CN203684567U - Waterproof wall floor decoration structure - Google Patents
Waterproof wall floor decoration structure Download PDFInfo
- Publication number
- CN203684567U CN203684567U CN201320744364.1U CN201320744364U CN203684567U CN 203684567 U CN203684567 U CN 203684567U CN 201320744364 U CN201320744364 U CN 201320744364U CN 203684567 U CN203684567 U CN 203684567U
- Authority
- CN
- China
- Prior art keywords
- ground decoration
- wall
- water
- composite bed
- proof strip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model provides a waterproof wall floor decoration structure, which is used for solving the problem that a wall floor decoration layer in the prior art is not waterproof. The waterproof wall floor decoration structure comprises at least two wall floor decoration modules adjacently arranged; a waterproof strip is arranged between the adjacent wall floor decoration modules; each waterproof strip is arranged at one side, near a wall floor, of each corresponding wall floor decoration module. By adopting the waterproof wall floor decoration structure provided by the utility model, the erosion of water to the wall floor decoration layer and a building can be effectively avoided, and the service life of the wall floor decoration layer is prolonged.
Description
Technical field
The utility model relates to wall ground decoration technical field, particularly a kind of mine dam ground decoration structure.
Background technology
In building decoration engineering construction, the materials such as wall floor tile, stone material, mosaic are embody architectural decoration style and use the requisite material of functional requirement, and the paving of wall floor tile is an important the work items in decoration construction.
The paving engineering of traditional wall floor tile mainly comprises: select brick sequence, cut out cut that edging, water conservation are moistening, mortar preparation, batch ash are pasted, maintenance reason seam and the series of processes such as filleting is clean.Above-mentioned operation all needs to complete at the construction field (site), makes the site operation cycle very long; Select brick sequence easily to produce odd problem; Sanction is cut edging also can produce the quality problems such as noise pollution and oblique angle; And major part all belongs to wet trade operation in above-mentioned operation, therefore easily produce hollowing, flake, come off and the unequal problem of brickwork joint width.Particularly for the space of the compact such as between washroom, Tea Room, kitchen, working face is limited by the restriction of various plumbing, the equipment end such as electric, is more unfavorable for situ wet job execution.Because the paving engineering of traditional wall floor tile exists, long construction period, appropriation of labour power are many, the utilization rates of wall floor tile are low, wet trade workload mainly with and the problem such as noise pollution, cause wall floor tile paving engineering to become the bottleneck engineering in building decoration engineering.
Along with the development of building decoration technology, have higher requirement in the aspects such as construction speed, construction cost, construction quality and the ambient influnence of the paving engineering to wall floor tile.Be called in name and in the patent of invention that " wall ground decoration module and mounting method thereof " application number is 201310547802X, disclose a kind of wall ground decoration module, by field operation in conventional art select brick sequence, cut out cut that edging, water conservation are moistening, mortar preparation, batch ash are pasted, maintenance reason seam and filleting is clean etc. that operation is all transferred to prefabricated completing in factory, greatly reduce the workload of job site, effectively accelerated on-the-spot fast construction speed, reduced construction cost and reduce noise pollution.But, on the decorative wall ground that the wall ground decoration module providing in the patent of invention that is 201310547802X by application number has been decorated, between adjacent wall ground decoration module, there is gap, in the process using in reality, water or other liquid are after splashing on metope, can infiltrate on wall ground decoration module and basement bottom of the building along the gap between wall ground decoration module, after long-term use, can cause the corrosion to wall ground decoration module, thereby reduce the application life of wall ground decoration module.
Summary of the invention
The purpose of this utility model is to provide a kind of mine dam ground decoration structure, be corroded and produce the problem that shortens application life, between wall ground decoration module, increase water-proof strip to solve wall ground decoration module in prior art, avoid moisture to invade wall ground installation module, improve the wall ground decoration module object in application life thereby reach.
For solving the problems of the technologies described above, the utility model provides a kind of mine dam ground decoration structure, comprising:
The wall ground decoration module of at least two adjacent layouts; And
Between adjacent described wall ground decoration module, a water-proof strip is all set;
Wherein, described water-proof strip is arranged at a side on the close wall ground of described wall ground decoration module.
Optionally, the material of described water-proof strip is metal material or plastic material.
Optionally, the material of described water-proof strip is stainless steel material.
Optionally, the two ends of described water-proof strip arrange respectively an adhered layer.
Optionally, the distance between the described adhered layer at two ends is less than or equal to the distance between adjacent described wall ground decoration module
Optionally, every described wall ground decoration module includes a decorative layer, a composite bed and multiple cladding plug-in unit, described decorative layer comprises the polylith ornamental blocks of arranging according to predetermined version type, described composite bed is arranged on the non-decorative cover of described decorative layer, and described dry hanging article is arranged at a side on the close wall ground of described composite bed.
Optionally, also comprise multiple pre-buried connection straps that are arranged in described composite bed, on described pre-buried connection strap, have multiple fixing holes, described cladding plug-in unit is threaded and is fixed on described composite bed by described fixing hole.
Optionally, described composite bed is calcium silicate board with microporous, honeycomb aluminum plate or aluminium corrugated sheet.
Optionally, on described cladding plug-in unit, also there is trimming bolt hole and be positioned at the trimming bolt in described trimming bolt hole.
In mine dam ground decoration structure provided by the utility model, between adjacent described wall ground decoration module, a water-proof strip is all set, described water-proof strip is arranged on a side on the wall close to be decorated ground of described wall ground decoration module.Being arranged between adjacent wall ground decoration module of water-proof strip, even if having water or other liquid to enter between adjacent wall ground installation module, also can be blocked by water-proof strip, thereby avoid the erosion to wall ground decoration module and basement bottom of the building, guaranteed the application life of wall ground decoration module.
Accompanying drawing explanation
Fig. 1 is the elevation of the mine dam ground decoration structure in the utility model one embodiment;
Fig. 2 is the sectional drawing of Fig. 1 along A-A ' line;
Fig. 3 is the structural representation of the wall ground decoration module in the utility model one embodiment;
Fig. 4 is the structural representation of the pre-buried connection strap in the utility model one embodiment;
Fig. 5 is the flow chart of the mine dam ground decoration structure installation method in another embodiment of the utility model;
Fig. 6 to Figure 10 is the structural representation of the each step of mine dam ground decoration structure installation method in another embodiment of the utility model.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the mine dam ground decoration structure the utility model proposes is described in further detail.According to the following describes and claims, advantage of the present utility model and feature will be clearer.It should be noted that, accompanying drawing all adopts very the form of simplifying and all uses non-ratio accurately, only in order to convenient, the object of aid illustration the utility model embodiment lucidly.
As depicted in figs. 1 and 2, the mine dam ground decoration structure 10 of the utility model one embodiment comprises wall ground decoration module 100 and at least one water-proof strip 200 of at least two adjacent layouts, between adjacent wall ground decoration module 100, a water-proof strip 200 is all set, and water-proof strip 200 is arranged at a side on the close wall ground of wall ground decoration module 100.
Splash in mine dam ground decoration structure 10 time when having water or other liquid, water or other liquid can enter gap between adjacent wall ground installation module 100, but be arranged on blocking of water-proof strip 200 between adjacent wall ground decoration module 100, thereby avoid the erosion of wall ground decoration module 100 and basement bottom of the building, guaranteed the application life of wall ground decoration module 100.
In order to improve the service time of water-proof strip 200, water-proof strip 200 can adopt metal material, further can be chosen as stainless steel material.In some less demanding application scenario, water-proof strip 200 can be chosen as the plastic material that weight is lighter.
Easy for installation for water-proof strip 200, conventionally, at the two ends of water-proof strip 200, adhered layer 201a and a 201b is set respectively, by adhered layer 201a and the 201b at two ends, water-proof strip 200 can be sticked on easily on adjacent wall ground decoration module 100a and 100b.After adhered layer 201 water suctions, wall ground decoration module 100 is impacted, adhered layer can select to have the water-proof sticking layer of water-proof function.Conventionally,, in order to facilitate contraposition, distance between two ends adhered layer 201a and 201b is set and equals the distance between adjacent wall ground decoration module 100a and 100b.But wall ground decoration module 100 is invaded in the side for fear of moisture from adhered layer, the distance that also can arrange between two ends adhered layer 201a and 201b is less than the distance between adjacent wall ground decoration module 100a and 100b.
As shown in Figure 3, the wall decoration module 100 of the utility model one embodiment comprises decorative layer 1, composite bed 2 and multiple cladding plug-in unit 3.Wherein, decorative layer 1 comprises the polylith ornamental blocks 11 of arranging according to predetermined version type, the polylith ornamental blocks 11 of decorative layer 1 gathers together by composite bed 2, and composite bed 2 is formed on the non-decorative cover of decorative layer 1, and multiple cladding plug-in units 3 are also set on composite bed 2.Wall ground decoration module 100 can be mounted on wall to be decorated ground by cladding plug-in unit 3.Composite bed 2 assembles polylith ornamental blocks 11 as a whole, preferred, and composite bed 2 is pasted together with decorative layer 1 by an adhesive linkage 4.
Adopt above-mentioned wall ground decoration module 100, polylith ornamental blocks 11 can be integrated, and can directly mount on wall to be decorated ground by cladding plug-in unit 3, and the integrated work of ornamental blocks 11 can complete by prefabrication, thus the workload of job site reduced.Existing ornament materials piece can use as ornamental blocks 11, for example, in ceramic tile, ceramic wafer, stone material, PLASTIC LAMINATED, mosaic or ornamental glass one or more.That is to say, only need to be by existing ornament materials piece prefabricated wall ground installation module 100 that is integrated in factory, then wall ground decoration module 100 is transported to and decorates the on-the-spot decorative engineering that can complete wall ground of installing.Specifically, first according to the real size on wall to be decorated ground, wall to be decorated ground is divided into several flat units, external corner unit and inner corner trim unit, and decorates needs according to reality, the ornamental blocks that each flat unit, external corner unit and inner corner trim unit are needed is carried out edition type design; Then, according to predetermined version type, several ornamental blocks are arranged in special mould, to form decorative layer; Then, and composite bed is sticked on the non-decorative cover of decorative layer, and cladding plug-in unit is set in composite bed.
In conjunction with Fig. 3 and Fig. 4, for cladding plug-in unit 3 is firmly fixed on composite bed 2, pre-buried connection strap 5 can be set in composite bed 2, on pre-buried connection strap 5, there are multiple fixing holes 51, described cladding plug-in unit 3 is threaded and is fixed on composite bed 2 by fixing hole 51.In addition, can also on cladding plug-in unit 3, trimming bolt hole 31 be set, trimming bolt 32 is also set in trimming bolt hole 31, can adjust the relative position on cladding plug-in unit 3 and wall to be decorated ground by adjusting trimming bolt 32.
Accordingly, the utility model also provides a kind of mounting method of mine dam ground decoration structure.Fig. 5 is the flow chart of the mounting method of the mine dam ground decoration structure of another embodiment of the utility model.Describe the mounting method of mine dam ground decoration structure in detail below in conjunction with Fig. 5 to Figure 10.
Step a: water-proof strip 200 described at least two wall ground decoration modules 100 and at least one is provided;
First, need to make wall rising wall ground decoration module.
Specifically, first, according to the real size on wall to be decorated ground, wall to be decorated ground is split into at least one decorating unit, decorating unit can comprise flat unit, external corner unit or inner corner trim unit; Then prepare corresponding die unit according to the decorating unit after splitting; Then according to decorating needs, determine material and the quantity of the required ornamental blocks of each decorating unit, and need to carry out edition type design to ornamental blocks according to decorating;
Then, die unit is placed on working platform, then according to predetermined version type, some packaged decorative blocks is arranged on corresponding die unit, and the decorative cover facing die of ornamental blocks is placed, to form decorative layer;
Then, on the non-decorative cover of decorative layer, form composite bed.In order to increase the bonding strength of composite bed and decorative layer, preferred, first brushing adhesive glue on the non-decorative cover of decorative layer, forms one deck adhered layer; Then, attach composite bed on adhered layer, the mechanical support providing by composite bed integrates the polylith ornamental blocks of decorative layer; Then, utilize curing apparatus to adhered layer is cured to processing, optional, curing apparatus is uv equipment, cold pressing curing apparatus or hot-press solidifying equipment;
Then, multiple cladding plug-in units are set in composite bed.For cladding plug-in unit is firmly fixed on composite bed, preferably, can form in the process of composite bed, multiple pre-buried connection straps are set in composite bed, and multiple fixing holes are set on pre-buried connection strap, and cladding plug-in unit is bolted on composite bed by fixing hole; Then, cladding plug-in unit is bolted on composite bed by fixing hole;
Finally, the decorative cover of clean decorative layer, and the decorative cover of decorative layer is criticized to envelope and process, so that decorative cover is clean clean and tidy, so far form wall ground decoration module 100 as shown in Figure 3.
As shown in Figure 6, install for convenient, on the adhered layer 201a at water-proof strip 200 two ends and 201b, topping 202a and 202b are set respectively.
Step b: a wall ground decoration module 100 is installed on wall to be decorated ground;
Specifically, first, on the wall to be decorated ground of building, cladding connector is installed;
As shown in Figure 7, according to the fractionation scheme for the treatment of in advance decorative wall ground, cladding connector 300 is installed in the relevant position of the decorating unit corresponding with wall decoration module; Adjust for convenient, preferred, cladding connector 300 is the cladding connector of bar shaped.
Then, the cladding plug-in unit button of described wall ground decoration module is suspended on described cladding connector.
As shown in Figure 8, the cladding plug-in unit of wall ground decoration module 100 3 buttons are suspended on corresponding cladding connector 300, wall ground decoration module 100 is fixed on wall to be decorated ground 400.In order to guarantee the installation firmness of wall ground decoration module 100, preferred, cladding connector 300 forms self-locking each other with cladding plug-in unit 3.
Accurate in order to guarantee the installation site of wall ground decoration module 100, can on cladding plug-in unit 3, trimming bolt hole 31 be set, the interior trimming bolt 32 that arranges in trimming bolt hole 31, by adjusting each trimming bolt 32, can adjust the relative position of cladding plug-in unit 3 and cladding connector 300, adjust the relative position on wall ground decoration module 100 and wall to be decorated ground 400 with this.
Step c: by the adhered layer 201 of water-proof strip 200 one end, water-proof strip 200 is sticked in the side of a wall ground decoration module 100a near wall to be decorated ground 400;
Specifically, as shown in Figure 9, first, tear the topping 202a of water-proof strip 200 one end, expose the adhered layer 201a of water-proof strip 200 one end; Then,, by the adhered layer 201a of water-proof strip 200 one end, water-proof strip 200 is sticked in the side of a described wall ground decoration module 100a near wall to be decorated ground.
Steps d: another piece wall ground decoration module 100b is installed to the side of a wall ground decoration module 100a near water-proof strip 200;
For the mounting method of another piece wall ground decoration module 100b, identical with the method that a wall ground decoration module 100a is installed in step b, repeat no more here.
Step e: by the adhered layer 201b of water-proof strip 200 other ends, water-proof strip 200 is sticked in the upper side near wall to be decorated ground of another piece wall ground decoration module 100b;
As shown in figure 10, tear the topping 202b of water-proof strip 200 other ends, expose the adhered layer 201a of water-proof strip 200 other ends; Adhered layer 201b by water-proof strip 200 other ends sticks on water-proof strip 200 in wall close to be decorated ground one side of another piece wall ground decoration module 100b.
Step f: repeating said steps b, to step e, is installed to all wall ground decoration modules 100 block-by-blocks on wall to be decorated ground, and all pastes water-proof strip 200 between adjacent wall ground decoration module 100, to form mine dam ground decoration structure 10.
In sum, in above-mentioned mine dam ground decoration structure, between adjacent wall ground decoration module, a water-proof strip is all set, described water-proof strip is arranged on a side on the wall close to be decorated ground of described wall ground decoration module.Being arranged between adjacent wall ground decoration module of water-proof strip, has effectively avoided the erosion of moisture to wall ground decoration module and basement bottom of the building, has guaranteed the application life of wall ground decoration module.
Foregoing description is only the description to the utility model preferred embodiment; the not any restriction to the utility model scope; any change, modification that the those of ordinary skill in the utility model field does according to above-mentioned disclosure, all belong to the protection domain of claims.
Claims (9)
1. a mine dam ground decoration structure, is characterized in that, comprising:
The wall ground decoration module of at least two adjacent layouts; And
Between adjacent described wall ground decoration module, a water-proof strip is all set;
Wherein, described water-proof strip is arranged at a side on the close wall ground of described wall ground decoration module.
2. mine dam ground decoration structure as claimed in claim 1, is characterized in that, the material of described water-proof strip is metal material or plastic material.
3. mine dam ground decoration structure as claimed in claim 1, is characterized in that, the material of described water-proof strip is stainless steel material.
4. mine dam ground decoration structure as claimed in claim 1, is characterized in that, the two ends of described water-proof strip arrange respectively an adhered layer.
5. mine dam ground decoration structure as claimed in claim 4, is characterized in that, the distance between the described adhered layer at two ends is less than or equal to the distance between adjacent described wall ground decoration module.
6. the mine dam ground decoration structure as described in any one in claim 1 to 5, it is characterized in that, every described wall ground decoration module includes a decorative layer, a composite bed and multiple cladding plug-in unit, described decorative layer comprises the polylith ornamental blocks of arranging according to predetermined version type, described composite bed is arranged on the non-decorative cover of described decorative layer, and described dry hanging article is arranged at a side on the close wall ground of described composite bed.
7. mine dam ground decoration structure as claimed in claim 6, it is characterized in that, also comprise multiple pre-buried connection straps that are arranged in described composite bed, on described pre-buried connection strap, have multiple fixing holes, described cladding plug-in unit is threaded and is fixed on described composite bed by described fixing hole.
8. mine dam ground decoration structure as claimed in claim 6, is characterized in that, described composite bed is calcium silicate board with microporous, honeycomb aluminum plate or aluminium corrugated sheet.
9. mine dam ground decoration structure as claimed in claim 6, is characterized in that, also has trimming bolt hole and be positioned at the trimming bolt in described trimming bolt hole on described cladding plug-in unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320744364.1U CN203684567U (en) | 2013-11-21 | 2013-11-21 | Waterproof wall floor decoration structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320744364.1U CN203684567U (en) | 2013-11-21 | 2013-11-21 | Waterproof wall floor decoration structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203684567U true CN203684567U (en) | 2014-07-02 |
Family
ID=51006489
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320744364.1U Withdrawn - After Issue CN203684567U (en) | 2013-11-21 | 2013-11-21 | Waterproof wall floor decoration structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203684567U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590563A (en) * | 2013-11-21 | 2014-02-19 | 上海市建筑装饰工程集团有限公司 | Waterproof wall ground decoration layer structure and installing method |
-
2013
- 2013-11-21 CN CN201320744364.1U patent/CN203684567U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590563A (en) * | 2013-11-21 | 2014-02-19 | 上海市建筑装饰工程集团有限公司 | Waterproof wall ground decoration layer structure and installing method |
CN103590563B (en) * | 2013-11-21 | 2016-08-31 | 上海市建筑装饰工程集团有限公司 | Waterproof wall ground decoration layer structure and installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104005502B (en) | A kind of precast light building cover board and industrialized building house floor slab structure | |
CN104047406A (en) | Construction process for ultra-thin stone-facing heat-preserving decorative plate | |
EP3070227B1 (en) | Foam glass integrated plate effective in water and fire proofing, thermal insulation and decoration | |
CN104695662B (en) | Stone facing prefabricated outer wall panel and its production method and external wall system | |
CN101131002A (en) | Mould-locking assembled water-proof heat-insulating slab and construction method thereof | |
CN103556804A (en) | Wall and floor decoration module and mounting method thereof | |
CN104499614A (en) | Wall heat-preservation integration point hanging system and mounting method thereof | |
CN204491984U (en) | Stone facing precast wall panel and external wall system | |
CN201539071U (en) | Detachable floor tile | |
CN203684567U (en) | Waterproof wall floor decoration structure | |
JP6089351B1 (en) | Installation method of stone stone panel, stone stone panel set and stone wall | |
CN102535807A (en) | Modular wall tile pre-bonding structure and construction method thereof | |
CN203569842U (en) | Wall and floor decoration module | |
CN207144321U (en) | Parapet abnormity bears down on one insulation and decoration component | |
CN103590563B (en) | Waterproof wall ground decoration layer structure and installation method | |
CN101560821A (en) | Heat insulation decorative ceramic tile | |
CN206554331U (en) | A kind of sound insulation cracking resistance decorates prefabricated indoor partition panel | |
CN212002008U (en) | Wall brick combination paving and pasting platform | |
CN204001625U (en) | Speed connects the compound basic unit's skirting assembly of exempting from of section steel plastic | |
CN204163304U (en) | The integrated large plate of interior decoration | |
CN207794492U (en) | A kind of integrated finishing component of integration environmental friendly indoor | |
CN204609196U (en) | A kind of lightweight wall floor decoration module | |
CN1325733C (en) | Tecnique for fabricating facing before pouring building facilities made from reinforced concrete | |
CN212507164U (en) | External wall insulation decorative board subassembly | |
CN200971595Y (en) | Thermal insulation energy-saving decoration brick |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20140702 Effective date of abandoning: 20160831 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |