CN212613960U - Assembled bathroom system - Google Patents
Assembled bathroom system Download PDFInfo
- Publication number
- CN212613960U CN212613960U CN202020891718.5U CN202020891718U CN212613960U CN 212613960 U CN212613960 U CN 212613960U CN 202020891718 U CN202020891718 U CN 202020891718U CN 212613960 U CN212613960 U CN 212613960U
- Authority
- CN
- China
- Prior art keywords
- plate
- fixed
- keel
- wall
- floor drain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Residential Or Office Buildings (AREA)
Abstract
The utility model relates to an assembled toilet system, which belongs to the technical field of assembled decoration and particularly comprises an assembled wall panel and an assembled ground, wherein the assembled wall panel comprises a wall keel fixed on the wall and a wall panel arranged on the wall keel, and the rear part of the wall panel is also provided with a damp-proof film which is fixed on the wall keel; the fabricated floor comprises an overhead module and a supporting and leveling component supported at the bottom of the overhead module, a waterproof chassis is laid on the overhead module, a wall panel is positioned in the waterproof chassis, a decorative panel is laid on the waterproof chassis, and a drainage floor drain is further mounted on the waterproof chassis; the built on stilts module includes the base box of making by galvanized steel sheet and installs the calcium silicate board on the base box, the utility model discloses the installation is simple, convenient, and the efficiency of construction is high.
Description
Technical Field
The utility model relates to an assembled bathroom system belongs to assembled fitment technical field.
Background
The assembly type decoration is a decoration process that parts produced in an industrialized mode are subjected to dry construction by industrial workers according to a standardized procedure in a reliable assembly mode. In the prior art, the traditional toilet procedures are changed from water and electricity, leveling, waterproofing, wall-pasting floor tiles and ceiling repairing, wet operation is adopted on site, the influence of nature and construction procedure factors is large, each professional department cannot carry out cross construction, the construction period is long, the traditional toilet building mode is greatly limited by the technical level of site constructors and the management capability of managers, and the traditional toilet building mode has uncontrollable property. The traditional toilet is generally drainage in different layers, the drainage noise is large, the lower-layer ceiling space is additionally occupied, the position of the toilet bowl is fixed and cannot be changed, the floor slab is penetrated by the drainage transverse branch pipe, the access hole is located in the lower-layer space, and neighborhood disputes are easily caused once problems such as water leakage occur. In the traditional same-floor drainage mode, the floor slab of the lower-floor toilet needs to descend by at least 250mm, seeper in the overhead layer is not easy to be perceived, the height of a floor drain trap is limited by the overhead, a large amount of filling materials are needed in the overhead layer, and the double-floor slab and the waterproof property can also increase the manufacturing cost. With the vigorous popularization of housing industrialization in China, the assembled toilet is an important component of arrangement and construction in a house, and is more and more concerned.
SUMMERY OF THE UTILITY MODEL
For solving the technical problem that prior art exists, the utility model provides an installation is simple, convenient, the assembled bathroom system that the efficiency of construction is high.
In order to achieve the purpose, the technical scheme adopted by the utility model is an assembly type toilet system, which comprises an assembly type wall panel and an assembly type ground, wherein the assembly type wall panel comprises a wall keel fixed on a wall body and a wall panel arranged on the wall keel, and the rear part of the wall panel is also provided with a damp-proof film which is fixed on the wall keel;
the fabricated floor comprises an overhead module and a supporting and leveling component supported at the bottom of the overhead module, a waterproof chassis is laid on the overhead module, the wall panel is positioned in the waterproof chassis, a decorative panel is laid on the waterproof chassis, and a drainage floor drain is further mounted on the waterproof chassis; the overhead module comprises a base box made of galvanized steel sheets and a calcium silicate plate arranged on the base box,
the supporting and leveling assembly is mainly composed of an adjusting screw, a supporting block, a U-shaped plate and a base plate, the base plate is fixed to the bottom of the adjusting screw, a threaded hole is formed in the center of the bottom of the supporting block, the adjusting screw is installed in the threaded hole, a connecting block is fixed to the supporting block, the connecting block is located between the overhead modules, the U-shaped plate is buckled on the connecting block, the box edge of the base box is inserted into the U-shaped plate, and the U-shaped plate is fixed to the connecting block through screws.
Preferably, the wall fossil fragments include horizontal leveling fossil fragments and vertical concatenation fossil fragments, horizontal leveling fossil fragments and vertical concatenation fossil fragments are arranged perpendicularly, horizontal leveling fossil fragments pass through expansion bolts to be fixed on the wall body, just install the shingle between the vertical concatenation fossil fragments, horizontal leveling fossil fragments back sets up the dampproof membrane, horizontal leveling fossil fragments and dampproof membrane are fixed on expansion bolts through two adjusting nut centre grippings respectively, still be provided with sealed the pad between horizontal leveling fossil fragments and the dampproof membrane, sealed pad suit is on expansion bolts.
Preferably, the transverse leveling keel mainly comprises a hanging plate, a connecting vertical plate and a contact panel, the connecting vertical plate is fixed on one side of the hanging plate, the contact panel is fixed on the connecting vertical plate, the hanging plate and the connecting vertical plate are vertically arranged, the contact panel and the connecting vertical plate are vertically arranged, bolt fixing holes are formed in the hanging plate, a positioning groove is formed in the contact panel, and a plurality of bolt fixing holes are formed in the positioning groove;
vertical concatenation fossil fragments mainly comprise bottom plate, connection riser and picture peg, the vertical connection riser that is fixed with on the bottom plate, be fixed with the picture peg on the connection riser, picture peg and bottom plate parallel arrangement, the length of bottom plate is longer than the length of picture peg, the picture peg is used for the cartridge in the recess of shingle nail tip, the bottom plate is located between shingle nail and the wall.
Preferably, a reinforcing rib plate is further fixed on one side of the contact panel, and the hanging plate, the connecting vertical plate, the contact panel and the reinforcing rib plate are integrally formed.
Preferably, the drainage floor drain comprises a floor drain main body, a water discharge tube and a water seal tube, wherein a mounting hole is formed in the waterproof chassis, the floor drain main body is mounted in the mounting hole, a bolt fixing column is fixedly arranged on the inner wall of the floor drain main body, an annular tray is arranged on the circumference of the upper portion of the floor drain main body and is positioned at the bottom of the waterproof chassis, an annular fixing cover is arranged at the top of the waterproof chassis and is fixed on the bolt fixing column through bolts, a decorative cover plate is further arranged on the annular fixing cover, a step fixing table is arranged on the inner ring of the annular fixing cover, the water discharge tube is mounted on the step fixing table, an ABS filter screen and a mesh cover plate are fixed at the top of the water discharge tube, the water seal tube is arranged outside the water discharge tube, the bottom of the water seal tube is sealed, and the water seal tube, one side of the floor drain main body is also provided with a drainage connecting socket, a drainage pipe is inserted into the drainage connecting socket, and first sealing gaskets are arranged between the annular tray and the waterproof chassis, between the drainage cylinder and the annular fixed cover and between the drainage pipe and the drainage connecting socket.
Preferably, the bottom of the floor drain main body is provided with a fixing stud, the bottom of the water seal cylinder is provided with a threaded groove, and the fixing stud is in threaded connection with the threaded groove.
Preferably, a main body filter screen is arranged in the drainage connecting socket and integrally formed with the floor drain main body, and the top point of the main body filter screen is lower than the top end face of the water sealing cylinder.
Compared with the prior art, the utility model discloses technical effect below having.
1. The utility model discloses well bathroom wall is paved with the dampproof membrane all around, board seam socket joint I shape aluminium alloy, wallboard also possess waterproof function, can triple waterproof, solves the problem that assembled bathroom wall is waterproof and part is connected.
2. The utility model provides a wet operation of wallboard and waterproof problem. The equipment module is prefabricated in a factory, the modularization degree is high, the field installation is convenient and fast, the standard is achieved, and the problem of dust pollution caused by field cutting is solved.
3. The utility model discloses well waterproof chassis, with layer drainage floor drain and built on stilts module, solved assembled bathroom ground drainage, waterproof problem, can realize adjusting the function of built on stilts thickness to this level and smooth of accomplishing the face of adjusting. The required parts have uniform specification, less required installation personnel, less work types and simple, quick and firm installation.
4. The utility model discloses need not to fall the board and realize the same layer drainage, avoid leaking and lead to anti-flavor, moist breeding bacterium, not good problem of overhauing.
5. The utility model discloses the integrated level is high, and the construction is convenient, and the work progress does not have wet operation, and the unified modularization preparation of portion's article is installed, solves traditional bathroom and wastes time, takes a lot of work, wastes the problem of material.
6. The utility model discloses constitute whole frame by prefabricated integrated waterproof chassis of batch production, wallboard, assemble at the scene. The floor adopts the non-falling plate to drain water on the same layer, the drainage is directly fed into the main pipe to reduce noise obviously, the plate does not need to fall when the drainage pipe is arranged under the overhead floor, the parts are assembled on site for dry construction, and the special water seal floor drain is convenient to overhaul. The integrated waterproof chassis of the dampproof membrane and ground of wall forms the complete waterproof system, matches cleaners and polishes and fittings of various functions, has advantages such as factory standardized production, quick installation, waterproof.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is the mounting structure schematic diagram of the middle wall panel of the present invention.
Fig. 3 is a schematic structural view of the middle transverse leveling keel of the utility model.
Fig. 4 is the utility model discloses the mounting structure schematic diagram of well vertical concatenation fossil fragments.
Fig. 5 is the mounting structure schematic diagram of the middle overhead module of the present invention.
Fig. 6 is a schematic structural view of the decorative panel of the present invention.
Fig. 7 is the mounting structure schematic diagram of the middle drainage floor drain of the utility model.
Detailed Description
In order to make the technical problem, technical solution and advantageous effects to be solved by the present invention more clearly understood, the following description is given in conjunction with the accompanying drawings and embodiments to illustrate the present invention in further detail. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
As shown in fig. 1, 2 and 5, an assembled toilet system comprises an assembled wall panel 1 and an assembled floor 2, wherein the assembled wall panel 1 comprises a wall keel 3 fixed on a wall and a wall panel 4 installed on the wall keel, a moisture-proof film 5 is further arranged at the rear part of the wall panel 4, and the moisture-proof film 5 is fixed on the wall keel 3.
As shown in fig. 5 to 7, the fabricated floor 2 comprises an overhead module 6 and a supporting leveling component 7 supported at the bottom of the overhead module 6, a waterproof chassis 8 is laid on the overhead module 6, a wall panel 4 is positioned in the waterproof chassis 8, a decorative panel 9 is laid on the waterproof chassis 8, and a drainage floor drain 10 is further mounted on the waterproof chassis 8; the overhead module 6 comprises a base box 11 made of galvanized steel sheet and a calcium silicate board 12 mounted on the base box,
the supporting and leveling assembly 7 mainly comprises an adjusting screw 13, a supporting block 14, a U-shaped plate 15 and backing plates 16, wherein the backing plates 16 are fixed at the bottom of the adjusting screw 13, a threaded hole 17 is formed in the center of the bottom of the supporting block 14, the adjusting screw 13 is installed in the threaded hole 17, a connecting block 18 is fixed on the supporting block 14, the connecting block 18 is located between the overhead modules 6, the U-shaped plate 15 is buckled on the connecting block 18, the box edge of the base box 11 is inserted into the U-shaped plate 15, and the U-shaped plate 15 is fixed on the connecting block 18 through screws.
The overhead module is made of a galvanized steel sheet composite silicic acid cover plate, a hole matched with a foundation bolt penetrates through the center of the supporting block, and the height of the overhead module is adjusted by adjusting and rotating the foundation bolt. When the U-shaped plate is installed, the side edge of the galvanized steel plate base of the overhead module is clamped, the two overhead modules are fixed, and the two overhead modules are connected and stable. The waterproof chassis can be directly laid on the overhead module, and the waterproof chassis is formed by thermoplastic compounding and can be customized according to the actual size. The waterproof chassis is divided into a waterproof chassis shower area and a waterproof chassis decorative area according to the use condition. The shower area can be directly exposed for use, and small square protrusions with fixed sizes are arranged on the surface of the shower area, so that the shower area plays roles in skid resistance and flow guide. The surface of the finish area is smooth, and finish layers such as ceramic tiles or calcium silicate composite boards can be directly compounded. All curb plates are all not less than 40mm around the waterproof chassis, and wall and ground handing-over department, wallboard and dampproof membrane inject waterproof chassis in, dampproof membrane and waterproof chassis curb plate overlap joint are not less than 40mm, form integrative waterproof layer. The waterproof chassis can customize the position of the floor drain of the waterproof chassis.
As shown in fig. 2 to 4, the wall surface keel 3 comprises a horizontal leveling keel 19 and a vertical splicing keel 20, the horizontal leveling keel 19 and the vertical splicing keel 20 are vertically arranged, the horizontal leveling keel 19 is fixed on a wall body through an expansion bolt 21, a wall panel 4 is installed between the vertical splicing keels 20, a moisture-proof film 5 is arranged on the back of the horizontal leveling keel 19, the horizontal leveling keel 19 and the moisture-proof film 5 are respectively clamped and fixed on the expansion bolt 21 through two adjusting nuts 22, a sealing gasket 23 is further arranged between the horizontal leveling keel 19 and the moisture-proof film 5, and the sealing gasket 23 is sleeved on the expansion bolt 21.
The horizontal leveling keel 19 mainly comprises a hanging plate 24, a connecting vertical plate 25 and a contact panel 26, wherein the connecting vertical plate 25 is fixed on one side of the hanging plate 24, the contact panel 26 is fixed on the connecting vertical plate 25, the hanging plate 24 and the connecting vertical plate 25 are vertically arranged, the contact panel 26 and the connecting vertical plate 25 are vertically arranged, a bolt fixing hole 27 is formed in the hanging plate 24, a positioning groove 28 is formed in the contact panel 26, and a plurality of bolt fixing holes are formed in the positioning groove 28; the vertical splicing keel 20 mainly comprises a bottom plate 29, a connecting vertical plate 30 and an inserting plate 31, the connecting vertical plate 30 is vertically fixed on the bottom plate 29, the inserting plate 31 is fixed on the connecting vertical plate 30, the inserting plate 31 is arranged in parallel with the bottom plate 29, the length of the bottom plate 29 is longer than that of the inserting plate 31, the inserting plate 31 is used for being inserted into a groove in the end part of a wall panel, and the bottom plate 29 is located between the wall panel and a wall surface.
The utility model discloses well horizontal leveling fossil fragments adopt the link plate, connect riser, contact panel and deep floor to make, and the link plate, connect riser, contact panel and deep floor adopt corrosion resistant plate integrative bending type, and the link plate is used for fixing on expansion bolts or counter-tension screw rod, and contact panel is used for contacting with the shingle nail to constitute the plane that supports the shingle nail. Set up positioning groove on the touch panel, be used for placing the screw in the positioning groove, fixed vertical concatenation fossil fragments. The reinforcing rib plate is used for enhancing the strength of the contact panel and avoiding the stress deformation of the contact panel. The structural support problem of the decorative wall panel and the original wall body is solved through the transverse leveling keels. The keel is fixed on the screw rod through the nut, and the function of adjusting the overhead thickness is provided by adjusting the position of the keel on the screw rod, so that the leveling of the finished surface is adjusted, and conditions are provided for installing and leveling the wallboard. The keel is fixed on an original wall body through the expansion screws and the opposite-pulling screw rods, the specifications of required parts are unified, and the installation is simple and rapid.
As shown in fig. 7, the floor drain 10 includes a floor drain main body 33, a lower water cylinder 34 and a water seal cylinder 35, a mounting hole 36 is provided on the waterproof chassis 8, the floor drain main body 33 is mounted in the mounting hole 36, a bolt fixing column 37 is fixed on the inner wall of the floor drain main body 33, an annular tray 38 is provided on the upper circumference of the floor drain main body 33, the annular tray 38 is located at the bottom of the waterproof chassis 8, an annular fixing cover 39 is provided on the top of the waterproof chassis 8, the annular fixing cover 39 is fixed on the bolt fixing column 37 by a bolt, a decorative cover plate 40 is further mounted on the annular fixing cover 39, a step fixing table 41 is provided on the inner ring of the annular fixing cover 40, the lower water cylinder 34 is mounted on the step fixing table 41, an ABS filter screen 42 and a mesh cover plate 43 are fixed on the top of the lower water cylinder 34, the water seal cylinder 35 is provided on the outer portion of the, a drainage connecting socket 44 is further arranged on one side of the floor drain main body 33, a drainage pipe 45 is inserted into the drainage connecting socket 44, and first sealing gaskets 46 are respectively arranged between the annular tray 38 and the waterproof chassis 8, between the drainage cylinder 34 and the annular fixed cover 39, and between the drainage pipe 45 and the drainage connecting socket 44. The bottom of the floor drain main body 33 is provided with a fixing stud 47, the bottom of the water seal cylinder 35 is provided with a threaded groove 48, and the fixing stud 47 is in threaded connection with the threaded groove 48. A main body filter screen 49 is arranged in the drainage connecting socket 44, the main body filter screen 49 and the floor drain main body 33 are integrally formed, and the top point of the main body filter screen 49 is lower than the top end surface of the water seal cylinder 35.
The utility model discloses the bottom terminal surface of well launching tube is less than the top end face of a water seal section of thick bamboo, and the distance between the bottom terminal surface of launching tube and the water seal section of thick bamboo bottom surface is not less than 10mm, and the height of a water seal section of thick bamboo is not less than 50mm, and the distance between the top end face of a water seal section of thick bamboo and the fixed lid of annular is not less than 10 mm. Otherwise, the height of the water seal is not more than 50mm, and peculiar smell is generated. A main body filter screen is arranged in the drainage connecting socket and integrally formed with the floor drain main body, and the top point of the main body filter screen is lower than the top end face of the water seal cylinder. The top surface of the mesh cover plate is not higher than that of the decorative cover plate, so that the decorative effect is better and the decorative cover plate is more attractive. The number of the bolt fixing columns is not less than 6, and bolt holes of the annular fixing cover are countersunk holes. And the bolt fixing column can not be arranged in the diameter of the main body filter screen, otherwise the drainage is not smooth. The floor drain main body, the water seal cylinder, the water discharge cylinder, the drainage connecting socket, the annular tray, the annular fixed cover, the mesh cover plate and the decorative cover plate are all round, rectangular, square or polygonal.
When the sewage water drainage device is used specifically, water enters the inner cavity of the water discharging barrel after being filtered by the ABS filter screen, then flows into the inner cavity of the water sealing barrel, the lower end of the water sealing barrel is closed, the upper end of the water sealing barrel is opened, when sewage water is accumulated to a water seal exceeding 50-55mm, the sewage water flows into the water sealing barrel and then forms a water seal not smaller than 50mm with the water discharging barrel by utilizing the drainage height difference, and the sewage water flows into the outer cavity of the water sealing barrel from the upper end of the water sealing barrel and then is filtered by the filter holes of. Simultaneously through setting up first sealed the pad and increase the leakproofness, prevent in the pipeline that positive pressure causes harmful substance such as sewage refluence or returning the foul smell from getting into indoorly between annular fixed lid and the lower water drum.
The foregoing is considered as illustrative and not restrictive of the preferred embodiments of the invention, and any modifications, equivalents and improvements made within the spirit and principles of the invention are intended to be included within the scope of the invention.
Claims (7)
1. The utility model provides an assembled bathroom system, includes assembled shingle nail and assembled ground, its characterized in that: the assembly type wall panel comprises a wall surface keel fixed on a wall body and a wall surface panel installed on the wall surface keel, and a moisture-proof film is further arranged at the rear part of the wall surface panel and fixed on the wall surface keel;
the fabricated floor comprises an overhead module and a supporting and leveling component supported at the bottom of the overhead module, a waterproof chassis is laid on the overhead module, the wall panel is positioned in the waterproof chassis, a decorative panel is laid on the waterproof chassis, and a drainage floor drain is further mounted on the waterproof chassis; the overhead module comprises a base box made of galvanized steel sheets and a calcium silicate plate arranged on the base box,
the supporting and leveling assembly is mainly composed of an adjusting screw, a supporting block, a U-shaped plate and a base plate, the base plate is fixed to the bottom of the adjusting screw, a threaded hole is formed in the center of the bottom of the supporting block, the adjusting screw is installed in the threaded hole, a connecting block is fixed to the supporting block, the connecting block is located between the overhead modules, the U-shaped plate is buckled on the connecting block, the box edge of the base box is inserted into the U-shaped plate, and the U-shaped plate is fixed to the connecting block through screws.
2. A fabricated toilet system according to claim 1, wherein: the wall keel comprises a transverse leveling keel and a vertical splicing keel, the transverse leveling keel and the vertical splicing keel are vertically arranged, the transverse leveling keel is fixed on a wall body through an expansion bolt, a wall panel is installed between the vertical splicing keels, a moisture-proof film is arranged at the back of the transverse leveling keel, the transverse leveling keel and the moisture-proof film are respectively fixed on the expansion bolt through two adjusting nut clamps, a sealing gasket is further arranged between the transverse leveling keel and the moisture-proof film, and the sealing gasket is sleeved on the expansion bolt.
3. A fabricated toilet system according to claim 2, wherein: the transverse leveling keel mainly comprises a hanging plate, a connecting vertical plate and a contact panel, wherein the connecting vertical plate is fixed on one side of the hanging plate, the contact panel is fixed on the connecting vertical plate, the hanging plate and the connecting vertical plate are vertically arranged, the contact panel and the connecting vertical plate are vertically arranged, bolt fixing holes are formed in the hanging plate, a positioning groove is formed in the contact panel, and a plurality of bolt fixing holes are formed in the positioning groove;
vertical concatenation fossil fragments mainly comprise bottom plate, connection riser and picture peg, the vertical connection riser that is fixed with on the bottom plate, be fixed with the picture peg on the connection riser, picture peg and bottom plate parallel arrangement, the length of bottom plate is longer than the length of picture peg, the picture peg is used for the cartridge in the recess of shingle nail tip, the bottom plate is located between shingle nail and the wall.
4. A fabricated toilet system according to claim 3, wherein: and a reinforcing rib plate is further fixed on one side of the contact panel, and the hanging plate, the connecting vertical plate, the contact panel and the reinforcing rib plate are integrally formed.
5. A fabricated lavatory system according to any one of claims 1 to 4, wherein: the drainage floor drain comprises a floor drain main body, a water discharging cylinder and a water sealing cylinder, wherein a mounting hole is formed in a waterproof chassis, the floor drain main body is mounted in the mounting hole, a bolt fixing column is fixedly arranged on the inner wall of the floor drain main body, an annular tray is arranged on the circumference of the upper portion of the floor drain main body and is positioned at the bottom of the waterproof chassis, an annular fixing cover is arranged at the top of the waterproof chassis and is fixed on the bolt fixing column through bolts, a decorative cover plate is further arranged on the annular fixing cover, a step fixing table is arranged on the inner ring of the annular fixing cover, the water discharging cylinder is mounted on the step fixing table, an ABS (acrylonitrile butadiene styrene) filter screen and a mesh cover plate are fixed at the top of the water discharging cylinder, the water sealing cylinder is arranged outside the water discharging cylinder, the bottom of the water sealing cylinder is sealed, the water sealing cylinder is fixed on the floor drain, the drainage connecting socket is inserted with a drainage pipe, and first sealing gaskets are arranged between the annular tray and the waterproof chassis, between the lower water cylinder and the annular fixed cover and between the drainage pipe and the drainage connecting socket.
6. A fabricated toilet system according to claim 5, wherein: the floor drain is characterized in that a fixing stud is arranged at the bottom of the floor drain main body, a threaded groove is formed in the bottom of the water seal cylinder, and the fixing stud is in threaded connection with the threaded groove.
7. A fabricated toilet system according to claim 5, wherein: a main body filter screen is arranged in the drainage connecting socket and integrally formed with the floor drain main body, and the top point of the main body filter screen is lower than the top end face of the water sealing cylinder.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020891718.5U CN212613960U (en) | 2020-05-25 | 2020-05-25 | Assembled bathroom system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020891718.5U CN212613960U (en) | 2020-05-25 | 2020-05-25 | Assembled bathroom system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN212613960U true CN212613960U (en) | 2021-02-26 |
Family
ID=74750469
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202020891718.5U Active CN212613960U (en) | 2020-05-25 | 2020-05-25 | Assembled bathroom system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN212613960U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111485737A (en) * | 2020-05-25 | 2020-08-04 | 山西建投装饰产业有限公司 | Prefabricated toilet system |
| CN113235790A (en) * | 2021-05-28 | 2021-08-10 | 中建八局南方建设有限公司 | Board-lowering toilet base layer overhead structure and overhead structure construction method |
| CN113818595A (en) * | 2021-10-21 | 2021-12-21 | 和能人居科技(天津)集团股份有限公司 | Assembly type wall body and construction method thereof |
| CN113863606A (en) * | 2021-07-07 | 2021-12-31 | 广州荷力胜蜂窝材料股份有限公司 | Integrated wallboard dry hanging system and installation method thereof |
| CN116220176A (en) * | 2022-12-20 | 2023-06-06 | 绿城建筑科技集团有限公司 | An assembled barrier-free floor drain |
-
2020
- 2020-05-25 CN CN202020891718.5U patent/CN212613960U/en active Active
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111485737A (en) * | 2020-05-25 | 2020-08-04 | 山西建投装饰产业有限公司 | Prefabricated toilet system |
| CN113235790A (en) * | 2021-05-28 | 2021-08-10 | 中建八局南方建设有限公司 | Board-lowering toilet base layer overhead structure and overhead structure construction method |
| CN113863606A (en) * | 2021-07-07 | 2021-12-31 | 广州荷力胜蜂窝材料股份有限公司 | Integrated wallboard dry hanging system and installation method thereof |
| CN113818595A (en) * | 2021-10-21 | 2021-12-21 | 和能人居科技(天津)集团股份有限公司 | Assembly type wall body and construction method thereof |
| CN116220176A (en) * | 2022-12-20 | 2023-06-06 | 绿城建筑科技集团有限公司 | An assembled barrier-free floor drain |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111485737A (en) | Prefabricated toilet system | |
| CN101363244A (en) | Inner wall board system and mounting method thereof | |
| CN106836516A (en) | A kind of integrated water-proof chassis of toilet pipeline | |
| CN112240108A (en) | Construction method of assembly type building integrated bathroom system | |
| CN110607925A (en) | Integral bathroom chassis | |
| CN106499221A (en) | Quick decoration system | |
| CN113638567B (en) | Quick-assembly integral ground system based on descending plate type toilet and construction method | |
| CN201258547Y (en) | Interior wall board system | |
| CN112095998A (en) | Assembled bathroom does not fall board drainage system | |
| CN210508509U (en) | Same-floor drainage assembly type waterproof toilet system | |
| CN212896995U (en) | Assembled faces bathroom light partition wall waterproof node | |
| CN210151913U (en) | Rural assembled house | |
| CN116927447B (en) | Assembly type decoration | |
| CN218406703U (en) | Assembled bathroom based on two waterproof self-sealing tray systems | |
| CN202164787U (en) | Three-functional separation sanitary intermediate system and drainage system thereof | |
| CN206625609U (en) | Quick decoration system | |
| KR20250077786A (en) | Structure of pod toilet module for modular and its installation method | |
| CN216920996U (en) | Assembly type wall body structure based on pipeline separation | |
| CN217053880U (en) | ALC wall body semi-embedded fire hydrant box connection structure | |
| CN213038959U (en) | Metal plate combined toilet | |
| CN217353856U (en) | A prefabricated concrete enclosure | |
| CN213653705U (en) | Assembled bathroom side floor drain | |
| CN224149245U (en) | A prefabricated modular toilet | |
| CN212323652U (en) | Horizontal pipeline separation structure of wall body | |
| KR101069563B1 (en) | A hybrid type smc water proof floor for unit bath room and construction method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |