CN106854930A - Pin-connected panel split water-proof chassis and installation method - Google Patents

Pin-connected panel split water-proof chassis and installation method Download PDF

Info

Publication number
CN106854930A
CN106854930A CN201611221390.0A CN201611221390A CN106854930A CN 106854930 A CN106854930 A CN 106854930A CN 201611221390 A CN201611221390 A CN 201611221390A CN 106854930 A CN106854930 A CN 106854930A
Authority
CN
China
Prior art keywords
groove
link slot
connection
back box
pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611221390.0A
Other languages
Chinese (zh)
Inventor
王骝
周东珊
余广
郑晓峰
龚婷
尤陈刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201611221390.0A priority Critical patent/CN106854930A/en
Publication of CN106854930A publication Critical patent/CN106854930A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/18Separately-laid insulating layers; Other additional insulating measures; Floating floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/18Separately-laid insulating layers; Other additional insulating measures; Floating floors
    • E04F15/187Underlayers specially adapted to be laid with overlapping edges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F2290/00Specially adapted covering, lining or flooring elements not otherwise provided for
    • E04F2290/04Specially adapted covering, lining or flooring elements not otherwise provided for for insulation or surface protection, e.g. against noise, impact or fire

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a kind of pin-connected panel split water-proof chassis and installation method.Pin-connected panel split water-proof chassis include:First back box includes the first capillary groove, and while for the first connection, the first capillary groove offers the first link slot to the corresponding bottom land in the first waterproof channel opening side, and the side opening that the first link slot is located at the first connection side is set;Second back box includes the second capillary groove, and while for the second connection, the second capillary groove offers the second link slot to the corresponding bottom land in the second waterproof channel opening side;The cell wall of the first link slot is relative with the cell wall of the second link slot to be connect;The cell wall of the first capillary groove is relative with the cell wall of the second capillary groove to be connect;Cover plate for sealing is fitted in the joint of the first link slot and the second link slot.Installation method is used to install pin-connected panel water-proof chassis.Pin-connected panel split water-proof chassis and installation method that the present invention is provided, simplify waterproof technology, reduce difficulty of construction, shorten the engineering time, improve the waterproof leakproof characteristic of toilet, realize rapid construction.

Description

Pin-connected panel split water-proof chassis and installation method
Technical field
The present invention relates to building waterproofing technique field, more particularly to a kind of pin-connected panel split water-proof chassis and installation method.
Background technology
The complexity and importance of toilet warterproof are determined due to the structure and purposes of toilet, the waterproof of toilet is The essential operation in finishing toilet, the waterproof during general civil engineering can not fully meet the requirement of toilet warterproof, institute A waterproof must be formally done before with toilet.
In the prior art, toilet warterproof typically uses the technique waterproof for repeatedly applying waterproof membrane, in actual mechanical process Need to clear up substrate surface → detailed treatment → preparation primer → brushing primer → thin portion attached middle school layer construction the → the first side painting successively Film → the second film → construction of waterproof layer → waterproof layer in film → 3rd once tries water → protection finish coat construction → waterproof The steps such as the secondary examination water of layer → waterproof layer examination.Above-mentioned construction technology has the following disadvantages:First, to basic unit's table of brushing waterproof Face job requirements are very high, substrate surface because keep drying, require it is smooth, firm, must not have hollowing, cracking and the defect such as dusting, The pipe root on prominent ground, floor drain, discharge outlet, extra play supplement treatment need to be carried out at negative and positive angle, operating process is excessively complicated, and applies Film is easily cracked and gap after the certain hour that works, water proofing property reduction;Second, above-mentioned construction technology will to surrounding enviroment Ask higher, such as can not be not less than 5 DEG C in rainy day or strong wind day construction, the environment temperature of winter construction, external environment is to energy The influence of no construction is larger, not only increases the difficulty of construction, also extends the time of construction.
Therefore, it is necessary to solve above-mentioned technical problem.
The content of the invention
The present invention provides a kind of pin-connected panel split water-proof chassis and installation method, to solve to be asked present in above-mentioned technology Topic, simplifies waterproof technology, reduces difficulty of construction, shortens the engineering time, improves the waterproof leakproof characteristic of toilet, and realization is quickly applied Work.
The invention provides a kind of pin-connected panel split water-proof chassis, including:First back box, first back box includes side First capillary groove of opening, the corresponding bottom land in the first waterproof channel opening side when being connected for first, first waterproof The inner side groove bottom of groove offers the first link slot, and the side opening that first link slot is located at the described first connection side sets Put;Second back box, second back box includes the second capillary groove of a side opening, the side correspondence of the second waterproof channel opening Bottom land while for the second connection, the inner side groove bottom of second capillary groove offers the second link slot, second connection The side opening that groove is located at the described second connection side is set;First connection is spliced when being connected with described second, and described the The cell wall of one link slot border relative with the cell wall of second link slot makes splicing groove;The cell wall of first capillary groove with The cell wall of second capillary groove is relative to be connect;Cover plate, the cover plate is arranged in the splicing groove and palette is described the Sealed between the inner surface of the joint of one link slot and the second link slot, the side of the cover plate and the splicing groove and filled out Fill.
Alternatively, the cover plate includes sealing surface, and the sealing surface is fitted in described the by waterproofing and airtight rubber belt sealing The joint of one link slot and second link slot.
Alternatively, the cover plate also includes Mosaic face, and the Mosaic face is oppositely arranged with the sealing surface, the splicing Face, the inner side groove bottom of first capillary groove, the inner side groove bottom of second capillary groove are in the same plane.
Alternatively, it is described first connection while and it is described second connection while weld.
Alternatively, the side that bottom land is located on the side of the first waterproof channel opening is the first inclined-plane, and described second prevents The side that bottom land is located on the side of tank opening is the second inclined-plane, is defined after first inclined-plane and second inclined-plane docking Go out first seal groove of the notch towards the cover plate, first connection while and to be respectively described first during second connection close Two trough rims of sealing groove.
Alternatively, the side surface of the cover plate is the 3rd inclined-plane, and the 3rd inclined-plane is defined with the inner surface of the splicing groove Second seal groove of the notch dorsad sealing surface.
Alternatively, first seal groove and second seal groove seal filling.
Alternatively, the quantity of the waterproofing and airtight adhesive tape be two, it is described first connection while and it is described second connection while Joint is located between two waterproofing and airtight adhesive tapes.
Based on same inventive concept, present invention also offers a kind of installation method of pin-connected panel split water-proof chassis, including Following steps:A., first back box is installed, first back box is included the first capillary groove of a side opening, first capillary groove While for the first connection, the inner side groove bottom of first capillary groove offers the first link slot to the corresponding bottom land in opening side, The side opening that first link slot is located at the described first connection side is set;B., second back box is installed, makes second back box The second capillary groove including a side opening, the corresponding bottom land in side of the second waterproof channel opening while for the second connection, institute The inner side groove bottom for stating the second capillary groove offers the second link slot, and second link slot is located at the one of the described second connection side Side opening is set;First connection is relative while with the described second connection to be connect, the cell wall of first link slot and described the The cell wall of two link slots makes splicing groove with respect to border;The cell wall phase of the cell wall of first capillary groove and second capillary groove Docking;C., cover plate is covered in the joint of first back box and second back box, the cover plate is arranged on the splicing In groove and palette is in first link slot and the joint of the second link slot, the side of the cover plate and the splicing groove Inner surface between seal filling.
Alternatively, the quantity of the waterproofing and airtight adhesive tape be two, it is described first connection while and it is described second connection while Joint is located between two waterproofing and airtight adhesive tapes.
Pin-connected panel split water-proof chassis and installation method that the present invention is provided, spell by by the first back box and the second back box The water-proof chassis of groove profile are connected into, can effectively prevent the edge of pin-connected panel split water-proof chassis from the problem of leak or infiltration occur, The first back box and the second back box are acted in joint by the connection and sealing of cover plate simultaneously, can reach good sealing effect Really, the waterproof requirement of indoor particularly toilet is effectively met.Wherein the first back box, the second back box and cover plate can be with In factory's one into machine-shaping, assembled at the construction field (site), installation process simplifies quick, not protected from environmental, reduces The difficulty of construction, shortens the engineering time, realizes rapid construction.
Brief description of the drawings
Preferred embodiment in the present invention will be described in detail by accompanying drawing below, it will help understand the purpose of the present invention and excellent Point, wherein:
The structural representation of the pin-connected panel split water-proof chassis that Fig. 1 is provided for the preferred embodiment of the present invention.
Fig. 2 is the exploded view of Fig. 1.
The structural representation of the pin-connected panel split water-proof chassis junction that Fig. 3 is provided for the preferred embodiment of the present invention.
Specific embodiment
With reference to embodiment, the present invention is described in detail.Wherein identical parts identical reference table Show.It should be noted that the word "front", "rear" for being used in description below, "left", "right", "up" and "down" refer to accompanying drawing In direction, word " interior " and " outward " are referred respectively to towards or away from the direction of particular elements geometric center.
The structural representation of the pin-connected panel split water-proof chassis that Fig. 1 is provided for the preferred embodiment of the present invention, Fig. 2 is Fig. 1's Exploded view, the structural representation of the pin-connected panel split water-proof chassis junction that Fig. 3 is provided for the preferred embodiment of the present invention.Such as Fig. 1 Shown in Fig. 3, the invention provides a kind of pin-connected panel split water-proof chassis, including the first back box 1, the second back box 2 and cover plate 3。
Referring to Fig. 1 to Fig. 3, first back box 1 includes the first capillary groove 11 of a side opening, and described first prevents Tank 11 can be cuboidal groove, and the corresponding bottom land in the opening of the first capillary groove 11 side is 12 while for the first connection.Institute The inner side groove bottom for stating the first capillary groove 11 offers the first link slot 13, and the first link slot 13 is located at the first capillary groove 11 and is close to The side on the first connection side 12, the side opening that first link slot 13 is located at the described first connection side 12 is set.Described The notch of one link slot 13 is respectively positioned on the groove bottom of first capillary groove 11.Second back box 2 includes the of a side opening Two capillary grooves 21, second capillary groove 21 equally can be cuboidal groove, the side pair of the opening of the second capillary groove 21 The bottom land answered is 22 while for the second connection, and the inner side groove bottom of second capillary groove 21 offers the second link slot 23, described Second link slot 23 is located at side of second capillary groove 21 near the second connection side 22, and second link slot 23 is located at described the One side opening on two connection sides 22 is set, and the notch of second link slot 23 is respectively positioned on the bottom land of second capillary groove 21 Face.First connection 22 is spliced when 12 be connecteds with described second, the first connection at 12 and the second connection 22 length phase Together, the cell wall of first link slot 13 border relative with the cell wall of second link slot 23 makes splicing groove.Described first The cell wall of capillary groove 11 is relative with the cell wall of second capillary groove 21 to be connect, and is spliced into the water-proof chassis of flute profile.The cover plate 3 sets Put it is described splicing groove in and palette the link slot 23 of first link slot 13 and second joint, it is ensured that first The link slot 23 of link slot 13 and second junction sealing, the side of the cover plate 3 and it is described splicing groove inner surface Between seal filling, it is ensured that the sealing between the inner surface of the side of cover plate 3 and splicing groove, above-mentioned setting can make cover plate Good fixation and sealing state is between 3 and the bottom land and cover plate 3 of splicing groove and the inner side cell wall of splicing groove.
The pin-connected panel split water-proof chassis that the present invention is provided, by the way that the first back box 1 and the second back box 2 are being spliced into groove profile Water-proof chassis, can effectively prevent the edge of pin-connected panel split water-proof chassis from the problem of leak or infiltration occur, while first The back box 2 of back box 1 and second is acted in joint by the connection and sealing of cover plate 3, can reach good sealing effectiveness, effectively Ground meets the waterproof requirement of indoor particularly toilet.Wherein the first back box 1, the second back box 2 and cover plate 3 can be in works Factory's one is assembled at the construction field (site) into machine-shaping, and installation process simple and fast is not protected from environmental, reduces and applies The difficulty of work, shortens the engineering time, realizes rapid construction.
Alternatively, the cover plate 3 includes sealing surface, and sealing surface is towards the inner side slot bottom of the first link slot 13 on cover plate 3 The surface of the inner side groove bottom of face and the second link slot 23.Waterproofing and airtight adhesive tape 4 is two-sided tape, and the sealing surface passes through waterproof With 4 palettes in first link slot 13 and the joint of second link slot 23, steam cannot be introduced into gastight adhesive The junction of one link slot 13 and the second link slot 23, it is ensured that the first link slot 13 and the second link slot 23 reach in junction Dry state, realizes the first link slot 13 and the second link slot 23 effectively connects the effect with waterproof in junction.
Further, the quantity of the waterproofing and airtight adhesive tape 4 is two, on two waterproofing and airtight adhesive tapes 4, an anti-aqueous vapor The one side of close adhesive tape 4 is bonded in the groove bottom of the first link slot 13, and another side is bonded on sealing surface.Another waterproofing and airtight glue The groove bottom of the second link slot 23 is bonded in 4 one side, another side is bonded on sealing surface.First connection side 12 and the institute The joint for stating the second connection side 22 is located between two waterproofing and airtight adhesive tapes 4, and external moisture cannot cross two waterproofs Gastight adhesive enters the first joint for connecting when 12 and second connect 22 with 4, realizes the first connection side 12 and the second connection Effective sealing effectiveness of the side 22 in joint.
Alternatively, the cover plate 3 also includes Mosaic face 31, and the Mosaic face 31 is oppositely arranged with the sealing surface, makes lid Plate 3 is entirely embedded the joint in the first capillary groove 11 and the second capillary groove 21, the Mosaic face 31, first capillary groove 11 inner side groove bottom, the inner side groove bottom of second capillary groove 21 are in the same plane, it is ensured that pin-connected panel split is prevented Planarization of the water-bed disk in bottom land.
It is described first connection while 12 and it is described second connection while 22 between the mode of being tightly connected have various, alternatively, institute The first connection is stated at 12 and second connection 22 by being weldingly connected, can make junction have Stability Analysis of Structures and sealing compared with The characteristics of good.
It is preferred that the side that bottom land is located on the side of first capillary groove 11 opening is the first inclined-plane 13, described the The side that bottom land is located on the side of the opening of two capillary groove 21 is the second inclined-plane 23, first inclined-plane 13 and second inclined-plane First seal groove of the notch towards the cover plate 3 is defined after 23 docking, first connection is at 12 and second connection 22 two trough rims for being respectively first seal groove.First inclined-plane 13 and the second inclined-plane 23 are welded after docking using hot melt Connect, it is ensured that the groove interior sealing of the first seal groove is full of scolding tin 5, said structure set-up mode is added significantly to the He of the first back box 1 Second back box 2 not only makes the first seal groove have enough intensity and stability, it is ensured that the first bottom in the contact area of junction The back box 2 of box 1 and second and can make have good sealing at the first seal groove in the structural strength of junction, effectively Waterproof.
Used as a preferred embodiment, the side surface of the cover plate 3 is the 3rd inclined-plane 32, the 3rd inclined-plane 32 and the spelling The inner surface of access slot defines the second seal groove of the notch dorsad sealing surface.Inner surface circle on the 3rd inclined-plane 32 and splicing groove The second seal groove made is welded using hot melt, it is ensured that the groove interior sealing of the second seal groove is full of scolding tin 5.Above-mentioned knot Structure set-up mode is added significantly to the contact area of the back box 1 of cover plate 3 and first, the back box 2 of cover plate 3 and second in junction, not only Make the second seal groove that there is enough intensity and stability, it is ensured that the back box 1 of cover plate 3 and first, the back box 2 of cover plate 3 and second are even The structural strength at place is connect, and the first sealing tank cover plate 3 and the first back box 1, the back box 2 of cover plate 3 and second can be made in junction With good sealing, effectively waterproof is realized.
Based on same inventive concept, present invention also offers a kind of installation method of pin-connected panel split water-proof chassis, including Following steps:A., first back box 1 is installed, first back box 1 is included the first capillary groove 11 of a side opening, described first prevents When being connected for first 12, the inner side groove bottom of first capillary groove 11 offers the to the corresponding bottom land in opening side of tank 11 One link slot 13, the side opening that first link slot 13 is located at the described first connection side 12 is set;B., second back box is installed 2, second back box 2 is included the second capillary groove 21 of a side opening, the side of the opening of the second capillary groove 21 is corresponding 22 while for the second connection, the inner side groove bottom of second capillary groove 21 offers the second link slot 23, described second to bottom land The side opening that link slot 23 is located at the described second connection side 22 is set;First connection is when 12 are connected with described second 22 Relative to connect, the cell wall of first link slot 13 border relative with the cell wall of second link slot 23 makes splicing groove;It is described The cell wall of the first capillary groove 11 is relative with the cell wall of second capillary groove 21 to be connect;C. cover plate 3 is covered in first back box 1 With the joint of second back box 2, the cover plate 3 is arranged in the splicing groove and palette is in first link slot 13 and second link slot 23 joint, between the side of the cover plate 3 and the inner surface of the splicing groove seal filling.
Further, the quantity of the waterproofing and airtight adhesive tape 4 is two, on two waterproofing and airtight adhesive tapes 4, an anti-aqueous vapor The one side of close adhesive tape 4 is bonded in the groove bottom of the first link slot 13, and another side is bonded on sealing surface;Another waterproofing and airtight glue The groove bottom of the second link slot 23 is bonded in 4 one side, another side is bonded on sealing surface.First connection side 12 and the institute The joint for stating the second connection side 22 is located between two waterproofing and airtight adhesive tapes 4, and external moisture cannot cross two waterproofs Gastight adhesive enters the first joint for connecting when 12 and second connect 22 with 4, realizes the first connection side 12 and the second connection Effective sealing function of the side 22 in joint.
Pin-connected panel split water-proof chassis and installation method that the present invention is provided, by by the first back box 1 and the second back box 2 The water-proof chassis of groove profile are spliced into, can effectively prevent the edge of pin-connected panel split water-proof chassis from asking for leak or infiltration occur Topic, while the first back box 1 and the second back box 2 are acted in joint by the connection and sealing of cover plate 3, can reach good close Envelope effect, effectively meets the waterproof requirement of indoor particularly toilet.Wherein the first back box 1, the second back box 2 and cover plate 3 Can be in factory's one into machine-shaping, assembled at the construction field (site), installation process simplifies quick, not by the shadow of environment Ring, reduce the difficulty of construction, shorten the engineering time, realize rapid construction.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although The present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It still may be used Modified with to the technical scheme described in foregoing embodiments, or equivalent is carried out to which part technical characteristic; And these modifications or replacement, do not make the scope of the essence disengaging various embodiments of the present invention technical scheme of appropriate technical solution.

Claims (10)

1. a kind of pin-connected panel split water-proof chassis, it is characterised in that including:
First back box, first back box includes the first capillary groove of a side opening, the first waterproof channel opening side correspondence Bottom land while for the first connection, the inner side groove bottom of first capillary groove offers the first link slot, first connection The side opening that groove is located at the described first connection side is set;
Second back box, second back box includes the second capillary groove of a side opening, the side pair of the second waterproof channel opening While for the second connection, the inner side groove bottom of second capillary groove offers the second link slot to the bottom land answered, and described second connects The side opening that access slot is located at the described second connection side is set;First connection is spliced when being connected with described second, described The cell wall of the first link slot border relative with the cell wall of second link slot makes splicing groove;The cell wall of first capillary groove It is relative with the cell wall of second capillary groove to connect;
Cover plate, the cover plate is arranged in the splicing groove and palette is in the right of first link slot and the second link slot Place is met, filling is sealed between the side of the cover plate and the inner surface of the splicing groove.
2. pin-connected panel split water-proof chassis according to claim 1, it is characterised in that the cover plate includes sealing surface, institute State the joint that sealing surface is fitted in first link slot and second link slot by waterproofing and airtight rubber belt sealing.
3. pin-connected panel split water-proof chassis according to claim 2, it is characterised in that the cover plate also includes Mosaic face, The Mosaic face is oppositely arranged with the sealing surface, the Mosaic face, the inner side groove bottom of first capillary groove, described second The inner side groove bottom of capillary groove is in the same plane.
4. pin-connected panel split water-proof chassis according to claim 3, it is characterised in that the first connection side and described the Two connection side welding.
5. pin-connected panel split water-proof chassis according to claim 4, it is characterised in that the one of the first waterproof channel opening The side that bottom land is located on side is the first inclined-plane, and the side of bottom land is located on the side of the second waterproof channel opening for second is oblique First seal groove of the notch towards the cover plate is defined after face, first inclined-plane and second inclined-plane docking, described the One connection while and be respectively two trough rims of first seal groove during second connection.
6. pin-connected panel split water-proof chassis according to claim 5, it is characterised in that the side surface of the cover plate is the 3rd Inclined-plane, the 3rd inclined-plane defines the second seal groove of the notch dorsad sealing surface with the inner surface of the splicing groove.
7. pin-connected panel split water-proof chassis according to claim 6, it is characterised in that first seal groove and described Two seal grooves seal filling.
8. pin-connected panel split water-proof chassis according to claim 1-7 any one, it is characterised in that the waterproofing and airtight The quantity of adhesive tape be two, it is described first connection while and it is described second connection while joint be located at two waterproofing and airtight glue Between band.
9. a kind of installation method of pin-connected panel split water-proof chassis, it is characterised in that comprise the following steps:
A., first back box is installed, first back box is included the first capillary groove of a side opening, the first waterproof channel opening The corresponding bottom land in side is while for the first connection, and the inner side groove bottom of first capillary groove offers the first link slot, described The side opening that first link slot is located at the described first connection side is set;
B., second back box is installed, second back box is included the second capillary groove of a side opening, the second waterproof channel opening The corresponding bottom land in side while for second connection while, the inner side groove bottom of second capillary groove offers the second link slot, institute A side opening of second link slot positioned at the described second connection side is stated to set;First connection phase when being connected with described second Docking, the cell wall of first link slot border relative with the cell wall of second link slot makes splicing groove;Described first prevents The cell wall of tank is relative with the cell wall of second capillary groove to be connect;
C., cover plate is covered in the joint of first back box and second back box, the cover plate is arranged on the splicing groove Interior and palette in first link slot and the joint of the second link slot, the side of the cover plate and the splicing groove Filling is sealed between inner surface.
10. installation method according to claim 9, it is characterised in that the quantity of the waterproofing and airtight adhesive tape is two, institute State the first connection while described second connect while joint be located at two waterproofing and airtight adhesive tapes between.
CN201611221390.0A 2016-12-26 2016-12-26 Pin-connected panel split water-proof chassis and installation method Pending CN106854930A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611221390.0A CN106854930A (en) 2016-12-26 2016-12-26 Pin-connected panel split water-proof chassis and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611221390.0A CN106854930A (en) 2016-12-26 2016-12-26 Pin-connected panel split water-proof chassis and installation method

Publications (1)

Publication Number Publication Date
CN106854930A true CN106854930A (en) 2017-06-16

Family

ID=59125913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611221390.0A Pending CN106854930A (en) 2016-12-26 2016-12-26 Pin-connected panel split water-proof chassis and installation method

Country Status (1)

Country Link
CN (1) CN106854930A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107126137A (en) * 2017-07-10 2017-09-05 长沙远大整体浴室有限公司 Integral bathroom chassis attachment structure and its installation method
CN111502183A (en) * 2020-04-28 2020-08-07 浙江亚厦装饰股份有限公司 Waterproof bottom box assembly and mounting method
CN113502999A (en) * 2021-07-28 2021-10-15 广州海鸥住宅工业股份有限公司 Concatenation formula 3D prints waterproof chassis
CN113944296A (en) * 2021-11-29 2022-01-18 苏州美瑞德建筑装饰有限公司 An adaptive assembled waterproof structure and its installation method
CN114562001A (en) * 2022-02-28 2022-05-31 宁夏极客空间建筑科技有限公司 Prefabricated system bathroom waterproof chassis of assembled

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11172835A (en) * 1997-12-09 1999-06-29 Gun Ei Chem Ind Co Ltd Roof
JP2002322769A (en) * 2001-04-27 2002-11-08 Sekisui Chem Co Ltd Waterproofing method for flat roof
CN201695529U (en) * 2010-05-11 2011-01-05 张维海 Integral waterproofing structure of toilet
CN103397790A (en) * 2013-07-08 2013-11-20 万科企业股份有限公司 Assembled bathroom and installation process
CN205171922U (en) * 2015-11-05 2016-04-20 浙江亚厦装饰股份有限公司 Box of split type waterproof end
CN105834626A (en) * 2016-06-15 2016-08-10 广船国际有限公司 Vertical butt welding seam liner support and welding method
CN205489407U (en) * 2016-04-05 2016-08-17 上海电力设计院有限公司 A waterproof apron for transformer substation's cable pit
CN106013712A (en) * 2016-05-20 2016-10-12 苏州科逸住宅设备股份有限公司 Adjustable combination tiled waterproof plate
CN206512973U (en) * 2016-12-26 2017-09-22 浙江亚厦装饰股份有限公司 Pin-connected panel split water-proof chassis

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11172835A (en) * 1997-12-09 1999-06-29 Gun Ei Chem Ind Co Ltd Roof
JP2002322769A (en) * 2001-04-27 2002-11-08 Sekisui Chem Co Ltd Waterproofing method for flat roof
CN201695529U (en) * 2010-05-11 2011-01-05 张维海 Integral waterproofing structure of toilet
CN103397790A (en) * 2013-07-08 2013-11-20 万科企业股份有限公司 Assembled bathroom and installation process
CN205171922U (en) * 2015-11-05 2016-04-20 浙江亚厦装饰股份有限公司 Box of split type waterproof end
CN205489407U (en) * 2016-04-05 2016-08-17 上海电力设计院有限公司 A waterproof apron for transformer substation's cable pit
CN106013712A (en) * 2016-05-20 2016-10-12 苏州科逸住宅设备股份有限公司 Adjustable combination tiled waterproof plate
CN105834626A (en) * 2016-06-15 2016-08-10 广船国际有限公司 Vertical butt welding seam liner support and welding method
CN206512973U (en) * 2016-12-26 2017-09-22 浙江亚厦装饰股份有限公司 Pin-connected panel split water-proof chassis

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈树华 张建华: "《钢结构原理》", 31 July 2015 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107126137A (en) * 2017-07-10 2017-09-05 长沙远大整体浴室有限公司 Integral bathroom chassis attachment structure and its installation method
CN111502183A (en) * 2020-04-28 2020-08-07 浙江亚厦装饰股份有限公司 Waterproof bottom box assembly and mounting method
CN113502999A (en) * 2021-07-28 2021-10-15 广州海鸥住宅工业股份有限公司 Concatenation formula 3D prints waterproof chassis
CN113502999B (en) * 2021-07-28 2022-06-10 广州海鸥住宅工业股份有限公司 Concatenation formula 3D prints waterproof chassis
CN113944296A (en) * 2021-11-29 2022-01-18 苏州美瑞德建筑装饰有限公司 An adaptive assembled waterproof structure and its installation method
CN114562001A (en) * 2022-02-28 2022-05-31 宁夏极客空间建筑科技有限公司 Prefabricated system bathroom waterproof chassis of assembled

Similar Documents

Publication Publication Date Title
JPH04242782A (en) Airtight panel inserting system for space frame structure
CN219000135U (en) Integral chassis mounting structure for toilet structure
CN205840619U (en) Door and window water-impervious node
CN206512973U (en) Pin-connected panel split water-proof chassis
CN207333978U (en) Construct convenient high-durability waterproof trapping wall feed-through pipeline
CN205348423U (en) Outer wall transverse joint structure node
CN102433939A (en) Connecting waterproof structure for prefabricated wall panel
CN205100447U (en) Prevent rain water leakage's roofing blast pipe
AU2015254977B2 (en) Fixed glazing
CN220118829U (en) Waterproof structure of wall penetrating pipe
CN215760041U (en) Various steel tile roof waterproof construction
CN105239732B (en) A kind of construction method of the stretching roofing pipe of rainwater leakage prevention
CA2575192A1 (en) Method for producing separator and electrodeposition coating device
CN205100445U (en) That prevents rain water leakage stretches out roofing pipe
CN204024326U (en) A kind of structure preventing outer eaves door and window mouth seepage from intaking
CN218149292U (en) A coiled material additional layer for roofing is waterproof
KR20190122095A (en) Polyurea spraying apparatus, waterproofing method and waterproofing structure using the same
CN207933876U (en) A kind of active type sealing device for pipeline of reeving for bridge
CN211899289U (en) Steel construction roofing seam waterproof construction
CN106149906B (en) Cross sealing element and encapsulating method between a kind of assembled peripheral protective system unit plate
CN217759338U (en) Vertical splicing, closing-up and connecting structure for building external wall panel
CN220978403U (en) Roof construction joint waterproof construction
CN1328349C (en) Method of sticking polyethylene polyproylene fiber water proof coiled material
CN205777154U (en) The roof thermal insulation waterproof construction that U-type groove combines with flexible covering film
CN221878588U (en) An internally attached roof pipe root waterproof enhancement treatment structure

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170616

RJ01 Rejection of invention patent application after publication