CN105587137B - A kind of built-in integral vacuum toilet - Google Patents

A kind of built-in integral vacuum toilet Download PDF

Info

Publication number
CN105587137B
CN105587137B CN201510960299.XA CN201510960299A CN105587137B CN 105587137 B CN105587137 B CN 105587137B CN 201510960299 A CN201510960299 A CN 201510960299A CN 105587137 B CN105587137 B CN 105587137B
Authority
CN
China
Prior art keywords
water
ground
switch
water tank
siding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510960299.XA
Other languages
Chinese (zh)
Other versions
CN105587137A (en
Inventor
杨振宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Li Yanhua
Original Assignee
Yunnan Vibration Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Vibration Technology Co Ltd filed Critical Yunnan Vibration Technology Co Ltd
Priority to CN201510960299.XA priority Critical patent/CN105587137B/en
Publication of CN105587137A publication Critical patent/CN105587137A/en
Application granted granted Critical
Publication of CN105587137B publication Critical patent/CN105587137B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/125Small buildings, arranged in other buildings
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B1/00Methods or layout of installations for water supply
    • E03B1/04Methods or layout of installations for water supply for domestic or like local supply
    • E03B1/041Greywater supply systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/12Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/64Insulation or other protection; Elements or use of specified material therefor for making damp-proof; Protection against corrosion
    • E04B1/644Damp-proof courses
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B1/00Methods or layout of installations for water supply
    • E03B1/04Methods or layout of installations for water supply for domestic or like local supply
    • E03B1/041Greywater supply systems
    • E03B2001/045Greywater supply systems using household water
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/30Relating to industrial water supply, e.g. used for cooling

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Hydrology & Water Resources (AREA)
  • Health & Medical Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Environmental & Geological Engineering (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

The present invention relates to a kind of built-in integral vacuum toilets, including floor tile, siding, support frame, bath wastewater utilizes system, switch integrated circuit system, the support frame is by adjusting lead screw according to the requirement that can meet uniform force, it is fixed on ground respectively, bath wastewater is installed on using system in the space on support frame and wall and ground, and it is connect with switch integrated circuit system, the floor tile of several customizations and siding button is embedding is installed on support frame, support frame as a result of steel construction and adjusting lead screw, enhance the stress-bearing capability of toilet entirety, each piece of floor tile and siding, which use, is detachably connected installation, only monolithic is needed to replace when damage, the cooperation switched made of law of buoyancy in water tank is used, it can make water pump automatic work.It is good that the present invention seals water resistance, can automatic pumping, the recycling of water is water-saving, quick for installation, maintains easily, and without construction pollution, at low cost, is suitable for for the first time or secondary decoration.

Description

A kind of built-in integral vacuum toilet
Technical field
The present invention relates to a kind of built-in integral vacuum toilets.
Background technology
With the development of decoration industry, interior decoration, installing engineering are increasingly intended to specialized, integrated, integration. The toilet tedious process of traditional handicraft finishing, irregular decorative effect have been unable to meet people for the quick of decoration Property, globality and increasingly harsh aesthetic requirement.
There are following drawbacks for ground installation method between conventional sanitation:Distributed finishing and installation, waterproof, floor leveling, The processes such as the layer paving of brick face, Pipe installing need to intert operation, be deposited to ambient enviroment using the wet constructions mode such as cement mortar paving In larger impact.Water-proofing treatment is time-consuming, and mode of operation purely relies on artificial progress, and the construction period is long, and labor intensity is big, work Skill is cumbersome, high labor cost, and bath water is not subject to any recycling even more in life, wastes efficient resource.
Also occur some integrated its ground of toilet on the market at present, metope module, can not be actively levelling the problems such as. And can only same specification have certain quantity that could make, used aloned requirement, existing accomodation ground module cannot be met There are following drawbacks:Accomodation ground module is that planar design is difficult to tie up the replacement of the maintenance of built-in pipeline and floor tile, siding It repaiies.
Invention content
In view of the above shortcomings of the prior art, the present invention provides a kind of antiseep ground, wall, saves space, facilitates dimension It repaiies, is quick for installation, without corner or spot as yet untouched by a clean-up campaign, and water-saving integral vacuum toilet.
In order to solve the above technical problems, the present invention uses following technical scheme:A kind of built-in integral vacuum toilet, feature exist In:Integral vacuum toilet includes floor tile(3), siding(4), ground supports skeleton(1), wall face supporting frame(1a), bath wastewater profit It is constituted with system and double integral circuitry systems of opening, wall face supporting frame(1a)To be divided to two kinds of single-sided structure or two-sided wall construction, ground Support frame(1)Pass through several adjusting lead screws(2)It is mounted on ground respectively, several piece floor tile(3)It is laid with peace respectively Mounted in ground supports skeleton(1)On, several piece siding(4)Installation is placed on wall face supporting frame(1a)On, bath wastewater utilizes system It is positioned over ground supports skeleton(1)With ground or wall face supporting frame(1a)In interlayer space between wall;
Two pieces of floor tiles(3)Between or two pieces of sidings(4)Between connection be detachable;Every piece of floor tile(3) With ground supports skeleton(1)Connection be detachably connected;Siding(4)With wall face supporting frame(1a)Connection is used and is detachably connected Form;
Described pair is opened integral circuitry system(13)Bath wastewater is fitted to utilize in system, it is double to open integral circuitry system (13)It is connect with main power source.
The adjusting lead screw(2)The requirement support that uniform force can be met on the ground, adjusts lead screw(2)With ground supports Skeleton(1)The frame of composition connects.
The bath wastewater utilizes the header tank in system(5)One end passes through water pump(12)Connect water tank(6), header tank (5)Other end handle washes Su basins(11), drainpipe and bath water enter header tank by being connected after double medium filtration floor drain(5).
Described pair is opened integral circuitry system(13)By header tank(5)And water tank(6)It is again provided with a connecting rod(13a), point Not with header tank(5), water tank(6)Contact point be support, connecting rod(13a)It can move up and down, stretch out header tank(5), water Case(6)Outer one end and first switch(13r)And second switch(13f)Connection, bottom is flat to be equipped with balance beam(13b)And locating rod (13e), float(13d)It is sleeved on locating rod(13e)On, a flexible strand is used in combination(13c)With balance beam(13b)One end connects, Balance beam(13b)The other end and connecting rod(13a)Positioned at water tank(6)Interior one end is by stabiliser bar(13g)Connection.
The floor tile(3)And siding(4)Detachable form is made using water-proof sheet material.
It is described in each piece of ground floor tile(3)Have waterproof layer(3b), guiding gutter is additionally provided at abutment joint(8), and apply Equipped with double faced adhesive tape and water-proof sealing rubber strip.
Several sidings(4)Pass through corner brace connector(9)It detains build-in and schedules support frame(1)On, and application double faced adhesive tape And water-proof sealing rubber strip.
Operation principle:According to intrinsic toilet to be installed of repairing the house, Decoration Design drawing is produced, factory is custom materials Ground supports skeleton(1), wall face supporting frame(1a), adjust lead screw(2), header tank(5), water tank(6)Needed for manufacturing The standard component of specification, siding(4)And floor tile(3)It can be processed into finished product, installation personnel need to only construct according to design drawing, First each adjusting lead screw is pressed(2)According to the requirement that can meet uniform force, it is fixed on ground respectively;Secondly, by ground Support frame(1)It is fixed on adjusting lead screw(2)On, bath wastewater is installed on ground supports skeleton using system(1)With ground Interlayer space in;Third, the floor tile of customization(3)It is laid with respectively using detachable form, detains and embedding be installed on ground supports Skeleton(1)On, siding(4)It is laid with respectively using detachable form, detains and embedding be installed on wall face supporting frame(1a)On, connecting portion needs Waterproof technique processing is done, in this course, available adjustment lead screw(2)Regulating floor brick(3)Height with ground or floor Brick(3)It is levelling, it is double to open integral circuitry system(13)The secondary cycle that cooperation bath wastewater can carry out washing Su water using system utilizes, Save water resource.
Wherein, double to open integral circuitry system(13)By first switch(13r), second switch(13f)With the automatic closure of switch Part forms, first switch(13r)It is installed on header tank(5)On, second switch(13f)It is installed on water tank(6)On, connecting rod one End connection balance beam(13b), other end connection first switch(13r)And second switch(13f), lever is utilized in two switches With water buoyancy principle, make float using buoyancy(13d)Lifting, and then drive the balance beam in same direction(13b)And connecting rod (13a)It lifts, and in hollow balance beam(13b)Inside set a ball(13h), ball(13h)Remain at balance beam(13b) Sinking one end overcomes ripples to shake float(13d)Lead to first switch(13r)And second switch(13f)When being closed or disconnecting Problem off and on ensures that switch can quick-make and disconnection.
Using water buoyancy and lever principle cooperation to be switches in the switch can automatically control, and substitution electronic induction switch can It prevents electric leakage accident from occurring, is also equipped with electronic induction and switchs unexistent water-proof function, and is durable, it is extremely low to repair flat rate.
Advantageous effect of the present invention:It is good to seal water resistance, energy automatic pumping can make to wash the utilization of Su water secondary cycles, section Water, it is quick for installation, it maintains easily, and without construction pollution, it is at low cost, it is suitable for for the first time or secondary decoration.
Description of the drawings
Fig. 1 is the overall structure figure of the present invention.
Fig. 2 is that the present invention adjusts lead screw and ground supports skeleton and floor tile connected structure figure.
Fig. 3 is single side wall of the present invention and support frame, siding connection figure.
Fig. 4 is the work system figure of the present invention.
Fig. 5 is the siding abutting joint structural map of the two-sided wall of the present invention.
Fig. 6 is the enlarged drawing at siding abutting joint position shown in Fig. 5.
Fig. 7 is the water tank structure chart of the present invention.
Fig. 8 is the double switching circuit figures for opening integral circuitry system of the present invention.
Fig. 9 is the mounting means of the header tank of the present invention.
Figure 10 utilizes system mounting means for the present invention without bath wastewater.
It is indicated in figure:1-ground supports skeleton, 1a-wall face supporting frame, 2-adjust lead screw, 3-floor tiles, 3a-ground Leakage, 3b-waterproof layer, 4-sidings, 5-header tanks, 5a-support bracket, 5b-gap, 6-water tanks, 6a-water inlet connect Mouthful, 6b-spilling water interface, 6c-blowdown valve, 6d-water outlet mouthpiece, 6e-tap water interface, 6f-tap interface, 6g-are oblique Plate, 7-waste preventers, 8-guiding gutters, 9-corner brace connectors, 10-total blown pipes, 11-wash Su basins, and 12-water pumps, 13-is bis- Open integral circuitry system, 13a-connecting rod, 13b-balance beam, 13c-flexible strand, 13d-float, 13e-locating rod, 13f- Second switch, 13g-stabiliser bar, 13h-ball, 13r-first switch, 13p-cable.
Specific implementation mode
According to intrinsic toilet to be installed of repairing the house, technical staff's in-site measurement toilet size removes exterior wall, and load-bearing is necessary It outside the wall of block, provides influent source, connect electric connection and sewage draining exit, make design drawing, and by factory custom materials ground Support frame 1 adjusts the standard component that lead screw 2, header tank 5, water tank 6 manufacture required specification, siding 4 and floor tile 3 It can be processed into finished product, installation personnel need to only carry out construction according to design drawing and can be completed.
The built-in integral vacuum toilet of the present invention includes floor tile, siding, ground supports skeleton, wall face supporting frame, bath wastewater profit With system, SWITCHING CIRCUITRY, the ground supports skeleton 1 is divided by adjusting lead screw 2 according to the requirement that can meet uniform force It is not fixed on ground and wall, bath wastewater is installed on floor tile 3 and ground supports skeleton 1 or siding 4 using system In wall face supporting frame 1a interlayer spaces, the floor tile 3 and siding 4 of several customizations be laid with respectively, detains and embedding is installed on ground supports On skeleton 1, wall face supporting frame 1a, SWITCHING CIRCUITRY is also connected with bath wastewater and utilizes system.
Floor tile 3 and siding 4 are made of water-proof sheet material can arbitrarily dismantle form.
Adjusting lead screw 2 is dispersedly distributed according to the requirement that can meet uniform force to be fixed on the ground, and and ground supports Skeleton 1 connects, it is proposed that using the higher stainless steel of purity as raw material, the environment of different regions can be suitble to use, carried simultaneously The whole load-bearing stress-bearing capability of high supporting support is looked for by adjusting 2 regulating floor brick 3 of lead screw and the height and floor tile 3 on ground It is flat.
Waterproof layer 3b is had in each piece of floor tile 3, ground is docked and be mounted on using detachable form between floor tile 3 On support frame 1, single repair and replacement can quickly be carried out by facilitating when damage, and guiding gutter is additionally provided at each piece of 3 abutment joint of floor tile 8, guiding gutter 8 connects header tank, and the water of leakage is guided to header tank, prevents water from leaking into ground.
Bath wastewater utilizes the collection for adjusting lead screw 2 and one cubical content computed in advance of space setting on ground using system Water tank 5,5 one end of header tank connect water tank by water pump 12, and the other end is connect with 11 drainpipe of Su basins is washed.
The bath water collected in header tank 5 is flowed directly by a double medium filtration floor drain in header tank, if there are one connect Mouth is connect with water pump 12, is also respectively connected with water tank spilling water interface 6b, is washed Su basins 11, and the waste water for washing the outflow of Su basins 11 is pooled to collection After water tank 5, water tank is extracted by water pump 12 it is used as and rush closestool water, header tank 5 is additionally provided with gap 5b and total blown pipe 10 The water beyond header tank moisture storage capacity is discharged in connection.
The bottom of water tank 6 is designed to that inclined-plane or funnel shaped, bottom surface can install the inverted T-shaped form of sewage draining exit, and oblique Several inclined plate 6g are arranged in face top certain distance, and there are the gap of certain distance, sealed bottoms to connect for the tie point between inclined plate 6g It connects, the bootable dirts of inclined plate 6g concentrate near the blowdown valve of bottom, when opening blowdown valve 6c, utilize the power of water flowing itself Bottom sediment is cleaned, the cleaning of case is kept.
Double integral circuitry systems 13 of opening are separately mounted in header tank 5 and water tank 6, water pump 12, first switch 13f and It is connected by cable 13p between first switch 13r, first switch 13f and second switch 13r are worked using fit system, double to open one Body circuit system 13 is again provided with a connecting rod 13a by header tank 5 and water tank 6, respectively with header tank 5, the contact point of water tank 6 For support, connecting rod 13a can move up and down, and stretch out header tank 5,6 outer one end of water tank and first switch 13r and second switch 13f Connection, bottom is flat to be equipped with balance beam 13b and locating rod 13e, and float 13d is sleeved on locating rod 13e, and a flexible strand is used in combination 13c is connect with the one end balance beam 13b, and the balance beam 13b other ends are located at one end in water tank 6 by stabiliser bar 13g with connecting rod 13a It connects and composes;The double buoyancy for opening integral circuitry system 13 using water being installed in water tank 6, certain altitude is risen to when waterborne, Float 13d rises with flexible strand 13c, and flexible strand 13c stretches a balance beam 13b and promoted, and the balance beam 13b other ends are then by stablizing Bar 13g drives connecting rod 13a to sink, and when connecting rod 13a is more than equalization point, connecting rod 13a leaves second switch 13f, and deenergization makes Immersible pump 12 is stopped, and water tank 6 is declined with the underwater certain altitude float 13d that is down to, and balance beam 13b is made to connect with connecting rod 13a One end rising is connect, connecting rod 13a contact second switches 13f is powered, and immersible pump or water pump 12 carry out work of drawing water.Balance beam 13b Inside there is a ball 13h that can pass through equalization point to be disconnected at outer masterpiece bottom, float 13d is avoided to make switch due to the wave of horizontal plane 13 are powered off and on damages water pump.
Be installed in header tank 5 it is double open integral circuitry system 13, open one by double on cable 13p and water tank 6 Circuit system 13 connects, and when water is more in header tank 5, float 13d is floated using buoyancy, is risen flat with flexible strand 13c The wood 13b of weighing is promoted, and the one end balance beam 13b being connect by stabiliser bar 13g with connecting rod 13a is by ball 13h downwardly against the company of drive One end first switch 13r of bar 13a is lifted upwards, and first switch 13r is made to be closed, and the work of water pump 12 is drawn water, when in header tank 5 Water it is less when, float 13d sinks, and ball 13h is rolled to this one end balance beam 13b of connection float 13d, and balance beam 13b is logical Crossing stabiliser bar 13g drives one end of connecting rod 13a to rise, and the first switch 13r on connecting rod 13a is forced to disconnect, and water pump 12 stops taking out Water conservancy project is made.
Several sidings 4 are fixed on the corner brace connector 9 on wall face supporting frame 1a, and application by the card slot inlay card opened up in advance Double faced adhesive tape makees buffering and water-proof sealing rubber strip waterproof.
Corner brace connector 9 is fixed on using the form of being adjusted on wall face supporting frame 1a, can be docked according to 4 big minor adjustment of siding The integral smoothness of point position and siding 4.
Embodiment 1:
According to Fig. 1, Fig. 4, water tank 1 is provided with blowdown valve and is connect with total blown pipe 10, in nearly wall in rough house On ground, each adjusting lead screw 2 according to the requirement that can meet uniform force, installation respectively is fixed, then ground supports skeleton 1 It is sequentially connected to and is adjusted on lead screw 2 according to construction drawing, the height for adjusting lead screw 2 carries out water detection to ground support frame 1 Flat and level altitude is packed into header tank 5,5 interface of header tank point in the interlayer space that ground is formed with the height for adjusting lead screw 2 It is not connect with water pump 12,6 gap of connection water tank washes 11 water outlet of Su basins, the water and wash Su that 6 gap mouth of water tank overflows The waste water that basin 11 flows out is pooled to jointly in header tank 5, is drawn into water tank 6 by water pump 12 and is used as and rush closestool water, catchments It is additionally provided with gap 5b on case 5 to connect with total blown pipe 10, the water beyond header tank moisture storage capacity is discharged.
According to Fig. 1, Fig. 4, Fig. 7, water tank 6 can be perforated through siding 4 and be fixedly mounted on wall face supporting frame 1a, deposit The gap that water tank bottom plate 4 is provided with the water inlet pipe being connect with water pump 12 and is connect with header tank 5 on one side, toilet flushing tank 7 go out Water interface, tap water inlet pipe interface, tap interface design the suitable location in 6 other faces of water tank according to actual needs. 6 inner wall bottom of water tank is designed with polylith inclined plate(Two pieces or three pieces of inclined plates), one is reserved between two pieces of inclined plate 6g of setting The gap of set a distance, the gap of inclined plate 6g can allow 6 inside bottom of automatic flushing water tank during water flowing, guide water tank 6 Interior dirt focuses near the blowdown valve of 6 bottom of water tank.When opening blowdown valve 6c, flowing water itself strength is capable of washing 6 inside bottom sediment of water tank keeps the cleaning in water tank 6.6 bottom surface sewage draining exit of water tank is in inverted T-shaped structure, and inside The inclined-planes Liang Kuai top in side keeps certain distance.
According to Fig.2, described to have waterproof layer 3b in each piece of floor tile 3, it is additionally provided with guiding gutter 8 at abutment joint, leads Sink 8 is connect with total blown pipe 10.
According to fig. 3, shown in Fig. 5, Fig. 6, it is two kinds of installation forms of single-sided structure and two-sided structure that wall face supporting frame 1a, which is divided to, respectively The interface of a siding 4 is provided with 2-2.5 times of asymmetric groove, mating not with the use of corner brace connector 9 on wall face supporting frame 1a Symmetrical inlay card docking is fixed, and the deep groove alignment wide fixed edge in school up carries when installation, and lower mouth is close to wall face supporting frame 1a simultaneously, really It is scheduled on siding to be anchored to behind position while pressing down and school narrow side is buckled, mould proof, the dope filling in gap position of interface, Siding is detained after the corner brace fixation adhesive tape that checkpost customizes well up and down, wall face supporting frame 1a sticks double faced adhesive tape and does buffering and school flatness. The glue for removing gap position when dismounting, up carries while pulling outward.
As shown in figure 8, used in this application pair is opened integral circuitry system 13 and is respectively arranged in header tank 5 and water tank 6, Double integral circuitry systems 13 of opening are again provided with a connecting rod 13a by header tank 5 and water tank 6, respectively with header tank 5, water tank 6 Contact point is support, and connecting rod 13a can move up and down, and stretches out header tank 5,6 outer one end of water tank and first switch 13r and second and opens Close 13f connections, bottom is flat to be sleeved on equipped with balance beam 13b and locating rod 13e, float 13d on locating rod 13e, be used in combination one it is soft Property rope 13c is connect with the one end balance beam 13b, and the balance beam 13b other ends are located at one end in water tank 6 by stablizing with connecting rod 13a Bar 13g is connected and composed;The double buoyancy for opening integral circuitry system 13 using water being installed in water tank 6, rise to centainly when waterborne Highly, float 13d rises with flexible strand 13c, and flexible strand 13c stretches a balance beam 13b and promoted, and the balance beam 13b other ends are then Connecting rod 13a is driven to sink by stabiliser bar 13g, when connecting rod 13a is more than equalization point, connecting rod 13a leaves second switch 13f, breaks Switch power supply makes water pump 12 be stopped, and water tank 6 is declined with the underwater certain altitude float 13d that is down to, and makes balance beam 13b and company One end of bar 13a connections rises, and connecting rod 13a contact second switches 13f is powered, and water pump 12 carries out work of drawing water.In balance beam 13b There is a ball 13h that can pass through equalization point to be disconnected at outer masterpiece bottom, float 13d is avoided to make second to open due to the wave of horizontal plane Pass 13f is powered off and on damages immersible pump 12.
According to Fig.8, be installed in header tank 5 it is double open integral circuitry system 13, pass through cable 13p and water tank 6 On it is double open the connection of integral circuitry systems 13, when water is more in header tank 5, float 13d is using buoyancy floating, with flexible strand 13c, which rises, promotes balance beam 13b, is pressed downward by ball 13h with one end balance beam 13b that connecting rod 13a is connect by stabiliser bar 13g Firmly, it driving one end first switch 13r of connecting rod 13a to be lifted upwards, and first switch 13r is made to be closed, the work of water pump 12 is drawn water, when When water in header tank 5 is less, float 13d sinks, and ball 13h is rolled to this one end balance beam 13b of connection float 13d, is put down The wood 13b that weighs drives connecting rod 13a to sink, and the other end, which rises, forces the first switch 13r on connecting rod 13a to disconnect, and water pump 12 stops taking out Water conservancy project is made.
The header tank 5 is opened integral circuitry system 13 with double in water tank 6 and need to be cooperated with each other, and two double to open one Circuit system 13 is connected by cable 13p, is done dual fail-safe system as the work of immersible pump 12, is prevented unexpected generation of leaking electricity.It is flexible Rope 13c connections are stired and make muddy when can make the storage clear water of 6 internal upper part of water tank whithin a period of time will not be by secondary plus water.Header tank 5 First switch 13r only need to armature contact and fixed contact exchange other structures the same terms under, the suitable weight of equalization point Ball 13h offsets make the contact surface distance of switch 13r increase, and can make header tank 5, first switch 13r closures and immersible pump in this way 12 connections, first switch 13r are connected to the second switch 13f of water tank 6, and the second switch 13f of water tank 6 connects power supply electricity Source, material is thus formed an Automatic Control power-supply system, this mechanical structure is not easy to get rusty in a humid environment, corrosion resistant Erosion, low cost are durable.
Embodiment 2:According to Fig.9, in the case that accomodation ground and flooring maintain an equal level(Secondary decoration), first make One, work is onesize with ground, is highly the header tank of 150cm 5, and header tank interior design is in inverted T-shaped form, in header tank 5 Inside several support bracket 5a are installed, and make each 2 nest point position of adjusting lead screw respectively it is corresponding be equipped in babinet hold On weight holder 5a points, the both ends support bracket 5a and the upper and lower surfaces of header tank 5 are in close contact, and sewage draining exit are reserved, in babinet Certain altitude is equipped with gap 5b, and gap 5b is connect with total blown pipe 10, adjusts lead screw 2 and is fixedly mounted on holding for header tank 5 On the corresponding position of weight holder 5a.
Embodiment 3:According to Fig.10, bath wastewater using system when not used, each adjusting lead screw 2 according to can meet The requirement of uniform force, is fixed on ground respectively, while the 1a installations of wall face supporting frame are fixed, ground supports skeleton 1 according to construction drawing sequentially be connected to adjust lead screw 2 on, adjust adjust lead screw 2 height ground support frame 1 is carried out it is levelling And level altitude, floor tile 3 is installed again, when 3 gap filler of floor tile is divided into tamps twice, first time filler after first-class wall siding 4 The glue reserved is less than 3 surface of floor tile, 2-3 ㎜, and second of filler maintains an equal level with 3 surface of floor tile can.It can ward off in this way and exempt from glue Walk too soon with the not tight leak of 3 side bonds of floor tile.

Claims (6)

1. a kind of built-in integral vacuum toilet, it is characterised in that:Integral vacuum toilet includes floor tile(3), siding(4), ground supports Skeleton(1), wall face supporting frame(1a), bath wastewater using system and it is double open integral circuitry system constitute, wall face supporting frame(1a) To be divided to two kinds of single-sided structure or two-sided wall construction, ground supports skeleton(1)Pass through several adjusting lead screws(2)Installation is fixed respectively In on ground, several piece floor tile(3)It is laid with respectively and is mounted on ground supports skeleton(1)On, several piece siding(4)Installation is placed on wall Face supporting rack(1a)On, bath wastewater is positioned over ground supports skeleton using system(1)With ground or wall face supporting frame(1a) In interlayer space between wall;
Two pieces of floor tiles(3)Between or two pieces of sidings(4)Between connection be detachable;Every piece of floor tile(3)With ground Face support frame(1)Connection be detachably connected;Siding(4)With wall face supporting frame(1a)Connection uses and is detachably connected shape Formula;
Described pair is opened integral circuitry system(13)Bath wastewater is fitted to utilize in system, it is double to open integral circuitry system(13) By first switch(13r), second switch(13f)It is formed with automatic closing section is switched, first switch(13r)It is installed on header tank (5)On, second switch(13f)It is installed on water tank(6)On, connecting rod one end connects balance beam(13b), other end connection first opens It closes(13r)And second switch(13f), double to open integral circuitry system(13)It is connect with main power source;
It is described in each piece of ground floor tile(3)Have waterproof layer(3b), guiding gutter is additionally provided at abutment joint(8), and be coated with Double faced adhesive tape and water-proof sealing rubber strip.
2. built-in integral vacuum toilet according to claim 1, it is characterised in that:The adjusting lead screw(2)Stress can be met It is uniform to require support on the ground, adjust lead screw(2)With ground supports skeleton(1)The frame of composition connects.
3. built-in integral vacuum toilet according to claim 1, it is characterised in that:The bath wastewater utilizes the collection in system Water tank(5)One end passes through water pump(12)Connect water tank(6), header tank(5)Other end handle washes Su basins(11), drainpipe and bathing Enter header tank by being connected after double medium filtration floor drain with water(5).
4. built-in integral vacuum toilet according to claim 1, it is characterised in that:Described pair is opened integral circuitry system(13)By Header tank(5)And water tank(6)It is again provided with a connecting rod(13a), respectively with header tank(5), water tank(6)Contact point be branch Support, connecting rod(13a)It can move up and down, stretch out header tank(5), water tank(6)Outer one end and first switch(13r)And second switch (13f)Connection, bottom is flat to be equipped with balance beam(13b)And locating rod(13e), float(13d)It is sleeved on locating rod(13e)On, and With a flexible strand(13c)With balance beam(13b)One end connects, balance beam(13b)The other end and connecting rod(13a)Positioned at water tank (6)Interior one end is by stabiliser bar(13g)Connection.
5. built-in integral vacuum toilet according to claim 1, it is characterised in that:The floor tile(3)And siding(4)Using Detachable form is made in water-proof sheet material.
6. built-in integral vacuum toilet according to claim 1, it is characterised in that:Several sidings(4)Connected by corner brace Fitting(9)It detains build-in and schedules support frame(1)On, and application double faced adhesive tape and water-proof sealing rubber strip.
CN201510960299.XA 2015-05-29 2015-12-21 A kind of built-in integral vacuum toilet Active CN105587137B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510960299.XA CN105587137B (en) 2015-05-29 2015-12-21 A kind of built-in integral vacuum toilet

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201510284990 2015-05-29
CN2015102849900 2015-05-29
CN201510960299.XA CN105587137B (en) 2015-05-29 2015-12-21 A kind of built-in integral vacuum toilet

Publications (2)

Publication Number Publication Date
CN105587137A CN105587137A (en) 2016-05-18
CN105587137B true CN105587137B (en) 2018-08-31

Family

ID=55927018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510960299.XA Active CN105587137B (en) 2015-05-29 2015-12-21 A kind of built-in integral vacuum toilet

Country Status (1)

Country Link
CN (1) CN105587137B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284541A (en) * 2015-06-09 2017-01-04 姜成华 Family domestic sewage reclamation set
CN106760374B (en) * 2017-03-20 2022-05-31 李西安 Split combined type chassis system
CN107476396A (en) * 2017-08-08 2017-12-15 黄裕华 A kind of family expenses caisson type toilet is flushed the toilet energy saver

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2328742Y (en) * 1998-03-18 1999-07-14 曹云平 Multifunctional integrated toilet
CN2594332Y (en) * 2003-01-08 2003-12-24 苗延福 Wast water recovery utilizing devices
CN101280632A (en) * 2008-05-26 2008-10-08 段云平 Combined type integral toilet with full-automatic intermediate water apparatus
CN201802088U (en) * 2010-08-07 2011-04-20 鸡西市健鑫农业科技开发有限公司 Combined type integral washroom
CN203783097U (en) * 2013-10-23 2014-08-20 苏州金螳螂建筑装饰股份有限公司 Integrated bathroom ground
CN204645732U (en) * 2015-05-29 2015-09-16 杨振宇 A kind of in-built integral vacuum toilet

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2328742Y (en) * 1998-03-18 1999-07-14 曹云平 Multifunctional integrated toilet
CN2594332Y (en) * 2003-01-08 2003-12-24 苗延福 Wast water recovery utilizing devices
CN101280632A (en) * 2008-05-26 2008-10-08 段云平 Combined type integral toilet with full-automatic intermediate water apparatus
CN201802088U (en) * 2010-08-07 2011-04-20 鸡西市健鑫农业科技开发有限公司 Combined type integral washroom
CN203783097U (en) * 2013-10-23 2014-08-20 苏州金螳螂建筑装饰股份有限公司 Integrated bathroom ground
CN204645732U (en) * 2015-05-29 2015-09-16 杨振宇 A kind of in-built integral vacuum toilet

Also Published As

Publication number Publication date
CN105587137A (en) 2016-05-18

Similar Documents

Publication Publication Date Title
CN105587137B (en) A kind of built-in integral vacuum toilet
CN106049903A (en) Assembled bathroom and construction method for same
CN204645732U (en) A kind of in-built integral vacuum toilet
CN208009524U (en) Water water storage, treatment for reuse and exhaust system in a kind of side-stand type for toilet
WO2016107376A1 (en) Waterproof, deodorant and leak-proof integrated toilet
CN105604290A (en) Split type waterproof bottom case
CN206189912U (en) Bathroom bottom plate
CN201428178Y (en) Settlement water-saving toilet
CN217574690U (en) Artistic waterscape modeling structure
CN1445419A (en) Water saving equipment and its system by reusing filtered waste water collected in multi-function and all-directions
CN104612219B (en) Automatic reuse system of intermediate water
CN201362875Y (en) Sedimentation water collecting maintenance type toilet
CN206599955U (en) A kind of modular bathroom floor
CN204960228U (en) Integrated bathroom bottom plate
CN205857814U (en) A kind of assembled toilet
CN206189909U (en) Bathroom room
CN106013566A (en) Assembled type bathroom floor slab and construction method
CN109707185A (en) The blank integrated bathroom of inner wall provided pipe line groove hole
CN206329067U (en) A kind of bathing room
CN206616888U (en) A kind of bathing room
CN207959332U (en) A kind of building water supply and drainage system
CN206189916U (en) Bathroom room
CN115596162A (en) Automatic collecting and lifting type waterproof device or technology for leakage water
CN206189908U (en) Bathroom room
CN219280830U (en) Washbowl wall drainage structures

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20161117

Address after: The information industry base in Yunnan province 650000 city of Kunming economic and Technological Development Zone 7-3 plots Jingyuan residential building 13 yuan blue No. 1003

Applicant after: YUNNAN ZHENSHU TECHNOLOGY CO.,LTD.

Address before: 650000 Yunnan city of Kunming province du area small town Fenglin spectacular case

Applicant before: Yang Zhenyu

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220919

Address after: 650000 No. 704, unit 1, building 7, group 1, Xinying community, Panlong District, Kunming City, Yunnan Province

Patentee after: Li Yanhua

Address before: No. 1003, Building 13, Lanyuan Jingyuan Residential Community, Plot No. 7-3, Information Industry Base, Economic and Technological Development Zone, Kunming City, Yunnan Province, 650000

Patentee before: YUNNAN ZHENSHU TECHNOLOGY CO.,LTD.