2,二层墙板上下的杆件2。 The C-shaped opening lever 1 (rectangular) penetrating from the top floor to the base wall of the rod member I, the top of the rod in turn connected to one wall 2, the upper and lower lever floor panels 2. 水平方向的杆件2与垂直方向的杆件I通过高强螺栓连接。 The lever member 2 and the vertical bar in the horizontal direction are connected by high-strength bolts I. 同时也连接了水平方向的两块墙板。 It is also connected to the two panels in the horizontal direction. 从顶部注入PU发泡剂,然后密封所有接缝处,等发泡完成形成密实的防水层。 PU foaming agent is injected from the top, and all seams sealed, completing the formation of a dense, foam water-repellent layer. 安装楼梯及扶手、栏杆。 Stairs and handrails, railings. 在二层墙板的顶部安装屋顶连接件的A部分,在屋顶板的底部安装屋顶连接件的B部分。 A roof member mounting portion is connected to the top wall of the floor, roof connector mounting portion B at the bottom of the roof panel. 左右2个方向同时安装屋顶板,先将其与2层楼板的顶部的连接件连接。 Two right and left directions while mounting roof panels, first connection member which is connected to the top of the floor slab 2. 然后将杆件I从左右两块屋顶板顶部水平方向穿入。 Then the rod member penetrating from about two I shingle top horizontal direction. 按照此步骤安装完所有的屋顶板,并做好缝隙处的防水处理。 After this step according to the installation of all roof panels, and well water treated at the seam.

[0026]以上所述的仅是本发明的一些实施方式。 [0026] The above are only some embodiments of the present invention. 对于本领域的普通技术人员来说,在不脱离本发明创造构思的前提下,还可以做出若干变形和改进,这些都属于发明的保护范围。 Those of ordinary skill in the art, without departing from the concept of the present inventions, can make various changes and modifications which fall within the protection scope of the invention.

Claims (9)

1.一种可快速搭建的纯部件板块组合工业化房屋装配结构,其特征在于,包括基础层、在基础层上设有的第一层墙板体、在第一层墙板体上设有的楼板层和在楼板层上设有的第二层墙板体,及在第二层墙板体上设有的屋顶板; 上述的基础层、第一层墙板体、第二层墙板体和屋顶板均包括多个拼接成框形的数模板、在数模板上下侧分别设有的C通管连接件、在数模板左右侧分别设有的方通管连接件,及在C通管连接件和方通管连接件上分别设有的预埋件; 所述的数模板包括表面复合有装饰层的双面组合板、在双面组合板中间设有的中空层、在双面组合板上下侧分别设有安装C通管连接件的第一凹槽,及在双面组合板左右侧分别设有错位安装方通管连接件的第二凹槽; 所述C通管连接件的截面积大小与第一凹槽的截面积大小相应;所述的方通管连接件的截面 1. A quickly build pure composition industrialized housing plate member assembly structure comprising a base layer, the base layer is provided on the first layer of the body wall, the body is provided on the first layer of panels floor layer in the floor layer and a second layer provided with a body wall, and a wall on the second layer of the body is provided with a roof plate; and the base layer, the first layer of wallboard, a second layer of wall member and roof panels each comprise a number of modules together into a plurality of block-shaped, C through the pipe coupling in the number of modules are provided upper and lower sides of the square through-pipe connecting member are provided right and left sides of the number of modules, and C through the pipe side through the connecting member and the connecting member are respectively provided with a tube member embedded; template comprising a number of said decorative surface of the composite layer double-sided plate combination, a combination of the intermediate plate is provided with a double-sided hollow layer, double-sided combination a first lower side with a plate mounting groove C through the connecting element, and a second groove through the connecting element around the side plates are provided with a combination of a double-sided offset mounting side; C through the connecting element the sectional area size of the cross-sectional area size corresponding to the first groove; a square cross-section through a connecting element 积大小是第二凹槽截面积大小的一半; 所述两块以上的数模板之间左右两侧相互拼接有方通管连接件; 所述的C通管连接件下侧与基础层或者楼板层拼接,上侧与楼板层或者屋顶板拼接。 The product is half the size of the second groove cross-sectional area size; left and right sides between two or more of the number of modules to each other through well-spliced ​​connection pipe; C through the pipe connecting the side member with the base layer or slab splice layer, the upper layer of the floor or roof panel mosaic.
2.根据权利要求1所述的一种可快速搭建的纯部件板块组合工业化房屋装配结构,其特征在于,所述的基础层是通过多块相互并排的数模板和连接两个数模板之间的方通管连接件拼接形成的地板;所述地板设置有的C通管连接件沿侧边围成方框;所述数模板两侧设置有的方通管连接件分别与C通管连接件垂直连接。 According to one of the claim 1 can quickly build pure composition industrialized housing plate member assembly structure, characterized in that said base layer by a plurality of template numbers alongside one another and connected between the two template number through the floor of the square pipe member joined to form a connection; C there is provided on the floor pipe connector block surrounded along the side; the number of modules on both sides of some square pipes are connected to the connecting member through the tube C vertical connection member.
3.根据权利要求1所述的一种可快速搭建的纯部件板块组合工业化房屋装配结构,其特征在于,所述的第一层墙板体是通过多块相互并排的数模板和连接两个数模板之间的方通管连接件拼接形成第一层楼的外墙。 According to one of the claim 1 can quickly build pure composition industrialized housing plate member assembly structure, characterized in that said first body is a wallboard layer by a plurality of template numbers alongside one another and connected to two square through-pipe connection between a number of modules joined to form a first floor of the exterior wall.
4.根据权利要求1所述的一种可快速搭建的纯部件板块组合工业化房屋装配结构,其特征在于,所述的楼板层是通过多块相互并排的数模板和连接两个数模板之间的方通管连接件拼接形成第二层楼的楼板;所述的拼接形成楼板后的数模板上下两侧的C通管连接件分别与第一层楼外墙上数模板的C通管连接件连接。 According to one of the claim 1 can quickly build pure composition industrialized housing plate member assembly structure, characterized in that said floor layer is formed by a plurality of template numbers alongside one another and connected between the two template number the square through-pipe connecting member joined to form the second floor slab; C through the upper and lower sides of the pipe coupling according to the number of template are joined to form C-pass pipe connecting the floor with the first layer outside the building wall template number piece connection.
5.根据权利要求1所述的一种可快速搭建的纯部件板块组合工业化房屋装配结构,其特征在于,所述的第二层墙板体是通过多块相互并排的数模板和连接两个数模板之间的方通管连接件拼接形成第二层楼的外墙;所述的拼接形成第二层楼外墙的数模板上下两侧的C通管连接件分别与第一层楼外墙上数模板的C通管连接件和屋顶板连接。 1 according to one of the pure components can be quickly set up composition industrialized housing plate mounting structure, wherein said second layer by a plurality of body panels number of templates alongside one another and connected to two claims square through-pipe connection between a number of splice template to form a second storey exterior walls; C through the pipe connecting member of the number of upper and lower sides of the template joined to form a second storey exterior walls with the first layer outside the building C the number of through-wall pipe connecting the template member and roof panels are connected.
6.根据权利要求5所述的一种可快速搭建的纯部件板块组合工业化房屋装配结构,其特征在于,所述的屋顶板是通过多块相互并排的数模板和连接两个数模板之间的方通管连接件拼接形成平面形的屋顶。 6. According to one of claim 5 may be built, the combination of pure industrial housing plate member assembly structure, characterized in that said roof plate by a plurality of template numbers alongside one another and connected between the two template number the square through-pipe connecting member joined to form planar roof.
7.根据权利要求5所述的一种可快速搭建的纯部件板块组合工业化房屋装配结构,其特征在于,所述的屋顶板是通过多块相互并排的数模板和连接两个数模板之间的方通管连接件拼接形成三角形的屋顶。 7. According to one claim 5, wherein the net member can quickly build industrial housing assembly plate composite structure, characterized in that said roof plate by a plurality of mutually parallel, and the number of modules connected between the two template number square pipe through a roof connecting member joined to form a triangle.
8.根据权利要求6或7所述的一种可快速搭建的纯部件板块组合工业化房屋装配结构,其特征在于,所述屋顶的数模板上设置有连接第二层楼外墙上数模板的屋顶板固定件。 8 or according to one of claim 6 to claim 7 may be built, the combination of pure industrial housing plate member assembly structure, characterized in that said connector is provided with a second layer of the wall outside the building on a logarithmic number of template template roof roofing board fixing member.
9.根据权利要求1-5任意一项所述的一种可快速搭建的纯部件板块组合工业化房屋装配结构,其特征在于,所述的方通管连接件内填充增强房屋整体稳固性和密封防水作用的HJ灌浆发泡。 9 according to any one of claims 1-5 one can quickly build pure composition industrialized housing plate member assembly structure, characterized in that the housing is filled to enhance the overall stability and inner seal through the tube connections HJ waterproof grout foaming action.
CN 201610981857 2016-11-08 2016-11-08 Pure part plate combined industrialized house assembling structure which can be rapidly erected CN106320521A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201610981857 CN106320521A (en) 2016-11-08 2016-11-08 Pure part plate combined industrialized house assembling structure which can be rapidly erected

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201610981857 CN106320521A (en) 2016-11-08 2016-11-08 Pure part plate combined industrialized house assembling structure which can be rapidly erected

Publications (1)

Publication Number Publication Date
CN106320521A true true CN106320521A (en) 2017-01-11

Family

ID=57816265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201610981857 CN106320521A (en) 2016-11-08 2016-11-08 Pure part plate combined industrialized house assembling structure which can be rapidly erected

Country Status (1)

Country Link
CN (1) CN106320521A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060066A (en) * 2017-05-06 2017-08-18 邓雪云 Fabricated building and construction method
CN107288210A (en) * 2017-06-05 2017-10-24 湖北源盛钢构有限公司 Fabricated house and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19817145A1 (en) * 1998-04-17 1999-10-21 Michael Rogge Joint for connecting panels of wood, chipboard or plywood used in manufacture of furniture, for example
US20040035068A1 (en) * 2002-01-02 2004-02-26 Maimon Eliyahu Modular wall segments and method of making such segments
US20070163197A1 (en) * 2005-12-27 2007-07-19 William Payne Method and system for constructing pre-fabricated building
CN2931627Y (en) * 2006-03-06 2007-08-08 王保民 Framework and wall panel combination floor
CN102535738A (en) * 2012-02-14 2012-07-04 黄昆 Prefabricated house wallboards, fully prefabricated house using wallboards, and installation method for fully prefabricated house
CN103061407A (en) * 2012-12-15 2013-04-24 黄昆 Prefabricated house building and building method thereof
CN105926982A (en) * 2016-06-29 2016-09-07 四川是钢实业有限公司 Assembly lightweight steel stilted building
CN206157903U (en) * 2016-11-08 2017-05-10 广州玮莱房屋建筑有限公司 Pure part plate combination industrialization house assembly structure that can build fast

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19817145A1 (en) * 1998-04-17 1999-10-21 Michael Rogge Joint for connecting panels of wood, chipboard or plywood used in manufacture of furniture, for example
US20040035068A1 (en) * 2002-01-02 2004-02-26 Maimon Eliyahu Modular wall segments and method of making such segments
US20070163197A1 (en) * 2005-12-27 2007-07-19 William Payne Method and system for constructing pre-fabricated building
CN2931627Y (en) * 2006-03-06 2007-08-08 王保民 Framework and wall panel combination floor
CN102535738A (en) * 2012-02-14 2012-07-04 黄昆 Prefabricated house wallboards, fully prefabricated house using wallboards, and installation method for fully prefabricated house
CN103061407A (en) * 2012-12-15 2013-04-24 黄昆 Prefabricated house building and building method thereof
CN105926982A (en) * 2016-06-29 2016-09-07 四川是钢实业有限公司 Assembly lightweight steel stilted building
CN206157903U (en) * 2016-11-08 2017-05-10 广州玮莱房屋建筑有限公司 Pure part plate combination industrialization house assembly structure that can build fast

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060066A (en) * 2017-05-06 2017-08-18 邓雪云 Fabricated building and construction method
CN107288210A (en) * 2017-06-05 2017-10-24 湖北源盛钢构有限公司 Fabricated house and construction method

Similar Documents

Publication Publication Date Title
US4488392A (en) Underground house and construction method
CN1263971A (en) Technology for building house with centrifugal structural concrete members and frames without brick walls
CN1796706A (en) Box shaped house model of construction and fabricating method
US3999355A (en) Method of constructing a transportable prefabricated room element
CN1245238A (en) Composite wall slab with pre-embedded inner steel frame
US20090165399A1 (en) Prefabricated reinforced-concrete single-family dwelling and method for erecting said dwelling
CN101418592A (en) Combined light steel structure house and mounting method thereof
CN101440635A (en) One layer combined type light steel structure house and installation method thereof
CN202324688U (en) Disaster relief placement mobile house
CN2740700Y (en) Assembled house of thin wallboard concrete with row columns for reinforcement
CN1075766A (en) Construction method of pre-poured combined building
CN202176123U (en) Assembled box-type integrated house with industrial production
CN101307629A (en) Fastener type self-decoration composite heat insulation high layer dwelling building module and its construction method
CN204804044U (en) House with equipment of three -dimensional light steel frame structure composite sheet module
CN102691363A (en) Foam concrete composite heat preservation wall body with concrete blocks and construction method thereof
US6779314B1 (en) Structure formed of foaming cement and lightweight steel, and a structure system and method of forming the structure system
US20080016802A1 (en) Building modular and panel system and method of construction thereof
US20080196349A1 (en) Connected structural panels for buildings
CN101725259A (en) Modular house architectural structure and construction method thereof
CN103821276A (en) Novel assembly-type modular building system
US4586299A (en) Building system of interconnected block elements
US20070130841A1 (en) Construction module system and method
Brookes et al. The building envelope: applications of new technology cladding
CN102561513A (en) Unit cabin type building system
CN102444233A (en) Multifunctional assembling and pouring type templated block, use method and use thereof

Legal Events

Date Code Title Description
PB01
C10 Entry into substantive examination