CN103835466A CN201410047649.9A CN201410047649A CN103835466A CN 103835466 A CN103835466 A CN 103835466A CN 201410047649 A CN201410047649 A CN 201410047649A CN 103835466 A CN103835466 A CN 103835466A
Authority
CN
China
Prior art keywords
metope
module
mould block
stainless steel
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410047649.9A
Other languages
Chinese (zh)
Other versions
CN103835466B (en
Inventor
陈邯
李年明
傅淳
杨明
张思思
赵正升
马樱
吴晓东
陶军
吕晓勇
李静
王莉莉
张礼翠
李丹
夏策峰
葛峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Gold Mantis Construction Decoration Co Ltd
Original Assignee
Suzhou Gold Mantis Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Gold Mantis Construction Decoration Co Ltd filed Critical Suzhou Gold Mantis Construction Decoration Co Ltd
Priority to CN201410047649.9A priority Critical patent/CN103835466B/en
Publication of CN103835466A publication Critical patent/CN103835466A/en
Application granted granted Critical
Publication of CN103835466B publication Critical patent/CN103835466B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The invention discloses a combined type toilet wall mould block which comprises wall mould block bodies (1) and a ground mould block body (6). The wall mould bodies (1) are connected to form a network mould block, and the network mould block is fixed to the ground mould block body (6). Antiseptic wood pads (3) are arranged on the back faces of the wall mould block bodies (1), and the network mould block is connected with hardware on a wall through the antiseptic wood pads (3). A metal reinforcing rib (2) is arranged on the back face of the position between every two wall mould block bodies (1) on the same face, and every two wall mould block bodies (2) are connected and fixed through the metal reinforcing rib (2). According to the combined type toilet wall mould block, the working procedure of wall plastering leveling and veneer mounting is eliminated, an intensive backfield processing mode is adopted by the wall mould block, standard operation is facilitated, the decoration effect is stable and good, the construction is simple and easy to implement, the construction efficiency of toilet wall mounting can be greatly improved, and labor cost can be saved.

Description

Metope module between combined sanitary
Technical field
The present invention relates to metope module between a kind of combined sanitary.
Background technology
Along with the development of decoration industry, interior decoration, installing engineering more and more trend towards specialization, integrated, integration.The loaded down with trivial details operation of conventional washroom metope and uneven decorative effect can not meet people for the agility of decorating, globality and day by day harsh aesthetic requirement.
There is following drawback in tradition washroom metope mounting method:
1, traditional washroom metope is to carry out distributed finishing and installation by bricklayer and installer, and the operations such as wall plastering levelling, the paving of brick (stone material) surface layer, waterproof, pipeline installation need be interted operation, when handing-over, easily go wrong.
2, traditional washroom metope adopts the wet trade modes such as cement mortar paving to have considerable influence to surrounding environment.
3, after the wall surfacing of traditional washroom completes, most of maintenance need be carried out destructiveness reparation, and cost is higher and surrounding environment is existed to considerable influence.
4, the pure dependence of mode of operation of traditional washroom metope paving is manually carried out, and cost of labor is high, expend large.
Summary of the invention
Goal of the invention of the present invention is: metope module between a kind of combined sanitary is provided, and it has omitted the operation of wall plastering levelling and facing installation; And metope module adopts intensive back court form processing, is conducive to standardized work, decorative effect is stable.
Technical scheme of the present invention is: metope module between a kind of combined sanitary, and it comprises metope module, earth module, and described multiple metope modules are interconnected to form mixed-media network modules mixed-media, and described mixed-media network modules mixed-media is fixed on earth module; The described metope module back side is provided with anticorrosive wood chock, and mixed-media network modules mixed-media is connected with the hardware of metope by anticorrosive wood chock.
Below technique scheme is further expalined:
Between two metope modules of described the same face, the back side is provided with metal reinforcing, between two metope modules, is connected and fixed by metal reinforcing.
Between two metope modules of described phase cross surface, be provided with elastic stainless steel connecting parts, between two metope modules, be connected and fixed by elastic stainless steel connecting parts.
Elastic stainless steel pad is installed on described earth module, and metope module is pressed into the gap between elastic stainless steel pad and earth module, and metope module and earth module are fixed by elastic stainless steel pad.
In described metope module, be provided with preserved pipeline hole.
Described metal reinforcing is U-shaped.
The described metope module back side is lattice-shaped.
Described elastic stainless steel connecting parts section is that L shaped, L shaped connecting parts two ends are connected with back-shaped fastener, and metope module is embedded in back-shaped fastener.
Advantage of the present invention is: metope module between combined sanitary of the present invention, and it has omitted the operation of wall plastering levelling and facing installation; And metope module adopts intensive back court form processing, is conducive to standardized work, decorative effect is stable, and good decorating effect, constructs simple, can significantly improve the efficiency of construction that washroom metope is installed, and saves cost of labor.
Brief description of the drawings
Below in conjunction with drawings and Examples, the present invention is described further:
Fig. 1 is that the axle of the embodiment of the present invention measures intention;
Fig. 2 is the back elevation structural representation of the embodiment of the present invention;
Fig. 3 is the positive facade structures perforate schematic diagram of the embodiment of the present invention;
Fig. 4 is metope module and the earth module connected node enlarged diagram of the embodiment of the present invention;
Fig. 5 is connected node enlarged diagram between the metope module of the embodiment of the present invention;
Wherein: 1 metope module; 2 metal reinforcings; 3 anticorrosive wood chocks; 4 elastic stainless steel pads; 5 elastic stainless steel connecting parts; 6 earth modules; 7 preserved pipeline holes.
Detailed description of the invention
Embodiment: as shown in Figure 2: metope module between a kind of combined sanitary, it comprises metope module 1, metal reinforcing 2, anticorrosive wood chock 3, elastic stainless steel pad 4, elastic stainless steel connecting parts 5, earth module 6, preserved pipeline hole 7.
As shown in Figure 1, multiple metope modules 1 are interconnected to form mixed-media network modules mixed-media, and between two metope modules 1 of the same face, the back side is provided with between 2, two metope modules 1 of metal reinforcing and is connected and fixed by metal reinforcing 2.Metal reinforcing 2 is U-shaped, is made by 0.5mm high-carbon steel, is fixed on the projection of latticed metope module by high strength self-tapping screw.Metal reinforcing 2 is as the accessory of fixing adjacent metope module 1.Metope module 1 back side adopts gridiron structure to alleviate deadweight, and gains in strength by metal reinforcing 2.Metope module 1 back side is lattice-shaped.
As shown in Figure 3, mixed-media network modules mixed-media is fixed on earth module 6; Described metope module 1 back side is provided with anticorrosive wood chock 3, and anticorrosive wood chock 3 is through fire prevention, anticorrosion, moistureproof processing.Specification is 80*80, and thickness is 8~12mm, adopts AB glue bond.Mixed-media network modules mixed-media is connected with the hardware of metope by anticorrosive wood chock 3.In metope module 1, be provided with preserved pipeline hole 7.Between the combined sanitary of the present embodiment, the preformed hole of metope module pipeline and equipment connection, partition, five metals are installed preformed hole, and customize the preformed hole of the customization five metals such as lavatory paper box.
As shown in Figure 4, elastic stainless steel pad 4 is installed on earth module 6, metope module 1 is pressed into the gap between elastic stainless steel pad 4 and earth module 6, and metope module 1 is fixing by elastic stainless steel pad 4 with earth module 6.Elastic stainless steel pad 4 is as the fastening means of fixing metope module 1 and earth module 6.
Metal reinforcing 2 is fixed on metope module 1 back side, connects adjacent metope module 1 and plays the effect of gaining in strength, and anticorrosive wood chock 3 is fixed on the position that five metals, pipeline and partition are installed in metope module 1 back, is convenient to the installation of five metals equipment and pipeline, partition; Elastic stainless steel pad 4 is installed on earth module 6 bottoms, metope module 1 is fixed in fixing effect by elastic stainless steel pad 4 when installation, is installed and fixed intersecting the metope module 1 of facade by elastic stainless steel connecting parts 5, thereby completed the installation work of metope module 1.Elastic stainless steel pad 4 adopts 1~1.2mm import high-carbon steel or stainless steel to make with elastic stainless steel connecting parts 5.
As shown in Figure 5, between two of phase cross surface metope modules 1, be provided with between 5, two metope modules 1 of elastic stainless steel connecting parts and be connected and fixed by elastic stainless steel connecting parts 5.Elastic stainless steel connecting parts 5 sections are that L shaped, L shaped connecting parts two ends are connected with back-shaped fastener, and metope module 1 is embedded in back-shaped fastener.Elastic stainless steel connecting parts 5 fixes respectively fixing from the crossing metope module 6 of module back inner corner trim opposite.
When specifically implementing, the present embodiment also comprises following main points:
1, the in-site measurement, the drafting deepen drawing that first carry out early stage, carry out hole according to on-the-spot size, civil engineering pipeline location and reserve, according to installation site and the trend of the platform basin of design and spray location positioning metope pipeline.
2, according to pipeline and five metals installation site after determining, determine position of opening, determine the installation site of anticorrosive wood chock 3.
3, dock with factory, produce metope module 1, consider on-the-spot position of opening and five metals, equipment installation site comprehensively.
4, on-the-spot wall, land clearing, and carry out the installation of earth module 6.
5, carry out the installation of the hidden pipeline of metope module 1 backboard and fix.
6, metope module 1 is installed splicing, and metal reinforcing 2 is installed.
7, earth module 6 installs elastic stainless steel pad 4 additional, by elastic stainless steel pad 4, metope module 1 is installed on to earth module 6 tops.
8, the metope five metals, the sanitary equipment that need pre-installation are in place.
9, by elastic stainless steel connecting parts 5, each metope facade is connected, complete installation.
The present embodiment is by the height of conventional processes is refined, and multiple operation, many handing-over, how artificial mode of operation are reduced to specialization, back court, integrated modern mounting means, ensured to greatest extent the lifting of on-the-spot artificial saving and productivity ratio; Applied metal reinforcing rib 2, has taken into account the lifting of the fixing and metope intensity of adjacent column, and the back side adopts the processing mode of anticorrosive wood chock 3 and 1 combination of metope module simultaneously, is more convenient to the installation of metope pipeline, Hardware fitting and partition.Substantially all products are all made production in the mode of back court processing, realize the slitless connection of design and product, have solved the requirement of the various operations of metope to the duration and the adverse effect of surrounding environment, promote to greatest extent client's experience.Reach finished surface more integrated, create more attractive in appearance, harmonious decorative effect.
It should be pointed out that for the present invention through absolutely proving, also can there is the embodiment of multiple conversion and remodeling, be not limited to above-mentioned specific embodiment.Above-described embodiment is as just explanation of the present invention, instead of limitation of the present invention.In a word, protection scope of the present invention should comprise those apparent conversion or alternative and remodeling to those skilled in the art.

Claims (8)

1. a metope module between combined sanitary, is characterized in that: it comprises metope module (1), earth module (6), and described multiple metope modules (1) are interconnected to form mixed-media network modules mixed-media, and described mixed-media network modules mixed-media is fixed on earth module (6); Described metope module (1) back side is provided with anticorrosive wood chock (3), and mixed-media network modules mixed-media is connected with the hardware of metope by anticorrosive wood chock (3).
2. metope module between combined sanitary according to claim 1, it is characterized in that: between two metope modules (1) of described the same face, the back side is provided with metal reinforcing (2), between two metope modules (1), is connected and fixed by metal reinforcing (2).
3. metope module between combined sanitary according to claim 1, it is characterized in that: between two metope modules (1) of described phase cross surface, be provided with elastic stainless steel connecting parts (5), between two metope modules (1), be connected and fixed by elastic stainless steel connecting parts (5).
4. metope module between combined sanitary according to claim 1, it is characterized in that: elastic stainless steel pad (4) is installed on described earth module (6), metope module (1) is pressed into the gap between elastic stainless steel pad (4) and earth module (6), and metope module (1) is fixing by elastic stainless steel pad (4) with earth module (6).
5. metope module between combined sanitary according to claim 1, is characterized in that: in described metope module (1), be provided with preserved pipeline hole (7).
6. metope module between combined sanitary according to claim 2, is characterized in that: described metal reinforcing (2) is U-shaped.
7. metope module between combined sanitary according to claim 1, is characterized in that: described metope module (1) back side is lattice-shaped.
8. metope module between combined sanitary according to claim 3, is characterized in that: described elastic stainless steel connecting parts (5) section is that L shaped, L shaped connecting parts two ends are connected with back-shaped fastener, and metope module (1) is embedded in back-shaped fastener.
CN201410047649.9A 2014-02-12 2014-02-12 Metope module between combined sanitary Active CN103835466B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410047649.9A CN103835466B (en) 2014-02-12 2014-02-12 Metope module between combined sanitary

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410047649.9A CN103835466B (en) 2014-02-12 2014-02-12 Metope module between combined sanitary

Publications (2)

Publication Number Publication Date
CN103835466A true CN103835466A (en) 2014-06-04
CN103835466B CN103835466B (en) 2016-11-23

Family

ID=50799327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410047649.9A Active CN103835466B (en) 2014-02-12 2014-02-12 Metope module between combined sanitary

Country Status (1)

Country Link
CN (1) CN103835466B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499221A (en) * 2016-12-14 2017-03-15 天津达因建材有限公司 Quick decoration system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11107509A (en) * 1997-10-07 1999-04-20 Sumori Kogyo:Kk Interior finishing structure and interior finish construction method for wooden building
CN201021548Y (en) * 2007-03-08 2008-02-13 陈地清 A combined whole toilet
CN201165735Y (en) * 2008-02-27 2008-12-17 张应坤 Integrated kitchen apparatus and wall surface, ground surface and top surface of integral toilet
DE202012009780U1 (en) * 2012-10-12 2013-02-18 Jörg Frydryszik Tile board for kitchens and bathrooms with plate holder and end support for construction of tile board as Legosystem
CN202810112U (en) * 2012-08-15 2013-03-20 筑内国际企业有限公司 Modularized floor system
CN203783041U (en) * 2014-02-12 2014-08-20 苏州金螳螂建筑装饰股份有限公司 Combined type bathroom wall surface module

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11107509A (en) * 1997-10-07 1999-04-20 Sumori Kogyo:Kk Interior finishing structure and interior finish construction method for wooden building
CN201021548Y (en) * 2007-03-08 2008-02-13 陈地清 A combined whole toilet
CN201165735Y (en) * 2008-02-27 2008-12-17 张应坤 Integrated kitchen apparatus and wall surface, ground surface and top surface of integral toilet
CN202810112U (en) * 2012-08-15 2013-03-20 筑内国际企业有限公司 Modularized floor system
DE202012009780U1 (en) * 2012-10-12 2013-02-18 Jörg Frydryszik Tile board for kitchens and bathrooms with plate holder and end support for construction of tile board as Legosystem
CN203783041U (en) * 2014-02-12 2014-08-20 苏州金螳螂建筑装饰股份有限公司 Combined type bathroom wall surface module

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499221A (en) * 2016-12-14 2017-03-15 天津达因建材有限公司 Quick decoration system

Also Published As

Publication number Publication date
CN103835466B (en) 2016-11-23

Similar Documents

Publication Publication Date Title
US10837187B2 (en) Modular integrated building and construction method thereof
AU2018267563B2 (en) Modular integrated building and construction method thereof
CN208792663U (en) A kind of room finishing system
CN105421826A (en) Assembly-type integrated bathroom and construction method thereof
CN202595943U (en) Toilet steel frame lightweight partition wall
CN203783041U (en) Combined type bathroom wall surface module
SG187296A1 (en) A multi-storey building with prefabricated members and a semi-prefabricating construction method thereof
US20100186333A1 (en) Modular Tile Panel and Associated Methods
CN103835466A (en) Combined type toilet wall mould block
TW201839225A (en) Method for joining floor slab to steel beam of wooden building capable of quickly constructing a wooden building and shortening the construction period
CN203783097U (en) Integrated bathroom ground
CN205171752U (en) Prefabricated light steel partition wall and mounting structure thereof
CN204510701U (en) A kind of imitative stone material GRC integrated plate for heat insulation hanging structure
CN103590590B (en) Integral vacuum toilet ground
CN208347208U (en) A kind of new indoor walling system
CN207144359U (en) A kind of exquisite log wall decorative cover structure
CN103982042A (en) Split mounting technique of quick home-decoration split mounting engineering
CN205025024U (en) Semicircle wood wallboard
CN203684567U (en) Waterproof wall floor decoration structure
CN205035969U (en) Integral wall plates
CN107165360A (en) A kind of exquisite log wall decorative cover structure
CN203808352U (en) Assembled whole bathroom and whole kitchen wallboard for housing industrialization
CN210316145U (en) Waterproof board frame and floor structure and building
CN203783035U (en) Decorative panel for outdoor steel structure
US10202750B2 (en) Structure and method for installing bathroom plumbing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant