CN105421826B - A kind of assembled integral vacuum toilet and its method of construction - Google Patents

A kind of assembled integral vacuum toilet and its method of construction Download PDF

Info

Publication number
CN105421826B
CN105421826B CN201510895502.XA CN201510895502A CN105421826B CN 105421826 B CN105421826 B CN 105421826B CN 201510895502 A CN201510895502 A CN 201510895502A CN 105421826 B CN105421826 B CN 105421826B
Authority
CN
China
Prior art keywords
foamed cement
combined wall
wall board
board
wedge block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510895502.XA
Other languages
Chinese (zh)
Other versions
CN105421826A (en
Inventor
樊立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Lyujian Plate Industry Co Ltd
Hengyuan Building Plate Industry Co Ltd
Taikong Intelligent Construction Co ltd
Original Assignee
Changzhou Lyujian Plate Industry Co Ltd
Hengyuan Building Plate Industry Co Ltd
Taikong Intelligent Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Lyujian Plate Industry Co Ltd, Hengyuan Building Plate Industry Co Ltd, Taikong Intelligent Construction Co ltd filed Critical Changzhou Lyujian Plate Industry Co Ltd
Priority to CN201510895502.XA priority Critical patent/CN105421826B/en
Publication of CN105421826A publication Critical patent/CN105421826A/en
Priority to CN201680070072.0A priority patent/CN110494618A/en
Priority to SG11201804065RA priority patent/SG11201804065RA/en
Priority to PCT/CN2016/100634 priority patent/WO2017097018A1/en
Priority to JP2018528643A priority patent/JP6606286B2/en
Application granted granted Critical
Publication of CN105421826B publication Critical patent/CN105421826B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/125Small buildings, arranged in other buildings
    • E04H1/1266Cubicles for dressing; Toilets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Residential Or Office Buildings (AREA)
  • Panels For Use In Building Construction (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Building Environments (AREA)

Abstract

The present invention relates to a kind of assembled integral vacuum toilet and its methods of construction.The present invention includes:Foamed cement composite bottom board, wallboard, top plate and sanitary bath equipment.Dovetail groove type steel frame side rib is equipped in plate, it is made of upper lower flange and dovetail trough rim costal fovea slot;And insert portion wedge block is equipped in the dovetail trough rim costal fovea slot;Connection between each plate is connected and fixed by the wedge block being equipped in bolt, connector and plate dovetail trough rim costal fovea slot.The advantage of the invention is that:The foamed cement composite plate of industrialized production, fire endurance >=4 hour are used in the present invention;Sound insulation >=42 decibel, constituted raw material are inorganic material, are non-combustible, have the comprehensive performances such as energy conservation and environmental protection, load bearing heat preserving, heat-insulated, fire resisting, durable, antidetonation, light, high-strength.Present invention installation is easy to operate, fast, securely, reduces environmental pollution and noise emissions caused by constructing between conventional sanitation.The present invention is a kind of energy-saving and environment-friendly green building product.

Description

A kind of assembled integral vacuum toilet and its method of construction
Technical field
The invention belongs to building field, a kind of assembled integral vacuum toilet and its method of construction are referred in particular to.
Background technique
Currently, traditional integral vacuum toilet form has in the field of construction:Glass fiber reinforced plastics composite material compression molding and reinforcing bar Concrete prefabricated integral vacuum toilet.The integral vacuum toilet being pressed and molded by glass fiber reinforced plastics composite material, main shortcoming are Fire protecting performance is low, soundproof effect is poor, and user can not be modified internal sanitary ware with facility;And by prefabricated concrete Integral vacuum toilet, main shortcoming are to be self-possessed too greatly, and single integral vacuum toilet self weight can not use tower crane up to 8-12 tons It is lifted.
Summary of the invention
It is provided a kind of prefabricated, simple by foamed cement composite board it is an object of the invention to overcome the shortage of prior art Single assembled integral vacuum toilet and its method of construction quick, that industrialized production can be achieved.Integral vacuum toilet of the present invention has matter Gently, load bearing heat preserving, heat-insulated, durable, antidetonation and excellent fire protecting performance and sound insulation property, it is a kind of energy-saving and environment-friendly green Color building products.
The technical scheme is that:
A kind of assembled integral vacuum toilet, it includes:Foamed cement composite bottom board, foamed cement combined wall board, foaming water Mud compound roof and sanitary bath equipment, it is characterised in that:The foamed cement composite bottom board, foamed cement combined wall board, Dovetail groove type steel frame side rib is respectively equipped in foamed cement compound roof;The dovetail groove type steel frame side rib, by upper Lower flange and dovetail trough rim costal fovea slot are constituted;And insert portion wedge block is equipped in the dovetail trough rim costal fovea slot;
Connection between the foamed cement combined wall board and the foamed cement composite bottom board, be by bolt, The wedge block being equipped in connector and plate dovetail trough rim costal fovea slot is connected and fixed;
Connection between the foamed cement combined wall board and the foamed cement combined wall board, be by bolt, The wedge block being equipped in connector and plate dovetail trough rim costal fovea slot is connected and fixed;
Connection between the foamed cement combined wall board and the foamed cement compound roof, be by bolt, The wedge block being equipped in connector and plate dovetail trough rim costal fovea slot is connected and fixed.
Wherein, the foamed cement composite bottom board, by steel frame, steel bar girder, steel wire, inorganic foamed cementitious core Material, the compound composition of upper and lower cement screedn;Wherein, steel wire is connected and fixed with steel frame;According to design requirement, steel wire can It is whole to be laid with or be partially laid with.Sewer pipe fitting can be equipped in foamed cement composite bottom board, including:Drainpipe, floor drain etc..
Foamed cement combined wall board, by steel frame, upper and lower steel wire, several steel rings socketed with upper and lower steel wire, nothing Machine foamed cement core material, the compound composition of upper and lower cement screedn;Wherein, steel wire is connected and fixed with steel frame;According to design Demand, steel wire can be integrally laid with or part is laid with.Upper hose, upper water swivel, horse can be equipped in foamed cement combined wall board Bucket draining via hole, switch magazine, conduit;Combined wall board can leave a door unlocked in advance, window.
Another structure of foamed cement combined wall board is, by steel frame, steel wire, steel bar girder, inorganic foamed cement Core material, the compound composition of upper and lower cement screedn;Wherein, steel wire is connected and fixed with steel frame;According to design requirement, steel wire It can integrally be laid with or part is laid with.In foamed cement combined wall board can be equipped with upper hose, upper water swivel, closestool draining via hole, Switch magazine, conduit;Combined wall board can leave a door unlocked in advance, window.
Foamed cement compound roof, by steel frame, steel wire, steel bar girder, inorganic foamed cement core material, upper and lower cement bonded sand The compound composition of pulp noodle layer;Wherein, steel wire is connected and fixed with steel frame;According to design requirement, steel wire can be integrally laid with or portion Divide and is laid with.Socket magazine, pipeline can be equipped in foamed cement compound roof;And ventilation, access hole can be reserved.
Be equipped with wedge block is slidable in the dovetail trough rim costal fovea slot, is quickly pacified in order to capturing position Dress.
The shape of the wedge block is matched with groove shapes.
The wedge block can be placed in advance in the groove of dovetail trough rim rib, can also be placed on dovetail trough rim during installation In the groove of rib.
The hole cooperated with bolt is equipped in the wedge block;And be equipped with can placing nut fluting.
Another structure of the wedge block is that the threaded hole cooperated with bolt is equipped in the wedge block.
The connector is square connector;And the via hole matched with bolt is equipped on connector.
In the interior and exterior of the assembled integral vacuum toilet, various decorating and renovating materials can be used and fitted up, with full The toilet decorations requirement of sufficient different-style.
In the assembled integral vacuum toilet, the waterproof material that various coating classes or coiled material class can be used carries out health Between water-proofing treatment, to meet different toilet warterproof requirements.
A kind of method of construction of assembled integral vacuum toilet, method and step include:
According to client's actual demand, used foamed cement composite bottom board, foamed cement combined wall board, foamed cement are multiple Close top plate and carry out industrialized customized production in factory, and according to design requirement by upper and lower conduit part, electrical equipment and Door, window etc. are prefabricated in foamed cement composite board;It is as playing with building blocks, foamed cement composite bottom board, foamed cement is multiple Conjunction wallboard, foamed cement compound roof carry out accurate, quick-assembling, and use and be mechanically connected fixation;And bathroom is installed and is set It is standby, and it is built into integrated bathroom;Integral vacuum toilet is transported to construction site again;It, will be whole using lifting lifting equipment Toilet Installation is in place.
Wherein, the integral vacuum toilet can complete waterproof in factory according to demand and interior and exterior finishes is constructed.
Set bathroom device equipment, can also complete to install at the construction field (site) in the integral vacuum toilet.
A kind of method of construction of assembled integral vacuum toilet, method and step include:
A, according to design requirement, foamed cement composite bottom board, foamed cement combined wall board, the compound top of foamed cement are made Plate;Wherein, it is set respectively in the foamed cement composite bottom board, foamed cement combined wall board, foamed cement compound roof There is dovetail groove type steel frame side rib;The dovetail groove type steel frame side rib, is made of upper lower flange and dovetail trough rim costal fovea slot; And insert portion wedge block is equipped in the dovetail trough rim costal fovea slot;
B, foamed cement composite bottom board is connect with foamed cement combined wall board:
Firstly, foamed cement composite bottom board is placed on horizontal basal plane, by design requirement, then by foamed cement composite wall Plate is disposed vertically on foamed cement composite bottom board relative position;The wedge block for being placed with nut foamed cement is put into respectively to answer It closes in the dovetail trough rim costal fovea slot that bottom plate and foamed cement combined wall board are equipped with;Again respectively by bolt across connector, and with The nut being placed in wedge block is connected and fixed, and is fastened using wedge block and dovetail groove type steel frame side rib, to make the water that foams Mud composite bottom board is connected and fixed with foamed cement combined wall board;By this method successively by remaining foamed cement combined wall board and foaming Cementitious composite bottom plate is connected to a fixed;
C, foamed cement combined wall board is connect with foamed cement combined wall board:
First second piece of foamed cement combined wall board is disposed vertically on foamed cement composite bottom board relative position, and is adjusted The relative position of second block of wallboard and first block of wallboard completes second piece of foamed cement combined wall board by step B and foamed cement is multiple Close the connection of bottom plate;
First block of wallboard and second block of wallboard are attached again:It is compound that the wedge block for being placed with nut is put into foamed cement In the dovetail trough rim costal fovea slot that wallboard is equipped with;Bolt is passed through into connector respectively again, and with the nut that is placed in wedge block It is connected and fixed, is fastened using wedge block and dovetail groove type steel frame side rib, to make foamed cement combined wall board and foamed cement Combined wall board connection:Successively remaining foamed cement combined wall board is connected to a fixed with foamed cement combined wall board by this method;
D, foamed cement combined wall board is connect with foamed cement compound roof:
Foamed cement compound roof is placed on foamed cement combined wall board, the wedge block of nut will be placed with respectively It is put into the dovetail trough rim costal fovea slot that foamed cement compound roof and foamed cement combined wall board are equipped with;Bolt is worn respectively again Connector is crossed, and is connected and fixed with the nut being placed in wedge block, is fastened using wedge block and dovetail groove type steel frame side rib, To make foamed cement combined wall board connect with foamed cement compound roof:Successively remaining wallboard is connected with top plate by this method Connect fixation;Whole assembly construction is completed;
E, according to design requirement, waterproof process is carried out;
F, according to design requirement, upholstery is carried out;
G, sanitary bath equipment is installed, including:Toilet seat, hand washing sink, bath apparatus;And bathroom door is installed.
Above-mentioned E, F, G step, can also complete at the construction field (site).
Wherein, the wedge block is slidably, quickly to pacify in order to capturing position in dovetail trough rim costal fovea slot Dress.
Be equipped in the wedge block hole that cooperates with bolt and can placing nut fluting.
Another structure of the wedge block is that the threaded hole cooperated with bolt is equipped in the wedge block.
The advantage of the invention is that:The foamed cement composite plate of industrialized production, fire endurance are used in the present invention >=4 hours;Sound insulation >=42 decibel, constituted raw material be inorganic material, be non-combustible, have energy conservation and environmental protection, load bearing heat preserving, The comprehensive performances such as heat-insulated, fire resisting, durable, antidetonation, light, high-strength.Therefore assembled integral vacuum toilet of the present invention have load bearing heat preserving, Heat-insulated, durable, antidetonation, light (integral vacuum toilet self weight is only 3-4 tons), excellent fire protecting performance and sound insulation property.The present invention The installation of assembled integral vacuum toilet is easy to operate, fast, securely, greatly reduces the wet behaviour of construction site between conventional sanitation Make, reduces environmental pollution and noise emissions caused by constructing between conventional sanitation.The present invention is that a kind of energy-saving and environment-friendly green is built Build product.
Detailed description of the invention
Fig. 1 is assembled integral vacuum toilet structural schematic diagram of the present invention.
Fig. 2-1 is the structural schematic diagram of foamed cement composite bottom board in the embodiment of the present invention.
Fig. 2-2 is the structural schematic diagram of foamed cement combined wall board in the embodiment of the present invention.
Fig. 2-3 is the structural schematic diagram of foamed cement compound roof in the embodiment of the present invention.
Fig. 2-4 is dovetail groove type steel frame side rib section in assembled integral vacuum toilet foamed cement composite plate of the present invention Figure.
Fig. 3-1, Fig. 3-2, Fig. 3-3 are wedge block structural schematic diagram in the embodiment of the present invention.
Fig. 4 is the connecting joint structure of foamed cement combined wall board and foamed cement composite bottom board in the embodiment of the present invention 1 Schematic diagram.
Fig. 5 is the connecting joint structure of foamed cement combined wall board and foamed cement combined wall board in the embodiment of the present invention 1 Schematic diagram.
Fig. 6 is the connecting joint structure of foamed cement combined wall board and foamed cement compound roof in the embodiment of the present invention 1 Schematic diagram.
Fig. 7-1, Fig. 7-2 are wedge block structural schematic diagram in the embodiment of the present invention 2.
Fig. 8 is the connecting joint structure of foamed cement combined wall board and foamed cement composite bottom board in the embodiment of the present invention 2 Schematic diagram.
Fig. 9 is formula side rib sectional view of rising as high as the banks in the embodiment of the present invention 3.
Figure 10-1 is the connecting node knot of foamed cement combined wall board and foamed cement composite bottom board in the embodiment of the present invention 3 Structure front schematic view.
Figure 10-2 is the connecting node knot of foamed cement combined wall board and foamed cement composite bottom board in the embodiment of the present invention 3 Structure side schematic view.
Figure 11 is the connecting joint structure of foamed cement combined wall board and foamed cement combined wall board in the embodiment of the present invention 3 Schematic diagram.
Figure 12-1, Figure 12-2 are the company of foamed cement combined wall board and foamed cement compound roof in the embodiment of the present invention 3 Connect node structure schematic diagram.
Figure 13 is the connecting joint structure of foamed cement combined wall board and foamed cement combined wall board in the embodiment of the present invention 4 Schematic diagram.
Figure 14 is the connecting joint structure of foamed cement combined wall board and foamed cement compound roof in the embodiment of the present invention 4 Schematic diagram.
Figure 15-1, Figure 15-2, Figure 15-3 are foamed cement combined wall board and foamed cement composite base in the embodiment of the present invention 4 The connecting joint structure schematic diagram of plate.
Figure 16 is foamed cement combined wall board and foamed cement composite bottom board (waterproof bead dovetail in the embodiment of the present invention 5 Slot type steel frame side rib) connecting joint structure schematic diagram.
Figure 17 is that foamed cement combined wall board with foamed cement composite bottom board (rise as high as the banks by waterproof bead in the embodiment of the present invention 5 Formula steel frame side rib) connecting joint structure schematic diagram.
Drawing reference numeral explanation:
Foamed cement composite bottom board 1,1 ';Foamed cement combined wall board 2,2 ';
Foamed cement compound roof 3,3 ';Steel frame 101;Steel bar girder 102;Inorganic foamed cement core material 103;On be lauched Cement mortar surface layer 104;Steel wire 105;Connector 106;
Bathroom door 4;Bath apparatus 51;Toilet seat 52;Hand washing sink 53;
Dovetail groove type steel frame side rib 6;Groove 61;Rectangular tube 62;
Wedge block 7;Hole 70;Fluting 71;
Threaded hole 72;Nut 73;Bolt 74;Bolt sleeve 75;Cover board 76;
Square connector 8;Via hole 81;
Formula of rising as high as the banks steel frame side rib 9;Rise as high as the banks 91;Hole 92;Cavity 93;Perforation 94;
Waterproof bead dovetail groove type steel frame side rib 10;Waterproof bead is risen as high as the banks formula steel frame side rib 11.
Specific embodiment
With reference to the accompanying drawings of the specification and embodiment, the invention will be further described.
Embodiment 1:
As shown in Figures 1 to 6, assembled integral vacuum toilet of the present invention mainly includes:Foamed cement composite bottom board 1, foaming Cementitious composite wallboard 2, foamed cement compound roof 3 and sanitary bath equipment:Bath apparatus 51, toilet seat 52, hand washing sink 53.
Distinguish in the foamed cement composite bottom board 1, foamed cement combined wall board 2, foamed cement compound roof 3 Equipped with dovetail groove type steel frame side rib 6;The dovetail groove type steel frame side rib 6, by upper lower flange and dovetail trough rim costal fovea slot 61 are constituted;And insert portion wedge block 7 is equipped in the dovetail trough rim costal fovea slot 61;And it is set in the wedge block 7 Have with bolt 74 cooperate hole 70 and can placing nut 73 fluting 71.
Connection between the foamed cement composite bottom board 1 and the foamed cement combined wall board 2, is to pass through bolt 74 pass through square connector 8 is connected and fixed with the nut 73 placed in wedge block 7;
Connection between the foamed cement combined wall board 2 and the foamed cement combined wall board 2 ', is to pass through spiral shell Bolt 74 passes through square connector 8 and is connected and fixed with the nut 73 placed in wedge block 7;
Connection between the foamed cement combined wall board 2 and the foamed cement compound roof 3, is to pass through bolt 74 pass through square connector 8 is connected and fixed with the nut 73 placed in wedge block 7.
Wherein, the via hole 81 matched with bolt is equipped on the square connector 8.
As shown in Fig. 2-1, Fig. 2-2, Fig. 2-3, Fig. 2-4 to Figure 17, in embodiments of the present invention, the foamed cement is multiple Bottom plate 1 or foamed cement composite bottom board 1 ' are closed, by steel frame 101, steel bar girder 102, steel wire 105, inorganic foamed cement Core material 103, the compound composition of upper and lower cement screedn 104;Wherein, steel wire 105 is connected and fixed with steel frame 101;According to setting Meter demand, steel wire 105 can be integrally laid with or part is laid with.Sewer pipe fitting, packet can be equipped in foamed cement composite bottom board 1 It includes:Drainpipe, floor drain etc..
The foamed cement combined wall board 2 or foamed cement combined wall board 2 ', by steel frame 101, steel bar girder 102, inorganic foamed cement core material 103, upper and lower steel wire 105, several connectors 106 socketed with upper and lower steel wire 105, on The compound composition of lower cement screedn 104;Wherein, steel wire 105 is connected and fixed with steel frame 101;According to design requirement, steel wire Net 105 can be integrally laid with or part is laid with.Upper hose, upper water swivel, closestool draining can be equipped in foamed cement combined wall board 2 Via hole, switch magazine, conduit;Combined wall board can leave a door unlocked in advance, window.
The foamed cement compound roof 3 or foamed cement compound roof 3 ', by steel frame 101, steel wire 105, Steel bar girder 102, inorganic foamed cement core material 103, the compound composition of upper and lower cement screedn 104;Wherein, steel wire 105 with Steel frame 101 is connected and fixed;According to design requirement, steel wire 105 can be integrally laid with or part is laid with.On the compound top of foamed cement Socket magazine, pipeline can be equipped in plate 3;And ventilation, access hole can be reserved.
Be equipped with wedge block 7 is slidable in the dovetail trough rim costal fovea slot 61, fast in order to capturing position Speed installation.
The shape of the wedge block 7 is matched with 61 shape of groove.
The wedge block 7 can be placed in advance in the groove 61 of dovetail trough rim rib 6, can also be placed on dovetail during installation In the groove 61 of trough rim rib 6.
The method of construction of 1 assembled integral vacuum toilet of the embodiment of the present invention, method and step include:
A, according to design requirement, foamed cement composite bottom board 1, foamed cement combined wall board 2, the compound top of foamed cement are made Plate 3;Wherein, divide equally in the foamed cement composite bottom board 1, foamed cement combined wall board 2, foamed cement compound roof 3 It She You not dovetail groove type steel frame side rib 6;The dovetail groove type steel frame side rib 6, by upper lower flange and dovetail trough rim costal fovea Slot 61 is constituted;And insert portion wedge block 7 is equipped in the dovetail trough rim costal fovea slot 61;It is equipped in wedge block 7 and spiral shell Bolt 74 cooperate hole 70 and can placing nut 73 fluting 71.
B, foamed cement composite bottom board 1 is connect with foamed cement combined wall board 2:
Firstly, foamed cement composite bottom board 1 is placed on horizontal basal plane, it is compound by design requirement, then by foamed cement Wallboard 2 is disposed vertically on 1 relative position of foamed cement composite bottom board;The wedge block 7 for being placed with nut 73 is put into hair respectively In the dovetail trough rim costal fovea slot 61 that soaked mud composite bottom board 1 and foamed cement combined wall board 2 are equipped with;Bolt 74 is worn respectively again Square connector 8 is crossed, and is connected and fixed with the nut 73 being placed in wedge block 7, wedge block 7 and dovetail groove type steel side are utilized Frame side rib 6 fastens, so that foamed cement composite bottom board 1 be made to connect with foamed cement combined wall board 2:
C, foamed cement combined wall board 2 is connect with foamed cement combined wall board 2:
First second piece of foamed cement combined wall board 2 is disposed vertically on 1 relative position of foamed cement composite bottom board, is adjusted The relative position of second block of wallboard and first block of wallboard completes second piece of foamed cement combined wall board 2 by step B and foamed cement is multiple Close the connection of bottom plate 1;
First piece of foamed cement combined wall board 2 and second piece of foamed cement combined wall board 2 are attached again:Spiral shell will be placed with The wedge block 7 of mother 73 is put into the dovetail trough rim costal fovea slot 61 that foamed cement combined wall board 2 is equipped with;Bolt 74 is worn respectively again Square connector 8 is crossed, and is connected and fixed with the nut 73 being placed in wedge block 7, wedge block 7 and dovetail groove type steel side are utilized Frame side rib 6 fastens, so that foamed cement combined wall board 2 be made to connect with foamed cement combined wall board 2:By this method successively by remaining Foamed cement combined wall board is connected to a fixed with foamed cement combined wall board;
D, foamed cement combined wall board 2 is connect with foamed cement compound roof 3:
Foamed cement compound roof 3 is placed on foamed cement combined wall board 2, the wedge of nut 73 will be placed with respectively Shape block 7 is put into the dovetail trough rim costal fovea slot 61 that foamed cement compound roof 3 and foamed cement combined wall board 2 are equipped with;Divide again Bolt 74 is not passed through into square connector 8, and is connected and fixed with the nut 73 being placed in wedge block 7, using wedge block 7 with Dovetail groove type steel frame side rib 6 fastens, so that foamed cement combined wall board 2 be made to connect with foamed cement compound roof 3:By this method Successively remaining wallboard is connected to a fixed with top plate;Whole assembly construction is completed;
E, according to design requirement, waterproof process is carried out;
F, according to design requirement, upholstery is carried out;
G, sanitary bath equipment is installed, including:Bath apparatus 51;Toilet seat 52;Hand washing sink 53;Bathroom door 4 is installed.
Above-mentioned E, F, G step, can also complete at the construction field (site).
Embodiment 2:
As shown in Figure 1, Figure 2-1 to Fig. 2-4, Fig. 7-1, Fig. 7-2, shown in Fig. 8, assembled integral vacuum toilet of the present invention is main to wrap It includes:Foamed cement composite bottom board 1, foamed cement combined wall board 2, foamed cement compound roof 3 and sanitary bath equipment:Bath apparatus 51, toilet seat 52, hand washing sink 53.
Distinguish in the foamed cement composite bottom board 1, foamed cement combined wall board 2, foamed cement compound roof 3 Equipped with dovetail groove type steel frame side rib 6;The dovetail groove type steel frame side rib 6, by upper lower flange and dovetail trough rim costal fovea slot 61 are constituted;And insert portion wedge block 7 is equipped in the dovetail trough rim costal fovea slot 61;And it is equipped in wedge block 7 and spiral shell The threaded hole 72 that bolt 74 cooperates.
Connection between the foamed cement composite bottom board 1 and the foamed cement combined wall board 2, is to pass through bolt 74, which pass through the wedge block 7 being equipped in square connector 8 and plate dovetail trough rim costal fovea slot 61, is connected and fixed.
Connection between the foamed cement combined wall board 2 and the foamed cement combined wall board 2 ', is to pass through spiral shell Bolt 74 passes through the wedge block 7 being equipped in square connector 8 and plate dovetail trough rim costal fovea slot 61 and is connected and fixed.
Connection between the foamed cement combined wall board 2 and the foamed cement compound roof 3, is to pass through bolt 74, which pass through the wedge block 7 being equipped in square connector 8 and plate dovetail trough rim costal fovea slot 61, is connected and fixed.
The method of construction of 2 assembled integral vacuum toilet of the embodiment of the present invention, method and step include:
A, according to design requirement, foamed cement composite bottom board 1, foamed cement combined wall board 2, the compound top of foamed cement are made Plate 3;Wherein, divide equally in the foamed cement composite bottom board 1, foamed cement combined wall board 2, foamed cement compound roof 3 It She You not dovetail groove type steel frame side rib 6;The dovetail groove type steel frame side rib 6, by upper lower flange and dovetail trough rim costal fovea Slot 61 is constituted;And insert portion wedge block 7 is equipped in the dovetail trough rim costal fovea slot 61;It is equipped on wedge block 7 and spiral shell The threaded hole 72 that bolt 74 cooperates;
B, foamed cement composite bottom board 1 is connect with foamed cement combined wall board 2:
Firstly, foamed cement composite bottom board 1 is placed on horizontal basal plane, it is compound by design requirement, then by foamed cement Wallboard 2 is disposed vertically on 1 relative position of foamed cement composite bottom board;The wedge block 7 for being placed with nut 73 is put into hair respectively In the dovetail trough rim costal fovea slot 61 that soaked mud composite bottom board 1 and foamed cement combined wall board 2 are equipped with;Bolt 74 is worn respectively again Square connector 8 is crossed, and is connected and fixed with the threaded hole 72 in wedge block 7, wedge block 7 and dovetail groove type steel frame side are utilized Rib 6 fastens, so that foamed cement composite bottom board 1 be made to be connected and fixed with foamed cement combined wall board 2;By this method successively by remaining Foamed cement combined wall board is connected to a fixed with foamed cement composite bottom board;
C, foamed cement combined wall board 2 is connect with foamed cement combined wall board 2:
First second piece of foamed cement combined wall board 2 is disposed vertically on 1 relative position of foamed cement composite bottom board, by B Step completes the connection of second piece of foamed cement combined wall board 2 and foamed cement composite bottom board 1;
First piece of foamed cement combined wall board 2 and second piece of foamed cement combined wall board 2 are attached again:Spiral shell will be placed with The wedge block 7 of mother 73 is put into the dovetail trough rim costal fovea slot 61 that foamed cement combined wall board 2 is equipped with;Bolt 74 is worn respectively again Square connector 8 is crossed, and is connected and fixed with the threaded hole 72 in wedge block 7, wedge block 7 and dovetail groove type steel frame side are utilized Rib 6 fastens, so that foamed cement combined wall board 2 be made to be connected and fixed with foamed cement combined wall board 2;By this method successively by remaining Foamed cement combined wall board is connected to a fixed with foamed cement combined wall board;
D, foamed cement combined wall board 2 is connect with foamed cement compound roof 3:
Foamed cement compound roof 3 is placed on foamed cement combined wall board 2, the wedge of nut 73 will be placed with respectively Shape block 7 is put into the dovetail trough rim costal fovea slot 61 that foamed cement compound roof 3 and foamed cement combined wall board 2 are equipped with;Divide again Bolt 74 is not passed through into square connector 8, and is connected and fixed with the threaded hole 72 in wedge block 7, wedge block 7 and dovetail are utilized Slot type steel frame side rib 6 fastens, so that foamed cement combined wall board 2 be made to connect with foamed cement compound roof 3:Successively by this method Remaining wallboard is connected to a fixed with top plate;Whole assembly construction is completed;
E, according to design requirement, waterproof process is carried out;
F, according to design requirement, upholstery is carried out;
G, sanitary bath equipment is installed, including:Bath apparatus 51;Toilet seat 52;Hand washing sink 53;Bathroom door 4 is installed;
Above-mentioned E, F, G step, can also complete at the construction field (site).
Embodiment 3:
As shown in Figure 1, Figure 2-1 to Fig. 2-4, Fig. 9, Figure 10-1, Figure 10-2, Figure 11, Figure 12-1, shown in Figure 12-2, present invention dress With formula integral vacuum toilet, mainly include:Foamed cement composite bottom board 1 ', foamed cement combined wall board 2 or foamed cement composite wall Plate 2 ', foamed cement compound roof 3 ' and sanitary bath equipment:Bath apparatus 51, toilet seat 52, hand washing sink 53.
The foamed cement composite bottom board 1 ' or the foamed cement compound roof 3 ', equipped with formula steel frame side of rising as high as the banks Rib 9 91 is made of upper lower flange and rising as high as the banks;And hole 70 is equipped on the edge of a wing;Hole 92 is equipped at stile of rising as high as the banks;At hole 92 It is equipped in rising as high as the banks by steel plate or the closed cavity 93 of fashioned iron, in order to be put into bolt 74 by hole 92.
The foamed cement combined wall board 2 is equipped with dovetail groove type steel frame side rib 6;The dovetail groove type steel frame Side rib 6 is made of upper lower flange and dovetail trough rim costal fovea slot 61;And insertion part is equipped in the dovetail trough rim costal fovea slot 61 Part wedge block 7;And be equipped in the wedge block 7 hole 70 that cooperates with bolt 74 and can placing nut 73 fluting 71.
Foamed cement combined wall board 2 ' is equipped with dovetail groove type steel frame side rib 6;The dovetail groove type steel frame side rib 6, It is made of upper lower flange and dovetail trough rim costal fovea slot 61;Hole 70 is equipped on the upper lower flange;And on dovetail groove type steel side A rectangular tube 62 is equipped in frame side rib 6.
Connection between the foamed cement composite bottom board 1 ' and the foamed cement combined wall board 2, is to pass through spiral shell Bolt 74 passes through hole 70 and is connected and fixed with the nut 73 being arranged in wedge block 7.
Connection between the foamed cement combined wall board 2 and the foamed cement combined wall board 2 ', is to pass through spiral shell Bolt 74 passes through hole 70 and is connected and fixed with the nut 73 being arranged in wedge block 7.
Connection between the foamed cement combined wall board 2 and the foamed cement compound roof 3 ', is to pass through spiral shell Bolt 74 passes through hole 70 and is connected and fixed with the nut 73 being arranged in wedge block 7.
The method of construction of 3 assembled integral vacuum toilet of the embodiment of the present invention, method and step include:
A, according to design requirement, it is compound that foamed cement composite bottom board 1 ', foamed cement combined wall board 2 and foamed cement are made Wallboard 2 ', foamed cement compound roof 3 ';
B, foamed cement composite bottom board 1 ' is connect with foamed cement combined wall board 2:
Firstly, foamed cement composite bottom board 1 ' is placed on horizontal basal plane, it is compound by design requirement, then by foamed cement Wallboard 2 is disposed vertically on 1 ' relative position of foamed cement composite bottom board;The wedge block 7 for being placed with nut 73 is put into foaming water In the dovetail trough rim costal fovea slot 61 that mud combined wall board 2 is equipped with;Again from hole 92, bolt 74 is passed through into hole 70 and wedge block 7 The nut 73 of interior setting is connected and fixed;By this method successively by remaining foamed cement combined wall board and foamed cement composite bottom board phase It is connected and fixed;
C, foamed cement combined wall board 2 is connect with foamed cement combined wall board 2 ':
First second piece of foamed cement combined wall board 2 ' is disposed vertically on 1 ' relative position of foamed cement composite bottom board, is adjusted Second piece of foamed cement combined wall board 2 ' and foaming water are completed by step B in the relative position of whole second block of wallboard and first block of wallboard The connection of mud composite bottom board 1 ';
First piece of foamed cement combined wall board 2 and second piece of foamed cement combined wall board 2 ' are attached again:It will be placed with The wedge block 7 of nut 73 is put into the dovetail trough rim costal fovea slot 61 that foamed cement combined wall board 2 is equipped with;Again respectively by bolt 74 The nut 73 being arranged in hole 70 and wedge block 7 is connected and fixed;By this method successively by remaining foamed cement combined wall board with Foamed cement combined wall board is connected to a fixed;
D, foamed cement combined wall board 2 is connect with foamed cement compound roof 3 ':
Foamed cement compound roof 3 ' is placed on foamed cement combined wall board 2, the wedge shape of nut 73 will be placed with Block 7 is put into the dovetail trough rim costal fovea slot 61 that foamed cement combined wall board 2 is equipped with;Again from hole 92, bolt 74 is passed through Hole 70 is connected and fixed with the nut 73 being arranged in wedge block 7;Successively remaining wallboard is connected to a fixed with top plate by this method;It is whole Body assembly construction is completed;
E, according to design requirement, waterproof process is carried out;
F, according to design requirement, upholstery is carried out;
G, sanitary bath equipment is installed, including:Bath apparatus 51;Toilet seat 52;Hand washing sink 53;Bathroom door 4 is installed.
Above-mentioned E, F, G step, can also complete at the construction field (site).
Embodiment 4:
As shown in Figure 1, Figure 2-1 to Fig. 2-4, Fig. 7, Fig. 9, Figure 13, Figure 14, shown in Figure 15-1 to Figure 15-3, assembled of the present invention Integral vacuum toilet mainly includes:Foamed cement composite bottom board 1 ', foamed cement combined wall board 2 or foamed cement combined wall board 2 ', Foamed cement compound roof 3 ' and sanitary bath equipment:Bath apparatus 51, toilet seat 52, hand washing sink 53.
Dovetail groove type steel frame side rib 6 is equipped in the foamed cement combined wall board 2;The dovetail groove type steel side Frame side rib 6 is made of upper lower flange and dovetail trough rim costal fovea slot 61;And it is equipped in the dovetail trough rim costal fovea slot 61 embedded Component wedge block 7;And be equipped in the wedge block 7 hole 70 that cooperates with bolt 74 and can placing nut 73 fluting 71。
Formula steel frame side rib of rising as high as the banks is equipped in the foamed cement combined wall board 2 ' or foamed cement compound roof 3 ' 9, it 91 is made of upper lower flange and rising as high as the banks;Perforation 94 is equipped in 91 rising as high as the banks;And bolt sleeve 75 is equipped in perforation 94;Flat 91 top flange of slot is equipped with cover board 76, and the shape of cover board 76 is identical as bolt sleeve 75;And cover board 76 is equipped with aperture 70.
The foamed cement composite bottom board 1 ', equipped with formula steel frame side rib 9 of rising as high as the banks, by upper lower flange and 91 structures of rising as high as the banks At;And hole 70 is equipped on the edge of a wing;It is equipped with rectangular tube 62 in rising as high as the banks (as shown in Figure 15-1,15-2).
Connection between the foamed cement composite bottom board 1 ' and the foamed cement combined wall board 2, is to pass through spiral shell Bolt 74 passes through hole 70, bolt sleeve 75 and the nut 73 being arranged in wedge block 7 and is connected and fixed.
Connection between the foamed cement combined wall board 2 and the foamed cement combined wall board 2 ', is to pass through spiral shell Bolt 74 passes through hole 70, rectangular tube 62 and the nut 73 being arranged in wedge block 7 and is connected and fixed.
Connection between the foamed cement combined wall board 2 and the foamed cement compound roof 3 ', is to pass through spiral shell Bolt 74 passes through hole 70, bolt sleeve 75 and the nut 73 being arranged in wedge block 7 and is connected and fixed.
The method of construction of 4 assembled integral vacuum toilet of the embodiment of the present invention, method and step include:
A, according to design requirement, it is compound that foamed cement composite bottom board 1 ', foamed cement combined wall board 2 and foamed cement are made Wallboard 2 ', foamed cement compound roof 3 ';
B, foamed cement composite bottom board 1 ' is connect with foamed cement combined wall board 2:
Firstly, foamed cement composite bottom board 1 ' is placed on horizontal basal plane, it is compound by design requirement, then by foamed cement Wallboard 2 is disposed vertically on 1 ' relative position of foamed cement composite bottom board;The wedge block 7 for being placed with nut 73 is put into foaming water In the dovetail trough rim costal fovea slot 61 that mud combined wall board 2 is equipped with;Bolt 74 is passed through in hole 70, rectangular tube 62 and wedge block 7 and is set The nut 73 set is connected and fixed;Successively remaining foamed cement combined wall board is connected with foamed cement composite bottom board by this method It is fixed;
C, foamed cement combined wall board 2 is connect with foamed cement combined wall board 2 ':
First second piece of foamed cement combined wall board 2 ' is disposed vertically on 1 ' relative position of foamed cement composite bottom board, is adjusted Second piece of foamed cement combined wall board 2 ' and foaming water are completed by step B in the relative position of whole second block of wallboard and first block of wallboard The connection of mud composite bottom board 1 ';
First piece of foamed cement combined wall board 2 and second piece of foamed cement combined wall board 2 ' are attached again:It will be placed with The wedge block 7 of nut 73 is put into the dovetail trough rim costal fovea slot 61 that foamed cement combined wall board 2 is equipped with;Again respectively by bolt 74 The nut 73 being arranged in hole 70, bolt sleeve 75 and wedge block 7 is connected and fixed;By this method successively by remaining foamed cement Combined wall board is connected to a fixed with foamed cement combined wall board;
D, foamed cement combined wall board 2 is connect with foamed cement compound roof 3 ':
Foamed cement compound roof 3 ' is placed on foamed cement combined wall board 2, the wedge shape of nut 73 will be placed with Block 7 is put into the dovetail trough rim costal fovea slot 61 that foamed cement combined wall board 2 is equipped with;Again from hole 92, bolt 74 is passed through Hole 70, bolt sleeve 75 and the nut 73 being arranged in wedge block 7 are connected and fixed;By this method successively by remaining wallboard and top plate phase It is connected and fixed;Whole assembly construction is completed;
E, according to design requirement, waterproof process is carried out;
F, according to design requirement, upholstery is carried out;
G, sanitary bath equipment is installed, including:Bath apparatus 51;Toilet seat 52;Hand washing sink 53;Bathroom door 4 is installed.
Above-mentioned E, F, G step, can also complete at the construction field (site).
Embodiment 5:
As shown in figure 16, described in above-described embodiment 1 to 4 in addition to foamed cement composite bottom board structure feature, at this Waterproof bead dovetail groove type steel frame side rib 10 is equipped in the foamed cement composite bottom board 1 of embodiment 5, in the foaming water When mud composite bottom board 1 is connect with foamed cement combined wall board 2, waterproof action can be played, is rolled up, is avoided vertically upward using bottom plate Water penetrates into the seam of wallboard and bottom plate in toilet.The other feature of the present embodiment is same as the previously described embodiments, therefore does not exist It repeats.
As shown in figure 17, described in above-described embodiment 1 to 4 in addition to foamed cement composite bottom board structure feature, at this It is equipped with waterproof bead in the foamed cement composite bottom board 1 ' of embodiment 5 to rise as high as the banks formula steel frame side rib 11, in the foaming water When mud composite bottom board 1 ' is connect with foamed cement combined wall board 2, waterproof action can be played.The other feature of the present embodiment with it is upper It is identical to state embodiment, therefore is not repeating.
It for those skilled in the art, can be according to different design requirements, by the water that foams in the embodiment of the present invention Connection type between cement composite plate material can be freely combined.Above-described embodiment is the preferred embodiment of the present invention, but simultaneously It is not limited to above-mentioned several ways.All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement Deng should all be included in the protection scope of the present invention.

Claims (17)

1. a kind of assembled integral vacuum toilet, it includes:Foamed cement composite bottom board, foamed cement combined wall board, foamed cement Compound roof and sanitary bath equipment, it is characterised in that:
Swallow is respectively equipped in the foamed cement composite bottom board, foamed cement combined wall board, foamed cement compound roof Stern notch formula steel frame side rib;The dovetail groove type steel frame side rib, is made of upper lower flange and dovetail trough rim costal fovea slot;And Insert portion wedge block is equipped in the dovetail trough rim costal fovea slot;
Connection between the foamed cement combined wall board and the foamed cement composite bottom board is by bolt, connection The wedge block being equipped in part and plate dovetail trough rim costal fovea slot is connected and fixed;
Connection between the foamed cement combined wall board and the foamed cement combined wall board is by bolt, connection The wedge block being equipped in part and plate dovetail trough rim costal fovea slot is connected and fixed;
Connection between the foamed cement combined wall board and the foamed cement compound roof is by bolt, connection The wedge block being equipped in part and plate dovetail trough rim costal fovea slot is connected and fixed;
Wherein, the shape of the wedge block is matched with groove shapes, and in dovetail trough rim costal fovea slot be it is slidable, with The Fast Installation convenient for capturing position;And the threaded hole that cooperates with bolt is equipped in the wedge block and can placing nut Fluting;
The connector is square connector;And the via hole matched with bolt is equipped on connector;
The foamed cement composite bottom board, by steel frame, steel bar girder, steel wire, inorganic foamed cement core material, upper and lower cement The compound composition of mortar surface layer;Wherein, steel wire is connected and fixed with steel frame;And according to design requirement, in foamed cement composite base Sewer pipe fitting is equipped in plate, it includes:Drainpipe, floor drain;
The foamed cement combined wall board, by steel frame, upper and lower steel wire, several connections socketed with upper and lower steel wire Part, inorganic foamed cement core material, the compound composition of upper and lower cement screedn;Wherein, steel wire is connected and fixed with steel frame;And root According to design requirement, upper hose, upper water swivel, closestool draining via hole, switch magazine, electric wire are equipped in foamed cement combined wall board Pipe;
The foamed cement compound roof, by steel frame, steel wire, steel bar girder, inorganic foamed cement core material, upper and lower cement The compound composition of mortar surface layer;Wherein, steel wire is connected and fixed with steel frame;And according to design requirement, on the compound top of foamed cement Socket magazine, pipeline are equipped in plate;
The steel wire is integrally laid with or part is laid with.
2. a kind of assembled integral vacuum toilet, mainly includes:Foamed cement composite bottom board, foamed cement combined wall board, foaming water Mud compound roof and sanitary bath equipment, it is characterised in that:
The foamed cement composite bottom board or the foamed cement compound roof, equipped with formula steel frame side rib of rising as high as the banks, by upper Lower flange and composition of rising as high as the banks;And hole is equipped on the edge of a wing;Hole is equipped at stile of rising as high as the banks;It is equipped in hole is risen as high as the banks by steel plate Or the closed cavity of fashioned iron, in order to be put into bolt by hole;
The foamed cement combined wall board is equipped with dovetail groove type steel frame side rib;The dovetail groove type steel frame side rib, by Upper lower flange and dovetail trough rim costal fovea slot are constituted;And insert portion wedge block is equipped in the dovetail trough rim costal fovea slot;
Another piece of foamed cement combined wall board is equipped with dovetail groove type steel frame side rib;The dovetail groove type steel frame side rib, by Upper lower flange and dovetail trough rim costal fovea slot are constituted;Hole is equipped on the upper lower flange;And in dovetail groove type steel frame side rib Inside it is equipped with a rectangular tube;
Connection between the foamed cement composite bottom board and the foamed cement combined wall board is to pass through hole by bolt It is connected and fixed with the nut being arranged in wedge block;
Connection between the foamed cement combined wall board and another piece of foamed cement combined wall board is to pass through hole by bolt It is connected and fixed with the nut being arranged in wedge block;
Connection between the foamed cement combined wall board and the foamed cement compound roof is to pass through hole by bolt It is connected and fixed with the nut being arranged in wedge block;
Wherein, the shape of the wedge block is matched with groove shapes, and in dovetail trough rim costal fovea slot be it is slidable, with The Fast Installation convenient for capturing position;And the threaded hole that cooperates with bolt is equipped in the wedge block and can placing nut Fluting;
The foamed cement composite bottom board, by steel frame, steel bar girder, steel wire, inorganic foamed cement core material, upper and lower cement The compound composition of mortar surface layer;Wherein, steel wire is connected and fixed with steel frame;And according to design requirement, in foamed cement composite base Sewer pipe fitting is equipped in plate, including:Drainpipe, floor drain;
The foamed cement combined wall board, by steel frame, upper and lower steel wire, several connections socketed with upper and lower steel wire Part, inorganic foamed cement core material, the compound composition of upper and lower cement screedn;Wherein, steel wire is connected and fixed with steel frame;And root According to design requirement, upper hose, upper water swivel, closestool draining via hole, switch magazine, electric wire are equipped in foamed cement combined wall board Pipe;
The foamed cement compound roof, by steel frame, steel wire, steel bar girder, inorganic foamed cement core material, upper and lower cement The compound composition of mortar surface layer;Wherein, steel wire is connected and fixed with steel frame;And according to design requirement, on the compound top of foamed cement Socket magazine, pipeline are equipped in plate;
The steel wire is integrally laid with or part is laid with.
3. a kind of assembled integral vacuum toilet, mainly includes:Foamed cement composite bottom board, foamed cement combined wall board, foaming water Mud compound roof and sanitary bath equipment, it is characterised in that:
Dovetail groove type steel frame side rib is equipped in the foamed cement combined wall board;The dovetail groove type steel frame side Rib is made of upper lower flange and dovetail trough rim costal fovea slot;And insert portion wedge shape is equipped in the dovetail trough rim costal fovea slot Block;
Formula steel frame side rib of rising as high as the banks is equipped in another piece of foamed cement combined wall board or foamed cement compound roof, by upper and lower The edge of a wing and composition of rising as high as the banks;Perforation is equipped in rising as high as the banks;And bolt sleeve is equipped in perforation;Rising as high as the banks, top flange is equipped with cover board, And the shape of cover board is identical as bolt sleeve;And cover board is equipped with aperture;
The foamed cement composite bottom board is made of upper lower flange and rising as high as the banks equipped with formula steel frame side rib of rising as high as the banks;And on the edge of a wing It is equipped with hole;Rectangular tube is equipped in rising as high as the banks;
Connection between the foamed cement composite bottom board and the foamed cement combined wall board, is passed through by bolt The nut being arranged in hole, bolt sleeve and wedge block is connected and fixed;
Connection between the foamed cement combined wall board and another piece of foamed cement combined wall board, is passed through by bolt The nut being arranged in hole, rectangular tube and wedge block is connected and fixed;
Connection between the foamed cement combined wall board and the foamed cement compound roof, is passed through by bolt The nut being arranged in hole, bolt sleeve and wedge block is connected and fixed;
Wherein, the shape of the wedge block is matched with groove shapes, and in dovetail trough rim costal fovea slot be it is slidable, with The Fast Installation convenient for capturing position;And the threaded hole that cooperates with bolt is equipped in the wedge block and can placing nut Fluting;
The foamed cement composite bottom board, by steel frame, steel bar girder, steel wire, inorganic foamed cement core material, upper and lower cement The compound composition of mortar surface layer;Wherein, steel wire is connected and fixed with steel frame;And according to design requirement, in foamed cement composite base Sewer pipe fitting is equipped in plate, including:Drainpipe, floor drain;
The foamed cement combined wall board, by steel frame, upper and lower steel wire, several connections socketed with upper and lower steel wire Part, inorganic foamed cement core material, the compound composition of upper and lower cement screedn;Wherein, steel wire is connected and fixed with steel frame;And root According to design requirement, upper hose, upper water swivel, closestool draining via hole, switch magazine, electric wire are equipped in foamed cement combined wall board Pipe;
The foamed cement compound roof, by steel frame, steel wire, steel bar girder, inorganic foamed cement core material, upper and lower cement The compound composition of mortar surface layer;Wherein, steel wire is connected and fixed with steel frame;And according to design requirement, on the compound top of foamed cement Socket magazine, pipeline are equipped in plate;
The steel wire is integrally laid with or part is laid with.
4. according to claim 1 or assembled integral vacuum toilet described in 2,3, it is characterised in that:The foamed cement is compound Wallboard leaves a door unlocked in advance, window.
5. according to claim 1 or assembled integral vacuum toilet described in 2,3, it is characterised in that:The foamed cement is compound Wallboard, by steel frame, steel wire, steel bar girder, inorganic foamed cement core material, upper and lower cement screedn is compound constitutes;Wherein, Steel wire is connected and fixed with steel frame;According to design requirement, steel wire is integrally laid with or part is laid with.
6. according to claim 1 or assembled integral vacuum toilet described in 2,3, it is characterised in that:The foamed cement is compound The reserved ventilation of top plate, access hole.
7. according to claim 1 or assembled integral vacuum toilet described in 2,3, it is characterised in that:The wedge block is put in advance It sets in the groove of dovetail trough rim rib, or is placed in the groove of dovetail trough rim rib during installation.
8. according to claim 1 or assembled integral vacuum toilet described in 2,3, it is characterised in that:It is whole in the assembled The interior and exterior of toilet is fitted up using various decorating and renovating materials, is wanted with meeting the toilet decorations of different-style It asks.
9. according to claim 1 or assembled integral vacuum toilet described in 2,3, it is characterised in that:It is whole in the assembled The interior and exterior decorating and renovating material of toilet is before toilet assembly in foamed cement composite bottom board, foamed cement composite wall Decoration construction is carried out in advance on plate, foamed cement compound roof, and decorations are completed after assembly is completed in toilet.
10. according to claim 1 or assembled integral vacuum toilet described in 2,3, it is characterised in that:It is whole in the assembled In toilet, toilet warterproof processing is carried out using the waterproof material of various coating classes or coiled material class, waterproof construction can be in health Between assemble before foamed cement composite bottom board construct, can also integral vacuum toilet assembly after construct, to meet different toilets Waterproof requirement.
11. according to claim 1 or assembled integral vacuum toilet described in 2,3, it is characterised in that:In foamed cement composite bottom board In be equipped with waterproof bead dovetail groove type steel frame side rib, rolled up vertically upward using bottom plate, in the foamed cement composite base When plate is connect with foamed cement combined wall board, waterproof action can be played, the water for avoiding toilet penetrates into wallboard and bottom plate In seam.
12. according to claim 1 or assembled integral vacuum toilet described in 2,3, it is characterised in that:In foamed cement composite bottom board It rises as high as the banks formula steel frame side rib equipped with waterproof bead, to be connect in the foamed cement composite bottom board with foamed cement combined wall board When, waterproof action can be played.
13. a kind of method of construction of assembled integral vacuum toilet, method and step include:
A, according to design requirement, foamed cement composite bottom board, foamed cement combined wall board, foamed cement compound roof are made;Its In, dovetail is respectively equipped in the foamed cement composite bottom board, foamed cement combined wall board, foamed cement compound roof Slot type steel frame side rib;The dovetail groove type steel frame side rib, is made of upper lower flange and dovetail trough rim costal fovea slot;And institute Insert portion wedge block is equipped in the dovetail trough rim costal fovea slot stated;
B, foamed cement composite bottom board is connect with foamed cement combined wall board:
Firstly, foamed cement composite bottom board is placed on horizontal basal plane, hang down by design requirement, then by foamed cement combined wall board Directly it is placed on foamed cement composite bottom board relative position;The wedge block for being placed with nut is put into foamed cement composite base respectively In the dovetail trough rim costal fovea slot that plate and foamed cement combined wall board are equipped with;Again respectively by bolt pass through connector, and with placement Nut in wedge block is connected and fixed, and is fastened using wedge block and dovetail groove type steel frame side rib, so that foamed cement be made to answer Bottom plate is closed to be connected and fixed with foamed cement combined wall board;By this method successively by remaining foamed cement combined wall board and foamed cement Composite bottom board is connected to a fixed;
C, foamed cement combined wall board is connect with foamed cement combined wall board:
First second piece of foamed cement combined wall board is disposed vertically on foamed cement composite bottom board relative position, and adjusts second Second piece of foamed cement combined wall board and foamed cement composite base are completed by step B in the relative position of block wallboard and first block of wallboard The connection of plate;
First block of wallboard and second block of wallboard are attached again:The wedge block for being placed with nut is put into foamed cement combined wall board In the dovetail trough rim costal fovea slot being equipped with;Bolt is passed through into connector respectively again, and is connect with the nut being placed in wedge block It is fixed, it is fastened using wedge block and dovetail groove type steel frame side rib, to keep foamed cement combined wall board and foamed cement compound Wallboard connection:Successively remaining foamed cement combined wall board is connected to a fixed with foamed cement combined wall board by this method;
D, foamed cement combined wall board is connect with foamed cement compound roof:
Foamed cement compound roof is placed on foamed cement combined wall board, is respectively put into the wedge block for being placed with nut In the dovetail trough rim costal fovea slot that foamed cement compound roof and foamed cement combined wall board are equipped with;Bolt is passed through respectively again and is connected Fitting, and be connected and fixed with the nut being placed in wedge block, it is fastened using wedge block and dovetail groove type steel frame side rib, thus It connect foamed cement combined wall board with foamed cement compound roof:Successively remaining wallboard is connected admittedly with top plate by this method It is fixed;Whole assembly construction is completed;
E, according to design requirement, waterproof process is carried out;
F, according to design requirement, upholstery is carried out;
G, sanitary bath equipment is installed;And bathroom door is installed;
E, F, G step, is completed at the construction field (site);The E, F-step, can also be in foamed cement composite bottom board, foaming It is completed before cementitious composite wallboard, the assembly of foamed cement compound roof;
Wherein, the wedge block is slidable, the Fast Installation in order to capturing position in dovetail trough rim costal fovea slot; And be equipped in the wedge block threaded hole that cooperates with bolt and can placing nut fluting;
The connector is square connector;And the via hole matched with bolt is equipped on connector.
14. a kind of method of construction of assembled integral vacuum toilet, method and step include:
A, according to design requirement, foamed cement composite bottom board, foamed cement combined wall board, foamed cement compound roof are made;
B, foamed cement composite bottom board is connect with foamed cement combined wall board:
Firstly, foamed cement composite bottom board is placed on horizontal basal plane, hang down by design requirement, then by foamed cement combined wall board Directly it is placed on foamed cement composite bottom board relative position;The wedge block for being placed with nut is put into foamed cement combined wall board institute In the dovetail trough rim costal fovea slot being equipped with;Again from hole, bolt is passed through into the nut being arranged in hole and wedge block and is connected and fixed;It presses Remaining foamed cement combined wall board is successively connected to a fixed by this method with foamed cement composite bottom board;
C, foamed cement combined wall board is connect with second piece of foamed cement combined wall board:
First second piece of foamed cement combined wall board is disposed vertically on foamed cement composite bottom board relative position, adjusts second piece Second piece of foamed cement combined wall board and foamed cement composite bottom board are completed by step B in the relative position of wallboard and first block of wallboard Connection;
First piece of foamed cement combined wall board and second piece of foamed cement combined wall board are attached again:The wedge of nut will be placed with Shape block is put into the dovetail trough rim costal fovea slot that foamed cement combined wall board is equipped with;Bolt is passed through in hole and wedge block respectively again The nut of setting is connected and fixed;Successively remaining foamed cement combined wall board is connected with foamed cement combined wall board by this method It is fixed;
D, foamed cement combined wall board is connect with foamed cement compound roof:
Foamed cement compound roof is placed on foamed cement combined wall board, the wedge block for being placed with nut is put into foaming In the dovetail trough rim costal fovea slot that cementitious composite wallboard is equipped with;Again from hole, bolt is arranged in hole and wedge block Nut is connected and fixed;Successively remaining wallboard is connected to a fixed with top plate by this method;Whole assembly construction is completed;
E, according to design requirement, waterproof process is carried out;
F, according to design requirement, upholstery is carried out;
G, sanitary bath equipment and installation bathroom door are installed;
Wherein, E, F, G step, is completed at the construction field (site);The E, F-step, can also foamed cement composite bottom board, It is completed before foamed cement combined wall board, the assembly of foamed cement compound roof.
15. a kind of method of construction of assembled integral vacuum toilet, method and step include:
A, according to design requirement, foamed cement composite bottom board, foamed cement combined wall board, foamed cement compound roof are made;
B, foamed cement composite bottom board is connect with foamed cement combined wall board:
Firstly, foamed cement composite bottom board is placed on horizontal basal plane, hang down by design requirement, then by foamed cement combined wall board Directly it is placed on foamed cement composite bottom board relative position;The wedge block for being placed with nut is put into foamed cement combined wall board institute In the dovetail trough rim costal fovea slot being equipped with;Bolt is passed through the nut being arranged in hole, rectangular tube and wedge block to be connected and fixed;By this method Successively remaining foamed cement combined wall board is connected to a fixed with foamed cement composite bottom board;
C, foamed cement combined wall board is connect with second piece of foamed cement combined wall board:
First second piece of foamed cement combined wall board is disposed vertically on foamed cement composite bottom board relative position, adjusts second piece Second piece of foamed cement combined wall board and foamed cement composite bottom board are completed by step B in the relative position of wallboard and first block of wallboard Connection;
First piece of foamed cement combined wall board and second piece of foamed cement combined wall board are attached again:The wedge of nut will be placed with Shape block is put into the dovetail trough rim costal fovea slot that foamed cement combined wall board is equipped with;Bolt is passed through into hole, bolt sleeve respectively again It is connected and fixed with the nut being arranged in wedge block;It is successively that remaining foamed cement combined wall board and foamed cement is compound by this method Wallboard is connected to a fixed;
D, foamed cement combined wall board is connect with foamed cement compound roof:
Foamed cement compound roof is placed on foamed cement combined wall board, the wedge block for being placed with nut is put into foaming In the dovetail trough rim costal fovea slot that cementitious composite wallboard is equipped with;Again from hole, bolt is passed through into hole, bolt sleeve and wedge block The nut of interior setting is connected and fixed;Successively remaining wallboard is connected to a fixed with top plate by this method;Whole assembly construction is completed;
E, according to design requirement, waterproof process is carried out;
F, according to design requirement, upholstery is carried out;
G, sanitary bath equipment is installed;Bathroom door is installed;
Wherein, E, F, G step, is completed at the construction field (site);The E, F-step, can also foamed cement composite bottom board, It is completed before foamed cement combined wall board, the assembly of foamed cement compound roof.
16. the method for construction of assembled integral vacuum toilet according to claim 14 or 15, it is characterised in that:In foaming water It is equipped with waterproof bead dovetail groove type steel frame side rib in mud composite bottom board, is rolled up vertically upward using bottom plate, in the foaming When cementitious composite bottom plate is connect with foamed cement combined wall board, waterproof action can be played, water in toilet is avoided and penetrates into wall In the seam of plate and bottom plate.
17. the method for construction of assembled integral vacuum toilet according to claim 14 or 15, it is characterised in that:Foamed cement It is equipped with waterproof bead in composite bottom board to rise as high as the banks formula steel frame side rib, with multiple in the foamed cement composite bottom board and foamed cement When closing wallboard connection, waterproof action can be played.
CN201510895502.XA 2015-12-08 2015-12-08 A kind of assembled integral vacuum toilet and its method of construction Active CN105421826B (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201510895502.XA CN105421826B (en) 2015-12-08 2015-12-08 A kind of assembled integral vacuum toilet and its method of construction
CN201680070072.0A CN110494618A (en) 2015-12-08 2016-09-28 A kind of assembled integral vacuum toilet and its method of construction
SG11201804065RA SG11201804065RA (en) 2015-12-08 2016-09-28 Prefabricated integrated bathroom and construction method thereof
PCT/CN2016/100634 WO2017097018A1 (en) 2015-12-08 2016-09-28 Assembly-type integrated bathroom and construction method therefor
JP2018528643A JP6606286B2 (en) 2015-12-08 2016-09-28 Unit bus and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510895502.XA CN105421826B (en) 2015-12-08 2015-12-08 A kind of assembled integral vacuum toilet and its method of construction

Publications (2)

Publication Number Publication Date
CN105421826A CN105421826A (en) 2016-03-23
CN105421826B true CN105421826B (en) 2018-11-27

Family

ID=55500331

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201510895502.XA Active CN105421826B (en) 2015-12-08 2015-12-08 A kind of assembled integral vacuum toilet and its method of construction
CN201680070072.0A Pending CN110494618A (en) 2015-12-08 2016-09-28 A kind of assembled integral vacuum toilet and its method of construction

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201680070072.0A Pending CN110494618A (en) 2015-12-08 2016-09-28 A kind of assembled integral vacuum toilet and its method of construction

Country Status (4)

Country Link
JP (1) JP6606286B2 (en)
CN (2) CN105421826B (en)
SG (1) SG11201804065RA (en)
WO (1) WO2017097018A1 (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421826B (en) * 2015-12-08 2018-11-27 太空智造股份有限公司 A kind of assembled integral vacuum toilet and its method of construction
CN106401212A (en) * 2016-11-08 2017-02-15 张爱民 Integrated bathroom device
CN107060378A (en) * 2017-01-06 2017-08-18 合肥国瑞集成建筑科技有限公司 A kind of lightweight steel construction assembled bio-toilet and its manufacture method
CN107288374A (en) * 2017-06-26 2017-10-24 上海毅匹玺建筑科技有限公司 Assembled toilet overall architecture
CN107269041B (en) * 2017-08-09 2023-11-28 广州市海帕智能家居有限公司 Modular assembled sanitary unit
CN107448013A (en) * 2017-08-09 2017-12-08 广州市海帕智能家居有限公司 The wall top attachment structure node of modular assembly formula sanitary unit
CN108222554B (en) * 2017-12-30 2024-02-20 浙江亚厦装饰股份有限公司 Toilet frame and toilet frame assembly method
CN108708483B (en) * 2018-06-20 2023-12-12 佛山东鹏洁具股份有限公司 External corner connection structure of wallboard of integral bathroom and integral bathroom thereof
CN108798084B (en) * 2018-09-03 2023-11-24 湖南建工集团有限公司 Coaxial socket joint formula bathroom structural system
FR3085642B1 (en) 2018-09-11 2022-06-24 Renault Sas ACOUSTIC PROTECTION DEVICE FOR MOTOR VEHICLE ENGINE
CN109881927A (en) * 2019-04-15 2019-06-14 长沙远大住宅工业集团股份有限公司 A kind of entirety kitchen and bath's structure and its manufacturing method
CN110522331B (en) * 2019-07-19 2021-11-16 北京工业大学 Assembled bathroom chassis
CN110815511A (en) * 2019-11-14 2020-02-21 安徽海龙建筑工业有限公司 Integral toilet box mold and manufacturing and mounting method thereof
CN112761384B (en) * 2020-12-25 2022-05-17 蓝城乐居建设管理集团有限公司 Assembled laboratory for detecting heat insulation performance of building door and window
CN114800901A (en) * 2022-05-07 2022-07-29 中建八局第二建设有限公司 Assembled toilet positioning and hole-opening device and construction method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015109591A1 (en) * 2014-01-27 2015-07-30 欧建宗 A hollow groove pipe structure

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6023503U (en) * 1983-07-26 1985-02-18 株式会社 九建 prefabricated house
AT406064B (en) * 1993-06-02 2000-02-25 Evg Entwicklung Verwert Ges COMPONENT
JPH07317339A (en) * 1993-12-17 1995-12-05 Inax Corp Module for plumbing equipment
CN1141472C (en) * 2000-01-24 2004-03-10 樊志 Assembly-type light partition
DE20012641U1 (en) * 2000-07-21 2000-09-21 Ibt Ingenieurbuero Fuer Befest Device for corner fixing a reveal panel
CN1181955C (en) * 2002-12-31 2004-12-29 北京太空板业股份有限公司 Foamed cement composite slab and its production method
JP2006183440A (en) * 2004-12-28 2006-07-13 Toto Ltd Wall panel connecting structure and unit room
CN1873167A (en) * 2006-06-15 2006-12-06 山东嘉源玻璃钢有限公司 Integral toilet
JP2008069584A (en) * 2006-09-15 2008-03-27 Mitsubishi Plastics Ind Ltd Fitting structure of cover plate for partition wall corner part
CN201021548Y (en) * 2007-03-08 2008-02-13 陈地清 A combined whole toilet
CN101265723B (en) * 2008-05-07 2012-08-15 北京太空板业股份有限公司 Architecture structure system assembled by composite building board and building method
CN202326557U (en) * 2011-11-15 2012-07-11 朱祯祥 Connecting piece for detachable panel furniture
CN102561513A (en) * 2012-02-02 2012-07-11 赵冰洋 Unit cabin type building system
CN202831362U (en) * 2012-09-01 2013-03-27 海伦市广厦陶粒砖厂 Foam cement compound wallboard
CN104947848A (en) * 2015-06-18 2015-09-30 北京大工简筑科技有限公司 Assembly type house light steel composite wallboard and mounting method thereof
CN205348844U (en) * 2015-12-08 2016-06-29 北京太空板业股份有限公司 Whole bathroom of assembled
CN105421826B (en) * 2015-12-08 2018-11-27 太空智造股份有限公司 A kind of assembled integral vacuum toilet and its method of construction

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015109591A1 (en) * 2014-01-27 2015-07-30 欧建宗 A hollow groove pipe structure

Also Published As

Publication number Publication date
CN110494618A (en) 2019-11-22
SG11201804065RA (en) 2018-06-28
JP2019504945A (en) 2019-02-21
WO2017097018A1 (en) 2017-06-15
CN105421826A (en) 2016-03-23
JP6606286B2 (en) 2019-11-13

Similar Documents

Publication Publication Date Title
CN105421826B (en) A kind of assembled integral vacuum toilet and its method of construction
CN103233596B (en) prefabricated toilet
CN207228684U (en) Integrated precast toilet
CN202595943U (en) Toilet steel frame lightweight partition wall
CN205134993U (en) Prefabricated whole bathroom
CN110159006A (en) A kind of structure, pipeline, heat preservation, decoration integrated assembled toilet
CN106522359A (en) Total-prefabricated rural residential class composite wall structure system and construction method thereof
CN207499513U (en) Integral bathroom structure
CN209260911U (en) Foldable modular building
CN208039610U (en) Assembled integrated heat-insulation wall plate
CN206681418U (en) The industrialization commercial residential buildings of energy-conserving and environment-protective
CN205348844U (en) Whole bathroom of assembled
CN109797988A (en) A kind of co-layer draining hard-cover precast block toilet of outer wall provided pipe line groove hole
CN212323652U (en) Horizontal pipeline separation structure of wall body
CN202596197U (en) Upstair water-tight toilet with steel and wood structure
CN102635254B (en) Watertight toilet on floor with steel-wood structure
CN103982042B (en) The assembling process of the assembled engineering of a kind of quick house ornamentation
CN208415810U (en) A kind of caisson type accomodation ground assembling mounting structure
CN104947935B (en) Construction method of combined kitchen and bathroom
CN106013566A (en) Assembled type bathroom floor slab and construction method
CN206091001U (en) Assembled bathroom floor
CN109779322A (en) A kind of co-layer draining hard-cover integral vacuum toilet of inner wall provided pipe line groove hole
CN109779319A (en) A kind of co-layer draining blank precast block toilet of outer wall provided pipe line groove hole
CN216041960U (en) Light combined integral prefabricated internal partition wall
CN203175075U (en) Prefabricated toilet

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 100070 12, 3 building, 1 nuclear Road, Science City, Fengtai District, Beijing.

Applicant after: Taikong Intelligent Construction Co.,Ltd.

Applicant after: HENGYUAN BUILDING PLATE INDUSTRY CO., LTD.

Applicant after: CHANGZHOU LYUJIAN PLATE INDUSTRY CO., LTD.

Address before: 100070 12, 3 building, 1 nuclear Road, Science City, Fengtai District, Beijing.

Applicant before: Beijing Taikong Panel Industry Corp.

Applicant before: HENGYUAN BUILDING PLATE INDUSTRY CO., LTD.

Applicant before: CHANGZHOU LYUJIAN PLATE INDUSTRY CO., LTD.

GR01 Patent grant
GR01 Patent grant