CN105133787A - 一种用于支撑后浇带的格构柱 - Google Patents
一种用于支撑后浇带的格构柱 Download PDFInfo
- Publication number
- CN105133787A CN105133787A CN201510631189.9A CN201510631189A CN105133787A CN 105133787 A CN105133787 A CN 105133787A CN 201510631189 A CN201510631189 A CN 201510631189A CN 105133787 A CN105133787 A CN 105133787A
- Authority
- CN
- China
- Prior art keywords
- steel plate
- fixedly connected
- supporting
- angle bars
- angle steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了一种用于支撑后浇带的格构柱,包括依据方形竖向排列的四根角钢,相邻两个角钢之间通过一个或从上到下依次间隔设置的多个固定板连接,四根所述角钢的上下端面齐平,且上端面固定连接有上钢板,下端面固定连接有下钢板,所述上钢板和下钢板的厚度为12mm,且与角钢通过焊接的方式固定连接。利用本发明可对后浇带支撑体系采用格构柱支撑体系做法,不仅解决了钢管扣件等施工材料的快速周转,同时搭设方便,对大部分采用环梁加格构柱的基坑支护体系工程可将基坑支护体系中拆除的格构柱得到有效利用,节约了施工成本。
Description
技术领域
本发明涉及工程施工设备技术领域,特别是涉及一种用于支撑后浇带的格构柱。
背景技术
现行规范设计的民用及公用建筑一般都设计有地下车库,地下车库一般均为框架结构,框架结构体量大,占地面积大,后浇带多,在施工中常面临主楼与地下车库间施工组织空间难度大等问题。
目前传统的后浇带支撑方法,包括如下两种:1、在进行后浇带支撑施工时,后浇带处支撑体系与其他模板体系分离,形成独立支撑体系,拆除模板时保留后浇带处支撑体系。2、不考虑后浇带独立支撑体系,在拆除模板支撑体系后重新按照模板支撑方案支设后浇带处支撑架体。上述第1种方法的缺陷为:虽然使用的钢管、扣件等材料依然可以周转重复使用,但是材料的使用量较大,且耗费大量的劳动力,无法取得钢管、扣件有效周转的预期效果。第2中方法的缺陷为:上述二次支顶做法会导致现场材料堆放混乱,占有场地过多,同时二次支顶材料使用量过大,不利于控制成本。
发明内容
本发明的目的是提供一种用于支撑后浇带的格构柱,以解决使用传统技术时,所带来的材料周转率低,施工成品高的问题。
为实现本发明的目的,本发明提供了一种用于支撑后浇带的格构柱,包括依据方形竖向排列的四根角钢,相邻两个角钢之间通过一个或从上到下依次间隔设置的多个固定板连接,四根所述角钢的上下端面齐平,且上端面固定连接有上钢板,下端面固定连接有下钢板,所述上钢板和下钢板的厚度为12mm,且与角钢通过焊接的方式固定连接。
其中,所述格构柱的横截面尺寸为400*400mm,所述角钢采用∠125*10角钢,所述格构柱的高度为楼层净高减去50mm。
其中,所述固定板与角钢通过焊接的方式固定连接,所述上钢板的板面与后浇带顶板下端面向平。
与现有技术相比,本发明的有益效果是:利用本发明可对后浇带支撑体系采用格构柱支撑体系做法,不仅解决了钢管扣件等施工材料的快速周转,同时搭设方便,对大部分采用环梁加格构柱的基坑支护体系工程可将基坑支护体系中拆除的格构柱得到有效利用,节约了施工成本。
附图说明
图1所示为本发明的结构示意图;
图2所示为本发明横截面的结构示意图;
图3所示为本发明的应用结构示意图;
图中:1.上钢板,2.角钢,3.固定板,4.下钢板。
具体实施方式
以下结合附图和具体实施例对本发明作进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
应当说明的是,本申请中所述的“连接”和用于表达“连接”的词语,如“相连接”、“相连”等,既包括某一部件与另一部件直接连接,也包括某一部件通过其他部件与另一部件相连接。
如图1、图2、图3,本发明提供了一种用于支撑后浇带的格构柱,包括依据方形竖向排列的四根角钢,相邻两个角钢之间通过一个或从上到下依次间隔设置的多个固定板连接,四根所述角钢的上下端面齐平,且上端面固定连接有上钢板,下端面固定连接有下钢板,所述上钢板和下钢板的厚度为12mm,且与角钢通过焊接的方式固定连接。
本发明后浇带采用格构柱支撑体系,沿后浇带两侧设置,格构柱支设间距为2.5m,排距为后浇带边缘不大于200mm。格构柱截面尺寸为400*400mm,角钢4根采用∠125*10角钢,每根格构柱高度为楼层净高低50mm,上下端部焊制12mm厚的钢板。支设时上端钢板面与顶板相平,底部采用木楔垫实。其中,所述固定板与角钢通过焊接的方式固定连接,所述上钢板的板面与后浇带顶板下端面向平。
与现有技术相比,本发明的有益效果是:利用本发明可对后浇带支撑体系采用格构柱支撑体系做法,不仅解决了钢管扣件等施工材料的快速周转,同时搭设方便,对大部分采用环梁加格构柱的基坑支护体系工程可将基坑支护体系中拆除的格构柱得到有效利用,节约了施工成本。
使用本发明进行施工的顺序如下:进行模板支撑碗扣架体→支撑体系验收→钢筋绑扎→混凝土浇筑→混凝土养护至设计强度→拆除碗扣架体模板支撑体系→回顶格构柱支撑体系。
以上所述仅是本发明的优选实施方式,应当指出的是,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。
Claims (3)
1.一种用于支撑后浇带的格构柱,其特征在于,包括依据方形竖向排列的四根角钢,相邻两个角钢之间通过一个或从上到下依次间隔设置的多个固定板连接,四根所述角钢的上下端面齐平,且上端面固定连接有上钢板,下端面固定连接有下钢板,所述上钢板和下钢板的厚度为12mm,且与角钢通过焊接的方式固定连接。
2.根据权利要求1所述的用于支撑后浇带的格构柱,其特征在于,所述格构柱的横截面尺寸为400*400mm,所述角钢采用∠125*10角钢,所述格构柱的高度为楼层净高减去50mm。
3.根据权利要求1所述的用于支撑后浇带的格构柱,其特征在于,所述固定板与角钢通过焊接的方式固定连接,所述上钢板的板面与后浇带顶板下端面向平。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510631189.9A CN105133787A (zh) | 2015-09-29 | 2015-09-29 | 一种用于支撑后浇带的格构柱 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510631189.9A CN105133787A (zh) | 2015-09-29 | 2015-09-29 | 一种用于支撑后浇带的格构柱 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105133787A true CN105133787A (zh) | 2015-12-09 |
Family
ID=54719333
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510631189.9A Pending CN105133787A (zh) | 2015-09-29 | 2015-09-29 | 一种用于支撑后浇带的格构柱 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105133787A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971298A (zh) * | 2016-06-17 | 2016-09-28 | 中国建筑第八工程局有限公司 | 一种大跨度立柱拉索防护棚 |
CN112921984A (zh) * | 2021-02-02 | 2021-06-08 | 王茂龙 | 一种铁路工程用基坑支护装置 |
-
2015
- 2015-09-29 CN CN201510631189.9A patent/CN105133787A/zh active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971298A (zh) * | 2016-06-17 | 2016-09-28 | 中国建筑第八工程局有限公司 | 一种大跨度立柱拉索防护棚 |
CN112921984A (zh) * | 2021-02-02 | 2021-06-08 | 王茂龙 | 一种铁路工程用基坑支护装置 |
CN112921984B (zh) * | 2021-02-02 | 2022-03-01 | 王茂龙 | 一种铁路工程用基坑支护装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105888108B (zh) | 内置定位预制件钢筋混凝土剪力墙及施工方法 | |
CN205875473U (zh) | 内置定位预制件钢筋混凝土剪力墙 | |
CN111236647A (zh) | 一种构造柱斜向对拉螺栓及其固定模板的施工方法 | |
CN104831639A (zh) | 一种超宽变截面连续梁0#块固结及解除施工方法 | |
CN106150085B (zh) | 一种劲性柱模板安装方法 | |
CN104088473A (zh) | 用于托换承重墙的施工结构及施工方法 | |
CN104895221B (zh) | 装配式型钢约束混凝土剪力墙结构 | |
CN105133787A (zh) | 一种用于支撑后浇带的格构柱 | |
CN103194982A (zh) | 桥梁边跨现浇段短悬臂支架施工方法 | |
CN205100433U (zh) | 一种用于支撑后浇带的格构柱 | |
CN210025768U (zh) | 一种用于沉箱模板安装的作业平台系统 | |
CN111058619A (zh) | 一种钢筋混凝土梁板后浇带临时支撑体系及应用方法 | |
CN203782984U (zh) | 可控制板面标高及平整度的马凳筋 | |
CN211899624U (zh) | 一种钢筋混凝土梁板后浇带临时支撑体系 | |
CN214884761U (zh) | 一种上拉式压型钢板组合楼板支撑装置 | |
CN105926820B (zh) | 一种预制梁钢承板电阻网片组合楼面的施工工法 | |
CN112609966B (zh) | 一种利用简易格构柱叠合板体系构筑超厚混凝土顶板的施工方法 | |
CN214530768U (zh) | 一种现浇综合管廊模板支撑结构 | |
CN211647302U (zh) | 一种钢筋混凝土捣制楼板支撑 | |
CN212002389U (zh) | 一种定型化可周转电梯井水平防护结构 | |
CN210562169U (zh) | 一种节点连接部件以及框架预应力锚索支护结构 | |
CN104895220A (zh) | 装配式型钢约束混凝土剪力墙连接结点 | |
CN105525629A (zh) | 地铁车站施工方法及装置 | |
CN103103994A (zh) | 一种可拆卸的顶板加固支撑装置和它的应用 | |
JP6710064B2 (ja) | 免震レトロフィットにおける建物の取り合い部分の施工方法と建物 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160425 Address after: 300141, No. two, No. 85 Road, Yuan Wei Road, Tianjin, Hebei District Applicant after: Tianjin No.2 Construction Engineering Co., Ltd. Applicant after: Tianjin Yijiang Construction Engineering Co., Ltd. Address before: 300141, No. two, No. 85 Road, Yuan Wei Road, Tianjin, Hebei District Applicant before: Tianjin No.2 Construction Engineering Co., Ltd. |
|
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151209 |
|
WD01 | Invention patent application deemed withdrawn after publication |