CN103397790A - Assembled bathroom and installation process - Google Patents

Assembled bathroom and installation process Download PDF

Info

Publication number
CN103397790A
CN103397790A CN2013102846496A CN201310284649A CN103397790A CN 103397790 A CN103397790 A CN 103397790A CN 2013102846496 A CN2013102846496 A CN 2013102846496A CN 201310284649 A CN201310284649 A CN 201310284649A CN 103397790 A CN103397790 A CN 103397790A
Authority
CN
China
Prior art keywords
chassis
ground
building
wallboard
metope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102846496A
Other languages
Chinese (zh)
Inventor
何涛
周超斌
刘军
谢圆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Vanke Co Ltd
Original Assignee
China Vanke Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Vanke Co Ltd filed Critical China Vanke Co Ltd
Priority to CN2013102846496A priority Critical patent/CN103397790A/en
Publication of CN103397790A publication Critical patent/CN103397790A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The invention provides an assembled bathroom comprising a floor, a wall face and a ceiling. The floor comprises a bottom plate with a floor drain hole and a decorative layer arranged on the bottom plate. The edge of the bottom plate is provided with an installation groove, the bottom or the inner side of the installation groove is communicated with the position, below the decorative layer, of the bottom plate, and the installation groove is assembled in the ground of a building in a mode that the floor drain hole is communicated with a sewer of the building and the edge of the installation groove is adjacent to the wall face of the building. The wall face comprises a plurality of vertical wall plates attached to the wall face in a splicing mode, and the bottom of each wall plate is embedded in the installation groove of the bottom plate. The ceiling is arranged on the top of the wall face. The invention further provides an installation process of the assembled bathroom. The prefabricated bottom plate, the decorative layer, the wall plates and the ceiling are assembled in a bathroom space of the building on site to form the bathroom, so that finish procedures of the bathroom are simplified and the finish schedule is shortened.

Description

Between the assembling bathroom, reach mounting process
Technical field
The present invention relates to the house decoration field, more particularly, relate between a kind of assembling bathroom and mounting process.
Background technology
Between bathroom, be requisite functional space in house, the finishing of washroom is in whole house decoration, to relate to operation to do one of many, that the duration is the longest projects.
Between present bathroom, adopt the structures such as masonry panel, pipeline set aside pre-embedded, waterproofing course, sticking brick, its construction technology process is as follows: (1) building wall; (2) water service pipe and conduit fluting; (3) water service pipe, conduit tubine; (4) preformed groove sealing; (5) the metope ash cake is made; (6) floated coat construction; (7) ground concrete levelling; (8) construction of waterproof layer; (9) waterproof is closed the water check; (10) metope and the construction of ground waterproof topping; (11) metope and floor tile are transported to that indoor, binder for face brick stirs, metope paving walltile; (12) paving floor tile; (13) finished surface closes the water check; (14) completion quality inspection.
As can be known by the work progress between above-mentioned bathroom, its operation is very numerous and diverse, and (comprise without hollowing because the national acceptance standard is high, butt joint difference of height, surface finish all have clear and definite regulation), therefore constructor's technical ability is had relatively high expectations, in the situation that at present a large amount of real estate and house decoration, existing workman can't meet the requirement of quality and the quantity of job site.And, due to the construction of must just marching into the arena after civil engineering structure completes between bathroom, cause the practice of construction time short, can't ensure the quality of products.In addition, after the construction of waterproof layer between bathroom is complete, also have a lot of operations not complete, very easily in follow-up construction, waterproofing course is damaged, cause in the later stage use procedure, seepage occurring between bathroom.
Between existing bathroom, also have that site operation environmental protection and energy saving are poor (need to carry out on-site cutting by building size by wall brick, floor tile, dust is large, low precision, cracky, the proportion of goods damageds be high), the problem such as maintenance difficult (in case leakage problems occurs, original finishing surface, waterproofing course, pipeline etc. need to be cut again).
Summary of the invention
The technical problem to be solved in the present invention is, for the problem that between above-mentioned house bathroom, construction is complicated, the duration is grown, provides between a kind of assembling bathroom and mounting process.
The technical scheme that the present invention solves the problems of the technologies described above is, provides between a kind of assembling bathroom, comprises ground, metope and smallpox, and described ground comprises chassis with ground small opening, is installed in the finish coat on chassis; Bottom or inboard chassis with the finish coat below that the edge on described chassis is provided with mounting groove and this mounting groove are communicated with, and the sewer of building with the connection of ground small opening, mode that edge is close to respectively the metope of building are assembled to the ground of building; Described metope by a plurality of vertical wallboard wall covering surfaces, be spliced and the mounting groove on the embedding chassis, bottom of each wallboard in; Described smallpox is arranged on the top of metope.
In between assembling bathroom of the present invention, described smallpox is formed by at least two mold pressing ceiling splicings and described mold pressing ceiling and wallboard contact portion are provided with U-lag, and the top of described wallboard embeds described U-lag.
In between assembling bathroom of the present invention, the bottom on described chassis is erected on the ground of building by a plurality of adjustable ground foot bolts, and the upper surface on described chassis has drainage grade centered by the ground small opening, 1.5%.
In between assembling bathroom of the present invention, described chassis is provided with the finish coat that protrudes from chassis and this chassis is divided into to two-part water-blocking bank, and described ground small opening is positioned at the below of water-blocking bank; One side of the water-blocking bank on described chassis has on access hole and described access hole and is coated with cover plate, on described cover plate, has toilet sewer pipe installing hole.
In between assembling bathroom of the present invention, the upper surface on the chassis of described water-blocking bank both sides has respectively a plurality of outstanding supporters, and described finish coat is erected on described supporter; Described water-blocking bank both sides are respectively equipped with the draining double-edged fine-toothed comb that is parallel to water-blocking bank.
In between assembling bathroom of the present invention, the back side of described wallboard has many with equally distributed vertical rib, in the gap of the vertical rib at the back side of at least part of described wallboard, is provided with water/electric line.
In between assembling bathroom of the present invention, described wallboard is divided into rotary corner plate and surface plate, and adjacent two blocks of wallboards have respectively vertical male groove and female groove and realize splicing by the mode that male groove embeds female groove in splicing place.
In between assembling bathroom of the present invention, the middle part of described public groove has vertical groove and this groove is communicated with the mounting groove on chassis.
In between assembling bathroom of the present invention, the upper surface of the front of described wallboard and the finish coat on ground has respectively by the bonding ceramic tile of tile binding material.
The present invention also provides the mounting process between a kind of assembling bathroom, between this assembling bathroom, comprises ground, metope and smallpox, comprises the following steps:
(a) will have the ground small opening chassis with the ground small opening be communicated with the sewer of building, the mode that edge is close to respectively the metope of building is assembled to the ground of building, and assembles finish coat on described chassis;
(b) a plurality of vertical wallboards are spliced into to metope in the mode that bottom embeds the mounting groove of chassis edge respectively, the bottom of the mounting groove of described chassis edge or inboardly be communicated with the chassis below finish coat;
(c) in the top of described metope assembling smallpox.
Between assembling bathroom of the present invention, reach mounting process, prefabricated chassis, finish coat, wallboard and the smallpox sanitary and balneal room Assembling in building become between bathroom,, can simplify finishing operation, shortening finishing duration between bathroom.And because above-mentioned splicing component is prefabricated, so industrialization degree is high, and is quality controllable, avoided the quality problems that cause due to workman's difference of technology level.
The accompanying drawing explanation
Fig. 1 is the floor map of embodiment between assembling bathroom of the present invention.
Fig. 2 is the schematic cross-section on ground in Fig. 1.
Fig. 3 is the mounting structure schematic diagram on chassis in Fig. 1.
Fig. 4 is the floor map on chassis in Fig. 1.
Fig. 5 is the schematic diagram of cover plate.
Fig. 6 is the schematic cross-section of Fig. 5 cover plate.
Fig. 7 is the schematic diagram of wallboard.
Fig. 8 is the schematic diagram of another wallboard.
Fig. 9 is the schematic cross-section of Fig. 8 deadlight.
Figure 10 is wallboard splicing construction schematic diagram.
Figure 11 is wallboard and chassis splicing construction schematic diagram.
Figure 12 is the structural representation of smallpox.
Figure 13 is the partial enlarged drawing at A place in Figure 12.
Figure 14 is the partial enlarged drawing at B place in Figure 12.
The specific embodiment
In order to make purpose of the present invention, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not intended to limit the present invention.
As shown in Figure 1-2, be the schematic diagram of embodiment between assembling bathroom of the present invention.Between this bathroom, comprise ground 10, metope 20 and smallpox, above-mentioned ground 10 comprise have ground small opening 111 chassis 11, be installed in the finish coat 12 on chassis 11; And bottom or inboard that 11De edge, above-mentioned chassis is provided with mounting groove 114 and this mounting groove 114 are communicated with the chassis 11 of finish coat 12 belows, and the mode of the sewer that build with 111 connections of ground small opening on this chassis 11, the metope (example is exterior wall 60, interior wall 50 as shown in Figure 1) that edge is close to respectively building is assembled to the ground of building; Metope 20 by a plurality of vertical wallboard wall covering surfaces, be spliced and the mounting groove 114 on the embedding chassis, bottom 11 of each wallboard in; Smallpox is arranged on the top of metope 20.
FRP(FiberReinforcedPolymer can be adopted in above-mentioned chassis 11, fibre-reinforced plastics) the waterproofing materials one-shot forming such as, so it has good water resistance, between the assembling bathroom before construction, without in building, doing waterproof construction and waterproof test, greatly shortened the duration.
On chassis 11, also water-blocking bank 14 can be set, this water-blocking bank 14 protrudes from the finish coat 12 on chassis 11, and this chassis 11 is divided into to dried district (toilet is installed) and wet district (being mainly shower area) two parts.Ground small opening 111 is positioned at the below of water-blocking bank 14.Above-mentioned water-blocking bank 14 can with chassis 11 one, or adopt independently parts and be assembled to chassis 11.
As shown in Fig. 2,4-6, one side of the water-blocking bank 14 on chassis 11 (doing district) can arrange access hole 112, the upper surface that is coated with this cover plate 15 of cover plate 15(on this access hole 112 can be laid finish coat 12), and on this cover plate 15, have toilet sewer pipe installing hole 151.Toilet 18 can be arranged on cover plate 15.By access hole 112, can realize the ground water pipe of the building of 11 belows, chassis or electric wire etc. are safeguarded to (such as sewer from blocking etc.).
The edge of the bottom surface of above-mentioned cover plate 15 is provided with the concentric public groove of at least two circles, and the edge of the access hole 112 on chassis 11 is provided with the concentric female groove of at least two circles, and cover plate 15 is attached to chassis 11 in the mode that male groove embeds female groove.By said structure, can effectively prevent the infiltration at access hole 112 places.
Upper surface on the chassis 11 of water-blocking bank 14 both sides, have respectively a plurality of outstanding supporters 115, and finish coat 12 is erected on supporter 115.In water-blocking bank 14 both sides, be respectively equipped with the draining double-edged fine-toothed comb 13 that is parallel to water-blocking bank 14.Water at the upper surface of finish coat 12 can also can be fed directly between the supporter 115 on chassis 11 in the edge gap of finish coat 12 by draining double-edged fine-toothed comb 13 inflow place small openings 111, and final inflow place small opening 111.
Especially, the bottom on above-mentioned chassis 11 is erected at by a plurality of adjustable stone bolt 19 that on the ground of building, (for example above-mentioned stone bolt 19 can be located at the below of the mounting groove 114 on chassis 11, to accept the weight of wallboard; In addition, near access hole 112, also stone bolt 19 can be set, to accept the weight of toilet 18), and the upper surface on this chassis 11 has drainage grade centered by ground small opening 111,1.5% (namely small opening 111 is positioned at the lowest part on chassis 11).On the ground of building (space between bathroom), can build a plurality of concrete block of wood 40, and on this concrete block of wood 40, lay hot-dip galvanizing sheet steel 41, the bottom of stone bolt 19 is supported on hot-dip galvanizing sheet steel 41, apical support on chassis 11 bottom (bottom on chassis 11 can arrange corresponding stone bolt 19 installation positions).The drainage grade on chassis 11 can pass through the height of the stone bolt 19 of adjusting diverse location to be realized.
The wallboard that is spliced into metope 20 can comprise that rotary corner plate 21 shown in Figure 7 and surface plate 22(shown in Figure 8 are respectively vertical strip), wherein rotary corner plate 21 splicings are at the place, corner of building.Certainly, in use, wallboard comprises more specification, and for example the body of wall in Fig. 1 is spliced by the wallboard of six kinds of different sizes.
Above-mentioned rotary corner plate 21 and surface plate 22 be integrated molding in factory all, therefore can realize the seamless spliced of place, corner, makes whole metope 20 shape all-in-one-piece waterproofing systems, has thoroughly stopped the possibility of water percolation of wall.Below as an example of the surface plate 22 shown in Fig. 8 example the explanation wallboard structure, the structure of rotary corner plate 21 is identical with the structure of surface plate 22.
Surface plate 22 comprises the Polymer by FRP(Fiber Reinforced) FRP plate 221 that material forms, the back side of this FRP plate has many end portion supports with equally distributed vertical rib 2211 and this vertical rib 2211 on the metope of building.Above-mentioned vertical rib 2211 can increase the intensity of surface plate 22, and vertical rib 2211 also and between metope leaves gap towards the metope of building when mounted.The thickness of FRP plate 221 (comprising vertical rib 2211) can be the 4CM left and right.
And, between above-mentioned vertical rib 2211, can be in advance fixing water/electric line, thereby can avoid the concrete wall fluting wiring in erecting bed.
The front of the FRP plate 221 of above-mentioned surface plate 22, be bonded with ceramic tile 223(prefabrication by tile binding material 222).The thickness of above-mentioned tile binding material 222 and ceramic tile 223 is the 1CM left and right.Thereby the thickness of whole surface plate is about 5CM.The upper surface of the finish coat 12 on ground 10 is prefabricated ceramic tile by the way also.
At the two ends of the FRP of surface plate 22 plate 221, be respectively equipped with vertical male groove 2212 and female groove 2213.As described in Figure 10, adjacent two blocks of wallboards (comprising surface plate 22 and rotary corner plate 21) are when splicing, and male groove 2212 embeds female groove 2213, thereby splicing place of wallboard is connected closely, are difficult for infiltration.
In addition, vertical groove and this groove can be set at the middle part of above-mentioned public groove 2212 is communicated with the mounting groove 114 on chassis 11.Like this, as shown in figure 11, because the bottom of wallboard is installed in the mounting groove 114 on chassis 11, even splicing place of wallboard infiltration, the current of infiltration also flow into the mounting groove 114 on chassis 11 by groove, and along the ground small opening 111 on mounting groove 114 inflow chassis 11.
As shown in Figure 12-14, smallpox is spliced by at least two mold pressing ceilings 31.Above-mentioned mold pressing ceiling 31 can adopt SMC(Sheet Molding Compound) materials processing forms, and mold pressing ceiling 31 is provided with U-lag 311 with the wallboard contact portion, and the top of wallboard embeds in U-lag 311.
Predeterminable on above-mentioned mold pressing ceiling 31 have light fixture, a super bath installing hole 32.Above-mentioned installing hole 32 can be simultaneously as the water pipe in later stage, the manhole of electric wire, be convenient to maintenance, renewal and the maintenance of later stage while using.
Certainly, in actual applications, smallpox also can adopt existing ceiling structure.
Sticking brick or stone material are adopted in metope between above-mentioned assembling bathroom, ground, meet present masses' habits and customs; And between above-mentioned assembling bathroom, adopt the integral type water-proof chassis, water resistance is good, and the civil engineering waterproof can be cancelled, and reduces operation, reduces construction cost.The systems such as feedwater, draining, illumination, all adopt the mode of the bright dress of pipeline, and installation, maintenance and later stage are changed equal convenience and high-efficiency.
The present invention also provides the mounting process between a kind of assembling bathroom, between this assembling bathroom, comprises ground, metope and smallpox, comprises the following steps:
The first step: will have the chassis 11 of ground small opening 111 with ground small opening 111, be communicated with assembling finish coat 12 on the ,Bing Zai chassis, ground 11 that the sewer of building, mode that edge is close to respectively the metope of building be assembled to building.This step can complete in civil engineering, the installation exercise face is carried out after transferring (the hydroelectric line joint is pre-buried putting in place all).
Particularly, this step can comprise: first concrete block of wood 40 opsition dependents of foundation bolt for supporting are built by laying bricks or stones and put in place, surface levelness error ± 5cm; Then chassis 11 is placed on concrete block of wood 40 by stone bolt 19, after on chassis 11, floor drain, floor drain soil pipe all are in place in advance, by stone bolt 19, carries out Level-adjusting; Last finish coat 12, artificial stone material are installed successively on chassis 11 checkdam 14, draining double-edged fine-toothed comb 13.
Second step: a plurality of vertical wallboards are spliced into to metope 20 in the mode of the mounting groove 114 at 11 edges, embedding chassis, bottom respectively, the bottom of the mounting groove 114 at 11 edges, chassis or inboardly be communicated with the chassis 11 below finish coat.
Particularly, can before assembled, the water of concealed work, electric line be installed to fix in position in advance at the back side of wallboard, then each wallboard is fixed, support by the mounting groove on chassis.First block of wallboard starts to install from door 28 rotary corner plates, then with the male and female groove connecting method, fills second block of wallboard, the 3rd block of wallboard, the 4th block of wallboard, presses counterclockwise according to this until the wallboard of last piece wallboard of doorway and first installation splicing sealing backward.
The 3rd step: in the top of metope assembling smallpox.Smallpox supports, fixes by the top that the U-lag that carries blocks wallboard.
After the smallpox installation, the water service pipe, the fulgurite that are arranged in advance after wallboard can be docked with water, the electric connection of embedment for Civil Works; Then stone material exterior window trim 29, door pocket 27, door 28 etc. are installed; Finally install five metals (such as tissue holder 26, toilet brush take in 16, showerhead 25 etc.), sanitary equipment (such as toilet 18), combined socket and switch, light fixture, super bath etc.
After installing, the finishing between bathroom namely completes.By survey data, show, two people install between a cover assembling bathroom and only need 0.5 work day (conventional on-site wet combining ceramic tile needs 14 work days, relates to 6 work posts).And the job site overall process does not have the participation of water, can reduce construction pollution; There is no on-the-spot secondary operation (as operations such as ceramic tile cuttings), the dust pollution in work progress is down to minimum, can reduce spillage of material, reduce building costs.
The above; only be the present invention's specific embodiment preferably, but protection scope of the present invention is not limited to this, anyly is familiar with those skilled in the art in the technical scope that the present invention discloses; the variation that can expect easily or replacement, within all should being encompassed in protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain of claim.

Claims (10)

1. between an assembling bathroom, comprise ground, metope and smallpox, it is characterized in that: described ground comprises chassis with ground small opening, is installed in the finish coat on chassis; Bottom or inboard chassis with the finish coat below that the edge on described chassis is provided with mounting groove and this mounting groove are communicated with, and the sewer of building with the connection of ground small opening, mode that edge is close to respectively the metope of building are assembled to the ground of building; Described metope by a plurality of vertical wallboard wall covering surfaces, be spliced and the mounting groove on the embedding chassis, bottom of each wallboard in; Described smallpox is arranged on the top of metope.
2. between assembling bathroom according to claim 1, it is characterized in that: described smallpox is formed by at least two mold pressing ceiling splicings and described mold pressing ceiling and wallboard contact portion are provided with U-lag, and the top of described wallboard embeds described U-lag.
3. between assembling bathroom according to claim 1, it is characterized in that: the bottom on described chassis is erected on the ground of building by a plurality of adjustable ground foot bolts, and the upper surface on described chassis has drainage grade centered by the ground small opening, 1.5%.
4. between assembling bathroom according to claim 1, it is characterized in that: described chassis is provided with the finish coat that protrudes from chassis and this chassis is divided into to two-part water-blocking bank, and described ground small opening is positioned at the below of water-blocking bank; One side of the water-blocking bank on described chassis has on access hole and described access hole and is coated with cover plate, on described cover plate, has toilet sewer pipe installing hole.
5. between assembling bathroom according to claim 3, it is characterized in that: the upper surface on the chassis of described water-blocking bank both sides has respectively a plurality of outstanding supporters, and described finish coat is erected on described supporter; Described water-blocking bank both sides are respectively equipped with the draining double-edged fine-toothed comb that is parallel to water-blocking bank.
6. between assembling bathroom according to claim 1, it is characterized in that: the back side of described wallboard has many with equally distributed vertical rib, in the gap of the vertical rib at the back side of at least part of described wallboard, is provided with water/electric line.
7. between assembling bathroom according to claim 1, it is characterized in that: described wallboard is divided into rotary corner plate and surface plate, and adjacent two blocks of wallboards have respectively vertical male groove and female groove and realize splicing by the mode that male groove embeds female groove in splicing place.
8. between assembling bathroom according to claim 7, it is characterized in that: the middle part of described public groove has vertical groove and this groove is communicated with the mounting groove on chassis.
9. between assembling bathroom according to claim 1, it is characterized in that: the upper surface of the front of described wallboard and the finish coat on ground has respectively by the bonding ceramic tile of tile binding material.
10. the mounting process between an assembling bathroom, comprise ground, metope and smallpox between this assembling bathroom, it is characterized in that: comprise the following steps:
(a) will have the ground small opening chassis with the ground small opening be communicated with the sewer of building, the mode that edge is close to respectively the metope of building is assembled to the ground of building, and assembles finish coat on described chassis;
(b) a plurality of vertical wallboards are spliced into to metope in the mode that bottom embeds the mounting groove of chassis edge respectively, the bottom of the mounting groove of described chassis edge or inboardly be communicated with the chassis below finish coat;
(c) in the top of described metope assembling smallpox.
CN2013102846496A 2013-07-08 2013-07-08 Assembled bathroom and installation process Pending CN103397790A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102846496A CN103397790A (en) 2013-07-08 2013-07-08 Assembled bathroom and installation process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102846496A CN103397790A (en) 2013-07-08 2013-07-08 Assembled bathroom and installation process

Publications (1)

Publication Number Publication Date
CN103397790A true CN103397790A (en) 2013-11-20

Family

ID=49561485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102846496A Pending CN103397790A (en) 2013-07-08 2013-07-08 Assembled bathroom and installation process

Country Status (1)

Country Link
CN (1) CN103397790A (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018700A (en) * 2014-01-03 2014-09-03 广州鸿力复合材料有限公司 Integrated bathroom base plate and manufacturing method thereof
CN104294999A (en) * 2014-10-31 2015-01-21 吴铁锋 Integrated bathroom prefabricated panel
CN104532923A (en) * 2014-12-30 2015-04-22 吴铁锋 Waterproof, deodorant and leak-proof integrated toilet
CN106013712A (en) * 2016-05-20 2016-10-12 苏州科逸住宅设备股份有限公司 Adjustable combination tiled waterproof plate
CN106049903A (en) * 2016-07-22 2016-10-26 焦明先 Assembled bathroom and construction method for same
CN106499221A (en) * 2016-12-14 2017-03-15 天津达因建材有限公司 Quick decoration system
CN106760374A (en) * 2017-03-20 2017-05-31 李西安 A kind of separate assembling chassis system
CN106854930A (en) * 2016-12-26 2017-06-16 浙江亚厦装饰股份有限公司 Pin-connected panel split water-proof chassis and installation method
CN107075862A (en) * 2014-11-06 2017-08-18 骊住株式会社 The construction method of bathroom unit and bathroom unit
CN107060378A (en) * 2017-01-06 2017-08-18 合肥国瑞集成建筑科技有限公司 A kind of lightweight steel construction assembled bio-toilet and its manufacture method
CN107296740A (en) * 2017-06-16 2017-10-27 北京松盛元环境科技有限公司 A kind of installation method of micro- mist saunas health care bathing system
CN107397482A (en) * 2017-08-12 2017-11-28 扬州市康宇实业有限公司 A kind of compound high waterproof ceramic tile bathroom chassis
CN108708577A (en) * 2018-06-20 2018-10-26 佛山东鹏洁具股份有限公司 Dry zoning chassis between a kind of integral bathroom and using between its integral bathroom
CN109106260A (en) * 2018-08-31 2019-01-01 宁波联城住工科技有限公司 Glass reinforced plastic bathroom chassis and its manufacturing method
CN109864644A (en) * 2019-01-29 2019-06-11 台州铭星装饰工程股份有限公司 A kind of toilet shower tray and its construction method
CN110318517A (en) * 2019-05-23 2019-10-11 金螳螂精装科技(苏州)有限公司 A kind of assembled facing perpendicular slotting mounting structure and installation method
CN110578361A (en) * 2019-09-30 2019-12-17 昆明市建筑设计研究院股份有限公司 Waterproof chassis of integrated bathroom of assembled
CN111236451A (en) * 2019-12-24 2020-06-05 广东菲力住工科技有限公司 Assembled waterproof construction of whole bathroom
CN112575994A (en) * 2020-12-11 2021-03-30 浙江亚厦装饰股份有限公司 Bathroom assembly type chassis and installation method
CN114259184A (en) * 2021-12-27 2022-04-01 广州鸿力筑工新材料有限公司 Integral bathroom chassis structure and production method thereof
CN114776006A (en) * 2022-04-30 2022-07-22 上海宝冶集团有限公司 Method for building assembled toilet in hospital ward
CN116876668A (en) * 2023-08-26 2023-10-13 赛尔特建筑科技(广东)有限公司 Anti-seismic aluminum alloy tent of independent assembled bathroom system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2093879U (en) * 1991-05-08 1992-01-22 国营济南塑料九厂 Assembly type full-plastic toilet
CN2100431U (en) * 1991-08-05 1992-04-01 千宝实业股份有限公司 Built-up bathroom
CN2451649Y (en) * 2000-11-25 2001-10-03 海尔集团公司 Integral bathroom waterproof floor with water channel
CN2639393Y (en) * 2003-07-23 2004-09-08 千宝实业股份有限公司 Improved structure of integral bathroom

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2093879U (en) * 1991-05-08 1992-01-22 国营济南塑料九厂 Assembly type full-plastic toilet
CN2100431U (en) * 1991-08-05 1992-04-01 千宝实业股份有限公司 Built-up bathroom
CN2451649Y (en) * 2000-11-25 2001-10-03 海尔集团公司 Integral bathroom waterproof floor with water channel
CN2639393Y (en) * 2003-07-23 2004-09-08 千宝实业股份有限公司 Improved structure of integral bathroom

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018700A (en) * 2014-01-03 2014-09-03 广州鸿力复合材料有限公司 Integrated bathroom base plate and manufacturing method thereof
CN104018700B (en) * 2014-01-03 2015-08-05 广州鸿力复合材料有限公司 The manufacture method on chassis between a kind of integral bathroom
CN104294999A (en) * 2014-10-31 2015-01-21 吴铁锋 Integrated bathroom prefabricated panel
CN107075862A (en) * 2014-11-06 2017-08-18 骊住株式会社 The construction method of bathroom unit and bathroom unit
CN104532923B (en) * 2014-12-30 2017-01-04 吴铁锋 Waterproof, deodorant, leak protection integrated form bathroom
CN104532923A (en) * 2014-12-30 2015-04-22 吴铁锋 Waterproof, deodorant and leak-proof integrated toilet
CN106013712B (en) * 2016-05-20 2020-05-15 苏州科逸住宅设备股份有限公司 Adjustable combined tile waterproof tray
CN106013712A (en) * 2016-05-20 2016-10-12 苏州科逸住宅设备股份有限公司 Adjustable combination tiled waterproof plate
CN106049903A (en) * 2016-07-22 2016-10-26 焦明先 Assembled bathroom and construction method for same
CN106499221A (en) * 2016-12-14 2017-03-15 天津达因建材有限公司 Quick decoration system
CN106854930A (en) * 2016-12-26 2017-06-16 浙江亚厦装饰股份有限公司 Pin-connected panel split water-proof chassis and installation method
CN107060378A (en) * 2017-01-06 2017-08-18 合肥国瑞集成建筑科技有限公司 A kind of lightweight steel construction assembled bio-toilet and its manufacture method
CN106760374A (en) * 2017-03-20 2017-05-31 李西安 A kind of separate assembling chassis system
CN107296740A (en) * 2017-06-16 2017-10-27 北京松盛元环境科技有限公司 A kind of installation method of micro- mist saunas health care bathing system
CN107397482A (en) * 2017-08-12 2017-11-28 扬州市康宇实业有限公司 A kind of compound high waterproof ceramic tile bathroom chassis
CN108708577B (en) * 2018-06-20 2023-11-14 佛山东鹏洁具股份有限公司 Dry-wet partition chassis of integral bathroom and integral bathroom using same
CN108708577A (en) * 2018-06-20 2018-10-26 佛山东鹏洁具股份有限公司 Dry zoning chassis between a kind of integral bathroom and using between its integral bathroom
CN109106260A (en) * 2018-08-31 2019-01-01 宁波联城住工科技有限公司 Glass reinforced plastic bathroom chassis and its manufacturing method
CN109864644A (en) * 2019-01-29 2019-06-11 台州铭星装饰工程股份有限公司 A kind of toilet shower tray and its construction method
CN110318517A (en) * 2019-05-23 2019-10-11 金螳螂精装科技(苏州)有限公司 A kind of assembled facing perpendicular slotting mounting structure and installation method
CN110578361A (en) * 2019-09-30 2019-12-17 昆明市建筑设计研究院股份有限公司 Waterproof chassis of integrated bathroom of assembled
CN111236451A (en) * 2019-12-24 2020-06-05 广东菲力住工科技有限公司 Assembled waterproof construction of whole bathroom
CN112575994A (en) * 2020-12-11 2021-03-30 浙江亚厦装饰股份有限公司 Bathroom assembly type chassis and installation method
CN114259184A (en) * 2021-12-27 2022-04-01 广州鸿力筑工新材料有限公司 Integral bathroom chassis structure and production method thereof
CN114776006A (en) * 2022-04-30 2022-07-22 上海宝冶集团有限公司 Method for building assembled toilet in hospital ward
CN116876668A (en) * 2023-08-26 2023-10-13 赛尔特建筑科技(广东)有限公司 Anti-seismic aluminum alloy tent of independent assembled bathroom system
CN116876668B (en) * 2023-08-26 2024-04-30 赛尔特建筑科技(广东)有限公司 Anti-seismic aluminum alloy tent of independent assembled bathroom system

Similar Documents

Publication Publication Date Title
CN103397790A (en) Assembled bathroom and installation process
CN203394108U (en) Fabricated bathroom
CN106836516B (en) A kind of integrated water-proof chassis of toilet pipeline
CN112240108A (en) Construction method of assembly type building integrated bathroom system
CN106958358A (en) The industrialization commercial residential buildings of energy-conserving and environment-protective
WO2020206501A1 (en) Panel and panel assembly for modular wet area construction
CN206189906U (en) Bathroom room
CN206681418U (en) The industrialization commercial residential buildings of energy-conserving and environment-protective
CN109707184A (en) The hard-cover integral vacuum toilet of fulgurite separate type, wall setting water pipe groove
CN109797988A (en) A kind of co-layer draining hard-cover precast block toilet of outer wall provided pipe line groove hole
CN110080491A (en) The lateral assembled paving structure and method for paving of a kind of ground finishing material
WO1992006251A1 (en) A modular slab on ground building system
CN206554180U (en) A kind of integrated water-proof chassis of toilet pipeline
CN109779319A (en) A kind of co-layer draining blank precast block toilet of outer wall provided pipe line groove hole
CN206189914U (en) Bathroom room
CN109779309A (en) The hard-cover integrated bathroom of outer wall provided pipe line groove hole
CN109707185A (en) The blank integrated bathroom of inner wall provided pipe line groove hole
CN110528709A (en) A kind of waterproof construction production method
CN103422671A (en) Construction method of integrated process model house for building engineering construction
CN104790472A (en) Same floor drainage structure of toilet
CN109779312A (en) The blank integral vacuum toilet of fulgurite separate type, wall setting water pipe groove and hole
CN109779311A (en) The hard-cover integral vacuum toilet of fulgurite separate type, wall setting water pipe groove and hole
CN109779317A (en) Fulgurite is embedded, the blank integral vacuum toilet of wall setting water pipe groove
Authority BILLS OF QUANTITIES
US12098556B2 (en) Shower tray and wall panels

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20131120