CN203783097U - Integrated bathroom ground - Google Patents
Integrated bathroom ground Download PDFInfo
- Publication number
- CN203783097U CN203783097U CN201320652231.1U CN201320652231U CN203783097U CN 203783097 U CN203783097 U CN 203783097U CN 201320652231 U CN201320652231 U CN 201320652231U CN 203783097 U CN203783097 U CN 203783097U
- Authority
- CN
- China
- Prior art keywords
- ground
- module
- customization
- accomodation
- vacuum toilet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 5
- 238000009434 installation Methods 0.000 abstract description 11
- 238000010276 construction Methods 0.000 abstract description 3
- 239000002184 metal Substances 0.000 abstract 4
- 238000000034 method Methods 0.000 description 4
- 238000005034 decoration Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 238000004078 waterproofing Methods 0.000 description 3
- 239000011083 cement mortar Substances 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000012937 correction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000007634 remodeling Methods 0.000 description 2
- 241000272165 Charadriidae Species 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
Abstract
The utility model discloses an integrated bathroom ground. The integrated bathroom ground comprises bathroom ground modules (1), multiple customized metal strips (2) and customized bases (4). The customized metal strips (2) are installed on the back sides of the bathroom ground modules (1) through bolts (3). The multiple customized metal strips (2) are distributed on the back sides of the bathroom ground modules (1) in a scattered mode according to the requirement for even stress. Threaded rods are arranged at the upper ends of the customized bases (4). The customized bases (4) are installed below the customized metal strips (2) through cooperation among the threaded rods, nuts and gaskets (5). The integrated bathroom ground is good in decorative effect, easy to construct, and capable of greatly improving the installation construction efficiency of the bathroom ground and reducing labor cost; due to the facts that the ground leveling step and the water resistance step are omitted and the ground modules are machined in a backfield, standard operation is facilitated, and the decorative effect is stable.
Description
Technical field
The utility model relates to a kind of integral vacuum toilet ground.
Background technology
Along with the development of decoration industry, interior decoration, installing engineering more and more trend towards specialization, integrated, integration.The loaded down with trivial details operation of conventional accomodation ground and uneven decorative effect can not meet people for the agility of decorating, globality and day by day harsh aesthetic requirement.
There is following drawback in tradition accomodation ground mounting method: 1, traditional accomodation ground is to carry out distributed finishing and installation by bricklayer and installer, the operations such as waterproof, floor leveling, the paving of brick (stone material) surface layer, pipeline installation need be interted operation, during handing-over, easily go wrong.2, traditional accomodation ground adopts the wet trade modes such as cement mortar paving to have considerable influence to surrounding environment.3, before traditional toilet decoration, waterproofing work is time-consuming, and need to carry out the complete of experimental examination waterproofing course, if waterproofing work is not in place, there will be the pure dependence of mode of operation of infiltration and drainage 4, traditional accomodation ground paving manually to carry out, cost of labor is high, expend greatly.
Also occurred on the market at present the earth module of some integrated washrooms, they also exist, and module deadweight is overweight, the problem such as levelling initiatively.There is following drawback in existing accomodation ground module: 1, accomodation ground module is planar design, without flange, need play glue or adopt rubber strip to carry out water-tight processing with metope module junction, and outward appearance and water resistance are all had to impact.2, accomodation ground module needs to carry out floor leveling before installing, and need carry out by apparatus the inspection correction of planeness while installing.
Utility model content
The purpose of this utility model is: a kind of integral vacuum toilet ground is provided, and its good decorating effect, constructs simple, can significantly improve the efficiency of construction that accomodation ground is installed, and saves cost of labor; Omitted the operation of floor leveling and waterproof, and earth module employing back court form processing, being conducive to standardized work, decorative effect is stable.
The technical solution of the utility model is: a kind of integral vacuum toilet ground, it comprises accomodation ground module, customization bonding jumper, customization base, described customization bonding jumper is installed on the back side of accomodation ground module by bolt, a plurality of customization bonding jumpers are according to the back side that can meet stressed uniform requirement and be distributed in dispersedly accomodation ground module, customization base upper end is provided with screw rod, and customization base coordinates with nut and pad by described screw rod to be installed on and customizes below bonding jumper.
Below technique scheme is further expalined:
In described accomodation ground module, be provided with the air level for whether installation level of calibration accomodation ground module.
Described air level comprises the both sides air level that is separately positioned on accomodation ground module both sides, and when the air level of both sides is during in center, ground is levelling state.
Described customization bonding jumper below is provided with evenly a plurality of customization bases spaced apart.
The described accomodation ground module back side is gridiron.
Described accomodation ground module four limits are provided with turnup structure.
In described accomodation ground module, be provided with floor drain pipeline preformed hole.
In described accomodation ground module, be provided with water closet preformed hole.
In described accomodation ground module, be provided with for coordinating the reserving hole of the indoor standpipe in washroom.
Described customization substructure height is 120mm~160mm.
Described accomodation ground module is the complete earth module of a monoblock, and its four limit is provided with turnup structure.
The utility model has the advantages that: integral vacuum toilet of the present utility model ground, it refines by the height to conventional processes, multiple operation, many handing-over, how artificial mode of operation are reduced to specialization, back court, integrated modern mounting means, have guaranteed to greatest extent the lifting of on-the-spot artificial saving and productivity ratio; Apply adjustable bolt ground is built on stilts, in mode easily, solved the problem of floor leveling, reserved the space that pipeline is installed simultaneously, more scientific and reasonable.By back court, process, realize the slitless connection of design and product, solved the problem of cement mortar surface levelling and ground waterproof, promote to greatest extent client's experience; Reach finished surface more integrated, create more attractive in appearance, harmonious decorative effect.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further described:
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is the structure schematic diagram of the utility model embodiment;
Fig. 3 is the plane structure schematic diagram of the utility model embodiment;
Fig. 4 is the structural representation at the base position of the utility model embodiment;
Wherein: 1 accomodation ground module; 2 customization bonding jumpers; 3 bolts; 4 customization bases; 5 nuts and pad; 6 air levels.
The specific embodiment
Embodiment: as Figure 1 and Figure 4, a kind of integral vacuum toilet ground, it comprises accomodation ground module 1, customization bonding jumper 2, customization base 4.
Customization bonding jumper 2 is installed on the back side of accomodation ground module 1 by bolt 3, a plurality of customization bonding jumpers 2 are according to the back side that can meet stressed uniform requirement and be distributed in dispersedly accomodation ground module 1, customization bonding jumper 2 belows are provided with evenly a plurality of customization bases 4 spaced apart, customization base 4 is highly 120mm~160mm, customization base 4 upper ends are provided with screw rod, and customization base 4 coordinates with nut and pad 5 by screw rod to be installed on and customizes bonding jumper 2 belows.In accomodation ground module 1, be provided with the air level 6 for calibration accomodation ground module 1 whether installation level.Air level 6 comprises the both sides air level that is separately positioned on accomodation ground module 1 both sides, and when the air level of both sides is during in center, ground is levelling state.
As shown in Figure 2 and Figure 3, accomodation ground module 1 back side is gridiron, and four limits are provided with turnup structure.In accomodation ground module 1, be provided with floor drain pipeline preformed hole, water closet preformed hole, for coordinating the reserving hole of the indoor standpipe in washroom.
In the present embodiment, accomodation ground module 1 is carried out flange according to toilet warterproof desired height (150~200mm), reaches waterproof object.
Accomodation ground module 1 back side adopts gridiron structure to alleviate deadweight, with customization bonding jumper 2 fixed positions be plate material, by bolt 3(M8 bolt) multiple spot fixes.
The present embodiment adopts customization bonding jumper 2 customization bases 4 finished surface planeness to be adjusted as Height Adjustment accessory with nut and pad 5.Employing is embedded in the air level 6 of accomodation ground module 1 as finished surface planeness inspection correction instrument.
In the present embodiment, the installation site of base and setting height(from bottom), move towards desired height by standpipe position, ground and horizontal tube and determine.
The construction method of the present embodiment is:
1, the in-site measurement, the drafting deepen drawing that first carry out early stage, carry out hole according to on-the-spot size, pipeline location and reserve, according to the sanitaryware location positioning arm installation site of design;
2,, according to the arm installation site after determining and consider symmetry principle, the installation site of reserved customization bonding jumper 2, need avoid arm trend;
3, dock with factory, produce earth module, air level 6 is embedded in the concealment part of ground and the handing-over of metope module;
4, field ground cleaning, determines that land subsidence scope is 200~210mm;
5, carry out the installation of the hidden pipeline in ground;
6, adopt bolt 3 that customization bonding jumper 2 is fixed on to accomodation ground 1 module reserved location;
7, customization base 4 is installed on special-shaped bonding jumper 2 by pad and nut 5;
8, on-the-spot installation, carries out the fine setting levelling of bolt according to on-the-spot reference line and air level 6.
It should be pointed out that for the utility model through absolutely proving, also can there is the embodiment of multiple conversion and remodeling, be not limited to above-mentioned specific embodiment.Above-described embodiment is as just explanation of the present utility model, rather than to restriction of the present utility model.In a word, protection domain of the present utility model should comprise those apparent conversion or alternative and remodeling to those skilled in the art.
Claims (10)
1. an integral vacuum toilet ground, it is characterized in that: it comprises accomodation ground module (1), customization bonding jumper (2), customization base (4), described customization bonding jumper (2) is installed on the back side of accomodation ground module (1) by bolt (3), a plurality of customization bonding jumpers (2) are according to the back side that can meet stressed uniform requirement and be distributed in dispersedly accomodation ground module (1), customization base (4) upper end is provided with screw rod, and customization base (4) coordinates with nut and pad (5) by described screw rod to be installed on and customizes below bonding jumper (2).
2. integral vacuum toilet according to claim 1 ground, is characterized in that: in described accomodation ground module (1), be provided with the air level (6) whether level is installed for calibration accomodation ground module (1).
3. integral vacuum toilet according to claim 2 ground, is characterized in that: described air level (6) comprises the both sides air level that is separately positioned on accomodation ground module (1) both sides, and when the air level of both sides is during in center, ground is levelling state.
4. integral vacuum toilet according to claim 1 ground, is characterized in that: described customization bonding jumper (2) below is provided with evenly a plurality of customization bases (4) spaced apart.
5. integral vacuum toilet according to claim 1 ground, is characterized in that: described accomodation ground module (1) back side is gridiron.
6. integral vacuum toilet according to claim 1 ground, is characterized in that: described accomodation ground module (1) four limit is provided with turnup structure.
7. integral vacuum toilet according to claim 1 ground, is characterized in that: in described accomodation ground module (1), be provided with floor drain pipeline preformed hole.
8. integral vacuum toilet according to claim 1 ground, is characterized in that: in described accomodation ground module (1), be provided with water closet preformed hole.
9. integral vacuum toilet according to claim 1 ground, is characterized in that: in described accomodation ground module (1), be provided with for coordinating the reserving hole of the indoor standpipe in washroom.
10. integral vacuum toilet according to claim 1 ground, is characterized in that: described accomodation ground module is the complete earth module of a monoblock, and its four limit is provided with turnup structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320652231.1U CN203783097U (en) | 2013-10-23 | 2013-10-23 | Integrated bathroom ground |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320652231.1U CN203783097U (en) | 2013-10-23 | 2013-10-23 | Integrated bathroom ground |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203783097U true CN203783097U (en) | 2014-08-20 |
Family
ID=51319298
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320652231.1U Expired - Lifetime CN203783097U (en) | 2013-10-23 | 2013-10-23 | Integrated bathroom ground |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203783097U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590590A (en) * | 2013-10-23 | 2014-02-19 | 苏州金螳螂建筑装饰股份有限公司 | Integrated bathroom floor |
CN105587137A (en) * | 2015-05-29 | 2016-05-18 | 杨振宇 | Interior integrated bathroom |
-
2013
- 2013-10-23 CN CN201320652231.1U patent/CN203783097U/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590590A (en) * | 2013-10-23 | 2014-02-19 | 苏州金螳螂建筑装饰股份有限公司 | Integrated bathroom floor |
CN103590590B (en) * | 2013-10-23 | 2016-03-23 | 苏州金螳螂建筑装饰股份有限公司 | Integral vacuum toilet ground |
CN105587137A (en) * | 2015-05-29 | 2016-05-18 | 杨振宇 | Interior integrated bathroom |
CN105587137B (en) * | 2015-05-29 | 2018-08-31 | 云南振书科技有限公司 | A kind of built-in integral vacuum toilet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2689796C (en) | Shower base apparatus | |
CA2790253A1 (en) | Improvements in shower enclosure design and assembly methods using prefabricated shower benches | |
CN203783097U (en) | Integrated bathroom ground | |
CN205062922U (en) | Installation is with layer drainage system's bathroom | |
CN106437093B (en) | Building decoration concealed installation ceramic tile baseboard structure and construction process thereof | |
CN103590590B (en) | Integral vacuum toilet ground | |
CN203783041U (en) | Combined type bathroom wall surface module | |
CN112095998A (en) | Assembled bathroom does not fall board drainage system | |
CN216690508U (en) | Leveling mechanism suitable for integral bathroom chassis | |
CN213509381U (en) | Anti-corrosion high-leveling-capacity raised floor structure | |
CN211080429U (en) | Novel toilet water supply and drainage pipe packaging structure | |
CN114135122A (en) | Assembled integrated waterproof intelligent public washroom system | |
CN210797823U (en) | Floor drain with lateral wall drainage function | |
CN104790472B (en) | Same floor drainage structure of toilet | |
CN211007488U (en) | Indoor ground overhead structure | |
CN111550008A (en) | Keel-free high-adaptability raised floor structure and construction method | |
CN103015501A (en) | Invisible floor drain | |
CN103982042B (en) | The assembling process of the assembled engineering of a kind of quick house ornamentation | |
CN101250892A (en) | Hanging device and construction method for light separating-wall hidden installation sanitary equipment | |
CN106013566A (en) | Assembled type bathroom floor slab and construction method | |
CN206554331U (en) | A kind of sound insulation cracking resistance decorates prefabricated indoor partition panel | |
CN218220048U (en) | Dry-wet separation structure of integral bathroom | |
CN202416536U (en) | Embedded waterproof floor drain | |
CN206189909U (en) | Bathroom room | |
CN206091001U (en) | Assembled bathroom floor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20140820 |
|
CX01 | Expiry of patent term |