CN203783041U - Combined type bathroom wall surface module - Google Patents
Combined type bathroom wall surface module Download PDFInfo
- Publication number
- CN203783041U CN203783041U CN201420061813.7U CN201420061813U CN203783041U CN 203783041 U CN203783041 U CN 203783041U CN 201420061813 U CN201420061813 U CN 201420061813U CN 203783041 U CN203783041 U CN 203783041U
- Authority
- CN
- China
- Prior art keywords
- module
- metope
- wall surface
- modules
- stainless steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000002184 metal Substances 0.000 claims abstract description 25
- 229910052751 metal Inorganic materials 0.000 claims abstract description 25
- 239000002023 wood Substances 0.000 claims abstract description 14
- 239000010935 stainless steel Substances 0.000 claims description 33
- 229910001220 stainless steel Inorganic materials 0.000 claims description 33
- 230000003014 reinforcing effect Effects 0.000 claims description 16
- 230000000694 effects Effects 0.000 abstract description 10
- 238000012545 processing Methods 0.000 abstract description 6
- 238000005034 decoration Methods 0.000 abstract description 4
- 238000000034 method Methods 0.000 abstract description 4
- 238000010276 construction Methods 0.000 abstract description 3
- 230000002787 reinforcement Effects 0.000 abstract 2
- 238000009434 installation Methods 0.000 description 16
- 150000002739 metals Chemical class 0.000 description 7
- 238000005192 partition Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 229910000677 High-carbon steel Inorganic materials 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000007634 remodeling Methods 0.000 description 2
- 101100334009 Caenorhabditis elegans rib-2 gene Proteins 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000010079 rubber tapping Methods 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model discloses a combined type bathroom wall surface module which comprises wall surface modules (1) and a ground module (6), wherein the multiple wall surface modules (1) are connected to form a network module; the network module is fixed on the ground module (6); anticorrosive wood sole timbers (3) are arranged on the back surfaces of the wall surface modules (1); the network module is connected with hardwares on a wall surface through the anticorrosive wood sole timbers (3); a metal reinforcement rib (2) is arranged on the back surface between every two wall surface modules (1) on the same surface, and the two wall surface modules (1) are fixedly connected through the metal reinforcement rib (2). According to the combined type bathroom wall surface module disclosed by the utility model, the working procedures of plastering and leveling the wall surface and mounting a veneer are eliminated; furthermore, the wall surface modules adopt an intensive back-processing mode, so that standardized work is facilitated, the decoration effect is stable, the decoration effect is good, and the construction is simple and feasible; the construction efficiency for bathroom wall surface mounting can be greatly improved, and the labor cost is lowered.
Description
Technical field
The utility model relates to metope module between a kind of combined sanitary.
Background technology
Along with the development of decoration industry, interior decoration, installing engineering more and more trend towards specialization, integrated, integration.The loaded down with trivial details operation of conventional washroom metope and uneven decorative effect can not meet people for the agility of decorating, globality and day by day harsh aesthetic requirement.
There is following drawback in tradition washroom metope mounting method:
1, traditional washroom metope is to carry out distributed finishing and installation by bricklayer and installer, and the operations such as wall plastering levelling, the paving of brick (stone material) surface layer, waterproof, pipeline installation need be interted operation, when handing-over, easily go wrong.
2, traditional washroom metope adopts the wet trade modes such as cement mortar paving to have considerable influence to surrounding environment.
3, after the wall surfacing of traditional washroom completes, most of maintenance need be carried out destructiveness reparation, and cost is higher and surrounding environment is existed to considerable influence.
4, the pure dependence of mode of operation of traditional washroom metope paving is manually carried out, and cost of labor is high, expend large.
Utility model content
Utility model object of the present utility model is: metope module between a kind of combined sanitary is provided, and it has omitted the operation of wall plastering levelling and facing installation; And metope module adopts intensive back court form processing, is conducive to standardized work, decorative effect is stable.
The technical solution of the utility model is: metope module between a kind of combined sanitary, and it comprises metope module, earth module, and described multiple metope modules are interconnected to form mixed-media network modules mixed-media, and described mixed-media network modules mixed-media is fixed on earth module; The described metope module back side is provided with anticorrosive wood chock, and mixed-media network modules mixed-media is connected with the hardware of metope by anticorrosive wood chock.
Below technique scheme is further expalined:
Between two metope modules of described the same face, the back side is provided with metal reinforcing, between two metope modules, is connected and fixed by metal reinforcing.
Between two metope modules of described phase cross surface, be provided with elastic stainless steel connecting parts, between two metope modules, be connected and fixed by elastic stainless steel connecting parts.
Elastic stainless steel pad is installed on described earth module, and metope module is pressed into the gap between elastic stainless steel pad and earth module, and metope module and earth module are fixed by elastic stainless steel pad.
In described metope module, be provided with preserved pipeline hole.
Described metal reinforcing is U-shaped.
The described metope module back side is lattice-shaped.
Described elastic stainless steel connecting parts section is that L shaped, L shaped connecting parts two ends are connected with back-shaped fastener, and metope module is embedded in back-shaped fastener.
The utility model has the advantages that: metope module between combined sanitary of the present utility model, it has omitted the operation of wall plastering levelling and facing installation; And metope module adopts intensive back court form processing, is conducive to standardized work, decorative effect is stable, and good decorating effect, constructs simple, can significantly improve the efficiency of construction that washroom metope is installed, and saves cost of labor.
Brief description of the drawings
Below in conjunction with drawings and Examples, the utility model is described further:
Fig. 1 is that the axle of the utility model embodiment measures intention;
Fig. 2 is the back elevation structural representation of the utility model embodiment;
Fig. 3 is the positive facade structures perforate schematic diagram of the utility model embodiment;
Fig. 4 is metope module and the earth module connected node enlarged diagram of the utility model embodiment;
Fig. 5 is connected node enlarged diagram between the metope module of the utility model embodiment;
Wherein: 1 metope module; 2 metal reinforcings; 3 anticorrosive wood chocks; 4 elastic stainless steel pads; 5 elastic stainless steel connecting parts; 6 earth modules; 7 preserved pipeline holes.
Detailed description of the invention
Embodiment: as shown in Figure 2: metope module between a kind of combined sanitary, it comprises metope module 1, metal reinforcing 2, anticorrosive wood chock 3, elastic stainless steel pad 4, elastic stainless steel connecting parts 5, earth module 6, preserved pipeline hole 7.
As shown in Figure 1, multiple metope modules 1 are interconnected to form mixed-media network modules mixed-media, and between two metope modules 1 of the same face, the back side is provided with between 2, two metope modules 1 of metal reinforcing and is connected and fixed by metal reinforcing 2.Metal reinforcing 2 is U-shaped, is made by 0.5mm high-carbon steel, is fixed on the projection of latticed metope module by high strength self-tapping screw.Metal reinforcing 2 is as the accessory of fixing adjacent metope module 1.Metope module 1 back side adopts gridiron structure to alleviate deadweight, and gains in strength by metal reinforcing 2.Metope module 1 back side is lattice-shaped.
As shown in Figure 3, mixed-media network modules mixed-media is fixed on earth module 6; Described metope module 1 back side is provided with anticorrosive wood chock 3, and anticorrosive wood chock 3 is through fire prevention, anticorrosion, moistureproof processing.Specification is 80*80, and thickness is 8~12mm, adopts AB glue bond.Mixed-media network modules mixed-media is connected with the hardware of metope by anticorrosive wood chock 3.In metope module 1, be provided with preserved pipeline hole 7.Between the combined sanitary of the present embodiment, the preformed hole of metope module pipeline and equipment connection, partition, five metals are installed preformed hole, and customize the preformed hole of the customization five metals such as lavatory paper box.
As shown in Figure 4, elastic stainless steel pad 4 is installed on earth module 6, metope module 1 is pressed into the gap between elastic stainless steel pad 4 and earth module 6, and metope module 1 is fixing by elastic stainless steel pad 4 with earth module 6.Elastic stainless steel pad 4 is as the fastening means of fixing metope module 1 and earth module 6.
Metal reinforcing 2 is fixed on metope module 1 back side, connects adjacent metope module 1 and plays the effect of gaining in strength, and anticorrosive wood chock 3 is fixed on the position that five metals, pipeline and partition are installed in metope module 1 back, is convenient to the installation of five metals equipment and pipeline, partition; Elastic stainless steel pad 4 is installed on earth module 6 bottoms, metope module 1 is fixed in fixing effect by elastic stainless steel pad 4 when installation, is installed and fixed intersecting the metope module 1 of facade by elastic stainless steel connecting parts 5, thereby completed the installation work of metope module 1.Elastic stainless steel pad 4 adopts 1~1.2mm import high-carbon steel or stainless steel to make with elastic stainless steel connecting parts 5.
As shown in Figure 5, between two of phase cross surface metope modules 1, be provided with between 5, two metope modules 1 of elastic stainless steel connecting parts and be connected and fixed by elastic stainless steel connecting parts 5.Elastic stainless steel connecting parts 5 sections are that L shaped, L shaped connecting parts two ends are connected with back-shaped fastener, and metope module 1 is embedded in back-shaped fastener.Elastic stainless steel connecting parts 5 fixes respectively fixing from the crossing metope module 6 of module back inner corner trim opposite.
When specifically implementing, the present embodiment also comprises following main points:
1, the in-site measurement, the drafting deepen drawing that first carry out early stage, carry out hole according to on-the-spot size, civil engineering pipeline location and reserve, according to installation site and the trend of the platform basin of design and spray location positioning metope pipeline.
2, according to pipeline and five metals installation site after determining, determine position of opening, determine the installation site of anticorrosive wood chock 3.
3, dock with factory, produce metope module 1, consider on-the-spot position of opening and five metals, equipment installation site comprehensively.
4, on-the-spot wall, land clearing, and carry out the installation of earth module 6.
5, carry out the installation of the hidden pipeline of metope module 1 backboard and fix.
6, metope module 1 is installed splicing, and metal reinforcing 2 is installed.
7, earth module 6 installs elastic stainless steel pad 4 additional, by elastic stainless steel pad 4, metope module 1 is installed on to earth module 6 tops.
8, the metope five metals, the sanitary equipment that need pre-installation are in place.
9, by elastic stainless steel connecting parts 5, each metope facade is connected, complete installation.
The present embodiment is by the height of conventional processes is refined, and multiple operation, many handing-over, how artificial mode of operation are reduced to specialization, back court, integrated modern mounting means, ensured to greatest extent the lifting of on-the-spot artificial saving and productivity ratio; Applied metal reinforcing rib 2, has taken into account the lifting of the fixing and metope intensity of adjacent column, and the back side adopts the processing mode of anticorrosive wood chock 3 and 1 combination of metope module simultaneously, is more convenient to the installation of metope pipeline, Hardware fitting and partition.Substantially all products are all made production in the mode of back court processing, realize the slitless connection of design and product, have solved the requirement of the various operations of metope to the duration and the adverse effect of surrounding environment, promote to greatest extent client's experience.Reach finished surface more integrated, create more attractive in appearance, harmonious decorative effect.
It should be pointed out that for the utility model through absolutely proving, also can there is the embodiment of multiple conversion and remodeling, be not limited to above-mentioned specific embodiment.Above-described embodiment is as just explanation of the present utility model, instead of to restriction of the present utility model.In a word, protection domain of the present utility model should comprise those apparent conversion or alternative and remodeling to those skilled in the art.
Claims (8)
1. a metope module between combined sanitary, is characterized in that: it comprises metope module (1), earth module (6), and described multiple metope modules (1) are interconnected to form mixed-media network modules mixed-media, and described mixed-media network modules mixed-media is fixed on earth module (6); Described metope module (1) back side is provided with anticorrosive wood chock (3), and mixed-media network modules mixed-media is connected with the hardware of metope by anticorrosive wood chock (3).
2. metope module between combined sanitary according to claim 1, it is characterized in that: between two metope modules (1) of described the same face, the back side is provided with metal reinforcing (2), between two metope modules (1), is connected and fixed by metal reinforcing (2).
3. metope module between combined sanitary according to claim 1, it is characterized in that: between two metope modules (1) of described phase cross surface, be provided with elastic stainless steel connecting parts (5), between two metope modules (1), be connected and fixed by elastic stainless steel connecting parts (5).
4. metope module between combined sanitary according to claim 1, it is characterized in that: elastic stainless steel pad (4) is installed on described earth module (6), metope module (1) is pressed into the gap between elastic stainless steel pad (4) and earth module (6), and metope module (1) is fixing by elastic stainless steel pad (4) with earth module (6).
5. metope module between combined sanitary according to claim 1, is characterized in that: in described metope module (1), be provided with preserved pipeline hole (7).
6. metope module between combined sanitary according to claim 2, is characterized in that: described metal reinforcing (2) is U-shaped.
7. metope module between combined sanitary according to claim 1, is characterized in that: described metope module (1) back side is lattice-shaped.
8. metope module between combined sanitary according to claim 3, is characterized in that: described elastic stainless steel connecting parts (5) section is that L shaped, L shaped connecting parts two ends are connected with back-shaped fastener, and metope module (1) is embedded in back-shaped fastener.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420061813.7U CN203783041U (en) | 2014-02-12 | 2014-02-12 | Combined type bathroom wall surface module |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420061813.7U CN203783041U (en) | 2014-02-12 | 2014-02-12 | Combined type bathroom wall surface module |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203783041U true CN203783041U (en) | 2014-08-20 |
Family
ID=51319242
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420061813.7U Expired - Lifetime CN203783041U (en) | 2014-02-12 | 2014-02-12 | Combined type bathroom wall surface module |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203783041U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103835466A (en) * | 2014-02-12 | 2014-06-04 | 苏州金螳螂建筑装饰股份有限公司 | Combined type toilet wall mould block |
CN106812241A (en) * | 2017-01-17 | 2017-06-09 | 优居优住家居装饰(北京)有限公司 | A kind of bathroom functional wall block combiner method |
CN112681655A (en) * | 2020-12-21 | 2021-04-20 | 广东正通博雅装饰工程有限公司 | Indoor decoration plate mounting structure and mounting method thereof |
-
2014
- 2014-02-12 CN CN201420061813.7U patent/CN203783041U/en not_active Expired - Lifetime
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103835466A (en) * | 2014-02-12 | 2014-06-04 | 苏州金螳螂建筑装饰股份有限公司 | Combined type toilet wall mould block |
CN103835466B (en) * | 2014-02-12 | 2016-11-23 | 苏州金螳螂建筑装饰股份有限公司 | Metope module between combined sanitary |
CN106812241A (en) * | 2017-01-17 | 2017-06-09 | 优居优住家居装饰(北京)有限公司 | A kind of bathroom functional wall block combiner method |
CN112681655A (en) * | 2020-12-21 | 2021-04-20 | 广东正通博雅装饰工程有限公司 | Indoor decoration plate mounting structure and mounting method thereof |
CN112681655B (en) * | 2020-12-21 | 2022-02-18 | 广东正通博雅装饰工程有限公司 | Indoor decoration plate mounting structure and mounting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10837187B2 (en) | Modular integrated building and construction method thereof | |
CN104005502B (en) | A kind of precast light building cover board and industrialized building house floor slab structure | |
CN204876080U (en) | Outer wall and crossbeam installation connection structure in aluminum alloy house | |
CN109267671A (en) | A kind of decoration method of indoor wall system | |
CN202595943U (en) | Toilet steel frame lightweight partition wall | |
CN203783041U (en) | Combined type bathroom wall surface module | |
CN203834771U (en) | Prefabricated light floor cover plate and industrial building floor plate structure | |
CN103835466A (en) | Combined type toilet wall mould block | |
TW201839225A (en) | Method for joining floor slab to steel beam of wooden building capable of quickly constructing a wooden building and shortening the construction period | |
CN205171752U (en) | Prefabricated light steel partition wall and mounting structure thereof | |
CN203783097U (en) | Integrated bathroom ground | |
CN110130556B (en) | Waterproof board frame and one-floor board structure and production method thereof | |
CN203613646U (en) | Prefabricated house convenient for wiring | |
CN208347208U (en) | A kind of new indoor walling system | |
CN103590590B (en) | Integral vacuum toilet ground | |
CN207144359U (en) | A kind of exquisite log wall decorative cover structure | |
CN201232328Y (en) | Prefabricating combined inside and outside wall safety ceramic tile | |
CN203684567U (en) | Waterproof wall floor decoration structure | |
CN205025024U (en) | Semicircle wood wallboard | |
CN103982042A (en) | Split mounting technique of quick home-decoration split mounting engineering | |
CN204728604U (en) | Integral bathroom wallboard | |
CN205134779U (en) | Adopt drainage structures in steel construction archaize building's corridor | |
CN210316145U (en) | Waterproof board frame and floor structure and building | |
CN107165360A (en) | A kind of exquisite log wall decorative cover structure | |
CN203846784U (en) | Installation structure of windowed wall of power plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |