CN105569336A - 一种免剔凿二次浇筑方法和装置 - Google Patents

一种免剔凿二次浇筑方法和装置 Download PDF

Info

Publication number
CN105569336A
CN105569336A CN201510963783.8A CN201510963783A CN105569336A CN 105569336 A CN105569336 A CN 105569336A CN 201510963783 A CN201510963783 A CN 201510963783A CN 105569336 A CN105569336 A CN 105569336A
Authority
CN
China
Prior art keywords
reinforcement
cage
build
exempt
mating face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510963783.8A
Other languages
English (en)
Inventor
刘奎生
刘震国
郭利佳
黄强
李健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Group Co Ltd
Original Assignee
Beijing Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Group Co Ltd filed Critical Beijing Urban Construction Group Co Ltd
Priority to CN201510963783.8A priority Critical patent/CN105569336A/zh
Publication of CN105569336A publication Critical patent/CN105569336A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings

Abstract

本发明提供一种免剔凿二次浇筑方法和装置,包括以下步骤:在待浇筑混凝土浇筑区域的结构骨架上的二次浇筑接合面安装钢筋骨架;在所述钢筋骨架上安装丝网;在所述钢筋骨架区域内进行一次浇筑;待所述一次浇筑硬化后,在所述接合面进行二次浇筑,其通过安装在钢筋骨架上的丝网作为二次浇筑的隔离带,从而使一次浇筑的旧混凝土接合面能够获得较为理想的粗糙度,使一次浇筑的旧混凝土接合面不需要单独剔凿即可直接进行二次浇筑。另一方面,由于丝网的设置,使得旧混凝土接合面不容易出现浮浆,因此接合面在二次浇筑以前也不需要进行清理,有效缩短了施工量和工期。

Description

一种免剔凿二次浇筑方法和装置
技术领域
本发明涉及混凝土浇筑技术领域,具体涉及一种免剔凿二次浇筑方法和装置。
背景技术
现有的混凝土浇筑工程中,在需要进行二次浇筑时,常用模板交护作为浇筑的隔离带,其中,最为常用的模板是钢板或木板,其存在的问题是:在进行二次浇筑时需要将支护模板拆除,施工量较大,浪费原料。且由于钢板或木板的表面较为光滑,与其对应的混凝土二次浇筑面(也即是接合面)也较为光滑。为了二次浇筑时新、旧混凝土能够构成牢固的整体,就必须对旧的混凝土接合面进行剔凿处理,并对剔凿处理后的表面进行清理,才能够获得较为理想粗糙度的二次浇筑面,使新的混凝土可以和旧混凝土的结合面牢固稳定。
在实际施工过程中,剔凿耗费的人工成本较高,且在狭长空间等人难以进入的区域内,剔凿的工期会进一步延长,为了使旧混凝土的接合面能够获得较好的粗糙度,从面减少剔凿难度和工期,本领域技术人员使用快易收口网作为接合面的支护组件,如中国专利CN103696564A公开了一种施工缝模板,其在刚性骨架上固定有快易收口网,其中快易收口网为冲压有若干孔的铁皮,借助于其上的孔使接合面获得一定粗糙度,但在实际使用中,将快易收口网拆除后,接合面上留下的孔数量有限,不足以直接进行二次浇筑,这样就必须将快易收口网拆除后,再进行一定程度的剔凿;另一种施工方式是:将快易收口网直接捣碎,其施工量大致相当于拆除快易收口网后再进行二次剔凿。虽然相比于模板支护来说,这种快易收口网支护能够在一定程度上缩小剔凿程度和工期,但仍没有解决二次浇筑需要进行剔凿的技术缺陷。
发明内容
因此,本发明要解决的技术问题在于克服现有技术中混凝土二次浇筑过程中需要对旧混凝土的接合面进行剔凿,耗费人力成本高,工期时间长的技术缺陷,从而提供一种使混凝土二次浇筑免于剔凿的免剔凿二次浇筑方法和装置。
为解决上述技术问题,本发明提供一种免剔凿二次浇筑方法,包括以下步骤:
在混凝土浇筑区域的结构骨架上的二次浇筑接合面安装钢筋骨架;
在所述钢筋骨架上二次浇筑的安装丝网;
在所述钢筋骨架区域内进行一次浇筑:
待所述一次浇筑硬化后,在所述接合面进行二次浇筑。
上述的免剔凿二次浇筑方法中,在安装所述丝网前,还包括以下步骤:
在所述钢筋骨架上安装止水钢板。
本发明还提供一种免剔凿二次浇筑装置,使用上述的免剔凿二次浇筑方法进行浇筑,包括:
钢筋骨架,固定设置在混凝土二次浇筑的接合面上;
丝网,设置在所述钢筋骨架上用于二次浇筑的接合面上。
上述的免剔凿二次浇筑装置中,所述丝网为18-20目钢丝网,其绑扎在所述钢筋骨架上。
上述的免剔凿二次浇筑装置中,还包括止水钢板;
所述钢筋骨架包括焊接设置在所述止水钢板上部的上部钢筋,和焊接设置在所述止水钢板下部的下部钢筋。
上述的免剔凿二次浇筑装置中,所述钢筋骨架为竖直方向上多根间隔布置的钢筋,所述丝网分别与每根所述钢筋绑扎。
上述的免剔凿二次浇筑装置中,所述钢筋骨架由Φ8-10钢筋制成。
上述的免剔凿二次浇筑装置中,所述钢筋骨架与构成混凝土浇筑区域的结构钢筋焊接相连,以使其固定设置在所述二次浇筑的接合面上。
本发明技术方案,具有如下优点:
1.本发明提供的二次浇筑方法中,其通过安装在钢筋骨架上的丝网作为二次浇筑的隔离带,从而使一次浇筑的旧混凝土接合面能够获得较为理想的粗糙度,使一次浇筑的旧混凝土接合面不需要单独剔凿即可直接进行二次浇筑。另一方面,由于丝网的设置,使得旧混凝土接合面不容易出现浮浆,因比接合面在二次浇筑以前也不需要进行清理,有效缩短了施工量和工期。
2.本发明提供的二次浇筑方法中,由于丝网的厚度较薄,且其形变力不会对混凝土本身的强度造成影响,因此在一次浇筑硬化后,丝网不需要从钢筋骨架上拆除可以直接粘合在一次浇筑的接合面上,相比于现有技术中使用快易收口网作为二次浇筑接合面隔离带的做法,本发明的免剔凿二次浇筑方法能够明显且有效的减少施工量,缩短工期,并提高一次浇筑和二次浇筑混凝土接合的强度。
附图说明
为了更清楚地说明本发明具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本发明的一些实施方式,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1为本发明的免剔凿二次浇筑装置的结构示意图。
附图标记说明:
10-钢筋骨架;21-止水件;11-丝网。
具体实施方式
下面将结合附图对本发明的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
在本发明的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因比不能理解为对本发明的限制。比外,术语“第一”、“第二”、“第三”仅用于描述目的,而不能理解为指示或暗示相对重要性。
在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。
比外,下面所描述的本发明不同实施方式中所涉及的技术特征只要彼比之间未构成冲突就可以相互结合。
实施例1
本实施例提供一种免剔凿二次浇筑方法,针对需要进行混凝土二次浇筑的施工情况,其包括以下步骤:
S1:在所述止水件上焊接钢筋骨架;
S2:在混凝土浇筑区域安装含钢筋骨架的止水钢板;
S3:在所述浇筑区域的二次浇筑接合面安装丝网;
S4:在所述钢筋骨架区域内进行一次浇筑;
S5:待所述一次浇筑硬化后,在所述接合面进行二次浇筑。
需要说明的是,上述施工方法一般适用于板体和墙体,本领域技术人员有能力根据实际的浇筑对象,对上述步骤进行调整,例如在梁的浇筑过程中,就不需要安装止水钢板21,而是将S1和S2删除后,替换为:在待施工区域安装钢筋骨架。在比则不对其他结构的浇筑进一步赘述。
上述技术方案是本实施例的核心技术方案:其通过安装在钢筋骨架上的丝网作为二次浇筑的隔离带,从而使一次浇筑的旧混凝土接合面能够获得较为理想的粗糙度,使一次浇筑的旧混凝土接合面不需要单独剔凿即可直接进行二次浇筑。另一方面,由于丝网的设置,使得旧混凝土接合面不容易出现浮浆,因比接合面在二次浇筑以前也不需要进行清理,有效缩短了施工量和工期。
另一方面,由于丝网11的厚度较薄,且其形变力不会对混凝土本身的强度造成影响,因比在一次浇筑硬化后,丝网11不需要从钢筋骨架10上拆除可以直接粘合在一次浇筑的接合面上。相比于现有技术中使用快易收口网作为二次浇筑接合面隔离带的做法,本实施例的免剔凿二次浇筑装置能够明显且有效的减少施工量,缩短工期,并提高一次浇筑和二次浇筑混凝土接合的强度。
实施例2:
本实施例提供一种免剔凿二次浇筑装置,其使用方法如实施例1的免剔凿二次浇筑方法所述,参考图1,其包括:
本实施例提供一种免剔凿二次浇筑装置,参考图1,其包括:
钢筋骨架10和丝网11,其中钢筋骨架10用于构成混凝土的浇筑区域,在钢筋骨架10的接合面(也即是将要用于进行二次浇筑的表面)位置处安装有丝网11,在混凝土浇筑到钢筋骨架10内经过硬化以后,在丝网11的作用下,硬化后的混凝土表面将会出现较为粗糙的网格状表面,并且有助于减少或去除浮浆,从而使得使用本实施例的免剔凿二次浇筑装置浇筑出的混凝土接合面可以在硬化后直接用于二次浇筑,面不需要对接合面进行剔凿、清理等处理,有助于减少施工量。
需要说明的是,上述免剔凿二次浇筑装置一般适用于板体和墙体,本领域技术人员有能力根据实际的浇筑对象,对上述步骤进行调整,例如在梁的浇筑过程中,就不需要安装止水钢板21,而是将S1和S2删除后,替换为:在待施工区域安装钢筋骨架。在比则不对其他结构的浇筑进一步赘述。
作为一种优选的实施方式,钢筋骨架10包括焊接设置在所述止水钢板21上部的上部钢筋,和焊接设置在所述止水钢板21下部的下部钢筋,且优选为竖直方向上多根间隔布置的钢筋,丝网11优选分别与每根竖直钢筋绑扎固定,从而提升丝网的11的强度,和降低丝网11在浇筑过程中的形变程度。
进一步,优选所述钢筋骨架由Φ8-10钢筋制成,更优选所述钢筋骨架为Φ8、Φ9和Φ10,申请人根据实际试验和测量获得上述优选数据,但需要说明的是,钢筋骨架的直径不仅限于上述Φ8-10,本领域技术人员可以根据以上描述,对钢筋骨架的直径进行合理的选择,其应涵盖在本发明的保护范围之内。
作为一种优选的实施方式,丝网11优选采用18-20目的钢丝网,更优选18目、19目或20目,并优选钢丝网是绑扎在钢筋骨架上的。申请人根据实际试验和测量获得上述优选数据,但需要说明的是,丝网11的目数不仅限于上述18-20,本领域技术人员可以根据以上描述,对丝网11的目数进行合理的选择,其应涵盖在本发明的保护范围之内。
显然,上述实施例仅仅是为清楚地说明所作的举例,而并非对实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。而由比所引伸出的显而易见的变化或变动仍处于本发明创造的保护范围之中。

Claims (8)

1.一种免剔凿二次浇筑方法,其特征在于,包括以下步骤:
在混凝土浇筑区域的结构骨架上的二次浇筑接合面安装钢筋骨架(10);
在所述钢筋骨架(10)上安装丝网(11);
在所述钢筋骨架区域内进行一次浇筑;
待所述一次浇筑硬化后,在所述接合面进行二次浇筑。
2.根据权利要求1所述的免剔凿二次浇筑方法,其特征在于:
在安装所述丝网(11)前,还包括以下步骤:
在所述钢筋骨架上安装止水钢板(21)。
3.一种免剔凿二次浇筑装置,使用权利要求1或2所述的免剔凿二次浇筑方法进行浇筑,其特征在于,包括:
钢筋骨架(10),浇筑前固定设置在混凝土二次浇筑的接合面上;
丝网(11),设置在所述钢筋骨架(10)上用于二次浇筑的接合面上。
4.根据权利要求3所述的免剔凿二次浇筑装置,其特征在于:
所述丝网(11)为18-20目钢丝网,其绑扎在所述钢筋骨架上。
5.根据权利要求3所述的免剔凿二次浇筑装置,其特征在于:
还包括止水钢板(21);
所述钢筋骨架(10)包括焊接设置在所述止水钢板(21)上部的上部钢筋,和焊接设置在所述止水钢板(21)下部的下部钢筋。
6.根据权利要求5所述的免剔凿二次浇筑装置,其特征在于:
所述钢筋骨架(10)为竖直方向上多根间隔布置的钢筋,所述丝网分别与每根所述钢筋绑扎。
7.根据权利要求3所述的免剔凿二次浇筑装置,其特征在于:
所述钢筋骨架(10)由Φ8-10钢筋制成。
8.根据权利要求3-7中任一项所述的免剔凿二次浇筑装置,其特征在于:所述钢筋骨架(10)与构成混凝土浇筑区域的结构钢筋焊接相连,以使其固定设置在所述二次浇筑的接合面上。
CN201510963783.8A 2015-12-22 2015-12-22 一种免剔凿二次浇筑方法和装置 Pending CN105569336A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510963783.8A CN105569336A (zh) 2015-12-22 2015-12-22 一种免剔凿二次浇筑方法和装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510963783.8A CN105569336A (zh) 2015-12-22 2015-12-22 一种免剔凿二次浇筑方法和装置

Publications (1)

Publication Number Publication Date
CN105569336A true CN105569336A (zh) 2016-05-11

Family

ID=55879907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510963783.8A Pending CN105569336A (zh) 2015-12-22 2015-12-22 一种免剔凿二次浇筑方法和装置

Country Status (1)

Country Link
CN (1) CN105569336A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135077A (zh) * 2021-11-08 2022-03-04 中建四局第六建设有限公司 一种混凝土超筑复位切割的免分仓条结构地坪施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH094230A (ja) * 1995-06-26 1997-01-07 Shimizu Corp コンクリート構造物の打継部の止水工法
US20110197545A1 (en) * 2010-01-06 2011-08-18 Unistress Corporation Embedded Mesh in Precast Walls
CN102277963A (zh) * 2011-05-06 2011-12-14 江苏正威建设有限公司 防先浇砼溢入后浇带结构
CN102900102A (zh) * 2012-04-27 2013-01-30 常州第一建筑集团有限公司 超前止水后浇带结构的地下室底板
CN202745211U (zh) * 2012-08-22 2013-02-20 中国建筑第六工程局有限公司 一种后浇带隔离施工结构
CN203947498U (zh) * 2014-05-28 2014-11-19 中建六局建设发展有限公司 地下室外墙后浇带墙端模板
CN205531353U (zh) * 2015-12-22 2016-08-31 北京城建集团有限责任公司 一种免剔凿二次浇筑装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH094230A (ja) * 1995-06-26 1997-01-07 Shimizu Corp コンクリート構造物の打継部の止水工法
US20110197545A1 (en) * 2010-01-06 2011-08-18 Unistress Corporation Embedded Mesh in Precast Walls
CN102277963A (zh) * 2011-05-06 2011-12-14 江苏正威建设有限公司 防先浇砼溢入后浇带结构
CN102900102A (zh) * 2012-04-27 2013-01-30 常州第一建筑集团有限公司 超前止水后浇带结构的地下室底板
CN202745211U (zh) * 2012-08-22 2013-02-20 中国建筑第六工程局有限公司 一种后浇带隔离施工结构
CN203947498U (zh) * 2014-05-28 2014-11-19 中建六局建设发展有限公司 地下室外墙后浇带墙端模板
CN205531353U (zh) * 2015-12-22 2016-08-31 北京城建集团有限责任公司 一种免剔凿二次浇筑装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135077A (zh) * 2021-11-08 2022-03-04 中建四局第六建设有限公司 一种混凝土超筑复位切割的免分仓条结构地坪施工方法

Similar Documents

Publication Publication Date Title
CN100469995C (zh) 后浇带梁板模板的施工方法
CN103696359B (zh) 一种预制和现浇相结合的桥梁墩身结构及施工方法
CN104806011B (zh) 筏板后浇带浇筑模板
WO2015184476A1 (en) Precast concrete falsework bubbledeck element and process of manufacturing thereof
CN104153508A (zh) 楼板的施工结构及其施工方法
CN105275097A (zh) 一种后浇带止水钢板和快易收口网安装方法
CN205531353U (zh) 一种免剔凿二次浇筑装置
CN102002953A (zh) 一种基坑围护肋板换撑的方法
KR101639009B1 (ko) 트러스거더형 데크패널을 이용한 천장거푸집 시공에서의 콘크리트 타설액 흘러내림 방지용 필러 및 이를 이용한 천장거푸집 시공구조
CN104088473A (zh) 用于托换承重墙的施工结构及施工方法
CN103696437A (zh) 一种切割格构柱的施工方法
CN105569336A (zh) 一种免剔凿二次浇筑方法和装置
CN211850804U (zh) 一种剪力墙沉降缝钢木结合模板支设装置
CN110130271A (zh) 一种侧壁混凝土单面模板加固的施工方法
KR101748781B1 (ko) 프리캐스트 벽체 구조체의 시공방법
CN208219844U (zh) 一种预制装配式建筑系统
CN214658802U (zh) 一种建筑施工梁柱节点高低标号混凝土分隔装置
CN105715042B (zh) 工具式建筑降板装置及其施工方法
CN114368696A (zh) 一种塔吊附墙连墙件的预埋施工方法
CN210152287U (zh) 一种多功能楼板马凳
CN108843016B (zh) 剪力墙模板内撑条与拉结筋组合式构件及方法
CN105133787A (zh) 一种用于支撑后浇带的格构柱
CN107119726B (zh) 一种后浇带留设方法
CN206941628U (zh) 一种施工场地围挡预制基础
CN212376028U (zh) 一种车辆段大跨度免支撑盖板

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Guo Lijia

Inventor after: Li Xiaonan

Inventor after: Guo Mingzhong

Inventor after: Yang Zhankun

Inventor after: Xiao Yong

Inventor after: Dan Liuxin

Inventor after: Cao Jingbin

Inventor after: Dou Yi

Inventor after: Li Mingkui

Inventor after: Tong Xin

Inventor after: Jiang Chao

Inventor after: Liu Kuisheng

Inventor after: Chen Bokun

Inventor after: Yao Lei

Inventor after: Ren Zelong

Inventor after: Song Jindai

Inventor after: Zhang Lianxue

Inventor after: Chen Wencong

Inventor after: Zhang Nan

Inventor after: Liu Gong

Inventor after: Hui Bo

Inventor after: Chen Jianbing

Inventor after: Liu Zhenguo

Inventor after: Huang Qiang

Inventor after: Li Jian

Inventor after: Xin Yusheng

Inventor after: Ma Le

Inventor after: Jin Yi

Inventor after: Duan Jinsong

Inventor before: Liu Kuisheng

Inventor before: Liu Zhenguo

Inventor before: Guo Lijia

Inventor before: Huang Qiang

Inventor before: Li Jian

COR Change of bibliographic data
CB03 Change of inventor or designer information

Inventor after: Guo Lijia

Inventor after: Yang Zhankun

Inventor after: Xiao Yong

Inventor after: Wen Xiaoying

Inventor after: Cai Da

Inventor after: Dan Liuxin

Inventor after: Cao Jingbin

Inventor after: Zou Haoran

Inventor after: Dou Yi

Inventor after: Huang Qiang

Inventor after: Li Jian

Inventor after: Liu Kuisheng

Inventor after: Tong Xin

Inventor after: Yao Lei

Inventor after: Song Jindai

Inventor after: Zhang Lianxue

Inventor after: Zhang Nan

Inventor after: Liu Gong

Inventor after: Yu Haipeng

Inventor after: Ren Zelong

Inventor after: Liu Zhenguo

Inventor after: Xin Yusheng

Inventor after: Guo Mingzhong

Inventor after: Ma Le

Inventor after: Jin Yi

Inventor after: Duan Jinsong

Inventor after: Li Xiaonan

Inventor before: Guo Lijia

Inventor before: Li Xiaonan

Inventor before: Guo Mingzhong

Inventor before: Yang Zhankun

Inventor before: Xiao Yong

Inventor before: Dan Liuxin

Inventor before: Cao Jingbin

Inventor before: Dou Yi

Inventor before: Li Mingkui

Inventor before: Tong Xin

Inventor before: Jiang Chao

Inventor before: Liu Kuisheng

Inventor before: Chen Bokun

Inventor before: Yao Lei

Inventor before: Ren Zelong

Inventor before: Song Jindai

Inventor before: Zhang Lianxue

Inventor before: Chen Wencong

Inventor before: Zhang Nan

Inventor before: Liu Gong

Inventor before: Hui Bo

Inventor before: Chen Jianbing

Inventor before: Liu Zhenguo

Inventor before: Huang Qiang

Inventor before: Li Jian

Inventor before: Xin Yusheng

Inventor before: Ma Le

Inventor before: Jin Yi

Inventor before: Duan Jinsong

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20160511

RJ01 Rejection of invention patent application after publication