CN114259184A - Integral bathroom chassis structure and production method thereof - Google Patents

Integral bathroom chassis structure and production method thereof Download PDF

Info

Publication number
CN114259184A
CN114259184A CN202111611855.4A CN202111611855A CN114259184A CN 114259184 A CN114259184 A CN 114259184A CN 202111611855 A CN202111611855 A CN 202111611855A CN 114259184 A CN114259184 A CN 114259184A
Authority
CN
China
Prior art keywords
base plate
chassis
backing plate
base
base plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111611855.4A
Other languages
Chinese (zh)
Inventor
陶运喜
马华超
宁恳修
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Hongli New Materials Co ltd
Original Assignee
Guangzhou Hongli New Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Hongli New Materials Co ltd filed Critical Guangzhou Hongli New Materials Co ltd
Priority to CN202111611855.4A priority Critical patent/CN114259184A/en
Publication of CN114259184A publication Critical patent/CN114259184A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses an integral bathroom chassis structure and a production method thereof, wherein the integral bathroom chassis structure comprises a plurality of base plates with different lengths and widths and a plurality of mounting pieces with different heights, connecting grooves extending along the length direction are formed in two ends of each base plate, connecting pieces penetrate through the connecting grooves of the adjacent base plates, and the base plates are spliced through the connecting pieces to form a chassis plane; all set up the mounting hole on the edge all around of backing plate, installed part is according to the height from high to low distribution in the mounting hole, and all wear out the bottom of backing plate, so that the chassis plane slope sets up. The invention effectively solves the problems that the ground gradient processing process of the integral sanitary ware chassis is complex and the integral sanitary ware chassis is easy to deform; and the ground gradient required by the integral bathroom chassis can be quickly determined so as to meet the production requirement.

Description

Integral bathroom chassis structure and production method thereof
Technical Field
The invention relates to the field of bathrooms, in particular to an integral bathroom chassis structure and a production method thereof.
Background
With the gradual temperature rise of the assembly type building and the market greatly promoted by the country, the whole bathroom industry is rapidly developed. The whole bathroom mainly comprises chassis, wallboard and smallpox, wherein the chassis is especially important because if chassis ground slope is not adjusted well then can lead to the ground drainage slow even ground to produce ponding to influence the use of whole bathroom, consequently it is very important to adjust whole bathroom chassis ground slope. The existing method for adjusting the gradient of the integral bathroom chassis generally comprises the following steps: 1) the method comprises the following steps of prefabricating a base plate base, machining and molding a ground slope machine by using numerical control equipment, and finally pasting ceramic tiles, wherein the machining process is complex, so that the overall bathroom base plate is high in machining cost and low in efficiency; 2) the base plate is integrally and compositely molded in a base plate mode, the base plate is a whole wood plate or a plastic plate, the base plate is machined to have a required gradient, and the base plate with the same house type can be produced.
Disclosure of Invention
Aiming at the problems in the prior art, the invention aims to provide a structure of an integral sanitary ware chassis and a production method thereof, which effectively solve the problems that the ground gradient processing process of the integral sanitary ware chassis is complex and the integral sanitary ware chassis is easy to deform; and the ground gradient required by the integral bathroom chassis can be quickly determined so as to meet the production requirement.
The technical scheme of the invention is realized as follows:
a whole bathroom chassis structure comprises a plurality of base plates with different lengths and widths and a plurality of mounting pieces with different heights, wherein connecting grooves extending along the length direction are formed in two ends of each base plate, connecting pieces penetrate through the connecting grooves of the adjacent base plates, and the base plates are spliced through the connecting pieces to form a chassis plane; all set up the mounting hole on the edge all around of backing plate, the installed part is according to high from the height to low distribution in the mounting hole, and all wears out the bottom of backing plate to make chassis plane slope setting.
Preferably, the installed part is the screw, and the below of mounting hole is equipped with the nut draw-in groove, is equipped with the nut in the nut draw-in groove, and the screw is according to highly distributing in the mounting hole from high to low to through with nut screw-thread fit with the height that the backing plate bottom was worn out to the adjustment screw.
Preferably, the mounting holes are evenly distributed on the peripheral edge of the backing plate so that the mounting pieces are evenly distributed on the backing plate from high to low in height.
Preferably, the backing plate is a hollow plate, and a reinforcing structure is arranged in the middle of the backing plate.
Preferably, the mounting hole is located inside the coupling groove.
Preferably, the both ends of backing plate are equipped with respectively along the draw-in groove and the card protruding of length direction extension, and draw-in groove and card protruding top that is located the spread groove, and draw-in groove and the protruding block of card through adjacent backing plate are connected in order to assist two adjacent backing plates.
Preferably, the backing plate is an aluminum backing plate.
A production method of an integrated bathroom chassis structure comprises the following steps:
step 1, customizing two width specifications of base plates, namely a base plate A and a base plate B, according to the size requirement of a bathroom chassis; respectively manufacturing a backing plate A and a backing plate B with different lengths by taking a preset interval modulus as a modulus to serve as a modulus substrate for assembling the integral bathroom chassis;
step 2, uniformly arranging mounting holes at the peripheral edges of all the base plates, arranging nut clamping grooves below the mounting holes, and arranging connecting grooves extending along the length direction at two ends of all the base plates in a penetrating manner;
step 3, according to the size requirements of the inner frames of different bathroom house types, firstly simulating and determining the sizes of the cushion plates required by different house types, then selecting the cushion plate A and the cushion plate B which accord with the sizes, and placing the cushion plates on the corresponding positions of the bathroom chassis;
step 4, placing the connecting pieces in the connecting grooves of the adjacent base plates to connect all the adjacent base plates, and finally assembling to form a base plate plane of the integral bathroom;
step 5, arranging a nut in the nut clamping groove;
step 6, distributing the installation pieces in the installation holes on the base plate from high to low according to the requirement of the ground gradient of the bathroom chassis, and adjusting the heights of the installation pieces at the peripheral angles of the plane of the chassis penetrating through the bottom of the base plate through the threaded fit of the installation pieces and the nuts, and determining the gradient of the four sides of the plane of the chassis; and then, on the basis of ensuring that the plane of the base plate of the integral bathroom is straight, adjusting the heights of the rest installation parts penetrating through the bottom of the base plate so as to adjust and determine the gradient of the base plate of the integral bathroom.
Preferably, in step 1, after the base plates a and B with different lengths are manufactured, different numbers are marked on each base plate to distinguish the base plates a and B with different lengths
Compared with the prior art, the invention has the following advantages:
the integral bathroom chassis is formed by splicing the backing plates with different lengths and widths so as to adapt to different bathroom types; the connecting piece is used for splicing a plurality of base plates, so that the deformation of the integral bathroom chassis caused by overlarge area and uneven stress of the base plates is reduced, the connecting structure is simple, and the damaged base plates can be independently replaced, so that the loss of the base plates is reduced; the installation part is distributed in the installation hole from high to low according to the height, and the bottom of the base plate is worn out, so that the plane of the base plate is inclined, the ground slope of the whole bathroom chassis is quickly determined to meet the production requirement, the operation is simple and convenient, the universality is high, the production and processing efficiency is improved, the production and processing cost and the consumable cost are reduced, and the production quality of the whole bathroom chassis is ensured.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic view of a shim plate A and a shim plate B of different lengths and widths according to the present invention;
FIG. 2 is a schematic view of a mat structure in the integrated sanitary ware base plate according to the present invention;
FIG. 3 is a schematic view of the connection of adjacent backing plates in the integrated sanitary ware chassis according to the present invention;
FIG. 4 is a schematic view of the installation parts in the integrated sanitary ware chassis according to the present invention;
FIG. 5 is a top view of the integrated sanitary ware chassis of the present invention;
fig. 6 is a schematic view of the ground slope of the integrated sanitary ware chassis according to the present invention.
The attached drawings are as follows:
1. a chassis plane; 10. a base plate; 11. mounting holes; 12. connecting grooves; 13. a connecting member; 14. a mounting member; 142. a nut; 15. a nut slot; 17. a reinforcing structure; 18. a card slot; 19. and (6) clamping and protruding.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," "fourth," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1 to 6, an embodiment of the present invention provides an integrated sanitary ware chassis structure, including a plurality of base plates 10 with different lengths and widths and a plurality of mounting pieces 14 with different heights, wherein two sides of each base plate 10 are provided with connecting grooves 12 extending along a length direction, connecting pieces 13 penetrate through the connecting grooves 12 of adjacent base plates 10, and the plurality of base plates 10 are spliced together through the connecting pieces 13 to form a chassis plane 1; the periphery of the backing plate 10 is provided with mounting holes 11, and the mounting pieces 14 are distributed in the mounting holes 11 from high to low according to the height and penetrate through the bottom of the backing plate 10, so that the chassis plane 1 is obliquely arranged.
Specifically, the integral bathroom chassis structure comprises a plurality of base plates 10 with different lengths and widths, wherein two ends of each base plate 10 are provided with connecting grooves 12 extending along the length direction, the connecting grooves 12 are positioned at the bottom of each base plate 10, and the notches of the connecting grooves face outwards; a connecting piece 13 penetrates through the connecting groove 12 of the adjacent cushion plate 10, and at least two protrusions matched with the connecting groove 12 are arranged on the connecting piece 13, in the embodiment, three protrusions, namely a first protrusion, a second protrusion and a third protrusion, are arranged on the connecting piece 13, wherein the first protrusion and the second protrusion are positioned at two ends of the connecting piece 13, and the third protrusion is positioned between the first protrusion and the second protrusion; in two adjacent backing plates, a first bulge of a connecting piece 13 is clamped with a connecting groove 12 at one end of one backing plate 10, a second bulge of the connecting piece 13 is clamped with a connecting groove 12 at one end of the other backing plate 10, and a third bulge is positioned at a notch of the connecting groove 12 on the two adjacent backing plates 10, so that the two adjacent backing plates 10 are assembled together, and by analogy, a plurality of backing plates 10 are spliced through the connecting piece 13 to form a chassis plane 1 of the integral bathroom, and the connecting structure is simple; and the coupling members 13 can be detachably mounted in the coupling grooves 12 of the adjacent two mats 10 only by the protrusions engaged with the coupling grooves 12, so that the damaged mats can be individually replaced by removing the coupling members, thereby reducing the amount of the damaged mats.
All set up mounting hole 11 on the edge all around of backing plate 10, and mounting hole 11 is located the inboard of spread groove 12, and in each backing plate 10, the mounting hole 11 of same vertical column all is located same straight line, and the mounting hole 11 of same row all is located same straight line to avoid the mounted position in disorder and lead to backing plate 10 atress inhomogeneous, thereby make backing plate 10 warp.
The integral bathroom chassis structure further comprises a plurality of mounting pieces 14 with different heights, the mounting pieces 14 are sequentially distributed in the mounting holes 11 from high to low according to the requirement of the slope of the bathroom chassis ground, the mounting pieces all penetrate through the bottom of the backing plate 10 to enable the chassis plane 1 to be obliquely arranged, the height of the mounting pieces 14 penetrating through the bottom of the backing plate 10 is adjusted to adapt to the uneven workbench plane according to the requirement of the slope of the bathroom chassis ground and the actual condition of the workbench plane, the straightness of the chassis plane 1 of the integral bathroom is guaranteed, the bottom end of each mounting piece 14 can be supported on the ground, the phenomenon that the integral bathroom chassis 1 is stressed unevenly due to the fact that partial mounting pieces 14 are suspended in the air is avoided, and finally the slope of the ground required by the integral bathroom chassis is determined to meet the production requirement; the installation method for the ground slope of the integral bathroom chassis is simple and convenient to operate, high in universality, capable of improving the production and machining efficiency of the integral bathroom chassis and reducing the production and machining cost and the material consumption cost, and therefore the production quality of the integral bathroom chassis is guaranteed.
The further improvement lies in that the mounting part 14 is a screw, a nut clamping groove 15 is arranged below the mounting hole 11, a nut 142 is arranged in the nut clamping groove 15, the screw is distributed in the mounting hole 11 from high to low according to the height, and the height of the screw penetrating out of the bottom of the cushion plate 10 is adjusted through the screw thread matching with the nut 142.
The mounting part 14 is a screw, the chassis plane 1 is mounted in the mounting hole 11 through the screw to be fixed on the workbench plane, in order to prevent the instable mounting, a nut slot 1 is arranged below the mounting hole 11, a nut 142 is arranged in the nut slot 15, and the chassis plane 1 is more stably mounted on the workbench plane through the screw matching of the screw and the nut 142.
Different screws, its high difference, according to the requirement of bathroom chassis ground slope, with the screw according to high from high to low distribution in the mounting hole 11 that corresponds, and through screw and nut 142 screw-thread fit, the height of backing plate 10 bottom is worn out to the adjusting screw to make the bottom that chassis plane 1 inclines to set up and every screw can both support subaerial, guarantee chassis plane 1's straightness simultaneously, and then confirm the ground slope of whole bathroom chassis demand.
A further improvement is that the mounting holes 11 are evenly distributed over the peripheral edge of the underlay sheet 10, so that the mounting elements 14 are evenly distributed over the underlay sheet 10 from high to low in height.
In order to prevent the uneven supporting force of the cushion plate 10 caused by the uneven mounting position of the mounting pieces 14, the mounting holes 11 are uniformly distributed on the peripheral edge of the cushion plate 10, so that the mounting pieces 14 are uniformly distributed on the cushion plate 10, and the deformation of the integral sanitary and bath chassis caused by the uneven stress of the cushion plate is reduced; and the mounting holes 11 can be properly added according to the shim plates 10 with different lengths, so that the shim plates 10 are more stably mounted on the plane of the workbench.
The further improvement lies in that the backing plate 10 is a hollow plate, the middle part of the backing plate 10 is provided with a reinforcing structure 17, the material consumption of the backing plate is saved, the weight is reduced, the structural strength and the stability of the backing plate 10 are improved, and the chassis is guaranteed not to deform after being used for a long time.
The further improvement lies in that the both ends of backing plate 10 are equipped with respectively along the draw-in groove 18 and the card of length direction extension 19, and draw-in groove 18 and card 19 are located the top of spread groove 12, and in two adjacent backing plates, draw-in groove 18 is located the one end of a backing plate 10, and card 19 is located the one end of another backing plate 10, and draw-in groove 18 and the card 19 block through adjacent backing plate 10 are connected in order to assist two adjacent backing plates 10. When one of the backing plates 10 needs to be replaced independently, the damaged backing plate 10 can be detached only by separating the clamping protrusion 19 from the clamping groove 18, and the device is simple in structure and convenient to operate.
A further improvement is that the shim plate 10 is an aluminium shim plate.
The aluminum pad 10 can effectively prevent water from being impregnated into the pad 10 and prevent the pad 10 from being softened and deformed due to the wetting of the pad 10 by water; the aluminum base plate 10 has a good heat dissipation function, and can discharge heat generated in the process of drilling the mounting hole 11 to the outside; the aluminum backing plate 10 has a uniform, flat and smooth surface, so that the phenomenon that the backing plate 10 is broken due to uneven stress when a micro drill bit drills the mounting hole 11 can be effectively avoided.
The integral bathroom chassis is formed by splicing a plurality of backing plates with reinforcing structures through the connecting pieces, so that the deformation of the integral bathroom chassis caused by the fact that the backing plates are too large in area and are stressed unevenly is reduced, the phenomenon that the backing plates are stressed and not deformed after long-term use is guaranteed, the connecting structure is simple, the damaged backing plates can be replaced independently, and the loss of the backing plates is reduced; the mounting holes 11 are uniformly distributed on the peripheral edge of the base plate 10, so that the deformation of the integral bathroom chassis caused by uneven stress of the base plate is reduced; the mounting pieces are distributed in the mounting holes from high to low according to the height and penetrate out of the bottom of the base plate, so that the plane of the base plate is obliquely arranged, the ground gradient of the integral bathroom base plate is quickly determined to meet the production requirement, the operation is simple and convenient, the universality is high, the production and processing efficiency is improved, the production and processing cost and the consumable cost are reduced, and the production quality of the integral bathroom base plate is ensured; softening deformation and the like of the pad plate 10 due to wetting of the pad plate 10 by moisture are prevented by using the aluminum pad plate.
On the other hand, referring to fig. 1 to 6, the embodiment of the invention further provides a production method of the integrated bathroom chassis structure, which comprises the following steps:
step 1, customizing two width specifications of base plates 10, namely a base plate A and a base plate B, according to the size requirement of a bathroom chassis; respectively manufacturing a backing plate A and a backing plate B with different lengths by taking a preset interval modulus of 5cm as a modulus to serve as a modulus substrate for assembling the integral bathroom chassis; different base plates can be selected to be spliced into any house size to meet the production requirement;
step 2, uniformly arranging mounting holes 11 on the peripheral edges of all the base plates 10, properly adding the mounting holes 11 to the base plates 10 with longer length, and ensuring that the mounting holes 11 in the same column are all positioned on the same straight line and the mounting holes 11 in the same row are all positioned on the same straight line on each base plate 10; a nut clamping groove 15 is formed below the mounting hole 11, and a notch of the nut clamping groove 15 faces downwards; two ends of all the base plates 10 are provided with connecting grooves 12 extending along the length direction at the outer sides of the mounting holes 11 in a penetrating manner, and notches of the connecting grooves 12 face outwards;
step 3, according to the size requirements of the inner frames of different bathroom house types, firstly simulating and determining the sizes of the base plates 10 required by different house types, then selecting the base plates A and B meeting the sizes from the modulus base plates, and placing the base plates A and B at corresponding positions of the bathroom chassis;
step 4, on two adjacent backing plates, placing one end of a connecting piece 13 in a connecting groove 12 at one end of one backing plate 10, placing the other end of the connecting piece 13 in a connecting groove at one end of the other backing plate 10 to assemble the adjacent backing plates 10 together, and so on, splicing a plurality of backing plates 10 through the connecting pieces 13, and finally assembling to form a chassis plane 1 of the integral bathroom;
step 5, arranging a nut 142 in the nut clamping groove 15, wherein a screw hole of the nut 142 corresponds to the mounting hole 11;
step 6, according to the requirement of the gradient of the ground of the bathroom chassis, the mounting pieces 14 are sequentially distributed in the mounting holes 11 on the base plate 10 from high to low according to the height, the mounting pieces 14 are in threaded fit with the nuts 142 until the bottom ends of the mounting pieces 14 penetrate through the base plate 10, at the moment, the height of the mounting pieces 14 at the peripheral corners of the chassis plane 1 penetrating through the bottom of the base plate 10 is firstly adjusted, and the gradient of the four sides of the chassis plane 1 is firstly determined; and then, on the basis of ensuring that the base plate plane 1 of the integral bathroom is straight, the heights of the rest installation parts 14 penetrating through the bottom of the backing plate 10 are adjusted to adjust and determine the gradient of the base plate of the integral bathroom.
In a further improvement, in step 1, after the cushion plates a and B with different lengths are manufactured, different numbers are marked on each cushion plate 10 to distinguish the cushion plates a and B with different lengths.
The production method of the integral bathroom chassis structure is formed by splicing the backing plates with different lengths and widths so as to be suitable for different bathroom types; the connecting piece is used for splicing a plurality of base plates, so that the deformation of the integral bathroom chassis caused by overlarge area and uneven stress of the base plates is reduced, the connecting structure is simple, and the damaged base plates can be independently replaced, so that the loss of the base plates is reduced; the installation part is distributed in the installation hole from high to low according to the height, and the bottom of the base plate is worn out, so that the plane of the base plate is inclined, the ground slope of the whole bathroom chassis is quickly determined to meet the production requirement, the operation is simple and convenient, the universality is high, the production and processing efficiency is improved, the production and processing cost and the consumable cost are reduced, and the production quality of the whole bathroom chassis is ensured.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (9)

1. An integral bathroom chassis structure is characterized in that,
the base plate comprises a plurality of base plates (10) with different lengths and widths and a plurality of mounting pieces (14) with different heights, connecting grooves (12) extending along the length direction are formed in two ends of each base plate (10), connecting pieces (13) penetrate through the connecting grooves (12) of the adjacent base plates (10), and the base plates (10) are spliced through the connecting pieces (13) to form a base plate plane (1); all offer mounting hole (11) on the edge all around of backing plate (10), installed part (14) are according to the height from high to low distribution in mounting hole (11), and all wear out the bottom of backing plate (10), so that chassis plane (1) slope sets up.
2. The one-piece sanitary ware base plate structure according to claim 1,
the mounting part (14) is a screw, a nut clamping groove (15) is arranged below the mounting hole (11), a nut (142) is arranged in the nut clamping groove (15), the screw is distributed in the mounting hole (11) from high to low according to the height, and the screw penetrates out of the height of the bottom of the base plate (10) through the thread fit with the nut (142).
3. The one-piece sanitary ware base plate structure according to claim 2,
the mounting holes (11) are uniformly distributed on the peripheral edge of the backing plate (10) so that the mounting pieces (14) are uniformly distributed on the backing plate (10) from high to low in height.
4. The one-piece sanitary ware base plate structure according to claim 3,
the backing plate (10) is a hollow plate, and a reinforcing structure (17) is arranged in the middle of the backing plate (10).
5. The one-piece sanitary ware base plate structure according to claim 4,
the mounting hole (11) is located inside the connecting groove (12).
6. The one-piece sanitary ware base plate structure according to claim 4,
the both ends of backing plate (10) are equipped with draw-in groove (18) and the protruding (19) of card that extend along length direction respectively, just draw-in groove (18) and the protruding (19) of card are located the top of spread groove (12), through adjacent draw-in groove (18) and the protruding (19) block of card of backing plate (10) are connected in order to assist two adjacent backing plates (10).
7. The one-piece sanitary ware base plate structure according to claim 6,
the backing plate (10) is an aluminum backing plate.
8. A method for producing an integral sanitary ware base structure according to any one of claims 1-5, characterized in that it comprises the following steps:
step 1, customizing two width specifications of base plates (10) according to the size requirement of a bathroom chassis, namely a base plate A and a base plate B; respectively manufacturing a backing plate A and a backing plate B with different lengths by taking a preset interval modulus as a modulus to serve as a modulus substrate for assembling the integral bathroom chassis;
step 2, uniformly arranging mounting holes (11) at the edges of the periphery of all the base plates (10), arranging nut clamping grooves (15) below the mounting holes (11), and arranging connecting grooves (12) extending along the length direction at two ends of all the base plates (10) in a penetrating manner;
step 3, according to the size requirements of the inner frames of different bathroom house types, simulating and determining the sizes of the base plates (10) required by different house types, selecting the base plates A and B meeting the sizes, and placing the base plates A and B at corresponding positions of the bathroom chassis;
step 4, placing the connecting pieces (13) in the connecting grooves (12) of the adjacent base plates (10) to connect all the adjacent base plates (10), and finally assembling to form a base plate plane (1) of the integral bathroom;
step 5, arranging a nut (142) in the nut clamping groove (15);
step 6, distributing the mounting pieces (14) in the mounting holes (11) on the base plate (10) from high to low according to the requirement of the gradient of the ground of the bathroom chassis, and adjusting the heights of the mounting pieces (14) of the peripheral corners of the chassis plane (1) penetrating through the bottom of the base plate (10) through the threaded fit of the mounting pieces (14) and nuts (142), and determining the gradients of the four sides of the chassis plane (1) firstly; and then, on the basis of ensuring that the base plate plane (1) of the integral bathroom is straight, the height of the rest installation parts (14) penetrating through the bottom of the base plate (10) is adjusted to adjust and determine the gradient of the base plate of the integral bathroom.
9. The one-piece sanitary ware base plate structure and the production method thereof according to claim 6,
in the step 1, after the base plates A and B with different lengths are manufactured, different numbers are marked on each base plate (10) to distinguish the base plates A and B with different lengths.
CN202111611855.4A 2021-12-27 2021-12-27 Integral bathroom chassis structure and production method thereof Pending CN114259184A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111611855.4A CN114259184A (en) 2021-12-27 2021-12-27 Integral bathroom chassis structure and production method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111611855.4A CN114259184A (en) 2021-12-27 2021-12-27 Integral bathroom chassis structure and production method thereof

Publications (1)

Publication Number Publication Date
CN114259184A true CN114259184A (en) 2022-04-01

Family

ID=80830319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111611855.4A Pending CN114259184A (en) 2021-12-27 2021-12-27 Integral bathroom chassis structure and production method thereof

Country Status (1)

Country Link
CN (1) CN114259184A (en)

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998022280A1 (en) * 1996-11-21 1998-05-28 Matthew Jenkins Floor mat system
CN101722540A (en) * 2008-10-24 2010-06-09 胜狮货柜技术研发(上海)有限公司 Long-breadth laminted wood and manufacturing method thereof
CN102078893A (en) * 2010-11-15 2011-06-01 陕西飞机工业(集团)有限公司 S-shaped section molding process equipment
CN103397790A (en) * 2013-07-08 2013-11-20 万科企业股份有限公司 Assembled bathroom and installation process
CN203394108U (en) * 2013-07-08 2014-01-15 万科企业股份有限公司 Fabricated bathroom
US20160272254A1 (en) * 2015-03-16 2016-09-22 Thunder Power Hong Kong Ltd. Underbody manufacturing method and vehicle underbody
CN107126137A (en) * 2017-07-10 2017-09-05 长沙远大整体浴室有限公司 Integral bathroom chassis attachment structure and its installation method
CN109008733A (en) * 2018-08-31 2018-12-18 宁波联城住工科技有限公司 Punch forming bathroom chassis and its manufacturing method
CN111227691A (en) * 2020-03-03 2020-06-05 金螳螂精装科技(苏州)有限公司 Splicing structure of assembled bathroom honeycomb chassis
CN111358322A (en) * 2020-04-14 2020-07-03 广东领和复合材料有限公司 Chassis connecting structure and bathroom chassis
CN212066572U (en) * 2019-08-02 2020-12-04 合肥高丽今生实业有限公司 Connecting structure for splicing chassis of bathroom dry area
CN112196119A (en) * 2020-10-30 2021-01-08 苏州中创铝业有限公司 Bathroom equipment
CN112190163A (en) * 2020-10-30 2021-01-08 苏州中创铝业有限公司 Base plate module and base plate structure of bathroom
CN112263166A (en) * 2020-11-12 2021-01-26 北京蚂蚁阿奇信息技术有限公司 Base plate is assembled to whole bathroom
CN213927315U (en) * 2020-10-30 2021-08-10 苏州中创铝业有限公司 Base plate structure of bathroom

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998022280A1 (en) * 1996-11-21 1998-05-28 Matthew Jenkins Floor mat system
CN101722540A (en) * 2008-10-24 2010-06-09 胜狮货柜技术研发(上海)有限公司 Long-breadth laminted wood and manufacturing method thereof
CN102078893A (en) * 2010-11-15 2011-06-01 陕西飞机工业(集团)有限公司 S-shaped section molding process equipment
CN103397790A (en) * 2013-07-08 2013-11-20 万科企业股份有限公司 Assembled bathroom and installation process
CN203394108U (en) * 2013-07-08 2014-01-15 万科企业股份有限公司 Fabricated bathroom
US20160272254A1 (en) * 2015-03-16 2016-09-22 Thunder Power Hong Kong Ltd. Underbody manufacturing method and vehicle underbody
CN107126137A (en) * 2017-07-10 2017-09-05 长沙远大整体浴室有限公司 Integral bathroom chassis attachment structure and its installation method
CN109008733A (en) * 2018-08-31 2018-12-18 宁波联城住工科技有限公司 Punch forming bathroom chassis and its manufacturing method
CN212066572U (en) * 2019-08-02 2020-12-04 合肥高丽今生实业有限公司 Connecting structure for splicing chassis of bathroom dry area
CN111227691A (en) * 2020-03-03 2020-06-05 金螳螂精装科技(苏州)有限公司 Splicing structure of assembled bathroom honeycomb chassis
CN111358322A (en) * 2020-04-14 2020-07-03 广东领和复合材料有限公司 Chassis connecting structure and bathroom chassis
CN112196119A (en) * 2020-10-30 2021-01-08 苏州中创铝业有限公司 Bathroom equipment
CN112190163A (en) * 2020-10-30 2021-01-08 苏州中创铝业有限公司 Base plate module and base plate structure of bathroom
CN213927315U (en) * 2020-10-30 2021-08-10 苏州中创铝业有限公司 Base plate structure of bathroom
CN112263166A (en) * 2020-11-12 2021-01-26 北京蚂蚁阿奇信息技术有限公司 Base plate is assembled to whole bathroom

Similar Documents

Publication Publication Date Title
CN102344077B (en) Novel guideway support structure
CN114259184A (en) Integral bathroom chassis structure and production method thereof
CN112096027A (en) Dry construction ceramic tile laying plate and production method thereof
CN212860747U (en) Press-fit forming device for multilayer acoustic boards
CN219586990U (en) Keel horizontal adjustment collet
CN208907303U (en) A kind of architectural engineering plank sheathing being easily installed disassembly
CN110744473A (en) Auxiliary tool for assembling automobile outer covering part
CN212929214U (en) Equipment installation base for electromechanical engineering
CN216993538U (en) Multifunctional printing machine wallboard
CN217621231U (en) Low-cost modularization building block brick bed die
CN218149580U (en) Ceramic tile laying structure capable of reducing hollowing rate
CN213710360U (en) Novel and turnover-used mold for shear wall deformation joint
CN217951106U (en) Counterweight support leveling structure and crane
CN212388295U (en) Mixed type plastic course is positioning mechanism for construction
CN211548745U (en) Self-reinforcing building template
CN113530045B (en) Mounting support for curtain wall
CN217395249U (en) Template sub-assembly, prefabricated post mould and prefabricated post production facility
CN219451367U (en) Floor structure is built in room
CN217195274U (en) Glass material rack
CN216828652U (en) Selective laser melting and forming platform and equipment
CN211080748U (en) Combined decorative metal box
CN216031446U (en) Vertical door core board production complete machine frame structure
CN210706219U (en) Stable form frame for bender
CN217749773U (en) Flexible switching device of workstation anchor clamps
CN216881652U (en) Automatic net releasing machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220401

RJ01 Rejection of invention patent application after publication