A kind of assembled integral vacuum toilet and its method of construction
Technical field
The invention belongs to building field, a kind of assembled integral vacuum toilet and its method of construction are referred in particular to.
Background technique
Currently, traditional integral vacuum toilet form has in the field of construction:Glass fiber reinforced plastics composite material compression molding and reinforcing bar
Concrete prefabricated integral vacuum toilet.The integral vacuum toilet being pressed and molded by glass fiber reinforced plastics composite material, main shortcoming are
Fire protecting performance is low, soundproof effect is poor, and user can not be modified internal sanitary ware with facility;And by prefabricated concrete
Integral vacuum toilet, main shortcoming are to be self-possessed too greatly, and single integral vacuum toilet self weight can not use tower crane up to 8-12 tons
It is lifted.
Summary of the invention
It is provided a kind of prefabricated, simple by foamed cement composite board it is an object of the invention to overcome the shortage of prior art
Single assembled integral vacuum toilet and its method of construction quick, that industrialized production can be achieved.Integral vacuum toilet of the present invention has matter
Gently, load bearing heat preserving, heat-insulated, durable, antidetonation and excellent fire protecting performance and sound insulation property, it is a kind of energy-saving and environment-friendly green
Color building products.
The technical scheme is that:
A kind of assembled integral vacuum toilet, it includes:Foamed cement composite bottom board, foamed cement combined wall board, foaming water
Mud compound roof and sanitary bath equipment, it is characterised in that:The foamed cement composite bottom board, foamed cement combined wall board,
Dovetail groove type steel frame side rib is respectively equipped in foamed cement compound roof;The dovetail groove type steel frame side rib, by upper
Lower flange and dovetail trough rim costal fovea slot are constituted;And insert portion wedge block is equipped in the dovetail trough rim costal fovea slot;
Connection between the foamed cement combined wall board and the foamed cement composite bottom board, be by bolt,
The wedge block being equipped in connector and plate dovetail trough rim costal fovea slot is connected and fixed;
Connection between the foamed cement combined wall board and the foamed cement combined wall board, be by bolt,
The wedge block being equipped in connector and plate dovetail trough rim costal fovea slot is connected and fixed;
Connection between the foamed cement combined wall board and the foamed cement compound roof, be by bolt,
The wedge block being equipped in connector and plate dovetail trough rim costal fovea slot is connected and fixed.
Wherein, the foamed cement composite bottom board, by steel frame, steel bar girder, steel wire, inorganic foamed cementitious core
Material, the compound composition of upper and lower cement screedn;Wherein, steel wire is connected and fixed with steel frame;According to design requirement, steel wire can
It is whole to be laid with or be partially laid with.Sewer pipe fitting can be equipped in foamed cement composite bottom board, including:Drainpipe, floor drain etc..
Foamed cement combined wall board, by steel frame, upper and lower steel wire, several steel rings socketed with upper and lower steel wire, nothing
Machine foamed cement core material, the compound composition of upper and lower cement screedn;Wherein, steel wire is connected and fixed with steel frame;According to design
Demand, steel wire can be integrally laid with or part is laid with.Upper hose, upper water swivel, horse can be equipped in foamed cement combined wall board
Bucket draining via hole, switch magazine, conduit;Combined wall board can leave a door unlocked in advance, window.
Another structure of foamed cement combined wall board is, by steel frame, steel wire, steel bar girder, inorganic foamed cement
Core material, the compound composition of upper and lower cement screedn;Wherein, steel wire is connected and fixed with steel frame;According to design requirement, steel wire
It can integrally be laid with or part is laid with.In foamed cement combined wall board can be equipped with upper hose, upper water swivel, closestool draining via hole,
Switch magazine, conduit;Combined wall board can leave a door unlocked in advance, window.
Foamed cement compound roof, by steel frame, steel wire, steel bar girder, inorganic foamed cement core material, upper and lower cement bonded sand
The compound composition of pulp noodle layer;Wherein, steel wire is connected and fixed with steel frame;According to design requirement, steel wire can be integrally laid with or portion
Divide and is laid with.Socket magazine, pipeline can be equipped in foamed cement compound roof;And ventilation, access hole can be reserved.
Be equipped with wedge block is slidable in the dovetail trough rim costal fovea slot, is quickly pacified in order to capturing position
Dress.
The shape of the wedge block is matched with groove shapes.
The wedge block can be placed in advance in the groove of dovetail trough rim rib, can also be placed on dovetail trough rim during installation
In the groove of rib.
The hole cooperated with bolt is equipped in the wedge block;And be equipped with can placing nut fluting.
Another structure of the wedge block is that the threaded hole cooperated with bolt is equipped in the wedge block.
The connector is square connector;And the via hole matched with bolt is equipped on connector.
In the interior and exterior of the assembled integral vacuum toilet, various decorating and renovating materials can be used and fitted up, with full
The toilet decorations requirement of sufficient different-style.
In the assembled integral vacuum toilet, the waterproof material that various coating classes or coiled material class can be used carries out health
Between water-proofing treatment, to meet different toilet warterproof requirements.
A kind of method of construction of assembled integral vacuum toilet, method and step include:
According to client's actual demand, used foamed cement composite bottom board, foamed cement combined wall board, foamed cement are multiple
Close top plate and carry out industrialized customized production in factory, and according to design requirement by upper and lower conduit part, electrical equipment and
Door, window etc. are prefabricated in foamed cement composite board;It is as playing with building blocks, foamed cement composite bottom board, foamed cement is multiple
Conjunction wallboard, foamed cement compound roof carry out accurate, quick-assembling, and use and be mechanically connected fixation;And bathroom is installed and is set
It is standby, and it is built into integrated bathroom;Integral vacuum toilet is transported to construction site again;It, will be whole using lifting lifting equipment
Toilet Installation is in place.
Wherein, the integral vacuum toilet can complete waterproof in factory according to demand and interior and exterior finishes is constructed.
Set bathroom device equipment, can also complete to install at the construction field (site) in the integral vacuum toilet.
A kind of method of construction of assembled integral vacuum toilet, method and step include:
A, according to design requirement, foamed cement composite bottom board, foamed cement combined wall board, the compound top of foamed cement are made
Plate;Wherein, it is set respectively in the foamed cement composite bottom board, foamed cement combined wall board, foamed cement compound roof
There is dovetail groove type steel frame side rib;The dovetail groove type steel frame side rib, is made of upper lower flange and dovetail trough rim costal fovea slot;
And insert portion wedge block is equipped in the dovetail trough rim costal fovea slot;
B, foamed cement composite bottom board is connect with foamed cement combined wall board:
Firstly, foamed cement composite bottom board is placed on horizontal basal plane, by design requirement, then by foamed cement composite wall
Plate is disposed vertically on foamed cement composite bottom board relative position;The wedge block for being placed with nut foamed cement is put into respectively to answer
It closes in the dovetail trough rim costal fovea slot that bottom plate and foamed cement combined wall board are equipped with;Again respectively by bolt across connector, and with
The nut being placed in wedge block is connected and fixed, and is fastened using wedge block and dovetail groove type steel frame side rib, to make the water that foams
Mud composite bottom board is connected and fixed with foamed cement combined wall board;By this method successively by remaining foamed cement combined wall board and foaming
Cementitious composite bottom plate is connected to a fixed;
C, foamed cement combined wall board is connect with foamed cement combined wall board:
First second piece of foamed cement combined wall board is disposed vertically on foamed cement composite bottom board relative position, and is adjusted
The relative position of second block of wallboard and first block of wallboard completes second piece of foamed cement combined wall board by step B and foamed cement is multiple
Close the connection of bottom plate;
First block of wallboard and second block of wallboard are attached again:It is compound that the wedge block for being placed with nut is put into foamed cement
In the dovetail trough rim costal fovea slot that wallboard is equipped with;Bolt is passed through into connector respectively again, and with the nut that is placed in wedge block
It is connected and fixed, is fastened using wedge block and dovetail groove type steel frame side rib, to make foamed cement combined wall board and foamed cement
Combined wall board connection:Successively remaining foamed cement combined wall board is connected to a fixed with foamed cement combined wall board by this method;
D, foamed cement combined wall board is connect with foamed cement compound roof:
Foamed cement compound roof is placed on foamed cement combined wall board, the wedge block of nut will be placed with respectively
It is put into the dovetail trough rim costal fovea slot that foamed cement compound roof and foamed cement combined wall board are equipped with;Bolt is worn respectively again
Connector is crossed, and is connected and fixed with the nut being placed in wedge block, is fastened using wedge block and dovetail groove type steel frame side rib,
To make foamed cement combined wall board connect with foamed cement compound roof:Successively remaining wallboard is connected with top plate by this method
Connect fixation;Whole assembly construction is completed;
E, according to design requirement, waterproof process is carried out;
F, according to design requirement, upholstery is carried out;
G, sanitary bath equipment is installed, including:Toilet seat, hand washing sink, bath apparatus;And bathroom door is installed.
Above-mentioned E, F, G step, can also complete at the construction field (site).
Wherein, the wedge block is slidably, quickly to pacify in order to capturing position in dovetail trough rim costal fovea slot
Dress.
Be equipped in the wedge block hole that cooperates with bolt and can placing nut fluting.
Another structure of the wedge block is that the threaded hole cooperated with bolt is equipped in the wedge block.
The advantage of the invention is that:The foamed cement composite plate of industrialized production, fire endurance are used in the present invention
>=4 hours;Sound insulation >=42 decibel, constituted raw material be inorganic material, be non-combustible, have energy conservation and environmental protection, load bearing heat preserving,
The comprehensive performances such as heat-insulated, fire resisting, durable, antidetonation, light, high-strength.Therefore assembled integral vacuum toilet of the present invention have load bearing heat preserving,
Heat-insulated, durable, antidetonation, light (integral vacuum toilet self weight is only 3-4 tons), excellent fire protecting performance and sound insulation property.The present invention
The installation of assembled integral vacuum toilet is easy to operate, fast, securely, greatly reduces the wet behaviour of construction site between conventional sanitation
Make, reduces environmental pollution and noise emissions caused by constructing between conventional sanitation.The present invention is that a kind of energy-saving and environment-friendly green is built
Build product.
Detailed description of the invention
Fig. 1 is assembled integral vacuum toilet structural schematic diagram of the present invention.
Fig. 2-1 is the structural schematic diagram of foamed cement composite bottom board in the embodiment of the present invention.
Fig. 2-2 is the structural schematic diagram of foamed cement combined wall board in the embodiment of the present invention.
Fig. 2-3 is the structural schematic diagram of foamed cement compound roof in the embodiment of the present invention.
Fig. 2-4 is dovetail groove type steel frame side rib section in assembled integral vacuum toilet foamed cement composite plate of the present invention
Figure.
Fig. 3-1, Fig. 3-2, Fig. 3-3 are wedge block structural schematic diagram in the embodiment of the present invention.
Fig. 4 is the connecting joint structure of foamed cement combined wall board and foamed cement composite bottom board in the embodiment of the present invention 1
Schematic diagram.
Fig. 5 is the connecting joint structure of foamed cement combined wall board and foamed cement combined wall board in the embodiment of the present invention 1
Schematic diagram.
Fig. 6 is the connecting joint structure of foamed cement combined wall board and foamed cement compound roof in the embodiment of the present invention 1
Schematic diagram.
Fig. 7-1, Fig. 7-2 are wedge block structural schematic diagram in the embodiment of the present invention 2.
Fig. 8 is the connecting joint structure of foamed cement combined wall board and foamed cement composite bottom board in the embodiment of the present invention 2
Schematic diagram.
Fig. 9 is formula side rib sectional view of rising as high as the banks in the embodiment of the present invention 3.
Figure 10-1 is the connecting node knot of foamed cement combined wall board and foamed cement composite bottom board in the embodiment of the present invention 3
Structure front schematic view.
Figure 10-2 is the connecting node knot of foamed cement combined wall board and foamed cement composite bottom board in the embodiment of the present invention 3
Structure side schematic view.
Figure 11 is the connecting joint structure of foamed cement combined wall board and foamed cement combined wall board in the embodiment of the present invention 3
Schematic diagram.
Figure 12-1, Figure 12-2 are the company of foamed cement combined wall board and foamed cement compound roof in the embodiment of the present invention 3
Connect node structure schematic diagram.
Figure 13 is the connecting joint structure of foamed cement combined wall board and foamed cement combined wall board in the embodiment of the present invention 4
Schematic diagram.
Figure 14 is the connecting joint structure of foamed cement combined wall board and foamed cement compound roof in the embodiment of the present invention 4
Schematic diagram.
Figure 15-1, Figure 15-2, Figure 15-3 are foamed cement combined wall board and foamed cement composite base in the embodiment of the present invention 4
The connecting joint structure schematic diagram of plate.
Figure 16 is foamed cement combined wall board and foamed cement composite bottom board (waterproof bead dovetail in the embodiment of the present invention 5
Slot type steel frame side rib) connecting joint structure schematic diagram.
Figure 17 is that foamed cement combined wall board with foamed cement composite bottom board (rise as high as the banks by waterproof bead in the embodiment of the present invention 5
Formula steel frame side rib) connecting joint structure schematic diagram.
Drawing reference numeral explanation:
Foamed cement composite bottom board 1,1 ';Foamed cement combined wall board 2,2 ';
Foamed cement compound roof 3,3 ';Steel frame 101;Steel bar girder 102;Inorganic foamed cement core material 103;On be lauched
Cement mortar surface layer 104;Steel wire 105;Connector 106;
Bathroom door 4;Bath apparatus 51;Toilet seat 52;Hand washing sink 53;
Dovetail groove type steel frame side rib 6;Groove 61;Rectangular tube 62;
Wedge block 7;Hole 70;Fluting 71;
Threaded hole 72;Nut 73;Bolt 74;Bolt sleeve 75;Cover board 76;
Square connector 8;Via hole 81;
Formula of rising as high as the banks steel frame side rib 9;Rise as high as the banks 91;Hole 92;Cavity 93;Perforation 94;
Waterproof bead dovetail groove type steel frame side rib 10;Waterproof bead is risen as high as the banks formula steel frame side rib 11.
Specific embodiment
With reference to the accompanying drawings of the specification and embodiment, the invention will be further described.
Embodiment 1:
As shown in Figures 1 to 6, assembled integral vacuum toilet of the present invention mainly includes:Foamed cement composite bottom board 1, foaming
Cementitious composite wallboard 2, foamed cement compound roof 3 and sanitary bath equipment:Bath apparatus 51, toilet seat 52, hand washing sink 53.
Distinguish in the foamed cement composite bottom board 1, foamed cement combined wall board 2, foamed cement compound roof 3
Equipped with dovetail groove type steel frame side rib 6;The dovetail groove type steel frame side rib 6, by upper lower flange and dovetail trough rim costal fovea slot
61 are constituted;And insert portion wedge block 7 is equipped in the dovetail trough rim costal fovea slot 61;And it is set in the wedge block 7
Have with bolt 74 cooperate hole 70 and can placing nut 73 fluting 71.
Connection between the foamed cement composite bottom board 1 and the foamed cement combined wall board 2, is to pass through bolt
74 pass through square connector 8 is connected and fixed with the nut 73 placed in wedge block 7;
Connection between the foamed cement combined wall board 2 and the foamed cement combined wall board 2 ', is to pass through spiral shell
Bolt 74 passes through square connector 8 and is connected and fixed with the nut 73 placed in wedge block 7;
Connection between the foamed cement combined wall board 2 and the foamed cement compound roof 3, is to pass through bolt
74 pass through square connector 8 is connected and fixed with the nut 73 placed in wedge block 7.
Wherein, the via hole 81 matched with bolt is equipped on the square connector 8.
As shown in Fig. 2-1, Fig. 2-2, Fig. 2-3, Fig. 2-4 to Figure 17, in embodiments of the present invention, the foamed cement is multiple
Bottom plate 1 or foamed cement composite bottom board 1 ' are closed, by steel frame 101, steel bar girder 102, steel wire 105, inorganic foamed cement
Core material 103, the compound composition of upper and lower cement screedn 104;Wherein, steel wire 105 is connected and fixed with steel frame 101;According to setting
Meter demand, steel wire 105 can be integrally laid with or part is laid with.Sewer pipe fitting, packet can be equipped in foamed cement composite bottom board 1
It includes:Drainpipe, floor drain etc..
The foamed cement combined wall board 2 or foamed cement combined wall board 2 ', by steel frame 101, steel bar girder
102, inorganic foamed cement core material 103, upper and lower steel wire 105, several connectors 106 socketed with upper and lower steel wire 105, on
The compound composition of lower cement screedn 104;Wherein, steel wire 105 is connected and fixed with steel frame 101;According to design requirement, steel wire
Net 105 can be integrally laid with or part is laid with.Upper hose, upper water swivel, closestool draining can be equipped in foamed cement combined wall board 2
Via hole, switch magazine, conduit;Combined wall board can leave a door unlocked in advance, window.
The foamed cement compound roof 3 or foamed cement compound roof 3 ', by steel frame 101, steel wire 105,
Steel bar girder 102, inorganic foamed cement core material 103, the compound composition of upper and lower cement screedn 104;Wherein, steel wire 105 with
Steel frame 101 is connected and fixed;According to design requirement, steel wire 105 can be integrally laid with or part is laid with.On the compound top of foamed cement
Socket magazine, pipeline can be equipped in plate 3;And ventilation, access hole can be reserved.
Be equipped with wedge block 7 is slidable in the dovetail trough rim costal fovea slot 61, fast in order to capturing position
Speed installation.
The shape of the wedge block 7 is matched with 61 shape of groove.
The wedge block 7 can be placed in advance in the groove 61 of dovetail trough rim rib 6, can also be placed on dovetail during installation
In the groove 61 of trough rim rib 6.
The method of construction of 1 assembled integral vacuum toilet of the embodiment of the present invention, method and step include:
A, according to design requirement, foamed cement composite bottom board 1, foamed cement combined wall board 2, the compound top of foamed cement are made
Plate 3;Wherein, divide equally in the foamed cement composite bottom board 1, foamed cement combined wall board 2, foamed cement compound roof 3
It She You not dovetail groove type steel frame side rib 6;The dovetail groove type steel frame side rib 6, by upper lower flange and dovetail trough rim costal fovea
Slot 61 is constituted;And insert portion wedge block 7 is equipped in the dovetail trough rim costal fovea slot 61;It is equipped in wedge block 7 and spiral shell
Bolt 74 cooperate hole 70 and can placing nut 73 fluting 71.
B, foamed cement composite bottom board 1 is connect with foamed cement combined wall board 2:
Firstly, foamed cement composite bottom board 1 is placed on horizontal basal plane, it is compound by design requirement, then by foamed cement
Wallboard 2 is disposed vertically on 1 relative position of foamed cement composite bottom board;The wedge block 7 for being placed with nut 73 is put into hair respectively
In the dovetail trough rim costal fovea slot 61 that soaked mud composite bottom board 1 and foamed cement combined wall board 2 are equipped with;Bolt 74 is worn respectively again
Square connector 8 is crossed, and is connected and fixed with the nut 73 being placed in wedge block 7, wedge block 7 and dovetail groove type steel side are utilized
Frame side rib 6 fastens, so that foamed cement composite bottom board 1 be made to connect with foamed cement combined wall board 2:
C, foamed cement combined wall board 2 is connect with foamed cement combined wall board 2:
First second piece of foamed cement combined wall board 2 is disposed vertically on 1 relative position of foamed cement composite bottom board, is adjusted
The relative position of second block of wallboard and first block of wallboard completes second piece of foamed cement combined wall board 2 by step B and foamed cement is multiple
Close the connection of bottom plate 1;
First piece of foamed cement combined wall board 2 and second piece of foamed cement combined wall board 2 are attached again:Spiral shell will be placed with
The wedge block 7 of mother 73 is put into the dovetail trough rim costal fovea slot 61 that foamed cement combined wall board 2 is equipped with;Bolt 74 is worn respectively again
Square connector 8 is crossed, and is connected and fixed with the nut 73 being placed in wedge block 7, wedge block 7 and dovetail groove type steel side are utilized
Frame side rib 6 fastens, so that foamed cement combined wall board 2 be made to connect with foamed cement combined wall board 2:By this method successively by remaining
Foamed cement combined wall board is connected to a fixed with foamed cement combined wall board;
D, foamed cement combined wall board 2 is connect with foamed cement compound roof 3:
Foamed cement compound roof 3 is placed on foamed cement combined wall board 2, the wedge of nut 73 will be placed with respectively
Shape block 7 is put into the dovetail trough rim costal fovea slot 61 that foamed cement compound roof 3 and foamed cement combined wall board 2 are equipped with;Divide again
Bolt 74 is not passed through into square connector 8, and is connected and fixed with the nut 73 being placed in wedge block 7, using wedge block 7 with
Dovetail groove type steel frame side rib 6 fastens, so that foamed cement combined wall board 2 be made to connect with foamed cement compound roof 3:By this method
Successively remaining wallboard is connected to a fixed with top plate;Whole assembly construction is completed;
E, according to design requirement, waterproof process is carried out;
F, according to design requirement, upholstery is carried out;
G, sanitary bath equipment is installed, including:Bath apparatus 51;Toilet seat 52;Hand washing sink 53;Bathroom door 4 is installed.
Above-mentioned E, F, G step, can also complete at the construction field (site).
Embodiment 2:
As shown in Figure 1, Figure 2-1 to Fig. 2-4, Fig. 7-1, Fig. 7-2, shown in Fig. 8, assembled integral vacuum toilet of the present invention is main to wrap
It includes:Foamed cement composite bottom board 1, foamed cement combined wall board 2, foamed cement compound roof 3 and sanitary bath equipment:Bath apparatus
51, toilet seat 52, hand washing sink 53.
Distinguish in the foamed cement composite bottom board 1, foamed cement combined wall board 2, foamed cement compound roof 3
Equipped with dovetail groove type steel frame side rib 6;The dovetail groove type steel frame side rib 6, by upper lower flange and dovetail trough rim costal fovea slot
61 are constituted;And insert portion wedge block 7 is equipped in the dovetail trough rim costal fovea slot 61;And it is equipped in wedge block 7 and spiral shell
The threaded hole 72 that bolt 74 cooperates.
Connection between the foamed cement composite bottom board 1 and the foamed cement combined wall board 2, is to pass through bolt
74, which pass through the wedge block 7 being equipped in square connector 8 and plate dovetail trough rim costal fovea slot 61, is connected and fixed.
Connection between the foamed cement combined wall board 2 and the foamed cement combined wall board 2 ', is to pass through spiral shell
Bolt 74 passes through the wedge block 7 being equipped in square connector 8 and plate dovetail trough rim costal fovea slot 61 and is connected and fixed.
Connection between the foamed cement combined wall board 2 and the foamed cement compound roof 3, is to pass through bolt
74, which pass through the wedge block 7 being equipped in square connector 8 and plate dovetail trough rim costal fovea slot 61, is connected and fixed.
The method of construction of 2 assembled integral vacuum toilet of the embodiment of the present invention, method and step include:
A, according to design requirement, foamed cement composite bottom board 1, foamed cement combined wall board 2, the compound top of foamed cement are made
Plate 3;Wherein, divide equally in the foamed cement composite bottom board 1, foamed cement combined wall board 2, foamed cement compound roof 3
It She You not dovetail groove type steel frame side rib 6;The dovetail groove type steel frame side rib 6, by upper lower flange and dovetail trough rim costal fovea
Slot 61 is constituted;And insert portion wedge block 7 is equipped in the dovetail trough rim costal fovea slot 61;It is equipped on wedge block 7 and spiral shell
The threaded hole 72 that bolt 74 cooperates;
B, foamed cement composite bottom board 1 is connect with foamed cement combined wall board 2:
Firstly, foamed cement composite bottom board 1 is placed on horizontal basal plane, it is compound by design requirement, then by foamed cement
Wallboard 2 is disposed vertically on 1 relative position of foamed cement composite bottom board;The wedge block 7 for being placed with nut 73 is put into hair respectively
In the dovetail trough rim costal fovea slot 61 that soaked mud composite bottom board 1 and foamed cement combined wall board 2 are equipped with;Bolt 74 is worn respectively again
Square connector 8 is crossed, and is connected and fixed with the threaded hole 72 in wedge block 7, wedge block 7 and dovetail groove type steel frame side are utilized
Rib 6 fastens, so that foamed cement composite bottom board 1 be made to be connected and fixed with foamed cement combined wall board 2;By this method successively by remaining
Foamed cement combined wall board is connected to a fixed with foamed cement composite bottom board;
C, foamed cement combined wall board 2 is connect with foamed cement combined wall board 2:
First second piece of foamed cement combined wall board 2 is disposed vertically on 1 relative position of foamed cement composite bottom board, by B
Step completes the connection of second piece of foamed cement combined wall board 2 and foamed cement composite bottom board 1;
First piece of foamed cement combined wall board 2 and second piece of foamed cement combined wall board 2 are attached again:Spiral shell will be placed with
The wedge block 7 of mother 73 is put into the dovetail trough rim costal fovea slot 61 that foamed cement combined wall board 2 is equipped with;Bolt 74 is worn respectively again
Square connector 8 is crossed, and is connected and fixed with the threaded hole 72 in wedge block 7, wedge block 7 and dovetail groove type steel frame side are utilized
Rib 6 fastens, so that foamed cement combined wall board 2 be made to be connected and fixed with foamed cement combined wall board 2;By this method successively by remaining
Foamed cement combined wall board is connected to a fixed with foamed cement combined wall board;
D, foamed cement combined wall board 2 is connect with foamed cement compound roof 3:
Foamed cement compound roof 3 is placed on foamed cement combined wall board 2, the wedge of nut 73 will be placed with respectively
Shape block 7 is put into the dovetail trough rim costal fovea slot 61 that foamed cement compound roof 3 and foamed cement combined wall board 2 are equipped with;Divide again
Bolt 74 is not passed through into square connector 8, and is connected and fixed with the threaded hole 72 in wedge block 7, wedge block 7 and dovetail are utilized
Slot type steel frame side rib 6 fastens, so that foamed cement combined wall board 2 be made to connect with foamed cement compound roof 3:Successively by this method
Remaining wallboard is connected to a fixed with top plate;Whole assembly construction is completed;
E, according to design requirement, waterproof process is carried out;
F, according to design requirement, upholstery is carried out;
G, sanitary bath equipment is installed, including:Bath apparatus 51;Toilet seat 52;Hand washing sink 53;Bathroom door 4 is installed;
Above-mentioned E, F, G step, can also complete at the construction field (site).
Embodiment 3:
As shown in Figure 1, Figure 2-1 to Fig. 2-4, Fig. 9, Figure 10-1, Figure 10-2, Figure 11, Figure 12-1, shown in Figure 12-2, present invention dress
With formula integral vacuum toilet, mainly include:Foamed cement composite bottom board 1 ', foamed cement combined wall board 2 or foamed cement composite wall
Plate 2 ', foamed cement compound roof 3 ' and sanitary bath equipment:Bath apparatus 51, toilet seat 52, hand washing sink 53.
The foamed cement composite bottom board 1 ' or the foamed cement compound roof 3 ', equipped with formula steel frame side of rising as high as the banks
Rib 9 91 is made of upper lower flange and rising as high as the banks;And hole 70 is equipped on the edge of a wing;Hole 92 is equipped at stile of rising as high as the banks;At hole 92
It is equipped in rising as high as the banks by steel plate or the closed cavity 93 of fashioned iron, in order to be put into bolt 74 by hole 92.
The foamed cement combined wall board 2 is equipped with dovetail groove type steel frame side rib 6;The dovetail groove type steel frame
Side rib 6 is made of upper lower flange and dovetail trough rim costal fovea slot 61;And insertion part is equipped in the dovetail trough rim costal fovea slot 61
Part wedge block 7;And be equipped in the wedge block 7 hole 70 that cooperates with bolt 74 and can placing nut 73 fluting 71.
Foamed cement combined wall board 2 ' is equipped with dovetail groove type steel frame side rib 6;The dovetail groove type steel frame side rib 6,
It is made of upper lower flange and dovetail trough rim costal fovea slot 61;Hole 70 is equipped on the upper lower flange;And on dovetail groove type steel side
A rectangular tube 62 is equipped in frame side rib 6.
Connection between the foamed cement composite bottom board 1 ' and the foamed cement combined wall board 2, is to pass through spiral shell
Bolt 74 passes through hole 70 and is connected and fixed with the nut 73 being arranged in wedge block 7.
Connection between the foamed cement combined wall board 2 and the foamed cement combined wall board 2 ', is to pass through spiral shell
Bolt 74 passes through hole 70 and is connected and fixed with the nut 73 being arranged in wedge block 7.
Connection between the foamed cement combined wall board 2 and the foamed cement compound roof 3 ', is to pass through spiral shell
Bolt 74 passes through hole 70 and is connected and fixed with the nut 73 being arranged in wedge block 7.
The method of construction of 3 assembled integral vacuum toilet of the embodiment of the present invention, method and step include:
A, according to design requirement, it is compound that foamed cement composite bottom board 1 ', foamed cement combined wall board 2 and foamed cement are made
Wallboard 2 ', foamed cement compound roof 3 ';
B, foamed cement composite bottom board 1 ' is connect with foamed cement combined wall board 2:
Firstly, foamed cement composite bottom board 1 ' is placed on horizontal basal plane, it is compound by design requirement, then by foamed cement
Wallboard 2 is disposed vertically on 1 ' relative position of foamed cement composite bottom board;The wedge block 7 for being placed with nut 73 is put into foaming water
In the dovetail trough rim costal fovea slot 61 that mud combined wall board 2 is equipped with;Again from hole 92, bolt 74 is passed through into hole 70 and wedge block 7
The nut 73 of interior setting is connected and fixed;By this method successively by remaining foamed cement combined wall board and foamed cement composite bottom board phase
It is connected and fixed;
C, foamed cement combined wall board 2 is connect with foamed cement combined wall board 2 ':
First second piece of foamed cement combined wall board 2 ' is disposed vertically on 1 ' relative position of foamed cement composite bottom board, is adjusted
Second piece of foamed cement combined wall board 2 ' and foaming water are completed by step B in the relative position of whole second block of wallboard and first block of wallboard
The connection of mud composite bottom board 1 ';
First piece of foamed cement combined wall board 2 and second piece of foamed cement combined wall board 2 ' are attached again:It will be placed with
The wedge block 7 of nut 73 is put into the dovetail trough rim costal fovea slot 61 that foamed cement combined wall board 2 is equipped with;Again respectively by bolt 74
The nut 73 being arranged in hole 70 and wedge block 7 is connected and fixed;By this method successively by remaining foamed cement combined wall board with
Foamed cement combined wall board is connected to a fixed;
D, foamed cement combined wall board 2 is connect with foamed cement compound roof 3 ':
Foamed cement compound roof 3 ' is placed on foamed cement combined wall board 2, the wedge shape of nut 73 will be placed with
Block 7 is put into the dovetail trough rim costal fovea slot 61 that foamed cement combined wall board 2 is equipped with;Again from hole 92, bolt 74 is passed through
Hole 70 is connected and fixed with the nut 73 being arranged in wedge block 7;Successively remaining wallboard is connected to a fixed with top plate by this method;It is whole
Body assembly construction is completed;
E, according to design requirement, waterproof process is carried out;
F, according to design requirement, upholstery is carried out;
G, sanitary bath equipment is installed, including:Bath apparatus 51;Toilet seat 52;Hand washing sink 53;Bathroom door 4 is installed.
Above-mentioned E, F, G step, can also complete at the construction field (site).
Embodiment 4:
As shown in Figure 1, Figure 2-1 to Fig. 2-4, Fig. 7, Fig. 9, Figure 13, Figure 14, shown in Figure 15-1 to Figure 15-3, assembled of the present invention
Integral vacuum toilet mainly includes:Foamed cement composite bottom board 1 ', foamed cement combined wall board 2 or foamed cement combined wall board 2 ',
Foamed cement compound roof 3 ' and sanitary bath equipment:Bath apparatus 51, toilet seat 52, hand washing sink 53.
Dovetail groove type steel frame side rib 6 is equipped in the foamed cement combined wall board 2;The dovetail groove type steel side
Frame side rib 6 is made of upper lower flange and dovetail trough rim costal fovea slot 61;And it is equipped in the dovetail trough rim costal fovea slot 61 embedded
Component wedge block 7;And be equipped in the wedge block 7 hole 70 that cooperates with bolt 74 and can placing nut 73 fluting
71。
Formula steel frame side rib of rising as high as the banks is equipped in the foamed cement combined wall board 2 ' or foamed cement compound roof 3 '
9, it 91 is made of upper lower flange and rising as high as the banks;Perforation 94 is equipped in 91 rising as high as the banks;And bolt sleeve 75 is equipped in perforation 94;Flat
91 top flange of slot is equipped with cover board 76, and the shape of cover board 76 is identical as bolt sleeve 75;And cover board 76 is equipped with aperture 70.
The foamed cement composite bottom board 1 ', equipped with formula steel frame side rib 9 of rising as high as the banks, by upper lower flange and 91 structures of rising as high as the banks
At;And hole 70 is equipped on the edge of a wing;It is equipped with rectangular tube 62 in rising as high as the banks (as shown in Figure 15-1,15-2).
Connection between the foamed cement composite bottom board 1 ' and the foamed cement combined wall board 2, is to pass through spiral shell
Bolt 74 passes through hole 70, bolt sleeve 75 and the nut 73 being arranged in wedge block 7 and is connected and fixed.
Connection between the foamed cement combined wall board 2 and the foamed cement combined wall board 2 ', is to pass through spiral shell
Bolt 74 passes through hole 70, rectangular tube 62 and the nut 73 being arranged in wedge block 7 and is connected and fixed.
Connection between the foamed cement combined wall board 2 and the foamed cement compound roof 3 ', is to pass through spiral shell
Bolt 74 passes through hole 70, bolt sleeve 75 and the nut 73 being arranged in wedge block 7 and is connected and fixed.
The method of construction of 4 assembled integral vacuum toilet of the embodiment of the present invention, method and step include:
A, according to design requirement, it is compound that foamed cement composite bottom board 1 ', foamed cement combined wall board 2 and foamed cement are made
Wallboard 2 ', foamed cement compound roof 3 ';
B, foamed cement composite bottom board 1 ' is connect with foamed cement combined wall board 2:
Firstly, foamed cement composite bottom board 1 ' is placed on horizontal basal plane, it is compound by design requirement, then by foamed cement
Wallboard 2 is disposed vertically on 1 ' relative position of foamed cement composite bottom board;The wedge block 7 for being placed with nut 73 is put into foaming water
In the dovetail trough rim costal fovea slot 61 that mud combined wall board 2 is equipped with;Bolt 74 is passed through in hole 70, rectangular tube 62 and wedge block 7 and is set
The nut 73 set is connected and fixed;Successively remaining foamed cement combined wall board is connected with foamed cement composite bottom board by this method
It is fixed;
C, foamed cement combined wall board 2 is connect with foamed cement combined wall board 2 ':
First second piece of foamed cement combined wall board 2 ' is disposed vertically on 1 ' relative position of foamed cement composite bottom board, is adjusted
Second piece of foamed cement combined wall board 2 ' and foaming water are completed by step B in the relative position of whole second block of wallboard and first block of wallboard
The connection of mud composite bottom board 1 ';
First piece of foamed cement combined wall board 2 and second piece of foamed cement combined wall board 2 ' are attached again:It will be placed with
The wedge block 7 of nut 73 is put into the dovetail trough rim costal fovea slot 61 that foamed cement combined wall board 2 is equipped with;Again respectively by bolt 74
The nut 73 being arranged in hole 70, bolt sleeve 75 and wedge block 7 is connected and fixed;By this method successively by remaining foamed cement
Combined wall board is connected to a fixed with foamed cement combined wall board;
D, foamed cement combined wall board 2 is connect with foamed cement compound roof 3 ':
Foamed cement compound roof 3 ' is placed on foamed cement combined wall board 2, the wedge shape of nut 73 will be placed with
Block 7 is put into the dovetail trough rim costal fovea slot 61 that foamed cement combined wall board 2 is equipped with;Again from hole 92, bolt 74 is passed through
Hole 70, bolt sleeve 75 and the nut 73 being arranged in wedge block 7 are connected and fixed;By this method successively by remaining wallboard and top plate phase
It is connected and fixed;Whole assembly construction is completed;
E, according to design requirement, waterproof process is carried out;
F, according to design requirement, upholstery is carried out;
G, sanitary bath equipment is installed, including:Bath apparatus 51;Toilet seat 52;Hand washing sink 53;Bathroom door 4 is installed.
Above-mentioned E, F, G step, can also complete at the construction field (site).
Embodiment 5:
As shown in figure 16, described in above-described embodiment 1 to 4 in addition to foamed cement composite bottom board structure feature, at this
Waterproof bead dovetail groove type steel frame side rib 10 is equipped in the foamed cement composite bottom board 1 of embodiment 5, in the foaming water
When mud composite bottom board 1 is connect with foamed cement combined wall board 2, waterproof action can be played, is rolled up, is avoided vertically upward using bottom plate
Water penetrates into the seam of wallboard and bottom plate in toilet.The other feature of the present embodiment is same as the previously described embodiments, therefore does not exist
It repeats.
As shown in figure 17, described in above-described embodiment 1 to 4 in addition to foamed cement composite bottom board structure feature, at this
It is equipped with waterproof bead in the foamed cement composite bottom board 1 ' of embodiment 5 to rise as high as the banks formula steel frame side rib 11, in the foaming water
When mud composite bottom board 1 ' is connect with foamed cement combined wall board 2, waterproof action can be played.The other feature of the present embodiment with it is upper
It is identical to state embodiment, therefore is not repeating.
It for those skilled in the art, can be according to different design requirements, by the water that foams in the embodiment of the present invention
Connection type between cement composite plate material can be freely combined.Above-described embodiment is the preferred embodiment of the present invention, but simultaneously
It is not limited to above-mentioned several ways.All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement
Deng should all be included in the protection scope of the present invention.