CN206681418U - The industrialization commercial residential buildings of energy-conserving and environment-protective - Google Patents
The industrialization commercial residential buildings of energy-conserving and environment-protective Download PDFInfo
- Publication number
- CN206681418U CN206681418U CN201720430968.7U CN201720430968U CN206681418U CN 206681418 U CN206681418 U CN 206681418U CN 201720430968 U CN201720430968 U CN 201720430968U CN 206681418 U CN206681418 U CN 206681418U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- wall
- cast
- kitchen
- bathroom
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Building Environments (AREA)
Abstract
本实用新型公开了一种节能环保的工业化商品住宅,包括框架结构主体、现浇外墙、预制内墙板、预制楼梯、整体卫浴、整体厨房,框架结构主体还具有外墙连接端、内墙连接端、楼道口、卫生间位、厨房位,现浇外墙为现浇混凝土结构,现浇外墙与外墙连接端现浇连接;预制内墙板为预制陶粒混凝土结构,预制内墙板与内墙连接端拼装连接;预制楼梯为预制钢筋混凝土结构,预制楼梯与楼道口连接;整体卫浴、整体厨房为预制板拼装结构,整体卫浴与卫生间位拼装连接,整体厨房与厨房位拼装连接;本节能环保的工业化商品住宅告别传统的建造方式,以工业化建造方式完成整个住宅建造过程,质量好,渗漏、开裂风险小,节能环保。
The utility model discloses an energy-saving and environment-friendly industrialized commodity house, which comprises a frame structure main body, a cast-in-place outer wall, a prefabricated inner wall panel, a prefabricated staircase, an integrated bathroom, and an integrated kitchen. The frame structure main body also has an outer wall connection end, an inner wall The connection end, corridor entrance, bathroom space, kitchen space, the cast-in-place exterior wall is cast-in-place concrete structure, and the cast-in-place exterior wall is connected with the exterior wall connection end; the prefabricated inner wall panel is a prefabricated ceramsite concrete structure, and the prefabricated inner wall Assembled and connected with the connection end of the inner wall; the prefabricated staircase is a prefabricated reinforced concrete structure, and the prefabricated staircase is connected with the corridor entrance; the integral bathroom and the integral kitchen are assembled with prefabricated panels, the integral bathroom and the toilet are assembled and connected, and the integral kitchen is assembled and connected with the kitchen; This energy-saving and environment-friendly industrialized commercial residence bids farewell to the traditional construction method, and completes the entire residential construction process in an industrialized construction method, with good quality, low risk of leakage and cracking, energy-saving and environmental protection.
Description
技术领域technical field
本实用新型涉及建筑及房地产开发领域,具体涉及一种节能环保的工业化商品住宅。The utility model relates to the field of construction and real estate development, in particular to an energy-saving and environment-friendly industrialized commercial residence.
背景技术Background technique
目前商品住宅主要采用传统的建造方式,砌筑抹灰,且现场加工作业工序繁多,大量湿作业,预制率低,作业人员工艺水平参差不齐,工业化建造程度低;施工质量水平低下,存在大量渗漏、开裂,且建筑能耗高,建筑垃圾多等不可持续发展等问题。At present, commercial housing mainly adopts the traditional construction method of masonry and plastering, and there are many on-site processing procedures, a large amount of wet work, low prefabrication rate, uneven technical level of operators, and low degree of industrialized construction; Unsustainable development problems such as leakage, cracking, high building energy consumption, and a lot of construction waste.
发明内容Contents of the invention
本实用新型的目的在于提供一种节能环保的工业化商品住宅;本节能环保的工业化商品住宅告别传统的建造方式,以工业化建造方式,预制率高、现场加工作业少,以工业化建造方式完成整个住宅建造过程,本节能环保的工业化商品住宅质量好,渗漏、开裂风险小,节能环保。The purpose of the utility model is to provide an energy-saving and environment-friendly industrialized commodity house; the energy-saving and environment-friendly industrialized commodity house bids farewell to the traditional construction method, adopts the industrialized construction method, has high prefabrication rate and less on-site processing operations, and completes the entire residence with the industrialized construction method During the construction process, the energy-saving and environment-friendly industrialized commercial housing has good quality, less risk of leakage and cracking, and is energy-saving and environment-friendly.
其技术方案如下:Its technical scheme is as follows:
节能环保的工业化商品住宅,包括框架结构主体、现浇外墙、预制内墙板、预制楼梯、整体卫浴、整体厨房;Energy-saving and environmentally friendly industrialized commercial housing, including the main body of the frame structure, cast-in-place exterior walls, prefabricated interior wall panels, prefabricated stairs, integrated bathrooms, and integrated kitchens;
a、所述框架结构主体包括:剪力墙、梁、楼地板形成一体式结构,所述框架结构主体为现浇钢筋混凝土结构,所述框架结构主体还具有外墙连接端、内墙连接端、楼道口、卫生间位、厨房位;A, the main body of the frame structure includes: shear walls, beams, and floors form an integrated structure, the main body of the frame structure is a cast-in-place reinforced concrete structure, and the main body of the frame structure also has an outer wall connection end and an inner wall connection end , Corridor entrance, toilet seat, kitchen seat;
b、所述现浇外墙为现浇混凝土结构,所述现浇外墙与所述框架结构主体的外墙连接端现浇连接;b. The cast-in-place exterior wall is a cast-in-place concrete structure, and the cast-in-place exterior wall is connected to the exterior wall connection end of the frame structure main body by cast-in-place;
c、所述预制内墙板为预制陶粒混凝土结构,预制内墙板与所述框架结构主体的内墙连接端拼装连接;c. The prefabricated inner wall panel is a prefabricated ceramsite concrete structure, and the prefabricated inner wall panel is assembled and connected with the inner wall connection end of the frame structure main body;
d、所述预制楼梯为预制钢筋混凝土结构,预制楼梯两端具有安装通孔,所述楼道口设有休息平台牛腿,所述休息平台牛腿上预埋有固定钢筋,固定钢筋穿过安装通孔,所述预制楼梯与休息平台牛腿固定连接;d. The prefabricated staircase is a prefabricated reinforced concrete structure. There are installation through holes at both ends of the prefabricated staircase. The corridor entrance is provided with a rest platform corbel, and fixed steel bars are pre-embedded on the rest platform corbel, and the fixed steel bars pass through the installation Through holes, the prefabricated stairs are fixedly connected with the rest platform corbels;
e、所述整体卫浴为预制板拼装结构,所述整体卫浴与所述框架结构主体的卫生间位拼装连接,所述楼地板在卫生间位预留排水洞口,并且在预留排水洞口处预埋有止水节,所述整体卫浴具有排水管,所述排水管与止水节相通连接;e. The integrated bathroom is a prefabricated panel assembly structure, the integrated bathroom is assembled and connected with the bathroom of the frame structure main body, and the floor has a drainage hole reserved in the bathroom, and there is a pre-buried drainage hole at the reserved drainage hole The water stop section, the overall bathroom has a drain pipe, and the drain pipe is connected to the water stop section;
f、所述整体厨房为预制板拼装结构,整体厨房与所述框架结构主体的厨房位拼装连接。f. The integrated kitchen is a prefabricated panel assembly structure, and the integrated kitchen is assembled and connected with the kitchen space of the main body of the frame structure.
进一步的,现浇外墙与框架结构主体之间的连接处设有结构拉缝,所述结构拉缝包括竖向拉缝、水平拉缝;所述现浇外墙与所述剪力墙的竖向连接处用竖向拉缝间隔,并用拉结钢筋连接,所述现浇外墙与所述梁、楼地板的水平连接处用水平拉缝间隔,并用拉结钢筋连接。Further, the connection between the cast-in-place exterior wall and the main body of the frame structure is provided with structural joints, and the structural joints include vertical joints and horizontal joints; the cast-in-place exterior wall and the shear wall The vertical joints are separated by vertical joints and connected with steel bars, and the horizontal joints between the cast-in-place exterior wall and the beams and floors are separated by horizontal joints and connected by steel bars.
进一步的,所述现浇外墙还具有外墙窗口,所述外墙窗口室内侧一圈具有凸起的混凝土凸台,并形成窗启口结构,窗框安装在窗启口结构外侧,整个窗框尺寸大于窗启口处尺寸。Further, the cast-in-place exterior wall also has an exterior wall window, and the inner side of the window of the exterior wall has a raised concrete boss to form a window opening structure. The window frame is installed on the outside of the window opening structure, and the whole The size of the window frame is larger than the size of the window opening.
进一步的,所述现浇外墙内侧还设有复合保温板,所述复合保温板与现浇外墙内侧粘贴连接,复合保温板朝向室内一侧设有装饰涂层,所述复合保温板包括保温层和石膏板。Further, the inner side of the cast-in-place exterior wall is also provided with a composite thermal insulation board, the composite thermal insulation board is glued and connected to the inner side of the cast-in-place outer wall, and the composite thermal insulation board is provided with a decorative coating on the side facing the interior, and the composite thermal insulation board includes Insulation and plasterboard.
进一步的,所述保温层具有致密的表层及闭孔结构内层。Further, the thermal insulation layer has a dense surface layer and a closed-cell inner layer.
进一步的,所述预制内墙板内具有冷拔钢丝网架,所述预制内墙板竖向中间具有中空椭圆孔。Further, the prefabricated inner wall panel has a cold-drawn steel wire grid inside, and the prefabricated inner wall panel has a hollow oval hole in the vertical middle.
进一步的,所述整体卫浴包括防水底盘、卫浴墙板、卫浴顶板,所述卫浴墙板的下端与防水底盘四周拼装连接,所述卫浴墙板的上端与卫浴顶板的四周拼装连接。Further, the integrated bathroom includes a waterproof chassis, a bathroom wall panel, and a bathroom roof. The lower end of the bathroom wall panel is assembled and connected with the waterproof chassis, and the upper end of the bathroom wall panel is assembled and connected with the surroundings of the bathroom roof.
进一步的,所述整体厨房包括厨房底盘、厨房墙板、厨房顶板,所述厨房墙板的下端与厨房底盘四周拼装连接,所述厨房墙板的上端与厨房顶板的四周拼装连接。Further, the integrated kitchen includes a kitchen chassis, a kitchen wall panel, and a kitchen top panel, the lower end of the kitchen wall panel is assembled and connected with the surroundings of the kitchen chassis, and the upper end of the kitchen wall panel is assembled and connected with the surroundings of the kitchen top panel.
进一步的,所述楼地板上面设有自流找平层,所述自流找平层上面设有地砖,所述地砖与自流找平层用胶泥连接。Further, a self-leveling layer is provided on the floor, floor tiles are arranged on the self-leveling layer, and the floor tiles are connected with the self-leveling layer by cement.
进一步的,所述预制内墙板、现浇外墙朝向室内一侧设有PVC墙纸,所述PVC墙纸与预制内墙板、现浇外墙室内一侧粘贴连接。Further, the indoor side of the prefabricated inner wall board and cast-in-place outer wall is provided with PVC wallpaper, and the PVC wallpaper is pasted and connected to the indoor side of the prefabricated inner wall board and cast-in-place outer wall.
进一步的,所述框架结构主体的顶端还具有屋面板,所述屋面板具有钢纤维钢筋混凝土结构,所述屋面板上面设有预制屋面保温复合板,所述预制屋面保温复合板包括隔热板、混凝土板,所述预制屋面保温复合板与所述框架结构主体的屋面板拼装连接。Further, the top of the main body of the frame structure also has a roof panel, the roof panel has a steel fiber reinforced concrete structure, and the roof panel is provided with a prefabricated roof insulation composite board, and the prefabricated roof insulation composite board includes a heat insulation board . Concrete slabs, the prefabricated roof thermal insulation composite slabs are assembled and connected to the roof slabs of the main body of the frame structure.
进一步的,还包括有地下室,所述地下室包括有地坪面层,所述地坪面层具有钢纤维混凝土结构,所述钢纤维混凝土结构具有乱向分布的钢纤维。Further, it also includes a basement, the basement includes a floor surface layer, the floor surface layer has a steel fiber concrete structure, and the steel fiber concrete structure has steel fibers distributed randomly.
进一步的,所述地坪面层上表面设金刚砂层,所述金刚砂层上面还设有密封固化剂层。Further, a carborundum layer is provided on the upper surface of the floor surface layer, and a sealing and curing agent layer is also provided on the carborundum layer.
下面对本实用新型的优点或原理进行说明:Advantages or principles of the present utility model are described below:
1、本实用新型的节能环保的工业化商品住宅(以下简称本住宅),包括框架结构主体、现浇外墙、预制内墙板、预制楼梯、整体卫浴、整体厨房;1. The energy-saving and environment-friendly industrialized commercial housing (hereinafter referred to as the housing) of the present utility model includes a frame structure main body, cast-in-place exterior walls, prefabricated interior wall panels, prefabricated stairs, integrated bathrooms, and integrated kitchens;
a、框架结构主体包括:剪力墙、梁、楼地板形成一体式结构,作为本住宅的主体结构;a, the main body of the frame structure includes: shear walls, beams, and floors form an integrated structure, which is the main structure of this house;
b、本住宅外墙采用现浇外墙,现浇外墙采用混凝土结构,一体浇筑成型,免除传统外墙砌筑,混凝土结构密不透水,可保证外墙不渗漏;b. The exterior wall of this residence adopts cast-in-place exterior wall, and the cast-in-place exterior wall adopts concrete structure, which is cast in one piece, avoiding traditional exterior wall masonry, and the concrete structure is airtight, which can ensure that the exterior wall does not leak;
c、本住宅内隔墙采用预制内墙板,预制内墙板工厂预制,现场整块直接拼装,替代传统砖砌筑,由于墙板精度高,可免除传统内墙抹灰,整个墙体厚度减小从而增大套内使用面积,免抹灰可避免墙面开裂,现场产生建筑垃圾少;c. The inner partition wall of this house adopts prefabricated inner wall panels, prefabricated inner wall panels are prefabricated in the factory, and the whole piece is directly assembled on site, replacing the traditional brick masonry. Due to the high precision of the wall panels, the plastering of the traditional inner walls can be exempted, and the entire wall thickness Reduce and increase the usable area in the sleeve, avoid plastering to avoid wall cracking, and generate less construction waste on site;
d、本住宅楼梯采用预制楼梯,在工厂机械化生产,质量比现场浇筑更好,现场直接吊装,工地现场作业量明显减少,粉尘污染、噪音污染也显著降低;d. The stairs of this residence adopt prefabricated stairs, which are mechanized in the factory. The quality is better than that of on-site pouring, and they can be directly hoisted on site. The workload on the site is significantly reduced, and the dust pollution and noise pollution are also significantly reduced;
e、本住宅卫生间采用整体卫浴,通过一体化设计并经工厂标准化生产,再采用标准化及规范化的装配方式,现场直接拼装安装,不产生建筑垃圾,绿色环保,实现工业化生产,楼地板在卫生间位预留排水洞口,并且在预留排水洞口处预埋有止水节,避免传统的套管预埋,省去二次穿管补洞等多道工序,止水节与混凝土粘接牢固,能够有效防治管道根部渗漏水,与排水管连接方便,安装简单,可有效解决卫生间渗水隐患;e. The bathroom of this residence adopts integral bathroom, which is designed through integrated design and standardized production by the factory, and then adopts standardized and standardized assembly methods. It can be assembled and installed directly on site without generating construction waste, green and environmentally friendly, and realizes industrialized production. The floor is located in the bathroom. Drainage holes are reserved, and water-stop joints are pre-embedded at the reserved drainage holes, avoiding the traditional casing pre-embedding, eliminating the need for multiple processes such as secondary piercing and filling holes, and the water-stop joints are firmly bonded to the concrete, which can Effectively prevent water leakage at the root of the pipe, easy to connect with the drain pipe, simple to install, and can effectively solve the hidden danger of water seepage in the bathroom;
f、本住宅厨房采用整体厨房,整体厨房通过一体化设计并经工厂标准化生产,再采用标准化及规范化的装配方式安装,实现工业化生产,安装现场不产生建筑垃圾,绿色环保。f. The residential kitchen adopts an integrated kitchen. The integrated kitchen is designed through integration and standardized production by the factory, and then installed in a standardized and standardized assembly method to achieve industrial production. The installation site does not generate construction waste and is green and environmentally friendly.
2、本住宅外墙包括现浇外墙、剪力墙,现浇外墙、剪力墙为现浇混凝土结构,由于整个外墙为现浇混凝土结构,整个住宅结构刚度会变大影响结构安全,故采用结构拉缝做法减小整个住宅结构刚度来保证结构安全;结构拉缝包括竖向拉缝、水平拉缝,现浇外墙与剪力墙的竖向连接处用竖向拉缝间隔,并用拉结钢筋连接,现浇外墙与梁、楼地板的水平连接处用水平拉缝间隔,并用拉结钢筋连接,此做法可大大减小整个住宅结构刚度;外墙为混凝土结构,一体浇筑成型,免除传统外墙砌筑,混凝土结构密不透水,可保证外墙不渗漏。2. The exterior walls of this residence include cast-in-place exterior walls and shear walls. The cast-in-place exterior walls and shear walls are cast-in-place concrete structures. Since the entire exterior walls are cast-in-place concrete structures, the rigidity of the entire residential structure will increase and affect structural safety. , so the method of structural joints is used to reduce the rigidity of the entire residential structure to ensure structural safety; the structural joints include vertical joints and horizontal joints, and the vertical joints between the cast-in-place exterior wall and the shear wall are separated by vertical joints , and connected with steel bars, the horizontal joints between the cast-in-place exterior walls and beams and floors are separated by horizontal joints, and connected with steel bars, this method can greatly reduce the structural rigidity of the entire house; the external wall is a concrete structure, integrated It is poured into shape, eliminating the need for traditional external wall masonry, and the concrete structure is airtight, which can ensure that the external wall does not leak.
3、本住宅外墙窗口做成窗启口结构,即整个窗口室内侧一圈做出凸起的混凝土凸台,窗框安装在窗启口结构外侧,整个窗框尺寸要大于窗启口处尺寸,窗启口可阻挡住通过缝隙渗漏进来的水,这样就可保证窗外侧水不会从窗启口与窗框缝隙渗漏进室内。3. The window on the exterior wall of this residence is made into a window opening structure, that is, a raised concrete boss is made around the inside of the entire window room, and the window frame is installed on the outside of the window opening structure, and the size of the entire window frame is larger than the window opening. The size of the window opening can block the water leaking in through the gap, so as to ensure that the water outside the window will not leak into the room through the gap between the window opening and the window frame.
4、考虑到日照保温隔热,本住宅的墙体保温采用内保温形式,现浇外墙墙体内侧铺贴复合保温板,复合保温板由保温层和石膏板复合而成,比传统的保温砂浆保温隔热性好,复合保温板通过粘贴层(粘结砂浆)粘贴在现浇外墙内侧,复合保温板朝内一侧设有装饰涂层,这样就完成了复合保温板的施工装饰,且安全环保。4. Considering the thermal insulation of sunlight, the wall insulation of this residence adopts the form of internal insulation, and the inner side of the cast-in-place exterior wall is paved with composite insulation boards. The mortar has good thermal insulation performance. The composite thermal insulation board is pasted on the inner side of the cast-in-place external wall through the adhesive layer (adhesive mortar). The interior side of the composite thermal insulation board is provided with a decorative coating, thus completing the construction and decoration of the composite thermal insulation board. And safe and environmentally friendly.
5、本住宅墙体保温采用具有致密的表层及闭孔结构内层的保温层,保温层的完全闭孔结构,使其具有轻质、高强度、抗潮湿的特性;在长时间的使用中,不老化、不分解、不产生有害物质,安全环保。5. The wall insulation of this residence adopts an insulation layer with a dense surface layer and an inner layer of a closed-cell structure. The completely closed-cell structure of the insulation layer makes it light, high-strength, and moisture-resistant; , no aging, no decomposition, no harmful substances, safe and environmentally friendly.
6、本住宅的预制内墙板为陶粒混凝土内墙板,内置冷拔钢丝网架,是一种新型节能墙材料,墙板在工厂经流水线浇注、整平、科学养护而成,质量好、强度高;预制内墙板竖向中间具有中空椭圆孔,线盒管线方便敷设在孔洞中,由于有孔洞,质量也减轻同时兼有保温隔热、隔音功能。6. The prefabricated inner wall panels of this residence are ceramsite concrete inner wall panels with built-in cold-drawn steel wire grids. , High strength; there is a hollow oval hole in the vertical middle of the prefabricated inner wall panel, and the wire box and pipeline are conveniently laid in the hole. Because of the hole, the weight is also reduced, and it also has the functions of heat insulation and sound insulation.
7、本住宅卫生间采用整体卫浴,整体卫浴通过一体化设计并经工厂标准化生产出防水底盘、卫浴墙板、卫浴顶板三大主体形成一个整体,供装设配套的卫浴设施以及上下水系统、电路系统,组成一个完整的卫浴;整体卫浴采用标准化及规范化的高效率装配方式安装,现场先安装防水底盘,再安装卫浴墙板,最后安装卫浴顶板,相当于形成盒体结构;传统卫生间的墙、地瓷砖分别被整体卫浴的防水底盘、卫浴墙板取代,现场直接拼装,底盘一次整体成型,质量稳定,可彻底解决卫生间渗漏问题,真正实现工业化生产,现场不产生建筑垃圾,绿色环保。7. The bathroom of this residence adopts an integrated bathroom. The integrated bathroom is designed through an integrated design and standardized by the factory to produce three main bodies: waterproof chassis, bathroom wall panels, and bathroom top panels to form a whole, for the installation of supporting bathroom facilities, water systems and circuits. system to form a complete bathroom; the overall bathroom is installed in a standardized and standardized high-efficiency assembly method. The waterproof chassis is installed on site first, then the bathroom wall panels, and finally the bathroom roof is installed, which is equivalent to forming a box structure; the walls of traditional bathrooms, The floor tiles are replaced by the waterproof chassis and bathroom wall panels of the overall bathroom, and they are directly assembled on site. The chassis is integrally formed at one time, and the quality is stable. It can completely solve the problem of toilet leakage, and truly realize industrial production. There is no construction waste on site, and it is green and environmentally friendly.
8、本住宅的厨房采用整体厨房,整体厨房由厨房底盘、厨房墙板、厨房顶板三大主体形成一个整体,供装设配套的厨房设施以及上下水系统、电路系统,组成一个完整的厨房;现场安装先安装厨房底盘,再安装厨房墙板,最后安装厨房顶板,并形成盒体结构;传统厨房的墙、地瓷砖分别被整体厨房的厨房底盘、厨房墙板取代;整体厨房采用标准化及规范化的高效率装配方式,现场直接拼装,安装快,质量稳定,真正实现工业化生产,现场不产生建筑垃圾,绿色环保。8. The kitchen of this residence adopts an integral kitchen. The integral kitchen is composed of three main parts: the kitchen chassis, the kitchen wall panel, and the kitchen roof. It is used for installing supporting kitchen facilities, water and water systems, and circuit systems to form a complete kitchen; On-site installation first installs the kitchen chassis, then installs the kitchen wall panels, and finally installs the kitchen roof to form a box structure; the wall and floor tiles of the traditional kitchen are replaced by the kitchen chassis and kitchen wall panels of the overall kitchen; the overall kitchen adopts standardization and standardization High-efficiency assembly method, direct assembly on site, fast installation, stable quality, truly industrialized production, no construction waste on site, green and environmentally friendly.
9、本住宅楼地面上面设有自流找平层,替代传统水泥砂浆找平,不起尘、不起层,平整度高,减少对水泥、砂的占用;楼地面地砖与自流找平层用胶泥连接,取代传统水泥砂浆,纯干法施工,工作面整洁、干净,贴砖厚度减小使房间净高提升,地砖空鼓大大减少,地面也更加平整。9. There is an artesian leveling layer on the ground of this residential building, which replaces the traditional cement mortar leveling, no dust, no layers, high flatness, and reduces the occupation of cement and sand; the floor tiles on the floor and the artesian leveling layer are connected with cement, Instead of traditional cement mortar, pure dry construction, the working surface is neat and clean, the thickness of the tiles is reduced, the net height of the room is improved, the hollowing of the floor tiles is greatly reduced, and the ground is smoother.
10、本住宅预制内墙板、现浇外墙室内一侧粘贴PVC墙纸,有较强的质感和较好的透气性,能够较好地抵御油脂和湿气的侵蚀,且难燃隔热、吸音、防霉,不易结露、受机械损伤,表面可擦洗,对酸碱有较强的抵抗能力。10. The prefabricated inner wall panels and cast-in-place outer walls of this house are pasted with PVC wallpaper on the indoor side, which has a strong texture and good air permeability, and can better resist the erosion of grease and moisture, and is flame-retardant and heat-insulating. Sound-absorbing, anti-mildew, not easy to condensation and mechanical damage, the surface can be scrubbed, and has strong resistance to acid and alkali.
11、本住宅还包括有屋面板,在屋面板的钢筋混凝土中加入钢纤维,钢纤维能够有效地阻碍混凝土内部微裂缝的扩展及宏观裂缝的形成,显著地改善了混凝土的抗拉、抗弯、抗冲击及抗疲劳性能,从而大大提高了住宅屋面的防水性能;屋面板上设预制屋面保温复合板,预制屋面保温复合板采用隔热板和混凝土板复合在一起,在工厂通过机械化生产,质量能得到更好地控制,工地现场直接拼装,作业量明显减少,粉尘污染、噪音污染显著降低。11. This house also includes a roof panel. Steel fibers are added to the reinforced concrete of the roof panel. The steel fibers can effectively prevent the expansion of micro-cracks inside the concrete and the formation of macro-cracks, and significantly improve the tensile and bending resistance of the concrete. , impact resistance and fatigue resistance, thereby greatly improving the waterproof performance of the residential roof; the roof panel is equipped with a prefabricated roof insulation composite board, and the prefabricated roof insulation composite board is combined with a heat insulation board and a concrete board, and is mechanized in the factory. Production, The quality can be better controlled, the construction site can be assembled directly, the workload is significantly reduced, and the dust pollution and noise pollution are significantly reduced.
12、本住宅地下室地坪面层采用钢纤维混凝土,在混凝土中掺入乱向分布的钢纤维,这些乱向分布的钢纤维能够有效地阻碍混凝土内部微裂缝的扩展及宏观裂缝的形成,显著地改善了混凝土的抗拉、抗弯、抗冲击及抗疲劳性能,从而大大提高地下室地坪面层的防水性能。12. The floor surface of the basement of this residence is made of steel fiber concrete, and randomly distributed steel fibers are mixed into the concrete. These randomly distributed steel fibers can effectively hinder the expansion of micro-cracks and the formation of macro-cracks inside the concrete, significantly It greatly improves the tensile, bending, impact and fatigue resistance of concrete, thereby greatly improving the waterproof performance of the basement floor surface.
13、本住宅地下室在地坪面层上设金刚砂层,最后表面再做密封固化剂层,完成后地坪面坚硬耐磨,防尘防滑、抗压抗渗、抗化学性、光亮环保。13. In the basement of this residence, a carborundum layer is set on the floor surface, and a sealing and curing agent layer is made on the final surface. After the completion, the floor surface is hard and wear-resistant, dust-proof, anti-skid, pressure-resistant, impermeable, chemical-resistant, bright and environmentally friendly.
附图说明Description of drawings
图1是本实用新型节能环保的工业化商品住宅平面布置图。Fig. 1 is the layout diagram of the utility model energy-saving and environment-friendly industrialized commercial housing.
图2是本实用新型节能环保的工业化商品住宅现浇外墙立面图。Fig. 2 is the elevation view of the cast-in-place external wall of the energy-saving and environment-friendly industrialized commodity residence of the utility model.
图3是本实用新型节能环保的工业化商品住宅现浇外墙结构图。Fig. 3 is a structural diagram of the cast-in-place exterior wall of the energy-saving and environment-friendly industrialized commercial residence of the utility model.
图4是本实用新型节能环保的工业化商品住宅窗启口结构图。Fig. 4 is the structural diagram of the window opening of the utility model energy-saving and environment-friendly industrialized commercial housing.
图5是本实用新型节能环保的工业化商品住宅现浇外墙剖视图。Fig. 5 is a cross-sectional view of the cast-in-place exterior wall of an energy-saving and environment-friendly industrialized commercial residence of the utility model.
图6是本实用新型节能环保的工业化商品住宅预制内墙板剖视图。Fig. 6 is a cross-sectional view of the prefabricated inner wall panel of the energy-saving and environment-friendly industrial commercial housing of the utility model.
图7是本实用新型节能环保的工业化商品住宅预制楼梯剖视图。Fig. 7 is a sectional view of the energy-saving and environment-friendly industrial commercial residential prefabricated stairs of the utility model.
图8是本实用新型节能环保的工业化商品住宅整体卫浴剖视图。Fig. 8 is a cross-sectional view of the integral bathroom of the energy-saving and environment-friendly industrialized commercial housing of the utility model.
图9是本实用新型节能环保的工业化商品住宅整体厨房剖视图。Fig. 9 is a cross-sectional view of an integrated kitchen of an energy-saving and environment-friendly industrialized commodity house of the utility model.
图10是本实用新型节能环保的工业化商品住宅楼地板剖视图。Fig. 10 is a sectional view of the floor of the energy-saving and environment-friendly industrial commercial residential building of the utility model.
图11是本实用新型节能环保的工业化商品住宅屋面板剖视图。Fig. 11 is a cross-sectional view of the energy-saving and environment-friendly industrial commercial residential roof panel of the utility model.
图12是本实用新型节能环保的工业化商品住宅地下室地坪面剖视图。Fig. 12 is a cross-sectional view of the basement floor of the energy-saving and environment-friendly industrialized commodity house of the utility model.
附图标记说明:Explanation of reference signs:
10、框架结构主体,11、剪力墙,12、梁,13、楼地板,131、自流找平层,132、地砖,20、现浇外墙,21、外墙连接端,22、结构拉缝,221、竖向拉缝,222、水平拉缝,23、拉结钢筋,24、外墙窗口,241、混凝土凸台,242、窗框,243、窗启口,25、复合保温板,251、保温层,252、石膏板,26、装饰涂层,30、预制内墙板,31、内墙连接端,32、冷拔钢丝网架,33、椭圆孔,34、PVC墙纸,40、预制楼梯,41、安装通孔,42、楼道口,43、休息平台牛腿,44、固定钢筋,50、整体卫浴,51、卫生间位,52、止水节,53、防水底盘,54、卫浴墙板,55、卫浴顶板,60、整体厨房,61、厨房位,62、厨房底盘,63、厨房墙板,64、厨房顶板,70、屋面板,71、预制屋面保温复合板,72、隔热板,73、混凝土板,80、地下室结构底板,81、地坪面层,82、金刚砂层,83、密封固化剂层。10. Main body of frame structure, 11. Shear wall, 12. Beam, 13. Floor, 131. Self-leveling layer, 132. Floor tile, 20. Cast-in-place external wall, 21. External wall connection end, 22. Structural joint , 221, vertical seam, 222, horizontal seam, 23, tie steel bar, 24, exterior wall window, 241, concrete boss, 242, window frame, 243, window opening, 25, composite insulation board, 251 , insulation layer, 252, gypsum board, 26, decorative coating, 30, prefabricated interior wall panels, 31, interior wall connection end, 32, cold-drawn steel wire mesh frame, 33, oval hole, 34, PVC wallpaper, 40, prefabrication Stairs, 41. Installation through hole, 42. Corridor entrance, 43. Rest platform corbel, 44. Fixed steel bar, 50. Overall bathroom, 51. Toilet seat, 52. Waterstop section, 53. Waterproof chassis, 54. Bathroom wall Board, 55, bathroom roof, 60, overall kitchen, 61, kitchen seat, 62, kitchen chassis, 63, kitchen wall panel, 64, kitchen roof, 70, roof panel, 71, prefabricated roof insulation composite board, 72, heat insulation Board, 73, concrete slab, 80, basement structure floor, 81, floor surface layer, 82, carborundum layer, 83, sealing and curing agent layer.
具体实施方式detailed description
下面对本实用新型的实施例进行详细说明。Embodiments of the present utility model are described in detail below.
如图1至图12所示,节能环保的工业化商品住宅,包括框架结构主体10、现浇外墙20、预制内墙板30、预制楼梯40、整体卫浴50、整体厨房60;框架结构主体10包括:剪力墙11、梁12、楼地板13形成一体式结构,框架结构主体10为现浇钢筋混凝土结构,框架结构主体10还具有外墙连接端21、内墙连接端31、楼道口42、卫生间位51、厨房位61。As shown in Figures 1 to 12, the energy-saving and environment-friendly industrialized commercial housing includes a frame structure main body 10, a cast-in-place exterior wall 20, a prefabricated interior wall panel 30, a prefabricated staircase 40, an integrated bathroom 50, and an integrated kitchen 60; the frame structure main body 10 Including: shear walls 11, beams 12, and floors 13 form an integrated structure, the frame structure main body 10 is a cast-in-place reinforced concrete structure, and the frame structure main body 10 also has an outer wall connection end 21, an inner wall connection end 31, and a corridor entrance 42 , Toilet seat 51, kitchen seat 61.
现浇外墙20为现浇混凝土结构,现浇外墙20与外墙连接端21现浇连接;由于现浇外墙20为现浇混凝土结构,整个住宅结构刚度会变大影响结构安全,故采用结构拉缝22做法减小整个住宅结构刚度来保证结构安全;结构拉缝22包括竖向拉缝221、水平拉缝222,现浇外墙20与剪力墙11的竖向连接处采用竖向拉缝221间隔,并用拉结钢筋23连接;现浇外墙20与梁12、楼地板13的水平连接处用水平拉缝222间隔,并用拉结钢筋23连接,此做法可大大减小整个住宅结构刚度;外墙为混凝土结构,一体浇筑成型,免除传统外墙砌筑,混凝土结构密不透水,可保证外墙不渗漏。The cast-in-place exterior wall 20 is a cast-in-place concrete structure, and the cast-in-place exterior wall 20 is connected with the exterior wall connection end 21; since the cast-in-place exterior wall 20 is a cast-in-place concrete structure, the rigidity of the entire residential structure will increase and affect the structural safety. Adopt the method of structural drawing joint 22 to reduce the rigidity of the entire residential structure to ensure the structural safety; Spaced to draw seam 221, and connect with tie steel bar 23; Horizontal joint 222 is used at the horizontal connection place of cast-in-place outer wall 20 and beam 12, floor floor 13, and is connected with tie tie bar 23, and this way can greatly reduce the whole The rigidity of the residential structure; the outer wall is a concrete structure, which is cast in one piece, eliminating the traditional masonry of the outer wall, and the concrete structure is airtight, which can ensure that the outer wall does not leak.
整个住宅外墙全部采用混凝土结构,通过结构拉缝22解决结构刚度,采用铝模板一次性整体浇筑成型,墙体整体精度高可实现墙面免抹灰;外墙窗口24做成窗启口243结构,即整个窗口室内侧一圈做出凸起的混凝土凸台241,窗框242安装在窗启口243结构外侧,整个窗框242尺寸要大于窗启口243处尺寸,窗启口243可阻挡住通过缝隙渗漏进来的水,而窗框242与窗启口243之间缝隙再用高强无收缩砂浆塞缝,这样就可保证窗外侧水不会从窗启口243与窗框242缝隙渗漏进室内,实现结构自防水。The exterior walls of the entire residence are all made of concrete structure, and the structural rigidity is solved through structural drawing joints 22, and the aluminum formwork is used for one-time integral casting. structure, that is, a raised concrete boss 241 is made around the inner side of the entire window room, and the window frame 242 is installed outside the structure of the window opening 243. The size of the entire window frame 242 is larger than that of the window opening 243, and the window opening 243 can be Stop the water leaking in through the gap, and then use high-strength non-shrinkage mortar to plug the gap between the window frame 242 and the window opening 243, so as to ensure that the water outside the window will not flow from the gap between the window opening 243 and the window frame 242 Seepage into the room to achieve self-waterproofing of the structure.
考虑到日照保温隔热,本住宅的现浇外墙20墙体保温采用内保温形式,现浇外墙20墙体内侧铺贴XPS复合保温板25,复合保温板25由XPS保温层251和石膏板252复合而成,XPS保温层251是以聚苯乙烯树脂为原料加上其他的原辅料与聚合物,通过加热混合同时注入催化剂,然后挤塑压出成型而制造的硬质泡沫塑料板,XPS保温层251具有致密的表层及闭孔结构内层,比传统的保温砂浆保温隔热性好,XPS保温层251的完全闭孔结构,使其具有轻质、高强度、抗潮湿的特性;且在长时间的使用中,不老化、不分解、不产生有害物质,安全环保;XPS复合保温板25通过粘贴层(粘结砂浆)粘贴在现浇外墙20内侧,现浇外墙20外侧再做外墙装饰层,XPS复合保温板25朝向室内一侧设有装饰涂层26,装饰涂层26上再粘贴PVC墙纸34,这样就完成了XPS复合保温板25的施工装饰,最终形成了一个外墙保温系统,且安全环保。Considering sunshine heat preservation and heat insulation, the wall insulation of the cast-in-place exterior wall 20 of this house adopts the form of internal heat preservation, and the inner side of the cast-in-place exterior wall 20 is paved with XPS composite insulation board 25, and the composite insulation board 25 is composed of XPS insulation layer 251 and gypsum The board 252 is compounded. The XPS insulation layer 251 is a rigid foam plastic board made of polystyrene resin as a raw material plus other raw materials and polymers. It is heated and mixed while injecting a catalyst, and then extruded. XPS insulation layer 251 has a dense surface layer and an inner layer of closed-cell structure, which is better than traditional thermal insulation mortar in thermal insulation. The completely closed-cell structure of XPS insulation layer 251 makes it light, high-strength, and moisture-resistant; And in long-term use, it will not age, decompose, and produce harmful substances, and is safe and environmentally friendly; the XPS composite thermal insulation board 25 is pasted on the inner side of the cast-in-place exterior wall 20 through an adhesive layer (adhesive mortar), and the outer side of the cast-in-place exterior wall 20 Make exterior wall decoration layer again, XPS composite thermal insulation board 25 is provided with decorative coating 26 towards indoor side, on decorative coating 26 paste PVC wallpaper 34 again, like this has just finished the construction decoration of XPS composite thermal insulation board 25, has finally formed An external wall insulation system that is safe and environmentally friendly.
预制内墙板30为陶粒混凝土内墙板,预制内墙板30与所述框架结构主体10的内墙连接端31拼装连接;预制内墙板30由水泥、砂、轻质陶粒、发泡剂及水等原材料浇筑成型,内置冷拔钢丝网架32,是一种新型节能墙材料,墙板在工厂经流水线浇注、整平、科学养护而成,质量好、强度高;预制内墙板30竖向具有椭圆孔33中空构造,线盒管线方便敷设在孔洞中,由于有孔洞,质量也减轻同时兼有保温隔热、隔音功能。The prefabricated inner wall panel 30 is a ceramsite concrete inner wall panel, and the prefabricated inner wall panel 30 is assembled and connected with the inner wall connection end 31 of the frame structure main body 10; the prefabricated inner wall panel 30 is made of cement, sand, lightweight ceramsite, hair Raw materials such as foaming agent and water are poured into shape, and the built-in cold-drawn steel wire grid 32 is a new type of energy-saving wall material. The wallboard is poured, leveled, and scientifically maintained in the factory, with good quality and high strength; the prefabricated inner wall The plate 30 has a hollow structure with an elliptical hole 33 vertically, and the wire box and pipeline are conveniently laid in the hole. Because of the hole, the mass is also reduced, and at the same time, it has the functions of thermal insulation and sound insulation.
安装预制内墙板30时,预制内墙板30的榫头对准榫槽进行拼接,预制内墙板30间接缝宽度为8mm,用砂浆嵌缝密实,保持预制内墙板30之间粘牢挤实,预制内墙板30缝槽内贴玻璃纤维布一道,最后再用砂浆找平,这样就能保证整个预制内墙板30板面的精度。When installing the prefabricated interior wall panels 30, the tenons of the prefabricated interior wall panels 30 are aligned with the tenon grooves for splicing. The joint width between the prefabricated interior wall panels 30 is 8mm, and the joints are tightly sealed with mortar to keep the prefabricated interior wall panels 30 firmly glued together. In fact, a piece of glass fiber cloth is pasted in the slits of the prefabricated interior wall panels 30, and finally leveled with mortar, so that the accuracy of the entire prefabricated interior wall panels 30 board surfaces can be guaranteed.
预制内墙板30工厂预制,现场整块直接拼装,替代传统砖砌筑,预制内墙板30具有质量轻、强度高、保温隔热、隔音、防火、快速施工等优点;墙板平整度、垂直度、精度高,可实现墙体免抹灰,整个墙体厚度减小从而增大套内使用面积,免抹灰可避免墙面开裂,现场产生建筑垃圾少。The prefabricated inner wall panel 30 is prefabricated in the factory and directly assembled on site, replacing traditional brick masonry. The prefabricated inner wall panel 30 has the advantages of light weight, high strength, thermal insulation, sound insulation, fire prevention, and rapid construction; the flatness of the wall panel, Verticality and high precision can realize no plastering on the wall, and the thickness of the whole wall is reduced to increase the usable area inside the sleeve. No plastering can avoid cracking of the wall surface, and there is less construction waste on site.
预制内墙板30、现浇外墙20室内一侧粘贴PVC墙纸34,PVC墙纸34以纯纸、无纺布、纺布等为基材,在基材表面喷涂PVC糊状树脂,再经印花、压花等工序加工而成,有较强的质感和较好的透气性,能够较好地抵御油脂和湿气的侵蚀,且难燃隔热、吸音、防霉,不易结露、受机械损伤,表面可擦洗,对酸碱有较强的抵抗能力。Prefabricated interior wall panels 30 and cast-in-place exterior walls 20 are pasted with PVC wallpaper 34 on one side of the room. The PVC wallpaper 34 is based on pure paper, non-woven fabrics, woven fabrics, etc., spraying PVC paste resin on the surface of the substrate, and then printing, Processed by embossing and other processes, it has strong texture and good air permeability, can better resist the erosion of oil and moisture, and is flame-retardant, heat-insulating, sound-absorbing, mildew-proof, and is not easy to condensation and mechanical damage , the surface can be scrubbed and has strong resistance to acid and alkali.
整个住宅户内踢脚线采用木塑踢脚线,相比传统板材踢脚线,木塑踢脚线防水防霉、环保、防虫蛀、不易变形;整个住宅户内门采用木塑门,相比传统板材的户内门,木塑门防水、防霉、环保、防虫蛀、不易变形。The indoor baseboard of the whole residence is made of wood-plastic baseboard. Compared with the traditional board baseboard, the wood-plastic baseboard is waterproof, mildew-proof, environmentally friendly, insect-proof, and not easy to deform; the entire residential door is made of wood-plastic door, which is relatively Compared with traditional plank indoor doors, wood-plastic doors are waterproof, mildew-proof, environmentally friendly, insect-proof, and not easily deformed.
预制楼梯40为预制钢筋混凝土结构,预制楼梯40是在厂通过模具化、机械化生产成的钢筋混凝土楼梯段,预制楼梯40两端分别设有2个安装通孔41,所述楼道口42设有休息平台牛腿43,所述休息平台牛腿43上预埋有固定钢筋44,在现场安装时,预制楼梯40直接吊装在现浇的休息平台牛腿43上,2个安装通孔41分别对应套在每个牛腿上预埋设有的2根固定钢筋44,再用高一等级砂浆灌实安装通孔41,保证预制楼梯40不会跑位;预制楼梯40与休息平台牛腿43的缝隙也用高一等级砂浆进行填补,这样就能保证预制楼梯40安装牢固、不跑位;预制楼梯40在工厂机械化生产,质量比现场浇筑更好,现场直接吊装,工地现场作业量明显减少,粉尘污染、噪音污染也显著降低。The prefabricated staircase 40 is a prefabricated reinforced concrete structure. The prefabricated staircase 40 is a reinforced concrete staircase section produced by moulding and mechanization in the factory. Two installation through holes 41 are respectively provided at both ends of the prefabricated staircase 40. The corridor entrance 42 is provided with The rest platform corbel 43, on which the rest platform corbel 43 is pre-embedded with fixed steel bars 44, during on-site installation, the prefabricated stairs 40 are directly hoisted on the cast-in-place rest platform corbel 43, and the two installation through holes 41 correspond to 2 fixed steel bars 44 are pre-buried on each corbel, and then the installation through hole 41 is filled with a higher level of mortar to ensure that the prefabricated stairs 40 will not move; the gap between the prefabricated stairs 40 and the rest platform corbel 43 It is also filled with a higher grade of mortar, so as to ensure that the prefabricated stairs 40 are installed firmly and do not move; the prefabricated stairs 40 are mechanized in the factory, and the quality is better than that of on-site pouring. The site is directly hoisted, and the amount of work on the site is significantly reduced. Pollution and noise pollution are also significantly reduced.
整体卫浴50为预制板拼装结构,整体卫浴50与所述框架结构主体10的卫生间位51拼装连接;整体卫浴50采用SMC(航空材料)为原料,SMC材料为防水材料,通过一体化设计并经工厂标准化生产出防水底盘53、卫浴墙板54、卫浴顶板55三大主体,配套卫浴设施以及上下水系统、电路系统,组成一个完整的卫浴;整体卫浴50采用标准化及规范化的高效率装配方式安装,现场先安装防水底盘53,再安装卫浴墙板54,最后安装卫浴顶板55,相当于形成盒体结构,防水底盘53、卫浴墙板54、卫浴顶板55三大主体拼接处打胶,最后再安装配套卫浴设施以及上下水系统、电路系统;卫浴顶板55上开天花检修口,用于安装时接驳给水、电工,作以及后期日常检修;防水底盘53、卫浴壁板、卫浴顶板55现场直接拼装,传统卫生间的墙、地瓷砖分别被整体卫浴50的SMC防水底盘53、SMC卫浴墙板54取代,免除了传统卫生间贴墙地瓷砖,免贴墙地瓷砖可彻底避免墙地瓷砖空鼓;整体卫浴50的门采用木塑浴室门,浴室柜采用木塑浴室柜,相比传统板材的户内门、浴室柜,木塑门、木塑浴室柜具有防水、防霉、环保、防虫蛀、不易变形等优点;现场直接拼装,底盘一次整体成型,质量稳定,可彻底解决卫生间渗漏问题,真正实现工业化生产,现场不产生建筑垃圾,绿色环保。The integral bathroom 50 is a prefabricated panel assembly structure, and the integral bathroom 50 is assembled and connected with the toilet seat 51 of the frame structure main body 10; the integral bathroom 50 uses SMC (aviation material) as a raw material, and the SMC material is a waterproof material. The factory standardizes the production of waterproof chassis 53, bathroom wall panels 54, and bathroom top panels 55. The supporting bathroom facilities, water and water systems, and circuit systems form a complete bathroom; the overall bathroom 50 is installed in a standardized and standardized high-efficiency assembly method , first install the waterproof chassis 53 on site, then install the bathroom wall panel 54, and finally install the bathroom top panel 55, which is equivalent to forming a box structure. Install supporting bathroom facilities, water and water systems, and circuit systems; a ceiling inspection port is opened on the bathroom roof 55, which is used for connecting water supply, electrician, work, and subsequent daily maintenance during installation; waterproof chassis 53, bathroom wall panels, and bathroom roof 55 are directly installed on site. Assembled, the wall and floor tiles of the traditional bathroom are replaced by the SMC waterproof chassis 53 and the SMC bathroom wall panel 54 of the overall bathroom 50, which eliminates the need for traditional bathroom wall and floor tiles, which can completely avoid wall and floor tile hollowing; The door of the overall bathroom 50 is made of wood-plastic bathroom door, and the bathroom cabinet is made of wood-plastic bathroom cabinet. Not easy to deform and other advantages; directly assembled on site, the chassis is integrally formed at one time, the quality is stable, it can completely solve the problem of toilet leakage, truly realize industrial production, no construction waste is generated on site, and it is green and environmentally friendly.
楼地板13在卫生间位51预留排水洞口,并且在预留排水洞口处预埋有止水节52,避免传统的套管预埋,止水节52直接预留于现浇板中,省去二次穿管补洞等多道工序,止水节52与混凝土粘接牢固,够有效防治管道根部渗漏水,与PVC排水管连接方便,安装简单,可有效解决卫生间渗水隐患,提高工程质量。止水节52为成品PVC止水节52,在卫生间楼板浇筑混凝土施工时,直接预埋于楼板混凝土中,由于止水节52异形外壁的异形结构可与混凝土充分接触,粘接紧密,可有效防治管道根部渗漏水。The floor 13 reserves a drainage hole in the bathroom 51, and a water stop section 52 is pre-buried at the reserved drainage hole to avoid the traditional casing pre-embedding. The water stop section 52 is directly reserved in the cast-in-place slab, eliminating the need for Multiple processes such as secondary piercing and hole filling, the water stop section 52 is firmly bonded to the concrete, which can effectively prevent water leakage at the root of the pipe, and it is convenient to connect with the PVC drainage pipe, and the installation is simple, which can effectively solve the hidden danger of water seepage in the toilet and improve the quality of the project . The water stop section 52 is a finished PVC water stop section 52, which is directly embedded in the floor concrete when pouring concrete on the floor of the bathroom. Because the special-shaped structure of the special-shaped outer wall of the water stop section 52 can fully contact with the concrete, the bonding is tight, which can effectively Prevent water leakage at the root of the pipe.
整体卫浴50具有排水管,排水管与止水节52相通连接;排水管与止水节52缝隙用密封胶密封,保证排水管与止水节52缝隙不会渗漏,这样就形成了整个住宅的卫生间下排水系统,彻底解决下排水渗漏问题。The overall bathroom 50 has a drain pipe, and the drain pipe is connected to the water stop section 52; the gap between the drain pipe and the water stop section 52 is sealed with a sealant to ensure that the gap between the drain pipe and the water stop section 52 will not leak, thus forming a whole house. The bathroom drainage system completely solves the problem of drainage leakage.
整体厨房60为预制板拼装结构,整体厨房60与框架结构主体10的厨房位61拼装连接;整体厨房60通过一体化设计并经工厂标准化生产出厨房底盘62、厨房墙板63、厨房顶板64三大主体形成一个整体,供装设配套的厨房设施以及上下水系统、电路系统,组成一个完整的厨房;厨房底盘62材料为玻璃钢、厨房墙板63和厨房顶板64材料均为彩钢板;现场安装先安装厨房底盘62,再安装厨房墙板63,最后安装厨房顶板64,并形成盒体结构,厨房墙板63的下端与厨房底盘62四周拼装连接,厨房墙板63的上端与厨房顶板64的四周拼装连接,厨房底盘62、厨房墙板63、厨房顶板64三大主体拼接处打胶;传统厨房的墙、地瓷砖分别被整体厨房60的厨房底盘62、厨房墙板63取代,免贴墙地瓷砖可彻底避免墙地瓷砖空鼓;整体厨房60采用标准化及规范化的高效率装配方式,现场直接拼装,安装快,质量稳定,真正实现工业化生产,现场不产生建筑垃圾,绿色环保。The integrated kitchen 60 is a prefabricated panel assembly structure, and the integrated kitchen 60 is assembled and connected with the kitchen position 61 of the frame structure main body 10; the integrated kitchen 60 is designed and standardized by the factory to produce a kitchen chassis 62, a kitchen wall panel 63, and a kitchen top panel 64. The large main body forms a whole for the installation of supporting kitchen facilities, water and water systems, and circuit systems to form a complete kitchen; the kitchen chassis 62 is made of fiberglass, the kitchen wall panels 63 and the kitchen roof 64 are made of color steel plates; on-site installation First install the kitchen chassis 62, then install the kitchen wall panel 63, and finally install the kitchen top plate 64 to form a box structure. Assembled and connected around, glue is applied to the joints of the three main parts of the kitchen chassis 62, kitchen wall panel 63, and kitchen roof panel 64; the wall and floor tiles of the traditional kitchen are replaced by the kitchen chassis 62 and kitchen wall panel 63 of the integral kitchen 60, free of wall stickers Floor tiles can completely avoid hollowing of wall and floor tiles; the overall kitchen 60 adopts a standardized and standardized high-efficiency assembly method, which can be assembled directly on site, fast in installation, and stable in quality. It truly realizes industrial production, does not generate construction waste on site, and is environmentally friendly.
楼地板13上面设有自流找平层131,楼地板13采用自流平砂浆找平,替代传统水泥砂浆找平,不起尘、不起层,平整度高,减少对水泥、砂的占用;自流找平层131上面设有地砖132,地砖132采用胶泥铺贴,取代传统水泥砂浆,纯干法施工,工作面整洁、干净,铺贴厚度只有2cm,从而实现地砖132薄贴,房间净高可以提升,地砖132空鼓率大大减少,地面也更加平整。There is a self-leveling layer 131 on the floor 13, and the floor 13 is leveled with self-leveling mortar, which replaces the traditional cement mortar for leveling. It does not prevent dust and layers, has high flatness, and reduces the occupation of cement and sand; the self-leveling layer 131 There are floor tiles 132 on it. The floor tiles 132 are paved with cement instead of traditional cement mortar. The pure dry construction makes the working surface neat and clean. The hollowing rate is greatly reduced and the ground is smoother.
本住宅还包括有屋面板70,屋面板70具有钢纤维钢筋混凝土结构,在屋面板70的钢筋混凝土中加入钢纤维,钢纤维能够有效地阻碍混凝土内部微裂缝的扩展及宏观裂缝的形成,显著地改善了混凝土的抗拉、抗弯、抗冲击及抗疲劳性能,从而大大提高了住宅屋面的防水性能;所述屋面板70上设预制屋面保温复合板71,预制屋面保温复合板71采用XPS隔热板72和混凝土板73复合在一起,在工厂通过机械化生产,质量能得到更好地控制,工地现场直接拼装,作业量明显减少,粉尘污染、噪音污染显著降低;框架结构主体10的顶端还具有屋面板70,预制屋面保温复合板71与屋面板70拼装连接。This house also includes a roof panel 70, the roof panel 70 has a steel fiber reinforced concrete structure, steel fibers are added to the reinforced concrete of the roof panel 70, the steel fiber can effectively prevent the expansion of micro cracks inside the concrete and the formation of macro cracks, significantly The tensile strength, bending resistance, impact resistance and fatigue resistance of concrete are greatly improved, thereby greatly improving the waterproof performance of the residential roof; the roof panel 70 is provided with a prefabricated roof insulation composite board 71, and the prefabricated roof insulation composite board 71 adopts XPS The insulation board 72 and the concrete board 73 are combined together, and the quality can be better controlled through mechanized production in the factory, and the construction site is directly assembled, the workload is significantly reduced, and the dust pollution and noise pollution are significantly reduced; the top of the frame structure main body 10 There is also a roof panel 70, and the prefabricated roof insulation composite board 71 is assembled and connected with the roof panel 70.
本住宅在阳台、屋面这些遇水区域,采用结构面找坡,通过对结构面进行找坡来排水,从而实现结构自防水。In the water-contacting areas such as balconies and roofs, this house adopts slope finding on the structural surface, and drains water through slope finding on the structural surface, so as to realize the self-waterproofing of the structure.
本住宅还包括有地下室,地下室包括有地坪面层81,地坪面层81具有钢纤维混凝土结构,在混凝土中掺入乱向分布的钢纤维,这些乱向分布的钢纤维能够有效地阻碍混凝土内部微裂缝的扩展及宏观裂缝的形成,显著地改善了混凝土的抗拉、抗弯、抗冲击及抗疲劳性能,从而大大提高地下室地坪面层81的防水性能;地下室地坪面层81采用激光整平机收面,保证地面的水平度、平整度的高精度,相比传统方式收面,地面更加平整。This house also includes a basement, the basement includes a floor surface 81, the floor surface 81 has a steel fiber concrete structure, and steel fibers distributed in random directions are mixed into the concrete, and these steel fibers distributed in random directions can effectively block The expansion of micro-cracks inside the concrete and the formation of macro-cracks significantly improve the tensile, bending, impact and fatigue resistance of concrete, thereby greatly improving the waterproof performance of the basement floor surface 81; the basement floor surface 81 The laser leveling machine is used to close the surface to ensure the levelness and high precision of the flatness of the ground. Compared with the traditional method of closing the surface, the ground is smoother.
本住宅地坪面层81上表面设金刚砂层82,地下室地坪面层81施工时在钢纤维混凝土表面干撒金刚砂,最后在金刚砂层82表面再做密封固化剂层83,完成后地坪面层81坚硬耐磨,防尘防滑、抗压抗渗、抗化学性、光亮环保。Carborundum layer 82 is set on the upper surface of the floor surface layer 81 of this house. During the construction of the basement floor surface layer 81, emery is dryly sprinkled on the steel fiber concrete surface, and finally a sealing and curing agent layer 83 is made on the surface of the emery layer 82. After completion, the floor surface Layer 81 is hard and wear-resistant, dust-proof, anti-skid, pressure-resistant, anti-seepage, chemical-resistant, bright and environmentally friendly.
本住宅的整体卫浴50、整体厨房60、地下室结构底板80、屋面板70、阳台板防水采用自愈合防水方式,其原理是在混凝土结构中掺入或表面涂刷具有活性化学物质的防水材料,活性化学物质在水的作用下,不断与混凝土内未水化的水泥颗粒发生水合反应,并促进水泥水化,生成大量不溶于水,并具有生长能力的晶体,不断愈合混凝土结构内部缝隙,使得混凝土结构密不透水,实现以水治水,可实现零渗透,防治渗漏与主体结构同寿;材料不含任何有机挥发物,也不含任何导致恶化大气和水源的物质,安全环保。The whole bathroom 50, the whole kitchen 60, the basement structure floor 80, the roof slab 70, and the balcony board of this house adopt self-healing waterproof method, the principle is to mix or brush the waterproof material with active chemical substances in the concrete structure , under the action of water, the active chemical substances continuously hydrate with the unhydrated cement particles in the concrete, promote the hydration of the cement, generate a large number of crystals that are insoluble in water and have the ability to grow, and continuously heal the internal gaps of the concrete structure. Make the concrete structure impermeable, realize water control, achieve zero penetration, prevent leakage and have the same life as the main structure; the material does not contain any organic volatiles, nor does it contain any substances that cause deterioration of the atmosphere and water sources, safe and environmentally friendly.
以上仅为本实用新型的具体实施例,并不以此限定本实用新型的保护范围;在不违反本实用新型构思的基础上所作的任何替换与改进,均属本实用新型的保护范围。The above are only specific embodiments of the utility model, and do not limit the protection scope of the utility model; any replacement and improvement made on the basis of not violating the concept of the utility model all belong to the protection scope of the utility model.
Claims (13)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720430968.7U CN206681418U (en) | 2017-04-21 | 2017-04-21 | The industrialization commercial residential buildings of energy-conserving and environment-protective |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720430968.7U CN206681418U (en) | 2017-04-21 | 2017-04-21 | The industrialization commercial residential buildings of energy-conserving and environment-protective |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206681418U true CN206681418U (en) | 2017-11-28 |
Family
ID=60403900
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720430968.7U Active CN206681418U (en) | 2017-04-21 | 2017-04-21 | The industrialization commercial residential buildings of energy-conserving and environment-protective |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206681418U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106958358A (en) * | 2017-04-21 | 2017-07-18 | 佛山市万科置业有限公司 | The industrialization commercial residential buildings of energy-conserving and environment-protective |
| CN114809380A (en) * | 2022-04-15 | 2022-07-29 | 厦门东翔工程设计有限公司 | Full concrete outer wall construction process |
-
2017
- 2017-04-21 CN CN201720430968.7U patent/CN206681418U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106958358A (en) * | 2017-04-21 | 2017-07-18 | 佛山市万科置业有限公司 | The industrialization commercial residential buildings of energy-conserving and environment-protective |
| CN114809380A (en) * | 2022-04-15 | 2022-07-29 | 厦门东翔工程设计有限公司 | Full concrete outer wall construction process |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101265723B (en) | Architecture structure system assembled by composite building board and building method | |
| CN104358341B (en) | A kind of building masonry and construction masonry method | |
| Spence et al. | Construction materials, methods and techniques | |
| CN106522359B (en) | Fully-assembled village and town dwelling type composite wall structure system and construction method thereof | |
| CN106958358A (en) | The industrialization commercial residential buildings of energy-conserving and environment-protective | |
| CN102248577A (en) | Superlight-foamed-cement-based manufacturing process for thermal-insulation bearing wall panel | |
| CN106121231A (en) | A kind of skyscraper interts cross construction method | |
| CN206681418U (en) | The industrialization commercial residential buildings of energy-conserving and environment-protective | |
| CN203394108U (en) | Fabricated bathroom | |
| CN108755968A (en) | Assembling synthesis building and its construction method | |
| CN205116541U (en) | Foaming light aggregate concrete partition plate | |
| CN205348554U (en) | Assembled wallboard and assembled station room | |
| CN111962715A (en) | Hollow outer wall body structure and preparation method thereof | |
| CN107415044B (en) | A prefabricated non-load-bearing reinforced concrete-aerated concrete composite wall panel | |
| CN211523508U (en) | Be used for house heat preservation intergral template external wall insulation node | |
| CN114753675A (en) | Assembled steel module system country villa and construction method thereof | |
| CN104153576A (en) | Construction methods for building combined buildings | |
| CN111254937A (en) | Installation method of fabricated building | |
| CN1888344B (en) | Composite thermal insulation concrete load-bearing wall | |
| CN207672761U (en) | A waterproof structure at the intersection of floor slab and steel plate wall | |
| CN205171752U (en) | Prefabricated light steel partition wall and mounting structure thereof | |
| CN215054296U (en) | High strength fire prevention heat preservation partition wall structure | |
| CN206233455U (en) | A kind of integral light precast concrete wall panel with exterior window trim | |
| CN1314870C (en) | Method of dry construction of energy saving walls with 3D adjustment | |
| CN204326275U (en) | Polyurethane composite thermal insulation template |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20180103 Address after: 519031 Guangdong city of Zhuhai province Hengqin Baohua Road No. 6, room 105, -29964 (central office) Co-patentee after: FOSHAN VANKE PROPERTY SERVICE Co.,Ltd. Patentee after: GUANGDONG KEZHU CONSTRUCTION MANAGEMENT Co.,Ltd. Address before: 528200 Guangdong Province Nanhai District of Foshan city streets Guicheng GUI Lan Road Vanke Golden International Garden 23 room 10, building 2 room 701 by -1 Patentee before: FOSHAN VANKE PROPERTY SERVICE Co.,Ltd. |
|
| PP01 | Preservation of patent right | ||
| PP01 | Preservation of patent right |
Effective date of registration: 20250903 Granted publication date: 20171128 |