CN105275097A - 一种后浇带止水钢板和快易收口网安装方法 - Google Patents
一种后浇带止水钢板和快易收口网安装方法 Download PDFInfo
- Publication number
- CN105275097A CN105275097A CN201410313745.3A CN201410313745A CN105275097A CN 105275097 A CN105275097 A CN 105275097A CN 201410313745 A CN201410313745 A CN 201410313745A CN 105275097 A CN105275097 A CN 105275097A
- Authority
- CN
- China
- Prior art keywords
- steel plate
- reinforcement
- sealing water
- fast
- net
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
本发明公开了一种后浇带止水钢板和快易收口网安装方法,包括以下步骤:a、将上部竖向钢筋和下部竖向钢筋分别固定在止水钢板的上方和下方;b、再将斜撑钢筋焊接在止水钢板一侧的斜边缘上;c、将水平钢筋与快易收口网采用铁丝绑扎;d、再将快易收口网安装固定在所述钢筋骨架上;e、在后浇带的施工缝的位置浇筑一条与底部钢筋等长的砂浆围挡混凝土;f、将安装好的快易收口网和止水钢板放置于后浇带的位置,将底部钢筋放置于砂浆围挡混凝土上;g、在顶部钢筋上设置一条与顶部钢筋等长度的木方围挡混凝土。采用本发明的后浇带止水钢板和快易收口网安装方法,节约钢筋用量,减少了钢筋与止水钢板的焊接量,加快了施工速度,并且止水效果好。
Description
技术领域
本发明涉及建筑工程领域,特别是后浇带渗漏水的处理方法,尤其涉及一种后浇带止水钢板和快易收口网安装方法。
背景技术
现有的施工技术领域中,越来越多的工程采用超大的基坑或地基,在基础工程中均需留置后浇带,后浇带是在建筑施工中为防止现浇钢筋混凝土结构由于温度、收缩不均以及不均匀沉降等原因产生的有害裂缝而按照设计或施工的规范要求在基础底板、墙、梁相应位置留设的临时施工缝,在箱型基础或地下室,底板和外墙板的混凝土是分开浇捣的,下次再浇捣墙板混凝土时,就有一条施工缝,当这条缝的位置在地下水位线以下时,就容易产生渗水。该施工缝将结构暂时划分为若干部分,在经过构件内部若干时间的收缩过程之后,再对该施工缝浇筑混凝土,从而将结构的若干部分连成一个整体,但这样的后浇带施工,往往在基础后浇带部位的结合面出现渗漏水的情况,而治理起来既非常困难,又不容易治理彻底。对施工缝进行技术处理的方法中,包括采用膨胀止水条、橡胶止水带、超前止水后浇带、止水钢板等,其中比较通行止水钢板焊接节点的方法是设置止水钢板。
但现有技术中采用止水钢板的方法,虽然能起到止水的作用,但用钢筋分别将快易收口网和止水钢板固定,用钢量比较大,现场钢筋的摆放也比较零乱,并且不能保证无渗漏的良好状态。
发明内容
为克服上述现有技术的缺陷,本发明所要解决的技术问题在于提供一种节约钢筋用量、操作简便、方便施工且提高相关作业人员的工作效率的后浇带止水钢板和快易收口网安装方法,并且能保证施工缝无渗漏的良好状态。
为实现上述目的,本发明采用的后浇带止水钢板和快易收口网安装具体方法如下:
一、将下部竖向钢筋上端固定在止水钢板的纵向中心线位置的下方,下部竖向钢筋的下端焊接在底部钢筋上;上部竖向钢筋的下端固定在止水钢板的纵向中心线位置的上方,上部竖向钢筋的上端焊接在顶部钢筋上,并且保证上部竖向钢筋和下部竖向钢筋在一条线上;
二、再将斜撑钢筋焊接在止水钢板一侧的斜边缘上,将止水钢板支撑牢固,将底部钢筋、下部竖向钢筋、止水钢板、上部竖向钢筋和顶部钢筋焊接在一起,形成一个刚性钢筋骨架;
三、将水平钢筋与快易收口网采用铁丝绑扎;
四、再将快易收口网安装固定在所述钢筋骨架上;
五、在后浇带的施工缝的位置浇筑一条与所述底部钢筋等长的砂浆围挡混凝土;
六、将安装好的快易收口网和止水钢板放置于后浇带的位置,将所述底部钢筋放置于所述砂浆围挡混凝土上,保证施工缝位于止水钢板的纵向中心线的位置,并且将斜撑钢筋放置于后浇带内;
七、在所述顶部钢筋上设置一条与所述顶部钢筋等长度的木方围挡混凝土。采用本发明的后浇带止水钢板和快易收口网安装方法,节约钢筋用量,减少了钢筋与止水钢板的焊接量,加快了施工速度;本发明的方法操作简易,可以预先将钢筋和快易收口网安装好,设计合理、成本低、安装简单,方便施工。本发明将底部钢筋、下部竖向钢筋、止水钢板、上部竖向钢筋和顶部钢筋焊接在一起,形成一个刚性钢筋骨架,避免了现有技术中容易出现止水钢板偏位的现象,形成的刚性钢筋骨架不仅强度高,而且止水效果好。
进一步地,所述止水钢板的厚度为4mm。
作为上述技术方案的改进,所述竖向钢筋的直径为22mm,且相互之间的间隔为300mm;所述斜撑钢筋的直径为18mm,且相互之间的间隔为300mm。
较佳地,所述水平钢筋的直径为14mm。
作为进一步改进,在步骤四中,将底部钢筋和顶部钢筋与所述快易收口网采用铁丝绑扎。
实施本发明实施例,具有如下有益效果:采用本发明的后浇带止水钢板和快易收口网安装方法,节约钢筋用量,减少了钢筋与止水钢板的焊接量,加快了施工速度;本发明的方法操作简易,可以预先将钢筋和快易收口网安装好,设计合理、成本低、安装简单,方便施工。本发明将底部钢筋、下部竖向钢筋、止水钢板、上部竖向钢筋和顶部钢筋焊接在一起,形成一个刚性钢筋骨架,避免了现有技术中容易出现止水钢板偏位的现象,形成的刚性钢筋骨架不仅强度高,而且止水效果好;在底部钢筋和顶部钢筋上分别设置砂浆围挡混凝土和木方围挡混凝土,防止在浇注的过程中混凝土从底部和顶部渗入到后浇带,影响施工;采用本发明的止水钢板和快易收口网安装方法使止水钢板不易出现偏位,且强度高,后浇带能保持无渗漏的良好状态,解决了后浇带施工中难以解决的结合面出现渗漏水的问题。
附图说明
为了更清楚地说明本发明实施例的技术方案,下面将对实施例的附图作简单地介绍。
图1是本发明优选实施例中的后浇带止水钢板和快易收口网安装的结构示意图。
图2是本发明优选实施例中的后浇带止水钢板和快易收口网安装后的剖面结构示意图。
具体实施方式
下面结合附图进一步详细说明本发明的具体实施方式。
如图1和图2所示,本发明一种后浇带止水钢板和快易收口网安装的优选实施例,一般在箱型基础或地下室,底板和外墙板的混凝土是分开浇捣的,下次再浇捣墙板混凝土时,就有一条施工缝,当这条缝的位置在地下水位线以下时,就容易产生渗水。本发明的止水钢板和快易收口网的安装方法就用于后浇带中,防止水从施工缝渗水,以便影响施工质量。在本发明优选的实施例中,后浇带止水钢板和快易收口网安装方法的具体步骤如下:首先将下部竖向钢筋1上端固定在止水钢板3的纵向中心线位置的下方,下部竖向钢筋1的下端焊接在底部钢筋4上;上部竖向钢筋2的下端固定在止水钢板3的纵向中心线位置的上方,上部竖向钢筋2的上端焊接在顶部钢筋5上,并且保证上部竖向钢筋2和下部竖向钢筋1在一条线上;
其次再将斜撑钢筋8焊接在止水钢板3一侧的斜边缘31上,将止水钢板3支撑牢固,通过将底部钢筋4、下部竖向钢筋1、止水钢板3、上部竖向钢筋2和顶部钢筋5焊接在一起,形成一个刚性钢筋骨架;
然后将水平钢筋11与快易收口网9采用铁丝绑扎;
再将快易收口网9安装固定在所述钢筋骨架上;
在后浇带的施工缝的位置浇筑一条与所述底部钢筋4等长的砂浆围挡混凝土7,所述砂浆围挡混凝土7一方面可以支撑定位所述钢筋骨架,让钢筋骨架大致位于施工缝的位置,另一方面防止后浇带两侧的混凝土在浇注时,从快易收口网9的顶部渗漏。
然后将安装好的快易收口网9和止水钢板3放置于后浇带的位置,将所述底部钢筋4放置于所述砂浆围挡混凝土7上,保证施工缝位于止水钢板3的纵向中心线的位置,并且将斜撑钢筋8放置于后浇带内;斜撑钢筋8放在后浇带内用于支撑钢筋骨架,以便在浇注后浇带两侧的混凝土时,保证快易收口网9和止水钢板3不倾斜,使止水钢板3不易出现偏位。
最后在所述顶部钢筋5上设置一条与所述顶部钢筋5等长度的木方围挡混凝土6,木方围挡混凝土6的设置是为了防止后浇带两侧的混凝土在浇注时,从快易收口网9的顶部渗入到后浇带中。
其中,所述快易收口网9是与混凝土结合的永久性模板,体质轻、易切割、易弯曲、易成型、易搬运,并且快易收口网9不会剥落或变形,当混凝土浇灌后,其孔网的角形嵌合会自动嵌入,这样对下一次所灌注之混凝土产生了一条机械键,对接缝质量有强大的粘力及抗剪力,快易收口网9在混凝土灌注后,无须拆除,只需移开支架、省时省工、加快施工进度。
快易收口网9在接口处形成粗糙表面,给下一次继续灌注提供非常理想的接合面,无须用人工凿除、打毛、清洗、养护等处理,即可进行第二次灌注作业,使新旧混凝土结合成牢固的整体,防渗漏,同时也避免因凿除、打毛的震荡而影响到结构受损。快易收口网9的网状孔眼可协助分散浇注时水泥沙浆所产生的水压,减少灌入混凝土压力达2/3,比传统模板的侧压力少得多,可大量节省摸板的支架,降低人工及材料费用。
本发明的一实施例中,所述止水钢板3的厚度为4mm,并且上部竖向钢筋2和下部竖向钢筋1的直径为22mm,且相互之间的间隔为300mm;所述斜撑钢筋8的直径为18mm,且相互之间的间隔为300mm,保证上部竖向钢筋2和下部竖向钢筋1将止水钢板3、底部钢筋4和顶部钢筋5连接成一个刚度好、强度高的钢筋骨架,对固定在所述钢筋骨架上的快易收口网9起到很好的支撑和固定作用。所述水平钢筋11的直径为14mm,所述水平钢筋11在所述快易收口网9中间部位分布的紧密,而在其它位置分布的疏松些,这样能提高止水钢板3附近快易收口网9的刚度,进一步防止止水钢板3的偏位,能在长时间内保持施工缝无渗漏的良好状态。
优选地,在步骤四中,将底部钢筋4和顶部钢筋5与所述快易收口网9采用铁丝绑扎,以便将快易收口网9更牢固的固定在钢筋骨架上。
在浇筑后浇带一侧的混凝土时,将一半的止水钢板3露在外面,在下次再浇筑混凝土时把另一部分的止水钢板3一起浇筑进去,起到阻止外面的压力水渗入的作用。
采用本发明的后浇带止水钢板和快易收口网安装方法,节约钢筋用量,减少了钢筋与止水钢板3的焊接量,加快施工速度;本发明的方法操作简易,可以预先将钢筋和快易收口网9安装好,设计合理、成本低、安装简单,方便施工。本发明将底部钢筋4、顶部钢筋5、上部竖向钢筋2、下部竖向钢筋1和止水钢板3焊接在一起,形成一个刚性钢筋骨架,避免了现有技术中容易出现止水钢板偏位的现象,形成的刚性钢筋骨架不仅强度高,而且止水效果好;在底部钢筋4和顶部钢筋5上分别设置砂浆围挡混凝土7和木方围挡混凝土6,防止在浇注的过程中混凝土从底部和顶部渗入到后浇带,影响施工;采用本发明的止水钢板和快易收口网安装方法使止水钢板3不易出现偏位,且强度高,后浇带能保持无渗漏的良好状态,解决了后浇带施工中难以解决的结合面出现渗漏水的问题,值得推广应用。
以上所揭露的仅为本发明的较佳实施例而已,当然不能以此来限定本发明之权利范围,因此依本发明权利要求所作的等同变化,仍属本发明所涵盖的范围。
Claims (5)
1.一种后浇带止水钢板和快易收口网安装方法,其特征在于:包括以下步骤:
一、将下部竖向钢筋上端固定在止水钢板的纵向中心线位置的下方,下部竖向钢筋的下端焊接在底部钢筋上;上部竖向钢筋的下端固定在止水钢板的纵向中心线位置的上方,上部竖向钢筋的上端焊接在顶部钢筋上,并且保证上部竖向钢筋和下部竖向钢筋在一条线上;
二、再将斜撑钢筋焊接在止水钢板一侧的斜边缘上,将止水钢板支撑牢固,将底部钢筋、下部竖向钢筋、止水钢板、上部竖向钢筋和顶部钢筋焊接在一起,形成一个刚性钢筋骨架;
三、将水平钢筋与快易收口网采用铁丝绑扎;
四、再将快易收口网安装固定在所述钢筋骨架上;
五、在后浇带的施工缝的位置浇筑一条与所述底部钢筋等长的砂浆围挡混凝土;
六、将安装好的快易收口网和止水钢板放置于后浇带的位置,将所述底部钢筋放置于所述砂浆围挡混凝土上,保证施工缝位于止水钢板的纵向中心线的位置,并且将斜撑钢筋放置于后浇带内;
七、在所述顶部钢筋上设置一条与所述顶部钢筋等长度的木方围挡混凝土。
2.如权利要求1所述的后浇带止水钢板和快易收口网安装方法,其特征在于,所述止水钢板的厚度为4mm。
3.如权利要求1所述的后浇带止水钢板和快易收口网安装方法,其特征在于,所述上部竖向钢筋和下部竖向钢筋的直径均为22mm,且相互之间的间隔为300mm;所述斜撑钢筋的直径为18mm,且相互之间的间隔为300mm。
4.如权利要求1所述的后浇带止水钢板和快易收口网安装方法,其特征在于,所述水平钢筋的直径为14mm。
5.如权利要求1所述的后浇带止水钢板和快易收口网安装方法,其特征在于,在步骤四中,将底部钢筋和顶部钢筋与所述快易收口网采用铁丝绑扎。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410313745.3A CN105275097A (zh) | 2014-07-03 | 2014-07-03 | 一种后浇带止水钢板和快易收口网安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410313745.3A CN105275097A (zh) | 2014-07-03 | 2014-07-03 | 一种后浇带止水钢板和快易收口网安装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105275097A true CN105275097A (zh) | 2016-01-27 |
Family
ID=55144850
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410313745.3A Pending CN105275097A (zh) | 2014-07-03 | 2014-07-03 | 一种后浇带止水钢板和快易收口网安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105275097A (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110173052A (zh) * | 2019-05-17 | 2019-08-27 | 武汉一冶建筑安装工程有限责任公司 | 施工缝施工方法 |
CN110820696A (zh) * | 2019-11-22 | 2020-02-21 | 北京金河水务建设集团有限公司 | 一种堆石混凝土塘坝的同步浇筑施工方法 |
CN110984235A (zh) * | 2019-10-28 | 2020-04-10 | 中国一冶集团有限公司 | 一种后浇带止水结构的施工方法 |
CN111335641A (zh) * | 2020-03-31 | 2020-06-26 | 北京天润建设有限公司 | 一种用于混凝土浇筑的阻隔装置 |
CN113323382A (zh) * | 2021-03-25 | 2021-08-31 | 中国十七冶集团有限公司 | 一种人防门框底槛后浇施工槽模板及其使用方法 |
CN113714715A (zh) * | 2021-08-20 | 2021-11-30 | 中建新疆建工(集团)有限公司 | 一种后浇带收口网施工用焊接装置 |
CN114718312A (zh) * | 2022-03-10 | 2022-07-08 | 中国建筑第二工程局有限公司 | 一种防水混凝土施工缝临时封堵结构及施工方法 |
CN114809115A (zh) * | 2022-05-27 | 2022-07-29 | 中建八局第三建设有限公司 | 一种传力型钢后浇带定型化拼装拦截施工方法 |
CN115305964A (zh) * | 2022-09-02 | 2022-11-08 | 中建八局第三建设有限公司 | 一种地下室后浇带处板面钢筋后安装施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004353309A (ja) * | 2003-05-29 | 2004-12-16 | Sekisui House Ltd | メタルスキンパネルの目地構造 |
CN102251540A (zh) * | 2011-06-03 | 2011-11-23 | 中国建筑第六工程局有限公司 | 一种底板施工缝的快易收口网施工安装方法 |
CN102720216A (zh) * | 2012-07-11 | 2012-10-10 | 南通市达欣工程股份有限公司 | 基础后浇带模板施工方法 |
CN103572784A (zh) * | 2013-11-21 | 2014-02-12 | 中建二局第三建筑工程有限公司 | 一种超厚筏板后浇带模板支撑系统及其施工方法 |
CN203440837U (zh) * | 2013-07-25 | 2014-02-19 | 中国建筑土木建设有限公司 | 一种底板施工缝混凝土收口网装置 |
-
2014
- 2014-07-03 CN CN201410313745.3A patent/CN105275097A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004353309A (ja) * | 2003-05-29 | 2004-12-16 | Sekisui House Ltd | メタルスキンパネルの目地構造 |
CN102251540A (zh) * | 2011-06-03 | 2011-11-23 | 中国建筑第六工程局有限公司 | 一种底板施工缝的快易收口网施工安装方法 |
CN102720216A (zh) * | 2012-07-11 | 2012-10-10 | 南通市达欣工程股份有限公司 | 基础后浇带模板施工方法 |
CN203440837U (zh) * | 2013-07-25 | 2014-02-19 | 中国建筑土木建设有限公司 | 一种底板施工缝混凝土收口网装置 |
CN103572784A (zh) * | 2013-11-21 | 2014-02-12 | 中建二局第三建筑工程有限公司 | 一种超厚筏板后浇带模板支撑系统及其施工方法 |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110173052A (zh) * | 2019-05-17 | 2019-08-27 | 武汉一冶建筑安装工程有限责任公司 | 施工缝施工方法 |
CN110984235A (zh) * | 2019-10-28 | 2020-04-10 | 中国一冶集团有限公司 | 一种后浇带止水结构的施工方法 |
CN110984235B (zh) * | 2019-10-28 | 2021-08-13 | 中国一冶集团有限公司 | 一种后浇带止水结构的施工方法 |
CN110820696A (zh) * | 2019-11-22 | 2020-02-21 | 北京金河水务建设集团有限公司 | 一种堆石混凝土塘坝的同步浇筑施工方法 |
CN111335641A (zh) * | 2020-03-31 | 2020-06-26 | 北京天润建设有限公司 | 一种用于混凝土浇筑的阻隔装置 |
CN113323382A (zh) * | 2021-03-25 | 2021-08-31 | 中国十七冶集团有限公司 | 一种人防门框底槛后浇施工槽模板及其使用方法 |
CN113714715A (zh) * | 2021-08-20 | 2021-11-30 | 中建新疆建工(集团)有限公司 | 一种后浇带收口网施工用焊接装置 |
CN113714715B (zh) * | 2021-08-20 | 2023-06-16 | 中建新疆建工(集团)有限公司 | 一种后浇带收口网施工用焊接装置 |
CN114718312A (zh) * | 2022-03-10 | 2022-07-08 | 中国建筑第二工程局有限公司 | 一种防水混凝土施工缝临时封堵结构及施工方法 |
CN114718312B (zh) * | 2022-03-10 | 2022-10-14 | 中国建筑第二工程局有限公司 | 一种防水混凝土施工缝临时封堵结构及施工方法 |
CN114809115A (zh) * | 2022-05-27 | 2022-07-29 | 中建八局第三建设有限公司 | 一种传力型钢后浇带定型化拼装拦截施工方法 |
CN115305964A (zh) * | 2022-09-02 | 2022-11-08 | 中建八局第三建设有限公司 | 一种地下室后浇带处板面钢筋后安装施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105275097A (zh) | 一种后浇带止水钢板和快易收口网安装方法 | |
CN207616844U (zh) | 基础承台预制混凝土侧模及成型装置 | |
CN105839850A (zh) | 地下室逆作法柱身后浇注预压施工方法 | |
CN108867690B (zh) | 大基坑的桩板挡墙逆向施工工法 | |
CN206174120U (zh) | 一种预制构造柱及其结构 | |
CN107268634A (zh) | 深基坑腰梁施工定型模板体系 | |
CN104746892A (zh) | 托梁拆墙装置及托梁拆墙施工方法 | |
CN201943086U (zh) | 一种地下建筑墙体 | |
CN102002953A (zh) | 一种基坑围护肋板换撑的方法 | |
CN110952995A (zh) | 一种外接式洞门后浇环梁施工方法 | |
KR101169462B1 (ko) | 포스트를 이용한 지하구조물 역타설 시공방법 | |
CN104088473A (zh) | 用于托换承重墙的施工结构及施工方法 | |
CN110130271B (zh) | 一种侧壁混凝土单面模板加固的施工方法 | |
CN202247938U (zh) | 一种楔形地脚螺栓预留孔芯模装置 | |
CN107558483A (zh) | 一种安装墙板的建筑基础及其施工方法 | |
CN108130889B (zh) | 泵闸主体底板与流道层侧墙台阶式施工缝制做方法 | |
CN108756034B (zh) | 架空结构地坪及其施工方法 | |
CN208023601U (zh) | 一种互扣式的预制桩基承台侧模 | |
CN203960878U (zh) | 一种支挡工程的施工模板 | |
CN206529881U (zh) | 承台及地梁结构的施工装置 | |
CN212223971U (zh) | 后浇带侧固内撑钢板组合模板 | |
CN103821149A (zh) | 大型深基坑留坡挖土及坑中坑混凝土后浇施工工法 | |
CN114197504A (zh) | 一种不稳定边坡的综合整治施工方法 | |
CN208917859U (zh) | 用于承台基础胎膜的预制板 | |
CN113373977A (zh) | 一种地下室外墙及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160127 |
|
RJ01 | Rejection of invention patent application after publication |