CN106499221A - Quick decoration system - Google Patents

Quick decoration system Download PDF

Info

Publication number
CN106499221A
CN106499221A CN201611152744.0A CN201611152744A CN106499221A CN 106499221 A CN106499221 A CN 106499221A CN 201611152744 A CN201611152744 A CN 201611152744A CN 106499221 A CN106499221 A CN 106499221A
Authority
CN
China
Prior art keywords
integrated
wallboard
toilet
floor
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611152744.0A
Other languages
Chinese (zh)
Inventor
闫俊杰
梅能敏
赵静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN DAYIN BUILDING MATERIAL Co Ltd
Original Assignee
TIANJIN DAYIN BUILDING MATERIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN DAYIN BUILDING MATERIAL Co Ltd filed Critical TIANJIN DAYIN BUILDING MATERIAL Co Ltd
Priority to CN201611152744.0A priority Critical patent/CN106499221A/en
Publication of CN106499221A publication Critical patent/CN106499221A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/125Small buildings, arranged in other buildings
    • E04H1/1266Cubicles for dressing; Toilets
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/12Plumbing installations for waste water; Basins or fountains connected thereto; Sinks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

The invention discloses a kind of quick decoration system, it is applied in assembled finishing, the quick decoration system specifically includes integrated Toilet system, integrated water supply system, integrated drainage system, integrated heating system, integrated partition wall system, integrated link plate system, integrated ceiling system and integrated kitchen system.Above-mentioned subsystem in the quick decoration system of the present invention, although have nothing in common with each other in manufacture, in assembly technology, but which is respectively provided with that assembling is quick, and the characteristics of assemble technical merit that quality, efficiency do not rely on workman.The quick decoration system of the present invention provides the solution of system for assembled finishing.

Description

Quick decoration system
Technical field
A kind of the present invention relates to assembled decoration technology field, more particularly to quick decoration system.
Background technology
Assembled finishing be a kind of component part by industrialized production by reliable assembling mode, pressed by industrial workers According to the fitment process that standardized program adopts dry construction.Mostly assembled finishing is dry construction based on construction characteristic, by propping up Efficiently separating for support body and obturator, makes house that there is structure durability, interior space motility and obturator updatability. Prefabricated in the factory more than supporter and obturator in being fitted up due to assembled, then assembled at the scene, so that dress The quality and efficiency repaiied do not rely on the technical merit of skilled industrial worker.
In fact, implementing the supporter that processed in the factory of enterprise or obturator of assembled finishing to be considered whole The component part of individual product, or the component part as " equipment " can be regarded as, when assembled finishing is carried out, will can construct Journey regards the general assembly process of the assembling process or " equipment " as product as.
According to described above, implemented assembled finishing part component mostly simply in prefabricated " equipment " in prior art How part, do not produce installation fitting, not overall assembling scheme
Therefore, it is necessary to provide a kind of assembled finished system, the offer for comprehensive and system solves assembled finishing Efficiency and the scheme of quality problems.
Content of the invention
For above-mentioned technical problem present in prior art, The embodiment provides a kind of quick decoration system System, the quick decoration system disclosure satisfy that the demand of assembled finishing.
For solving above-mentioned technical problem, the technical scheme that embodiments of the invention are adopted is:
A kind of quick decoration system, including:
Integrated Toilet system, it include toilet wallboard, bathroom floor and be installed in the toilet wallboard and WC Facilities on the bathroom floor, wherein, are formed with wallboard between the toilet wallboard and toilet structural wall Stilt layer, is formed with floor Stilt layer between the bathroom floor and toilet structure foundation;
Integrated water supply system, its are arranged in the wallboard Stilt layer, the integrated water supply system include water main and The multiple distributive pipes being connected with the water main, the water inlet of the WC Facilities is by the wallboard Stilt layer Water inlet pipe is connected with the distributive pipe;
Integrated drainage system, its are arranged in the floor Stilt layer, and the discharge outlet of the WC Facilities is by being located at Drain pipe in the floor Stilt layer is connected with the integrated drainage system.
Preferably, also include that integrated partition wall system, the integrated partition wall system include two partition plates, are located at partition wall described in two Between plate and for the keel shoe for supporting the partition plate and the damp-proof separator layer being pasted on the keel shoe.
Preferably, also include that integrated link plate system, the integrated link plate system include indoor wallboard and be used for adjusting institute State indoor wallboard position first adjustment component, described first adjustment component include the guide rail being fixed on indoor wall, can Along the slide and the adjustment part that can be fixed on the guide rail, the support member being fixed on the adjustment part;Described Indoor wallboard is fixed on the support member.
Preferably, also include integrated ceiling system, the integrated ceiling system includes top board and hangs the top board Ceiling joist, the ceiling joist includes keelson and main joist, and the keelson is used for the overlapping edges of the top board On wallboard, the main joist is used for top board described in support.
Preferably, also include that integrated heating system, the integrated heating system include multiple floor heating modules and be multiple Point water water collector that the floor heating module supplies water, multiple floor heating modules are assembled to form floor heating layer, each described floor heating mould Block includes structure with cavity volume, the obturator being arranged in the cavity volume, is laid in the internal floor heating pipe of the filling, The floor heating module is erected on structure foundation to form floor heating Stilt layer by foundation bolt.
Preferably, also include that integrated kitchen system, the integrated kitchen system include cabinet, the cabinet is by prefabricated plate Bar grafting is formed.
Preferably, overall chassis is additionally provided with the bathroom floor, and the edge on the overall chassis is provided with gear Water edge, the upper surface on the overall chassis are provided with anti-skid bulge.
Preferably, the toilet wallboard is installed on the toilet body of wall by the second adjustment component, and described second Adjustment component includes that the swollen bolt being fixed in the toilet body of wall is fixedly connected with the swollen bolt and perpendicular to the toilet The support column of body of wall, the free end for being fixed on the support column the support block for supporting the toilet wallboard.
Preferably, floor drain is provided with the overall chassis, and the floor drain includes the first cylinder being arranged and the second cylinder, First sleeve and the second sleeve form circular passage, to enable water to retain in closure draining in the circular passage Pipe.
Preferably, the integrated partition wall system also includes fast-assembling door, and the fast-assembling door includes door pocket and door leaf, the door pocket Including vertical set and top cover, the vertical set is located on the body of wall, and the body of wall includes two wallboards be arrangeding in parallel, wall described in two Packing space is formed between plate, it is characterised in that the vertical set includes mounting framework, supporter and embedded body, the installation Skeleton has the bearing surface and the first mounting surface for installing door leaf for abutting respectively, the support with wallboard described in two Body is arranged on the mounting framework, wherein, the embedded body be fixed on the supporter and at least part of stretch into described In packing space, it is fixedly connected with the body of wall with the implant by being filled in the packing space.
Compared with prior art, the beneficial effect of quick decoration system of the invention and fast-assembling door is:The present invention's is quick Above-mentioned subsystem in finished system, although have nothing in common with each other in manufacture, assembly technology, but which is respectively provided with assembling quickly, and fill The characteristics of matching somebody with somebody the technical merit that quality, efficiency do not rely on workman.The quick decoration system of the present invention is provided for assembled finishing The solution of system.
Description of the drawings
The toilet wallboard of the integrated Toilet system in the quick decoration system that Fig. 1 is provided for embodiments of the invention Mounting structure schematic diagram.
The bathroom floor of the integrated Toilet system in the quick decoration system that Fig. 2 is provided for embodiments of the invention Mounting structure schematic diagram.
The knot on the overall chassis of the integrated Toilet system in the quick decoration system that Fig. 3 is provided for embodiments of the invention Structure schematic diagram.
The structure of the floor drain of the integrated Toilet system in the quick decoration system that Fig. 4 is provided for embodiments of the invention is shown It is intended to.
The structural representation of the integrated water supply system in the quick decoration system that Fig. 5 is provided for embodiments of the invention.
The structural representation of the integrated drainage system in the quick decoration system that Fig. 6 is provided for embodiments of the invention.
The structural representation of the integrated partition wall system in the quick decoration system that Fig. 7 is provided for embodiments of the invention is (not Partition plate is installed).
Structural representation (the peace of the integrated partition wall system in the quick decoration system that Fig. 8 is provided for embodiments of the invention Partition plate is housed).
The structural representation of the integrated link plate system in the quick decoration system that Fig. 9 is provided for embodiments of the invention.
The structural representation of the integrated ceiling system in the quick decoration system that Figure 10 is provided for embodiments of the invention.
The structural representation of the integrated heating system in the quick decoration system that Figure 11 is provided for embodiments of the invention.
The structure of the door pocket in integrated partition wall system in the quick decoration system that Figure 12 is provided for embodiments of the invention Schematic diagram.
In figure:
11- toilet wallboards;12- toilet structural walls;13- wallboard Stilt layers;14- second adjusts component;141- is swollen bolt; 142- support columns;143- support blocks;15- toilet structure foundations;16- bathroom floors;17- floors Stilt layer;18- integral bottoms Disk;181- dash alongs;19- water inlet pipes;20- floor heating modules;21- structures;22- obturators;23- floor heating pipes;24- balance layers; 25- indoor floors;26- floor heating Stilt layers;27- foundation bolts;200- floor drains;201- floor drain bodies;The second cylinders of 202-;203- First cylinder;204- circular passages;205- aqueducts;The integrated water supply systems of 30-;31- water mains;32- distributive pipes;33- is quick Joint;The integrated drainage systems of 40-;41- main sewers;42- point of drain pipe;61- first adjusts component;611- guide rails;612- is adjusted One integral piece;613- support members;62- doors structure walls;63- indoor wallboards;71- keelsons;72- main joists;73- pull bars;74- is pushed up Plate;The vertical sets of 80-;81- mounting frameworks;82- door leafs;83- implants;84- buries body;100- doors structure grounds.
Specific embodiment
For making those skilled in the art be better understood from technical scheme, below in conjunction with the accompanying drawings and specific embodiment party Formula elaborates to the present invention.
As shown in Fig. 1 to 12, embodiment of the invention discloses that a kind of quick decoration system, is applied to assembled finishing In, the quick decoration system specifically includes integrated Toilet system, integrated water supply system 30, integrated drainage system 40, integrated adopts Heating system, integrated partition wall system, integrated link plate system, integrated ceiling system and integrated kitchen system.
As depicted in figs. 1 and 2, integrated Toilet system specifically includes toilet wallboard 11, bathroom floor 16 and dress WC Facilities on the toilet wallboard 11 and bathroom floor 16, wherein, toilet wallboard 11 and toilet structural wall Wallboard Stilt layer 13 is formed between 12, is formed with floor Stilt layer between bathroom floor 16 and toilet structure foundation 15 17;Wallboard Stilt layer 13 and floor Stilt layer 17 are used for the pipeline for housing integrated water supply system 30 and integrated drainage system 40, from And hide pipeline, and bathroom floor 16 and toilet wallboard 11 play soundproof effect to the current in pipeline.
As shown in figure 5, integrated water supply system 30 specifically includes water main 31 and distributive pipe 32, the water main 31 and floor Water inlet manifold connects, and distributive pipe 32 is connected with water main 31 by snap joint 33, uses water in the distributive pipe 32 and toilet Facility connects, for providing water source (such as providing cold water or hot water for toilet, water heater etc.) with drainage facility in toilet;This is integrated The main body of water supply system 30 is arranged in wallboard Stilt layer 13, so that integrated water supply system 30 is hidden and do not exposed so that defend Between life outward appearance preferably, using snap joint 33 using grafting by the way of, specifically, the snap joint 33 is formed with intubation, Sealing ring is arranged in the intubation, after insertion comes in and goes out water pipe, sealing ring plays sealing function to splicing position, so that between water pipe Fast sealing connection is achieved, and snap joint 33 causes grafting effect not rely on the technical merit of workman.Therefore, convenient Dismounting, short construction period, installation effectiveness are high.Avoid the time-consuming and hidden danger of quality of conventional coupling arrangement.
As shown in fig. 6, integrated drainage system 40 specifically includes point drain pipe 42 being connected with main sewer 41, this point of draining Pipe 42 is arranged in floor Stilt layer 17, and the discharge outlet of WC Facilities is by the drain pipe and collection in floor Stilt layer 17 Connect into drainage system 40, as all drain pipies are may be contained within floor Stilt layer 17, using the pumping equipment in toilet The not direct passing through floors of (such as toilet and floor drain 200 etc.) discharge outlet, but the horizontally-arranged row by the floor Stilt layer 17 that is laid in Water pipe is pooled in the main sewer 41 of vertical row.The maintenance of pipeline and maintenance are all carried out in this layer, will not be brought to resident family of lower floor Inconvenience, enjoys the property right independence of true work.And using hot melt and flexible socket joint connection between drain pipe, connection is reliable, ne-leakage, Prevent flange, never hang dirty, it is to avoid blocking, it is ensured that 50 years service life.
As shown in Figure 7 and Figure 8, integrated partition wall system includes two partition plates 55, is located between two partition plates 55 and is used for propping up The keel shoe and the damp-proof separator layer 54 being pasted on keel shoe of support partition plate 55.Wherein, keel shoe includes:Respectively apical grafting in The day ground joist 51 of top board 74 and structure foundation and with day ground joist vertical keel 52 connected vertically;Damp-proof separator layer 54 Stick on two sides of keel frame with puigging 53;Pacified in top/bottom part respectively in the way of level on damp-proof separator layer 54 Lateral keel is housed, and lateral keel is connected on vertical keel or day ground joist 51 to compress damp-proof separator layer 54;Top Drift angle keel strip and lower margin keel strip is respectively equipped with bottom horizontal Os Draconis, is laterally inserted in drift angle keel strip and lower margin keel strip groove Enter multiple seamless spliced partition plates 55, on drift angle keel strip and lower margin keel strip, distinguish spiral-lock corner angle staff and base anchor.Thus, Partition plate 55 is supported and fixed by keel shoe, and the whole partition wall for being formed is stably mounted on indoor floor 25.This is integrated Partition wall system simplifies partition wall construction technology, erection & lift efficiency and quality using keel shoe;Damp-proof separator layer 54 solves Os Draconis Frame waterproof, protection against the tide, anti-mildew, the problems such as;Veneered surfaces have anti-pollution, scrubbing resistance, acid and alkali-resistance characteristic for UV applications;Whole Partition wall quality is strong, intensity is high, sound insulation is excellent;The system adopts raw material energy-conserving and environment-protective and recoverable.
As shown in figure 9, integrated link plate system includes indoor wallboard 63 and for adjusting 63 position of indoor wallboard first Adjustment component 61, the first adjustment component 61 include the guide rail 611 being fixed on doors structure wall 62, can slide along guide rail 611 And the adjustment part 612 that can be fixed on guide rail 611, the support member 613 being fixed on adjustment part 612;Indoor wallboard 63 is fixed On support member 613.Specifically, support member 613 is quickly fixed with indoor wallboard 63 by environment-friendlyadhesive adhesive nail, and guide rail 611 leads to Cross gluing or securing member and the 62 quick fixation of doors structure wall.Thus, after indoor wallboard 63 is fixed with support member 613, passing through Adjustment part 612 is slided the position that adjusts indoor wallboard 63 on guide rail 611 so that the position sign of indoor wallboard 63 is attached together with will Ask.As the adjustment of indoor wallboard 63 is can achieve by mobile adjustment part 612, therefore so that the installation matter of indoor wallboard 63 Amount and efficiency do not rely on the technical merit of skilled industrial worker, so as to improve installation effectiveness and quality;And indoor wall need not Perforate reduces the destruction to structure wall, it is to avoid operational error;Both horizontally and vertically can adjusted by the first adjustment component 61 Section is levelling.Support member 613 and 612 design optimization of adjustment part, are balanced installation Os Draconis and the gravity of indoor wallboard 63.It is preferred that Ground, between indoor wallboard 63 can also by internal corner component, external corner strip, plug connector realize assembled, close spelling between indoor wallboard 63, oneself The functions such as lock closing in.The fixation of indoor wallboard 63, splicing, the connector of connection indoor wallboard 63 or Os Draconis are standardization and set Meter, factory is mass customized, normalized construction, lifts total quality, reduces field operation, saves work efficiency liberation labour force.
As shown in Figure 10, the ceiling joist that integrated ceiling system includes top board 74 and hangs top board 74, ceiling joist Including keelson 71 and main joist 72, keelson 71 is formed with a confession by inserting that indoor wallboard 63 or toilet wallboard 11 are inserted One faying surface for the overlap joint of top board 74 of access slot and formation, 74 side of top board are overlapped on faying surface, and opposite side is by main joist 72 supports, and the main joist 72 is lifted on roof by a pull bar 73.Keelson 71 is used for the overlapping edges of top board 74 to exist On indoor wallboard 63, main joist 72 is used for support top board 74.
As shown in figure 11, integrated heating system includes multiple floor heating modules 20 and dividing for the water supply of multiple floor heating modules 20 Water water collector (not shown), to form floor heating layer, each floor heating module 20 includes having to 20 assembly of multiple floor heating modules The structure 21 of cavity volume, the obturator 22 being arranged in cavity volume, the floor heating pipe 23 being laid in obturator 22, floor heating module 20 lead to Cross foundation bolt 27 to be erected on doors structure ground 100 to form floor heating Stilt layer 26.Wherein, the obturator 22 is by heat conduction material Material is made, and arranges heat-insulation layer in the bottom of cavity volume, to prevent heat from shedding from the bottom of structure 21.When multiple floor heating modules 20 Assembled and after the completion of setting up, at least one of which balance layer 24 is also laid on floor heating module 20, re-lay ground on the balance layer 24 Plate, the balance layer 24 is used for preventing from trampling or weight is so that floor heating pipe 23 is damaged or prevents the function of subsiding.Each floor heating module Floor heating pipe 23 in 20 is through repeatedly bending or spiraling, and forms outlet and water inlet, the outlet and water inlet with point The outlet pipe of water water collector and water inlet pipe 19 connect so that hot water enters from water inlet, then through radiating, heat reduce after from Outlet flows out.In the integrated heating system, the floor heating module 20 for being supported is caused to meet specification by foundation bolt 27 equal Cloth load, load are required, while the bottom of foundation bolt 27 is equipped with Rubber shock-absorbing pad plays sound insulation and noise reduction effect.Structure Heat-insulation layer, floor heating pipe 23 by galvanized iron sheet punch forming, and can be carried out parcel by balance layer 24 and play protection against the tide, fire prevention by body 21 Increase the service life, and two pieces of adjacent 20 outlets of floor heating module open up jagged outfit floor heating pipe 23 with water inlet and protect Set.An indoor Stilt layer is actually formed between floor heating module 20 and doors structure ground 100, and the indoor Stilt layer is winding displacement cloth Pipe provides enough spaces, solves the cross-cutting issue of pipeline and the arrangement of floor heating pipe 23.Balance layer 24 is furnished with c-type buckle just Connect and fix with balance layer 24 in structure 21.Any glue is not adopted in 20 factory's manufacturing process of floor heating module, reduces environment Pollution.The flat foot of support in foundation bolt 27 can pass through floor heating module after floor heating module 20 is all installed with diagonal brace lower margin Secondary levelling regulation of the adjustment hole of 20 edge improves installation accuracy.Adjacent two pieces of floor heating modules 20 are fixed on two by U-shaped buckle On the flange of individual adjacent structure body 21, and it is locked with flat foot is supported by screw, the impact resistance that is allowed to be connected firmly is excellent.Flat Weighing apparatus layer 24 offers c-type card and is reserved as groove milling, and after fixing c-type card, 20 integral smoothness of floor heating module is more preferably.Floor and balance Cement fibrolite plate of the layer 24 for same material, improves heat conductivity, and integrated rapid installing integrated heating ground system has light weight, intensity High, installation is fast, radiate uniform effect.
Integrated kitchen system includes that cabinet, cabinet are formed by prefabricated lath grafting.
In a preferred embodiment of the invention, as shown in Figures 2 and 3, entirety is additionally provided with bathroom floor 16 Chassis 18, the edge on overall chassis 18 are provided with dash along 181, and the upper surface on overall chassis 18 is provided with anti-skid bulge.Defend The capillary groove of the overall chassis 18 design forming entirety between life on floor 16 has dash along 181, and sewage is intercepted in integral bottom In disk 18, compared with the tiling technique of ground:It is dry operation while solution leakproof and draining, without using cement mortar Floating installation is more efficient;Overall chassis 18 is that batch production mould processing customed product can flexibly be arranged sky according to house type functional requirement Between size, scene need not cut perforate using any power-driven tool, pollution-free to working environment;Overall chassis 18 belongs to flexible material Surface is non slip surface, and such as falling down overall chassis 18 in toilet imprudence effectively prevents secondary injury;Due to overall chassis 18 Concaveconvex structure is provided with, bulk strength is improve, so that thickness is only 4mm, toilet mark is taken so as to effectively solve High problem.
In a preferred embodiment of the invention, toilet wallboard 11 is installed in toilet by the second adjustment component 14 On body of wall, the second adjustment component 14 includes that the swollen bolt 141 being fixed in toilet body of wall is fixedly connected with swollen bolt 141 and vertical Support column 142, the free end for being fixed on support column 142 support block for supporting toilet wallboard 11 in toilet body of wall 143.Wherein, support block 143 can be made up of galvanized sheet, and is fixed with toilet wallboard 11 by structure glue.Wherein, toilet Water inlet pipe 19 is arranged between toilet body of wall and toilet wallboard 11.
In a preferred embodiment of the invention, as shown in Figure 3 and Figure 4, floor drain 200 is provided with overall chassis 18, Specifically, the floor drain 200 includes that 200 core of floor drain body 201 and floor drain, the side of floor drain body 201 are provided with aqueduct 205, The aqueduct 205 is horizontally disposed with, and connects with the inner space of floor drain body 201, and 200 core of floor drain is arranged on floor drain body 201 Inner space in, make sewage initially enter 200 core of floor drain, but the inside entered outside 200 core of floor drain by 200 core of floor drain be empty Between in, subsequently into aqueduct 205 in.Specifically, 200 core of floor drain includes the first cylinder 203 and the second cylinder 202, first Body 203 and the second cylinder 202 are vertically arranged, and the lower end of the first cylinder 203 is fitted with the diapire of floor drain body 201 so as to being sealed Stifled, and between the lower end of the second cylinder 202, the second cylinder 202 and the first cylinder 203, upper end three's shape of the first cylinder 203 Into the passage for supplying sewage to pass through and connect with aqueduct 205.Specifically,
The upper end of the first cylinder 203 is open, and the lower end of the second cylinder 202 is extend in the first cylinder 203, so that first A circular passage 204 is surrounded between cylinder 203 and the second cylinder 202, and the lower end of the second cylinder 202 is higher than the first cylinder 203 lower end, the gap of both lower ends define the water inlet of circular passage 204, and the upper end of the first cylinder 203 is less than second The upper end of body 202, the difference in height of both upper ends form the outlet of circular passage 204.Thus, when draining, sewage is from The upper end of two cylinders 202 is entered in the second cylinder 202, then water inlet of the sewage from the circular passage 204 of 202 lower end of the second cylinder Mouth is entered in circular passage 204, and sewage is flowed up in circular passage 204, then from the annular of the upper end of the first cylinder 203 The outlet of passage 204 flows out, in the inner space outside sewage entrance 200 core of floor drain of outflow, subsequently into aqueduct 205 In, outdoor is discharged by aqueduct 205.After indoor sewage is drained, the water surface in circular passage 204 is due to receiving the first cylinder The limitation in height of 203 upper end, water surface elevation terminate in the upper end of first passage, and the water due to circular passage 204 and first Water connection in body 203, the height of the water in circular passage 204 are equal all the time with the height of the water in the first cylinder 203, the water The unique passage that aqueduct 205 is connected has been blocked with interior, so that the odor air produced in aqueduct 205 cannot be introduced into room Interior, i.e., circular passage 204 blocks odor air in aqueduct 205.
200 core of floor drain in the present invention by the first cylinder 203 and the second cylinder 202 highly go up shift to install, from And making 200 core of floor drain define a linker, it is unique with interior that aqueduct 205 has been blocked up in the water seal so as to pass through in linker Passage, so as to effectively prevent gas with foreign flavor from getting in, improve interior air quality.
In a preferred embodiment of the invention, as shown in figure 12, integrated partition wall system also includes fast-assembling door, fast-assembling door Including door pocket and door leaf 82, door pocket includes that vertical set 80 and top cover, vertical set 80 are located on body of wall, and body of wall includes two for be arrangeding in parallel Indoor wallboard 63, forms packing space between two indoor wallboards 63, and vertical set 80 includes mounting framework 81, supporter and embedded body 84, mounting framework 81 has the bearing surface for abutting respectively and the first peace for installing door leaf 82 with two indoor wallboards 63 Dress face, supporter are arranged on mounting framework 81, wherein, and embedded body 84 is fixed on supporter and at least part of stretches into filling In space, it is fixedly connected with body of wall with the implant 83 by being filled in packing space.Thus, by filling out in packing space Fill the implants such as asbestos 83, make embedded body 84 is at least part of is embedded in asbestos so that embedded body 84 is defined with asbestos One entirety, deviates from from asbestos so as to effectively prevent embedded body 84, so that vertical set 80 is stably fixed on body of wall.
Above-mentioned subsystem in the quick decoration system of the present invention, although have nothing in common with each other in manufacture, assembly technology, but its The characteristics of being respectively provided with that assembling is quick, and assemble technical merit that quality, efficiency do not rely on workman.The quick decoration system of the present invention System compensate for the infull defect of product class in prior art.
Above example is only the exemplary embodiment of the present invention, is not used in the restriction present invention, protection scope of the present invention It is defined by the claims.Those skilled in the art can be made respectively to the present invention in the essence and protection domain of the present invention Modification or equivalent is planted, this modification or equivalent also should be regarded as being within the scope of the present invention.

Claims (10)

1. a kind of quick decoration system, it is characterised in that include:
Integrated Toilet system, it include toilet wallboard, bathroom floor and are installed in the toilet wallboard and described WC Facilities on bathroom floor, wherein, are formed with wallboard and make somebody a mere figurehead between the toilet wallboard and toilet structural wall Layer, is formed with floor Stilt layer between the bathroom floor and toilet structure foundation;
Integrated water supply system, its are arranged in the wallboard Stilt layer, the integrated water supply system include water main and with institute Multiple distributive pipes of water main connection are stated, the water inlet of the WC Facilities is by the water inlet in the wallboard Stilt layer Pipe is connected with the distributive pipe;
Integrated drainage system, its are arranged in the floor Stilt layer, and the discharge outlet of the WC Facilities is by located at described Drain pipe in the Stilt layer of floor is connected with the integrated drainage system.
2. quick decoration system according to claim 1, it is characterised in that also include integrated partition wall system, described integrated Partition wall system includes two partition plates, is located at described in two between partition plate and for supporting the keel shoe of the partition plate and stick Damp-proof separator layer on the keel shoe.
3. quick decoration system according to claim 1, it is characterised in that also include integrated link plate system, described integrated Link plate system includes indoor wallboard and the first adjustment component for adjusting the indoor wallboard position, the first adjustment group Part include the guide rail being fixed on indoor wall, can be along the slide and the adjustment that can be fixed on the guide rail Part, the support member being fixed on the adjustment part;The indoor wallboard is fixed on the support member.
4. quick decoration system according to claim 1, it is characterised in that also include integrated ceiling system, described integrated The ceiling joist that ceiling system includes top board and hangs the top board, the ceiling joist include keelson and main joist, The keelson is used for the overlapping edges of the top board in wallboard, and the main joist is used for top board described in support.
5. quick decoration system according to claim 1, it is characterised in that also include integrated heating system, described integrated Point water water collector that heating system includes multiple floor heating modules and supplies water for multiple floor heating modules, multiple floor heating moulds To form floor heating layer, each described floor heating module includes structure with cavity volume, is arranged in the cavity volume for block assembly Obturator, be laid in the internal floor heating pipe of the filling, the floor heating module by foundation bolt be erected on structure foundation with Form floor heating Stilt layer.
6. quick decoration system according to claim 1, it is characterised in that also include integrated kitchen system, described integrated Kitchen system includes that cabinet, the cabinet are formed by prefabricated lath grafting.
7. quick decoration system according to claim 1, it is characterised in that be additionally provided with entirety on the bathroom floor Chassis, the edge on the overall chassis are provided with dash along, and the upper surface on the overall chassis is provided with anti-skid bulge.
8. quick decoration system according to claim 1, it is characterised in that the toilet wallboard passes through the second adjustment group Part is installed on the toilet body of wall, the second adjustment component include the swollen bolt that is fixed in the toilet body of wall and The swollen bolt is fixedly connected and the support column perpendicular to the toilet body of wall, is fixed on the free end of the support column and is used for Support the support block of the toilet wallboard.
9. quick decoration system according to claim 7, it is characterised in that be provided with floor drain on the overall chassis, institute The first cylinder and the second cylinder that floor drain includes being arranged is stated, first sleeve and the second sleeve form circular passage, with Enable water to retain in closure drain pipe in the circular passage.
10. quick decoration system according to claim 2, it is characterised in that the integrated partition wall system also includes fast-assembling Door, the fast-assembling door include that door pocket and door leaf, the door pocket include that vertical set and top cover, the vertical set are located on the body of wall, The body of wall includes two wallboards be arrangeding in parallel, forms packing space described in two between wallboard, it is characterised in that the vertical set bag Mounting framework, supporter and embedded body is included, the mounting framework has the bearing surface for abutting respectively with wallboard described in two And for installing the first mounting surface of door leaf, the supporter is arranged on the mounting framework, wherein, the embedded body is solid Be scheduled on the supporter and at least part of stretch in the packing space, with by being filled in filling out in the packing space Fill thing to be fixedly connected with the body of wall.
CN201611152744.0A 2016-12-14 2016-12-14 Quick decoration system Pending CN106499221A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611152744.0A CN106499221A (en) 2016-12-14 2016-12-14 Quick decoration system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611152744.0A CN106499221A (en) 2016-12-14 2016-12-14 Quick decoration system

Publications (1)

Publication Number Publication Date
CN106499221A true CN106499221A (en) 2017-03-15

Family

ID=58330921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611152744.0A Pending CN106499221A (en) 2016-12-14 2016-12-14 Quick decoration system

Country Status (1)

Country Link
CN (1) CN106499221A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339257A (en) * 2018-09-25 2019-02-15 重庆互邦莱装配式建筑工程有限公司 Assembled water-proof plate and its processing method
CN115075499A (en) * 2022-07-22 2022-09-20 深圳市小豹快装科技有限公司 Indoor rapid decoration method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR980002514U (en) * 1996-06-21 1998-03-30 Front panel of car
CN2436564Y (en) * 2000-07-28 2001-06-27 刘庆和 Domestic circulation type water supply-drainage system
KR20050120006A (en) * 2004-06-17 2005-12-22 최갑순 Wall-hung type water closet room housing method by using polyuretane skin wall panel---t-gps
CN103397790A (en) * 2013-07-08 2013-11-20 万科企业股份有限公司 Assembled bathroom and installation process
CN103835466A (en) * 2014-02-12 2014-06-04 苏州金螳螂建筑装饰股份有限公司 Combined type toilet wall mould block
JP5569736B2 (en) * 2010-09-06 2014-08-13 すてきナイスグループ 株式会社 Water supply / drainage system in buildings
CN104234194A (en) * 2013-06-06 2014-12-24 上海超杰环境保护有限公司 Pre-assembly integrated bathroom by modular ceramic tiles and assembly method of pre-assembly integrated bathroom
CN105735610A (en) * 2016-04-13 2016-07-06 王凤蕊 Waterproof undercarriage for bathroom
CN206625609U (en) * 2016-12-14 2017-11-10 天津达因建材有限公司 Quick decoration system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR980002514U (en) * 1996-06-21 1998-03-30 Front panel of car
CN2436564Y (en) * 2000-07-28 2001-06-27 刘庆和 Domestic circulation type water supply-drainage system
KR20050120006A (en) * 2004-06-17 2005-12-22 최갑순 Wall-hung type water closet room housing method by using polyuretane skin wall panel---t-gps
JP5569736B2 (en) * 2010-09-06 2014-08-13 すてきナイスグループ 株式会社 Water supply / drainage system in buildings
CN104234194A (en) * 2013-06-06 2014-12-24 上海超杰环境保护有限公司 Pre-assembly integrated bathroom by modular ceramic tiles and assembly method of pre-assembly integrated bathroom
CN103397790A (en) * 2013-07-08 2013-11-20 万科企业股份有限公司 Assembled bathroom and installation process
CN103835466A (en) * 2014-02-12 2014-06-04 苏州金螳螂建筑装饰股份有限公司 Combined type toilet wall mould block
CN105735610A (en) * 2016-04-13 2016-07-06 王凤蕊 Waterproof undercarriage for bathroom
CN206625609U (en) * 2016-12-14 2017-11-10 天津达因建材有限公司 Quick decoration system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339257A (en) * 2018-09-25 2019-02-15 重庆互邦莱装配式建筑工程有限公司 Assembled water-proof plate and its processing method
CN115075499A (en) * 2022-07-22 2022-09-20 深圳市小豹快装科技有限公司 Indoor rapid decoration method

Similar Documents

Publication Publication Date Title
US8402706B2 (en) Pillar part for modular construction
US4513545A (en) Apparatus for and method of constructing, transporting and erecting a structure of two or more stories comprised of a plurality of prefabricated core modules and panelized room elements
CN101654927B (en) Main structure of combined type house and assembly method thereof
EP1712694B1 (en) Curtain wall
CN101070713A (en) Environment-protection energy-saving ventilating air-conditioning sound-insulating novel building and construction method
CN103397790A (en) Assembled bathroom and installation process
CN109072612A (en) Pre-assembled siding for communal facility installation
EA013932B1 (en) Assembleable and modular housing unit exhibiting powder impression molded construction
US20070130841A1 (en) Construction module system and method
EP3358096A1 (en) Method for producing a wall or roof panel having installations included, walls or roofs pre-fabricated using said method and joints between the wall and roof panels
CN108824648A (en) Space module house
CN107771234A (en) Wall system
CN212613960U (en) Assembled bathroom system
CN101654928B (en) Structure of multi-layer combined type house and assembly method thereof
CN106499221A (en) Quick decoration system
CN206625609U (en) Quick decoration system
AU2020256635A1 (en) Panel and panel assembly for modular wet area construction
CN112523556B (en) Heat-insulation energy-saving prefabricated house and assembling method thereof
KR20100070745A (en) Structure of prefabricated bathroom
KR101787567B1 (en) Building rooftop Panel construction structure and construction method
CN201276755Y (en) Major structure of combined house
CN201276756Y (en) Multi-layer combined house
RU2312191C1 (en) Method for modular building erection (variants)
CN209145000U (en) A kind of assembling type steel structure modularization campsite building construction system
CN209145011U (en) For the assembling type steel structure module faced and built of constructing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170315