CN107075862A - The construction method of bathroom unit and bathroom unit - Google Patents

The construction method of bathroom unit and bathroom unit Download PDF

Info

Publication number
CN107075862A
CN107075862A CN201580059593.1A CN201580059593A CN107075862A CN 107075862 A CN107075862 A CN 107075862A CN 201580059593 A CN201580059593 A CN 201580059593A CN 107075862 A CN107075862 A CN 107075862A
Authority
CN
China
Prior art keywords
wall members
interior wall
frame body
bathroom unit
mentioned
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201580059593.1A
Other languages
Chinese (zh)
Inventor
中杉慎
中杉慎一
林铁平
羽田滋明
秀岛正高
大原将挥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lixil Corp
Original Assignee
Lixil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lixil Corp filed Critical Lixil Corp
Publication of CN107075862A publication Critical patent/CN107075862A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

The free degree of the movement of present invention offer wall components is higher and can simply carry out the bathroom unit and the construction method of bathroom unit of installation and the dismounting of wall components.The bathroom unit (1) of the present invention possesses:Flooring element (11);The frame body (12) of multiple frame parts (121) of upper surface side with the periphery for standing up flooring element (11);It is installed on the ceiling component (13) of frame body (12);And the inner side of frame body (12) and the interior wall members (16) that can be loaded and unloaded relative to frame body (12) are installed between flooring element (11) and ceiling component (13), upper end and the ceiling component (13) of interior wall members (16) are discretely configured.

Description

The construction method of bathroom unit and bathroom unit
Technical field
The present invention relates to the construction method of bathroom unit and bathroom unit.
Background technology
Now, the ceiling component of the known upper surface for possessing wall components and wall components being configured at seamless state Bathroom unit (for example, referring to patent document 1).
Also, the also known bathroom for possessing the wall components installed in the way of across vertically extending a pair of posts Unit.
Prior art literature
Patent document
Patent document 1:Japanese Patent Publication 1-11883 publications
The content of the invention
Invent problem to be solved
In the bathroom unit described in patent document 1, due to being configured with ceiling in the seamless unoccupied place in the upper surface of wall components Component, so if not after ceiling component is pulled down, being then difficult to the operation of installation and the dismounting of wall components.Also, In bathroom unit with the wall components installed in the way of across vertically extending a pair of posts, due to being installed on edge The pillar of above-below direction extension, so sometimes dumb at mobile aspect transversely.It is therefore desirable to be able to simply carry out wall The installation and dismounting of part and the higher bathroom unit of the free degree of the movement of wall components.
It is an object of the present invention to provide the free degree of the movement of wall components is higher and can simply carry out wall components Installation and dismounting bathroom unit and the construction method of bathroom unit.
Scheme for solving problem
The present invention relates to a kind of bathroom unit, possess:Flooring element;Frame body, it, which has, stands up above-mentioned floor Multiple frame parts of the upper surface side of the periphery of component;Ceiling component, it is installed on said frame body;And interior wall members, It is installed on the inner side of said frame body between above-mentioned flooring element and above-mentioned ceiling component, and relative to said frame physical efficiency Enough handling, the upper end of above-mentioned interior wall members is so that discretely mode is configured with above-mentioned ceiling component.
Also, it is preferably provided with the interior wall members configured in the way of filling up between above-mentioned interior wall members and above-mentioned ceiling component Caulking part.
Also, it is preferred that above-mentioned interior wall members have the interior wall members suspention for being used to be suspended to said frame body in its rear side Part.
Also, it is preferred that above-mentioned interior wall members suspension member is located at the upper end of above-mentioned interior wall members.
Also, exterior wall members are preferably provided with, the exterior wall members are installed on the outside of said frame body, and relative to above-mentioned frame Support body can be loaded and unloaded.
Also, interior wall members limiting unit is preferably provided with, the interior wall members limiting unit limits the bottom of above-mentioned interior wall members To the direction movement of the direction close to said frame part and remote said frame part.
Also, the present invention relates to a kind of construction method of bathroom unit, the bathroom unit possesses:Flooring element;Frame body, It has multiple frame parts of the upper surface side for the periphery for standing up above-mentioned flooring element;Ceiling component, it is installed on Said frame body;And interior wall members, it is installed on said frame body between above-mentioned flooring element and above-mentioned ceiling component Inner side, and can be loaded and unloaded relative to said frame body, the construction method of the bathroom unit includes:With above-mentioned ceiling component with it is upper State the process that above-mentioned interior wall members are installed on said frame body by the mode in gap as defined in being formed between interior wall members;And with Interior wall members caulking part is installed on above-mentioned interior wall members by the mode filled up between above-mentioned interior wall members and above-mentioned ceiling component With the process between above-mentioned ceiling component.
The effect of invention is as follows.
According to the present invention, it is possible to provide the free degree of the movement of wall components is higher and can simply carry out the peace of wall components The bathroom unit and the construction method of bathroom unit for being filled with and dismantling.
Brief description of the drawings
Fig. 1 is the side view for the bathroom unit 1 for showing the first embodiment of the present invention.
Fig. 2 is to show to pull down interior wall members 16 and outer wall structure in the bathroom unit 1 of the first embodiment of the present invention The side view of state after part 18.
Fig. 3 is the figure for illustrating to install the method for interior wall members 16 in the bathroom unit 1 of first embodiment.
Fig. 4 is the figure for illustrating to install the method for interior wall members 16 in the bathroom unit 1 of first embodiment.
Fig. 5 is the figure for illustrating to install the method for exterior wall members 18 in the bathroom unit 1 of first embodiment.
Fig. 6 is the figure for illustrating to pull down the method for interior wall members 16 in the bathroom unit 1 of first embodiment.
Fig. 7 is the figure for illustrating to pull down the method for exterior wall members 18 in the bathroom unit 1 of first embodiment.
Fig. 8 is the side view for the bathroom unit 1A for showing second embodiment of the present invention.
Fig. 9 is the side view for the bathroom unit 1B for showing third embodiment of the present invention.
Figure 10 is the side view for the bathroom unit 1C for showing the 4th embodiment of the present invention.
Embodiment
Hereinafter, preferred each embodiment referring to the drawings to the bathroom unit of the present invention is illustrated.Fig. 1 is to show this The side view of the bathroom unit 1 of the first embodiment of invention.Fig. 2 is to show the bathroom list in the first embodiment of the present invention The side view of the state after interior wall members 16 and exterior wall members 18 is pulled down in member 1.
The main structure to the wall of bathroom unit 1 is illustrated.Further, since bathtub etc. used in bathroom unit 1 its Its structure is identical with general structure, so omitting the description.
As shown in Figure 1 and Figure 2, the bathroom unit 1 of first embodiment possesses:Flooring element 11;It is configured at floor structure The frame body 12 of the upper surface of part 11;It is installed on the ceiling component 13 on the top of frame body 12;It is installed on the inner side of frame body 12 Interior wall members 16;It is used as the interior wall members side filler rod (モ ー Le of interior wall members caulking part) 17;It is installed on frame body 12 The exterior wall members 18 in outside;And it is used as the exterior wall members side filler rod (モ ー Le of exterior wall members caulking part) 19.In addition, framework The inner side of body 12 refers to, the space side impaled by flooring element 11 and frame body 12 of frame body 12.
Flooring element 11 is formed as the square tabular with specific thickness.Flooring element 11 is configured to open up in the horizontal direction Open.Flooring element 11 is configured with leaving predetermined distance at setting place from concrete slab 21.In the lower surface of flooring element 11 Raised part 20 is installed.Flooring element 11 is elevated by raised part 29 from the concrete slab 21 of setting place.
Frame body 12 is integrally made up of profile in the framework of cubic shaped.Frame body 12 has:In flooring element 11 The upper surface side of periphery erects the vertical framework (frame parts) of all four of setting from each corner of flooring element 11 respectively 121;Four configured in the mutual mode of adjacent framework in upper end four vertical frameworks 121 of connection of vertical framework 121 Crossing frame 122;And multiple rod units 15.
Vertical framework 121 and crossing frame 122 are configured to the tubulose that section is square.Flooring element 11 and four vertical frameworks 121 connect via connection member connection (not shown) or by welding.Four vertical frameworks and four crossing frames are via even Relay part connection (not shown) is connected by welding.
Multiple rod units 15 edge between ceiling component 13 and flooring element 11 in the way of connecting adjacent vertical framework 121 Horizontal direction extends.Multiple rod units 15 are configured to the tubulose that section is square.The both ends of rod unit 15 and adjacent vertical frame Frame 121 is connected.Rod unit 15 configures multiple in the vertical direction spaced apartly.Peace is through with the horizontal direction in rod unit 15 Hole 151 is filled, the mounting hole 151 is used for the interior wall members hook part (interior wall members suspension member) for suspending interior wall members 16 described later in midair 163 and the exterior wall members hook part (exterior wall members suspension member) 183 of exterior wall members 18.Mounting hole 151 is by frame body 12 Interior side opening interior wall members side mounting hole 151a and the exterior wall members side mounting hole 151b of outer openings in frame body 12 Constitute.
Ceiling component 13 constitutes the ceiling of bathroom unit 1.Ceiling component 13 is formed as the square tabular with specific thickness. Ceiling component 13 is configured to deploy in the horizontal direction.Ceiling component 13 is pacified by connecting sheet material 142 and screwed part 141 The side of inner side loaded on four vertical frameworks 121.Impaled by flooring element 11, ceiling component 13 and four vertical frameworks 121 Space constitutes the bathroom 10 of bathroom unit 1.
Interior wall members 16 are installed on the inner side of frame body 12 between flooring element 11 and ceiling component 13.Interior wall members 16 Be formed as tabular, it is vertically extending.Lower side and ceiling component 13 of the upper end of interior wall members 16 in ceiling component 13 Discretely configure.Interior wall members 16 constitute the inwall of bathroom unit 1.Interior wall members 16 are by being detachably installed on rod unit 15, can be loaded and unloaded relative to frame body 12.
Interior wall members 16, which have the ceramic tile part 161 on the surface for constituting interior wall members 16 and pasted for ceramic tile part 161, to be set The lining component 162 put.Also, interior wall members 16 have hook-shaped multiple interior wall members hook parts 163.The inwall structure of the top Part hook part 163 is located at the upper end of interior wall members 16.Interior wall members hook part 163 is suspended to rod unit 15.
Interior wall members hook part 163 is located at the rear side of interior wall members 16.Interior wall members hook part 163 is from lining component 162 back side is risen along horizontal-extending specific length, and extension is protruded deviously downwards at the position after extension specific length. Multiple interior wall members hook parts 163 discretely configure multiple in the vertical direction, and discretely configure in the horizontal direction many It is individual.
When interior wall members 16 are installed on into frame body 12, interior wall members hook part 163 is being inserted in rod unit 15 After the mounting hole 151a of interior wall members side, interior wall members 16 are made to move downwards, thus by the hooking of interior wall members hook part 163 in bar The caliper portion of the pipe of the interior wall members side mounting hole 151a of part 15 downside.Thus, interior wall members 16 are suspended to rod unit 15。
When interior wall members 16 are pulled down from frame body 12, after interior wall members 16 are moved upward, from interior wall members Side mounting hole 151a extracts interior wall members hook part 163, thus from the thickness of the pipe of interior wall members side mounting hole 151a downside Pull down interior wall members hook part 163 in part.
In the bottom of the lining component 162 of interior wall members 16, the positioning being recessed from the lateral upside in bottom is formed with recessed Portion's (interior wall members limiting unit) 164.Location indentations 164 can engaging in flooring element 11 interior wall members it is (interior with locator protrusions Wall member limiting unit) 111.By by location indentations 164 engaging in interior wall members locator protrusions 111, to limit interior wall members Moved to the direction close to vertical framework 121 and the direction away from vertical framework 121 16 bottom.
Interior wall members side filler rod 17 is configured to fill up between interior wall members 16 and ceiling component 13.Interior wall members side filler rod 17 It is embedded in the inner side of frame body 12 between interior wall members 16 and ceiling component 13.Interior wall members side filler rod 17 is along vertical framework 121 Inner surface configured in the way of the circumferential whole region throughout frame body 12.Interior wall members side filler rod 17 is to improve design The purpose of property and the part installed, for example, formed by resin component.
Exterior wall members 18 are installed on the outside of frame body 12.Exterior wall members 18 are formed as tabular, vertically extending.Outside Lower side and adjacent room 30 of the upper end of wall member 18 in the ceiling component 31 in the room 30 abutted with bathroom unit 1 Ceiling component 31 is discretely configured.The ceiling component 31 in the room 30 abutted with bathroom unit 1 is for example opposite with bathroom unit 1 The end of side the structure in house is installated (fixed) in by screwed part 321 via connection sheet material 322.Outer wall structure Part 18 constitutes the inwall in the room 30 abutted with bathroom unit 1.If changing visual angle, the room 30 abutted with bathroom unit 1 Inwall is made up of exterior wall members 18, can also be considered as the outer wall of bathroom unit 1.Exterior wall members 18 are by being detachably installed on Rod unit 15, can be loaded and unloaded relative to frame body 12.
Exterior wall members 18, which have the panel member 181 on the surface for constituting exterior wall members 18 and pasted for panel member 181, to be set The lining component 182 put.Also, exterior wall members 18 have hook-shaped multiple exterior wall members hook parts 183.The outer wall structure of the top Part hook part 183 is located at the upper end of exterior wall members 18.Exterior wall members hook part 183 is suspended to rod unit 15.
Exterior wall members hook part 183 is located at the rear side of exterior wall members 18.Exterior wall members hook part 183 is from lining component 182 back side is risen along horizontal-extending specific length, and extension is protruded deviously downwards at the position after extension specific length. Multiple exterior wall members hook parts 183 discretely configure multiple in the vertical direction, and discretely configure in the horizontal direction many It is individual.
When exterior wall members 18 are installed on into frame body 12, exterior wall members hook part 183 is being inserted in rod unit 15 After the mounting hole 151b of exterior wall members side, exterior wall members 18 are made to move downwards, thus by the hooking of exterior wall members hook part 183 in bar The caliper portion of the pipe of the exterior wall members side mounting hole 151b of part 15 downside.Thus, exterior wall members 18 are suspended to rod unit 15.So, exterior wall members 18 are installed on frame body 12 by being installed on rod unit 15.
When exterior wall members 18 are pulled down from frame body 12, after exterior wall members 18 are moved upward, from exterior wall members Side mounting hole 151b extracts exterior wall members hook part 183, thus from the thickness of the pipe of exterior wall members side mounting hole 151b lower side Pull down exterior wall members hook part 183 in degree part.
In the bottom of the lining component 182 of exterior wall members 18, the location indentations (outer wall of the depression from the side of end is formed with Component limiting unit) 184.Location indentations 184 can engaging in flooring element 11 exterior wall members with locator protrusions (exterior wall members limit Portion processed) 112.By by location indentations 184 engaging in exterior wall members locator protrusions 112, to limit the lower end of exterior wall members 18 Moved to the direction close to vertical framework 121 and the direction away from vertical framework 121 in portion.
Exterior wall members side filler rod 19 is configured to the ceiling structure in the room 30 for filling up exterior wall members 18 and being adjacent to bathroom unit 1 Between part 31.Exterior wall members side filler rod 19 is embedded in exterior wall members 18 and the top in the room 30 abutted in the outside of frame body 12 Between shed component 31.Exterior wall members side filler rod 19 is with throughout the circumferential whole region in the room 30 for being adjacent to bathroom unit 1 Mode is configured.Exterior wall members side filler rod 19 is the part to improve the purpose of design and install, for example, formed by resin component.
Next, being illustrated to the method that interior wall members 16 and exterior wall members 18 are installed on to frame body 12.Fig. 3 with And Fig. 4 is the figure for illustrating to install the method for interior wall members 16 in the bathroom unit 1 of first embodiment.Fig. 5 is illustrated The figure of the method for exterior wall members 18 is installed in the bathroom unit 1 of one embodiment.
In the case where interior wall members 16 are installed on into frame body 12, as shown in figure 3, with ceiling component 13 and inwall structure Interior wall members 16 are installed on frame body 12 by the mode in gap as defined in being formed between part 16.For example, at one of bathroom unit 1 In side, by the hooking of interior wall members hook part 163 of interior wall members 16 in the interior wall members side mounting hole 151a of rod unit 15, make Interior wall members 16 are moved downwards, so that interior wall members 16 are suspended into frame body 12.Due to the interior wall members hook portion of the top Part 163 is located at the upper end of interior wall members 16, so interior wall members 16 are stably fixed to upper end.Moreover, as shown in figure 4, In all sides of the four direction of bathroom unit 1, interior wall members 16 are similarly suspended to frame body 12.Now, inside The lower end of wall member 16, makes location indentations 164 engaging in interior wall members locator protrusions 111.By pacifying in frame body 12 Interior wall members 16 are filled, to form the inwall of bathroom unit 1.
Next, as shown in figure 4, installing ceiling component in the way of the upper end from interior wall members 16 is separated upward 13.Ceiling component 13 by connect sheet material 142 and screwed part 141 and the inner side for being installated (fixed) in four vertical frameworks 121 Side.Thus, the ceiling of bathroom unit 1 is formed.Afterwards, the embedded interior wall members between interior wall members 16 and ceiling component 13 Side filler rod 17.Because the upper end of interior wall members 16 is stably fixed by interior wall members hook part 163, so interior wall members side is embedding Bar 17 is stably supported on the upper end of interior wall members 16, thus be stably fixed to interior wall members 16 and ceiling component 13 it Between.
In the case where exterior wall members 18 are installed on into frame body 12, as shown in figure 5, to be adjacent to bathroom unit 1 Exterior wall members 18 are installed on framework by the mode in gap as defined in being formed between the ceiling component 31 and exterior wall members 18 in room 30 Body 12.For example, in a side of bathroom unit 1, by the hooking of exterior wall members hook part 183 of exterior wall members 18 in rod unit 15 exterior wall members side mounting hole 151b, makes exterior wall members 18 move downwards, so that exterior wall members 18 are suspended into frame body 12.Because the exterior wall members hook part 183 of the top is located at the upper end of exterior wall members 18, so exterior wall members 18 are stably solid Due to upper end.Now, in the lower end of exterior wall members 18, location indentations 184 are made engaging in exterior wall members locator protrusions 112.By installing exterior wall members 18 in frame body 12, to form the outer wall of bathroom unit 1, and formed and the phase of bathroom unit 1 The inwall in adjacent room 30.Afterwards, in exterior wall members 18 and it is adjacent to embedding between the ceiling component 31 in the room 30 of bathroom unit 1 Enter exterior wall members side filler rod 19.Because the upper end of exterior wall members 18 is stably fixed by exterior wall members hook part 183, beyond institute Wall member side filler rod 19 is stably supported on the upper end of exterior wall members 18, so as to be stably fixed to exterior wall members 18 and ceiling Between component 31.
Next, being illustrated to the method for pulling down interior wall members 16 and exterior wall members 18 from frame body 12.Fig. 6 is Illustrate the figure that the method for interior wall members 16 is pulled down in the bathroom unit 1 of first embodiment.Fig. 7 is illustrated in the first embodiment party The figure of the method for exterior wall members 18 is pulled down in the bathroom unit 1 of formula.
In the case where pulling down interior wall members 16 from frame body 12, as shown in fig. 6, first, interior wall members 16 will be configured at Interior wall members side filler rod 17 between ceiling component 13 is pulled down.Herein, 13 points of the upper end of interior wall members 16 and ceiling component From.Therefore, the space for making interior wall members 16 move upward is ensured in the upper side of interior wall members 16.Moreover, utilizing Space between interior wall members 16 and ceiling component 13, while be moved upward interior wall members 16, while from interior wall members side Mounting hole 151a extracts interior wall members hook part 163, thus pulls down interior wall members 16 from frame body 12.Thus, due to can Interior wall members 16 are made to move upward, so the operation that interior wall members 16 are pulled down from frame body 12 is become into easy.
By exterior wall members 18 from the case that frame body 12 is pulled down, as shown in fig. 7, first, exterior wall members will be configured at 18 and the exterior wall members side filler rod 19 that is adjacent between the ceiling component 31 in the room 30 of bathroom unit 1 pull down.Herein, outer wall structure The upper end of part 18 is separated with ceiling component 13.Therefore, exterior wall members 18 upper side ensure be used for make exterior wall members 18 to The space of upper side movement.Moreover, using the space between exterior wall members 18 and ceiling component 31, while make exterior wall members 18 to Top is moved, while extract exterior wall members hook part 183 from exterior wall members side mounting hole 151b, thus by exterior wall members 18 from frame Support body 12 is pulled down.Thus, due to exterior wall members 18 can be made to move upward, so exterior wall members 18 are torn open from frame body 12 Under operation become easy.
According to the bathroom unit 1 of present embodiment discussed above, following such effect is played.
So that discretely mode is configured with the upper ends of interior wall members 16 with ceiling component 13.Thus, ceiling component is not pulled down 13 just can be moved upward interior wall members 16, so that the free degree of the movement of interior wall members 16 is higher, and can be simple Ground carries out the installation and dismounting of interior wall members 16.Thus, it is possible to improve the workability of installation and the dismounting of interior wall members 16.
Possesses the interior wall members side filler rod 17 configured in the way of filling up between interior wall members 16 and ceiling component 13.Cause This, improves the design between interior wall members 16 and ceiling component 13.
Interior wall members 16 have the interior wall members hook part 163 for being suspended to frame body 12 in its rear side.Therefore, only will be interior Wall member hook part 163 is suspended to frame body 12, it becomes possible to which interior wall members 16 are installed on into frame body 12.Thus, improving will be interior Wall member 16 is installed on the workability of frame body 12.
The interior wall members hook part 163 of the top is located at the upper end of interior wall members 16.Therefore, interior wall members 16 are stably It is fixed on upper end.Because the upper end of interior wall members 16 is stably fixed by interior wall members hook part 163, so interior wall members Side filler rod 17 is stably supported on the upper end of interior wall members 16, so as to be stably fixed to interior wall members 16 and ceiling structure Between part 13.
Exterior wall members 18 have the exterior wall members hook part 183 for being suspended to frame body 12 in its rear side.Therefore, only will be outer Wall member hook part 183 is suspended to frame body 12, it becomes possible to which exterior wall members 18 are installed on into frame body 12.Thus, improving will be outer Wall member 18 is installed on the workability of frame body 12.
Possesses the bottom of limitation interior wall members 16 to the direction close to vertical framework 121 and away from the side for indulging framework 121 To mobile interior wall members locator protrusions 111 and location indentations 164.Thus, interior wall members 16 are being installed on frame body When 12, simply the bottom of interior wall members 16 can be positioned.
Next, being illustrated to the bathroom unit 1A of second embodiment of the present invention.Fig. 8 is show the present invention the The bathroom unit 1A of two embodiments side view.The bathroom unit 1A and the bathroom list of first embodiment of second embodiment Member 1 is compared, and mainly interior wall members 16A installation constitution is different.When illustrate second embodiment when, pair and first embodiment Structure identical structure mark identical symbol, and its explanation is omitted or simplified.
The bathroom unit 1A of second embodiment possesses:The interior wall members 16A of hooking sheet material 43 is provided with bottom;It is fixed Vertical framework 121 and ceiling component 13 and the connection sheet material 41 for the upper end for detachably fixing interior wall members 16A;And it is fixed In the lower end and hooking for indulging framework 121 in the protrusion sheet material 42 of hooking sheet material 43.
Prominent sheet material 42 is located at the lower end in the face of the inner side of vertical framework 121.Prominent sheet material 42 is formed by sheet material, possesses first Vertical plate part 421, the vertical plate part 423 of base plate 422 and second.First vertical plate part 421 is indulging the lower end side of framework 121, From the lower end side closer to the top than vertical framework 121 lower end is extended to along the inner side of vertical framework 121 facing to lower section.Base plate 422 upper surface from the end of the lower side of the first vertical plate part 421 to the direction away from vertical framework 121 along flooring element 11 Extend specific length.Second vertical plate part 423 is from the end of the side opposite with vertical framework 121 of base plate 422 towards upper Fang Yanshen specific lengths.Second vertical plate part 423 is configured to protrude from flooring element 11.
Prominent sheet material 42 is fixed on vertical framework 121 at the first vertical plate part 421 by screwed part 445.
Lower end of the hooking sheet material 43 located at the back side of interior wall members 16.Hooking sheet material 43 is formed by sheet material, with inwall The mounting portion 431 at the back side of interior wall members 16 is connected at the back side of the lower end side of component 16;It is configured to than mounting portion 431 The parallel portion 433 discretely extended parallel to more on the lower and with the back side of interior wall members 16 relative to interior wall members 16;With And connection mounting portion 431 and the coupling part 432 of parallel portion 433.
In order to by the hooking of hooking sheet material 43 in prominent sheet material 42, parallel portion 433 in the way of being open downward with There is gap between interior wall members 16.By making to protrude gap of the sheet material 42 engaging in hooking sheet material 43, to interior wall members 16 The position of bottom positioned.
Hooking sheet material 43 is fixed on the back side of interior wall members 16 at mounting portion 431 by screwed part 446.
Connection sheet material 41 is formed by sheet material, possesses upper horizontal plate portion 411, intermediate vertical plate portion 412, by-level plate portion 413 and lower vertical plate portion 414.Upper horizontal plate portion 411 in the end side of the horizontal direction of the lower surface of ceiling component 13, From the position away from vertical framework 121 along the lower surface of ceiling component 13 in the way of close to vertical framework 121 along horizontal-extending rule Measured length.Intermediate vertical plate portion 412 is from the end of the side of vertical framework 121 of upper horizontal plate portion 411 along the inner side of vertical framework 121 Facing to lower section extend specific length.By-level plate portion 413 is from the end of the downside of middle horizontal plate part 413 away from The direction of vertical framework 121 is along horizontal-extending specific length.Lower vertical plate portion 414 is from middle horizontal plate part 413 and vertical framework The end of 121 opposite sides, which is risen, extends downwards specific length.
Connection sheet material 41 is fixed in upper horizontal plate portion 411 by screwed part 441.Sheet material 41 is connected in intermediate vertical plate portion 412 are fixed by screwed part 442,443.For lower vertical plate portion 414 and interior wall members 16A, located at interior wall members The 16A hooking of hooking sheet material 43 is in after prominent sheet material 42, and the downside that connection sheet material 41 is connected in interior wall members 16A upper end is hung down In the state of straight plate part 414, lower vertical plate portion 414 and interior wall members 16A are installed as by handling screwed part 444 can Handling.
In the second embodiment constituted as above, prominent sheet material 42 and hooking sheet material 43 are used as limitation inwall structure The interior wall members limiting unit that the bottom of part 16 is moved to the direction close to vertical framework 121 and the direction away from vertical framework 121 Function.Thus, when interior wall members 16A is installed on into frame body 12, bottom that can simply to interior wall members 16A Positioned.
Next, being illustrated to the bathroom unit 1B of third embodiment of the present invention.Fig. 9 is show the present invention the The bathroom unit 1B of three embodiments side view.The bathroom unit 1B and the bathroom list of first embodiment of 3rd embodiment Member 1 is compared, and interior wall members 16B construction is different.It is pair identical with the structure of first embodiment when illustrating three embodiments Structure mark identical symbol, and its explanation is omitted or simplified.
The interior wall members 16B of 3rd embodiment except first embodiment interior wall members 16 ceramic tile part 161 and Outside lining component 162, also pass through part 50 with pipe arrangement.Pipe arrangement is installed on the inwall structure of first embodiment by part 50 The back side of lining component 162 in part 16.Interior wall members hook part 163 is located at the back side of the pipe arrangement by part 50.
Pipe arrangement is formed as vertically extending tubular by part 50.It can be matched somebody with somebody in pipe arrangement by the inside of part 50 Put pipe arrangement 60.In present embodiment, pipe arrangement 60 insertion ceramic tile part 161 and lining component 162, and extend in the horizontal direction Pipe arrangement is extended downwards deviously by part 50 in pipe arrangement by the inside of part 50.
In the 3rd embodiment constituted as above, the space of the setting pipe arrangement 60 of bathroom unit 1 can be located at Interior wall members 16B inside.Thus, being capable of effectively flexible utilization compared with being provided for setting the space of pipe arrangement 60 in addition Space.
Next, being illustrated to the bathroom unit 1C of the 4th embodiment of the present invention.Figure 10 shows the present invention The bathroom unit 1C of 4th embodiment side view.The bathroom unit 1C and the bathroom of first embodiment of 4th embodiment Unit 1 is compared, and the aspect for being also equipped with lifting piece 70 is different from the bathroom unit 1 of first embodiment.When explanation the 4th is implemented During mode, pair identical symbol is marked with the structure identical structure of first embodiment, and its explanation is omitted or simplified.
Lifting piece 70 carries perfect aspect, the frame body 12 of bathroom unit 1 in crane using lifting etc. with suspending in midair When use.Lifting piece 70 be formed as insertion along the vertical direction indulge framework 121 inside as it is bar-shaped.In lifting piece 70 Upper end is formed with hang part 701.Hang part 701 is formed as ring-type, so as to which crane by lifting etc. suspends in midair.To When lifting piece 70 is installed on frame body 12, the upper end side and lower end side of lifting piece 70 by upside nut 702 and under Side nut 703 and be fixed on vertical framework 121.
, can be by by the way that lifting piece 70 is installed on into bathroom unit 1 in the 4th embodiment constituted as above The hooking of hang part 701 is suspended in midair in the hook (not shown) of the crane of lifting etc., so as to lift bathroom unit 1.By This, the movement of bathroom unit 1 becomes easy.
More than, the preferred embodiment to the bathroom unit of the present invention is illustrated, but the present invention is not limited Due to above-mentioned embodiment, can suitably it change.
For example, in the above-described first embodiment, be configured to relative to multiple rod units 15 suspend in midair interior wall members 16 or Exterior wall members 18, but it is not limited to this.It can also be configured to, be open by being set in vertical framework 121, by interior wall members 16 Or exterior wall members 18 are suspended to the opening of vertical framework 121.
Also, in the above-described first embodiment, it is configured to suspend interior wall members 16 or outer wall in midair relative to vertical framework 121 Component 18, but it is not limited to this.For example, it is also possible to be configured to make interior wall members 16 or exterior wall members 18 be embedded in vertical framework 121。
Also, in the above-described embodiment, by interior wall members locator protrusions 111, the exterior wall members structure of locator protrusions 112 As its part as prominent such projection, but it is not limited to this.Prominent part can also be configured to along level side Replaced to the prominent groove of extension raised.
Also, in the above-described first embodiment, it is configured to utilize interior wall members hook part relative to multiple rod units 15 163 or the suspention interior wall members 16 or exterior wall members 18 of exterior wall members hook part 183, but it is not limited to this.Can also be by Interior wall members 16 or exterior wall members 18 are directly mounted at frame body 12.
The explanation of symbol
1st, 1A, 1B, 1C-bathroom unit, 11-flooring element, 12-frame body, 13-ceiling component, 16,16A, 16B, 16C-interior wall members, 17-interior wall members side filler rod (interior wall members caulking part), 18-exterior wall members, 42-protrude sheet material (interior wall members limiting unit), 43-hooking sheet material (interior wall members limiting unit), 111-interior wall members locator protrusions (inwall structure Part limiting unit), 121-vertical framework (frame parts), 163-interior wall members hook part (interior wall members suspension member), 164-fixed Position recess (interior wall members limiting unit), 183-exterior wall members hook part (exterior wall members suspension member).

Claims (7)

1. a kind of bathroom unit, it is characterised in that possess:
Flooring element;
Frame body, it has multiple frame parts of the upper surface side for the periphery for standing up above-mentioned flooring element;
Ceiling component, it is installed on said frame body;And
Interior wall members, it is installed on the inner side of said frame body between above-mentioned flooring element and above-mentioned ceiling component, and relatively It can be loaded and unloaded in said frame body,
The upper end of above-mentioned interior wall members is configured in the way of being separated with above-mentioned ceiling component.
2. bathroom unit according to claim 1, it is characterised in that
Possesses the interior wall members caulking part configured in the way of filling up between above-mentioned interior wall members and above-mentioned ceiling component.
3. bathroom unit according to claim 1 or 2, it is characterised in that
Above-mentioned interior wall members have the interior wall members suspension member for being used for being suspended to said frame body in its rear side.
4. bathroom unit according to claim 3, it is characterised in that
Above-mentioned interior wall members suspension member is located at the upper end of above-mentioned interior wall members.
5. the bathroom unit according to any one of Claims 1 to 4, it is characterised in that
Possess exterior wall members, the exterior wall members are installed on the outside of said frame body, and can be loaded and unloaded relative to said frame body.
6. the bathroom unit according to any one of Claims 1 to 5, it is characterised in that
Possesses interior wall members limiting unit, the interior wall members limiting unit limits the bottoms of above-mentioned interior wall members to close to said frame The direction of part and the direction movement away from said frame part.
7. a kind of construction method of bathroom unit, the bathroom unit possesses:
Flooring element;
Frame body, it has multiple frame parts of the upper surface side for the periphery for standing up above-mentioned flooring element;
Ceiling component, it is installed on said frame body;And
Interior wall members, it is installed on the inner side of said frame body between above-mentioned flooring element and above-mentioned ceiling component, and relatively It can be loaded and unloaded in said frame body,
The construction method of above-mentioned bathroom unit is characterised by, including:
Above-mentioned interior wall members are installed in the way of gap as defined in being formed between above-mentioned ceiling component and above-mentioned interior wall members In the process of said frame body;And
Interior wall members caulking part is installed in above-mentioned in the way of filling up between above-mentioned interior wall members and above-mentioned ceiling component Process between wall member and above-mentioned ceiling component.
CN201580059593.1A 2014-11-06 2015-11-02 The construction method of bathroom unit and bathroom unit Pending CN107075862A (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2014-226496 2014-11-06
JP2014226496A JP2016089519A (en) 2014-11-06 2014-11-06 Bathroom unit and construction method for bathroom unit
PCT/JP2015/080912 WO2016072383A1 (en) 2014-11-06 2015-11-02 Bathroom unit and bathroom unit construction method

Publications (1)

Publication Number Publication Date
CN107075862A true CN107075862A (en) 2017-08-18

Family

ID=55909108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201580059593.1A Pending CN107075862A (en) 2014-11-06 2015-11-02 The construction method of bathroom unit and bathroom unit

Country Status (4)

Country Link
JP (1) JP2016089519A (en)
CN (1) CN107075862A (en)
SG (1) SG11201703496UA (en)
WO (1) WO2016072383A1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0463750U (en) * 1990-10-15 1992-05-29
JPH0530353U (en) * 1991-09-25 1993-04-20 大建工業株式会社 Assembly wall panel structure
JPH08240020A (en) * 1995-03-02 1996-09-17 Sekisui Chem Co Ltd Fixing structure of wall panel in bathroom unit
JP2002309787A (en) * 2001-04-12 2002-10-23 Sekisui Chem Co Ltd Sanitary unit
CN103397790A (en) * 2013-07-08 2013-11-20 万科企业股份有限公司 Assembled bathroom and installation process
CN203531430U (en) * 2013-10-22 2014-04-09 广州鸿力复合材料有限公司 Unit bathroom

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6111848U (en) * 1984-06-27 1986-01-23 東陶機器株式会社 unit bathroom
JPH066589U (en) * 1992-06-25 1994-01-28 松下電工株式会社 Structure around the ceiling
JP2544882B2 (en) * 1993-05-28 1996-10-16 ナショナル住宅産業株式会社 Bathroom wall panel mounting structure
JP2990434B1 (en) * 1998-09-08 1999-12-13 日崎建設株式会社 How to assemble the plumbing unit of the building to the frame by the frame wall method
JP2004044140A (en) * 2002-07-09 2004-02-12 Matsushita Electric Works Ltd Fitting structure of wall panel of unit room

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0463750U (en) * 1990-10-15 1992-05-29
JPH0530353U (en) * 1991-09-25 1993-04-20 大建工業株式会社 Assembly wall panel structure
JPH08240020A (en) * 1995-03-02 1996-09-17 Sekisui Chem Co Ltd Fixing structure of wall panel in bathroom unit
JP2002309787A (en) * 2001-04-12 2002-10-23 Sekisui Chem Co Ltd Sanitary unit
CN103397790A (en) * 2013-07-08 2013-11-20 万科企业股份有限公司 Assembled bathroom and installation process
CN203531430U (en) * 2013-10-22 2014-04-09 广州鸿力复合材料有限公司 Unit bathroom

Also Published As

Publication number Publication date
SG11201703496UA (en) 2017-06-29
WO2016072383A1 (en) 2016-05-12
JP2016089519A (en) 2016-05-23

Similar Documents

Publication Publication Date Title
CN107771233A (en) Hanged roof system
WO2011033267A3 (en) A method of forming and installing a j-tube system
CN107075862A (en) The construction method of bathroom unit and bathroom unit
CN202370179U (en) Waterproof cushion block for waterproof floor lifting mould support
KR200484378Y1 (en) Display booth easy to install and remove of panel
CN205840332U (en) Hang mould positioner
WO2016072384A1 (en) Bathroom unit
CN203808490U (en) Outdoor object suspension device for assembly house
CN205988161U (en) Multi-functional environment-protection pin-connected panel exhibitions section bar
KR101698548B1 (en) Form block apparatus and bridge for form block for constructing concrete wall
CN204802834U (en) Quick -witted installing support of door
CN104295872B (en) Equipment mounting bracket
JP6777968B2 (en) Support member and unit bath supported by this support member
CN209509266U (en) Glass curtain wall expansion joint structure system
CN107152109B (en) A kind of assembling type partition wall
CN204311650U (en) The metal storehouse plate of anti-layering male and female groove concealed fastener type metal storehouse plate sheet material and formation thereof
CN204212317U (en) The metal storehouse plate of a kind of anti-layered metal storehouse plate sheet material and formation thereof
CN109695327A (en) A kind of connecting elements of building outer laying and hanging ornamental prefabricated component and building body
CN203846724U (en) External wall panel vertical installing structure
KR101748927B1 (en) Prefabricated side braces
CN104485179B (en) Shake the head dish erection support
KR102173450B1 (en) A wire anchor with improved support power
CN213774178U (en) Reinforced base for overhanging railing
KR20130006189U (en) Ceiling attachment-type laundry-dry stand
CN117286952B (en) Node connecting device for assembled building structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170818