CN101250892A CNA2008101035360A CN200810103536A CN101250892A CN 101250892 A CN101250892 A CN 101250892A CN A2008101035360 A CNA2008101035360 A CN A2008101035360A CN 200810103536 A CN200810103536 A CN 200810103536A CN 101250892 A CN101250892 A CN 101250892A
Authority
CN
China
Prior art keywords
sanitary equipment
post leg
steel plate
partition wall
mount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008101035360A
Other languages
Chinese (zh)
Inventor
杨军霞
刘晨
南海
沈庆华
曾琳
邢建仓
杨峻峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING URBAN CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
BEIJING URBAN CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING URBAN CONSTRUCTION ENGINEERING Co Ltd filed Critical BEIJING URBAN CONSTRUCTION ENGINEERING Co Ltd
Priority to CNA2008101035360A priority Critical patent/CN101250892A/en
Publication of CN101250892A publication Critical patent/CN101250892A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The invention relates to a light partition wall concealed installing sanitary appliance hanging garment device and a construction method, which comprises a column leg and a brace, and further comprise a column base and a hanging garment steel plate, wherein the bottom surface of the column is fixedly connected with the column base, the column base is fixedly connected with the top surface of a floor or a building structure on the floor through an expanding bolt or an embedded part, the column leg is equipped with an inner layer and an outer layer, the top portion and the middle and lower portions between the column legs are fixedly connected into a rectangular frame which is a sanitary appliance support by the brace, the hanging garment steel plate is fixedly connected with a position of the outer surface of the outer layer column leg, where is equipped with a sanitary appliance, the sanitary appliance is hung and is arranged on the outer surface of a light partition wall through a mounting hole or a bolt which is arranged on the hanging garment steel plate. The light partition wall concealed installing sanitary appliance hanging garment device solves a practical problem of hanging and arranging the sanitary appliance on the light partition wall in a prior same layer drainage system, is a device which snugly arranges the sanitary appliance, and further improves and supplements the construction method.

Description

Light separating-wall hidden installation sanitary equipment hanging device and job practices
Technical field
The present invention relates to sanitary equipment hanging device and job practices in a kind of light partition wall Homofloor drainage system.
Background technology
Co-layer draining as the term suggests in other words drainage problem solve at this layer, branch drain is passing through floors not, links to each other with soil stack in same floor, certain soil stack still connects each layer.The wall drainage system is a kind of Homofloor drainage system, it is made in dewatering horizontal tube in the wall, various sanitaryware all adopt the side drainage pattern, also can be described as the concealed type installation system, it is that bathroom accessory system is incorporated in the body of wall, and the concealed type support is set in body of wall, and draining and feedwater piping also are arranged in the concealed type support, and fully fixing with support, sanitary apparatus also directly and support fix.Elder generation's mounting bracket fixes a drainpipe and feedwater piping again during installation, and installation surface ornament materials and sanitary apparatus install then, reveal bright part and have only sanitary apparatus body and water distribution tap, give clean and tidy, clean sensation.
It is to install on blockwork and shear wall substantially that present Homofloor drainage system mounts sanitary equipment, support is a single row configuration, on body of wall, take root or take root jointly at body of wall and ground, the most frequently used atlas can be with reference to the 124th page of national building standard 03SS408 " dwelling house kitchen, defend water supply and sewerage pipeline install ", the concealed water tank full-page proof of Du Feisi, this atlas is not suitable for the installation of light partition wall Homofloor drainage system sanitary equipment.
Summary of the invention
The object of the present invention is to provide a kind of light separating-wall hidden installation sanitary equipment hanging device and job practices, it has solved the practical problem that mounts sanitary equipment in the present Homofloor drainage system on light partition wall, is that concealed type is installed the device of sanitary equipment and further improving and replenishing of job practices.
The object of the present invention is achieved like this:
A kind of light separating-wall hidden installation sanitary equipment hanging device, it comprises: the post leg, stull, it also comprises: suspension column mounts steel plate; Post leg bottom surface is connected with suspension column, suspension column is fixedlyed connected with bloated bolt or built-in fitting with the building structure plate top surface on flooring or ground, the post leg is by inside and outside two-layer setting, be fixedly connected into rectangular frame at top and middle and lower part with stull between the post leg, be the sanitary equipment support, mounting the external surface that steel plate is fixed in outer post leg installs on the position of sanitary equipment, mount and be welded with the bolt that mounts sanitary equipment on the steel plate or have the installing hole supporting with sanitary equipment, sanitary equipment are mounted on the light partition wall outside via the installing hole or the bolt that mount on the steel plate.
It also comprises bearing diagonal; Outer post leg is higher than internal layer post leg, and outer post leg top is affixed with bearing diagonal and internal layer post leg, and the angle of bearing diagonal and ground line is not less than 45 °, and two sides of sanitary equipment support respectively are provided with 1 bearing diagonal.Described sanitary equipment are lavatory pan and cistern thereof, cistern is a flat pattern, supporting use finished product support of while, cistern fixedly is positioned in the prefabricated groove in finished product support top, finished product support outside is outsourcing sanitary equipment support again, and welding is fixed between two stands, and pad is not less than 5 points, last 1 point, about each 2 point.Described mount on the steel plate 2-4 of welding mount the bolt of sanitary equipment or have 2-4 with the supporting installing hole of sanitary equipment, the described steel plate thickness that mounts is not less than 8mm, requires undersized to lean on the size of wall side in sanitary equipment;
Light separating-wall hidden installation sanitary equipment mounts job practices, construction successively according to the following steps,
A. each component processing of sanitary equipment support
Each parts of sanitary equipment support include: the post leg, and stull, suspension column mounts steel plate, and bearing diagonal is selected materials earlier, blanking, the brush rustproof paint is transported to the erecting bed again;
B., suspension column, post leg are installed
Post leg bottom surface is connected with suspension column, suspension column is fixedlyed connected with bloated bolt or built-in fitting with the building structure plate top surface on flooring or ground, post leg and suspension column are by inside and outside two-layer setting, and outer post leg is concordant with the light partition wall keel outside with suspension column, and internal layer post leg and suspension column are in light partition wall;
C., stull is installed, the installation bearing diagonal of bearing diagonal is arranged
Be fixedly connected into rectangular frame at top and middle and lower part with stull between the post leg, be the sanitary equipment support, the sanitary equipment support all is positioned in the light partition wall, for concealed type is installed,
Outer post leg is higher than internal layer post leg, and affixed mutually with bearing diagonal between outer post leg top and internal layer post leg, the angle of bearing diagonal and ground line is not less than 45 °, and two sides of sanitary equipment support respectively are provided with 1 bearing diagonal;
D. whether the field trial firmness is qualified
Check solder joint and tie point, on the sanitary equipment support, mount approachingly,, and apply dynamic loading, simulate its maximum load state, the defective step a that returns of firmness, the qualified next step that carries out greater than the weight of sanitary equipment weight with the sanitary equipment size;
E., sanitary equipment are installed are mounted a stull
On near sanitary equipment mount a position the outer post leg stull can be installed separately again;
F. pour into a mould alley
The foot of a wall place, light partition wall medial and lateral concrete pouring alley on the building structure plate top surface is highly looked the buildings waterproof requirement for height, generally is not less than 15cm, and inside and outside layer post leg bottom and suspension column together are poured into alley;
G. install and mount steel plate
Mounting the external surface that steel plate is fixed in outer post leg installs on the position of sanitary equipment, mounting on the steel plate 2-4 of welding mounts the bolt of sanitary equipment or has the installing hole supporting with sanitary equipment, mount steel plate thickness and be not less than 8mm, can not surpass final decorated wall surface, require undersized in the size of sanitary equipment by the wall side;
Water closet or washbowl might cause the displacement of sanitary equipment because of human factor, and fixedly water closet or washbowl and the stressed strong point set up is the dynamic load stress point are installed at the dynamic load stress point and mounted steel plate.
H. anticorrosive construction
Pad brush rustproof paint falls the lacquer place individually and mends the brush rustproof paint.
I. metope shrouding
Light partition wall exposes except that mounting steel plate, and other surface location is all sealed with the light partition wall panel, and the light partition wall panel can be gypsum plank;
J. light partition wall surface construction
But the partition wall panel outside swabbing or the subsides ceramic tile of plastering carry out wall decoration, and coating is epoxy coating preferably, and at gypsum plank outside round brush, its surface is irregular fine granularity;
K. mount sanitary equipment
Sanitary equipment are mounted on the light partition wall outside via the installing hole or the bolt that mount on the steel plate.
The present invention has following advantage and good effect:
Prior art is not suitable for concealed type installation sanitary equipment on light partition wall, the invention solves this problem, can reach desirable installation effect.The present invention has successfully realized mounting sanitary equipment on light partition wall, and has prevented the cracking and the distortion of body of wall, and sanitary equipment mount firmly, and give sensation clean and tidy, clean, attractive in appearance, have realized good effect.
The stressed of sanitary equipment of the present invention born by support fully, do not rely on light partition wall stressed.The sanitary equipment support is taken root on ground, be provided with double suspension column and post leg, suspension column firmly is connected with bolt or built-in fitting with ground, formation is fulcrum with the mixed lateral column leg, distance between the double pillar leg is the stress of the arm of force, the moment that the performance of columnae medialis leg is bigger, the moment that balance sanitary equipment and dynamic loading produce reaches stable firm again effect.
Description of drawings
Fig. 1 is a construction technology process block diagram of the present invention;
Fig. 2 is a sanitary equipment support plan view;
Fig. 3 is a sanitary equipment support front elevation drawing;
Fig. 4 is a sanitary equipment support right view;
Fig. 5 is that water closet mounts the steel plate installation drawing;
Fig. 6 is that washbowl mounts the steel plate installation drawing;
Fig. 7 is that water closet and tank bracket mount front elevational view;
Fig. 8 is that water closet and tank bracket mount sectional side view;
Fig. 9 is that the urinal support mounts sectional side view;
Figure 10 is that the washbowl support mounts sectional side view;
Figure 11 is that another washbowl support mounts sectional side view.
The specific embodiment
Describe the present invention in detail below in conjunction with drawings and Examples.Drawing reference numeral is as follows among the figure: sanitary equipment support 1, sanitary equipment 2, building structure plate 3, bloated bolt 4, built-in fitting 5, finished product support 6; Post leg 101, suspension column 102, stull 103 mounts steel plate 104; Installing hole or bolt 104A, bearing diagonal 105, water closet 201A and water tank 201B, washbowl 202, urinal 203, light partition wall panel 7.
Light partition wall sanitary equipment support can only be taken root with ground, and the position of not taking root on body of wall need process, install the support that is independent of outside the stressed system of light partition wall voluntarily.The present invention is distributed to and body of wall independently on the shape steel bracket sanitary equipment are stressed, reaches sanitary equipment and mounts and the body of wall state of relative isolation mutually, has both embodied the advantage of the construction of light partition wall, has satisfied the requirement that sanitary equipment mount again.
The independent system rack form needs selected earlier and calculated load, and qualified through the field trial firmness, and its relative dimensions requirement is: water closet adopts 50 * 5 square steel, and face and urinal adopt 40 * 4 angle steel.Installation, affixed mode are generally welding, also can be bolt and connect.
Water closet and cistern thereof are the sanitary equipment that the finished product support is arranged, need seal reinforcement at finished product support external application shape steel bracket, necessary bearing diagonal is set, the size of bearing diagonal mostly is 40 * 4 angle steel, and be not less than 45 ° with the angle of ground line, mount on the body of wall contact surface welding at sanitary equipment and mount steel plate, satisfy the extruding of dynamic load body of wall.
Washbowl, urinal are the sanitary equipment of no finished product support, need installation and processing shape steel bracket voluntarily, and necessary bearing diagonal is set, and satisfy the force request that sanitary equipment mount, and add to weld on dynamic load sanitary equipment and body of wall contact surface and mount steel plate, satisfy the extruding of dynamic load to body of wall.
Sanitary equipment support 1 comprises: post leg 101, and stull 103, suspension column 102 mounts steel plate 104 and bearing diagonal 105;
Stressed transferring structure:
Sanitary equipment 2-→ finished product support 6 (notes have only water closet and cistern thereof that the finished product support is arranged)-→ installing hole or bolt 104A-→ sanitary equipment support 1 include: mount steel plate 104, bearing diagonal 105 (annotate and also can not do bearing diagonal), stull 103, post leg 101, suspension column 102}-→ bolt 4 or built-in fitting 5-→ building structure plate 3 expand.
Embodiment 1: water closet and cistern hanging device and job practices
As Fig. 7, shown in Figure 8: water closet and cistern thereof are the sanitary equipment that finished product support 6 is arranged, the finished product support can be purchased with sanitary equipment and sell, for with water closet and the supporting rectangular planes steel bracket of cistern thereof, water tank fixedly is positioned on its top, the water closet position also has crossbeam one.
Sanitary equipment support 1 comprises: 102,1 of 103,4 suspension columns of 101,4 stulls of 4 post legs mount 104,2 bearing diagonals 105 of steel plate;
Post leg bottom surface is welded with suspension column, suspension column is fixedlyed connected with bloated bolt 4 or built-in fitting 5 with building structure plate 3 end faces on flooring or ground, the post leg is by inside and outside two-layer setting, and outer post leg is concordant with the light partition wall keel outside with suspension column, and internal layer post leg and suspension column are in light partition wall; Outer post leg and finished product support are at grade, outside the finished product support, the side is sealed reinforcement with 2 outer post legs and end face with 1 stull, outer post leg is higher than internal layer post leg, weld with bearing diagonal and internal layer post leg on outer post leg top, be welded into rectangular frame with 3 stulls between inside and outside two-layer post leg, become sanitary equipment support 1, the sanitary equipment support all is positioned in the light partition wall, for concealed type is installed, the foot of a wall place, light partition wall medial and lateral on the building structure plate top surface together is poured into alley with the alley of concrete pouring certain altitude with inside and outside layer post leg bottom and suspension column; Cistern is an outsourcing piece, flat pattern, the matching used finished product support of outsourcing simultaneously, cistern is positioned in the prefabricated groove in finished product support top, finished product support outside is outsourcing sanitary equipment support again, welding is fixed between two stands, and pad is not less than 5 points, last 1 point, about each 2 point, mount the external surface that steel plate is welded on outer post leg and install on the position of water closet, mount and have installing hole or the weld bolt 104A supporting, anticorrosive construction on the steel plate with water closet 201A, light partition wall exposes except that mounting steel plate, other surface location is all sealed with the light partition wall panel, and the light partition wall panel can be gypsum plank, also can plaster and paste the further surface layer processing of ceramic tile in partition wall panel outside; Water closet is mounted on the light partition wall outside via the installing hole or the bolt that mount on the steel plate.
Embodiment 2: washbowl, urinal hanging device and job practices
As Fig. 9, shown in Figure 10: washbowl, urinal are the sanitary equipment of no finished product support, and this device comprises: 102,1 of 103,4 suspension columns of 101,4 stulls of 4 post legs mount 104,2 bearing diagonals 105 of steel plate; Post leg bottom surface is welded with suspension column, suspension column is fixedlyed connected with bloated bolt 4 or built-in fitting 5 with building structure plate 3 end faces on flooring or ground, the post leg is by inside and outside two-layer setting, weld with 4 stulls at end face between the post leg, become rectangular frame, be sanitary equipment support 1, mount the external surface that steel plate is welded on outer post leg and install on the position of washbowl or urinal, mount and have on the steel plate and washbowl or supporting installing hole or the weld bolt 104A of urinal, washbowl or urinal are positioned on the sanitary equipment support with bolt or installing hole.
Embodiment 3: another kind of washbowl hanging device and job practices
As shown in figure 11: sanitary equipment support 1 is pure rectangular box, and this device comprises: 102,1 of 103,4 suspension columns of 101,4 stulls of 4 post legs mount steel plate 104, do not establish bearing diagonal 105.
Draining and the feedwater piping supporting with sanitary equipment are installed as prior art, sanitary equipment support and finished product support are installed are installed afterwards, repeat no more.

Claims (5)

1. light separating-wall hidden installation sanitary equipment hanging device, it comprises: the post leg, stull is characterized in that: it also comprises: suspension column mounts steel plate; Post leg bottom surface is connected with suspension column, suspension column is fixedlyed connected with bloated bolt or built-in fitting with the building structure plate top surface on flooring or ground, the post leg is by inside and outside two-layer setting, be fixedly connected into rectangular frame at top and middle and lower part with stull between the post leg, be the sanitary equipment support, mounting the external surface that steel plate is fixed in outer post leg installs on the position of sanitary equipment, mount and be welded with the bolt that mounts sanitary equipment on the steel plate or have the installing hole supporting with sanitary equipment, sanitary equipment are mounted on the light partition wall outside via the installing hole or the bolt that mount on the steel plate.
2. light separating-wall hidden installation sanitary equipment hanging device according to claim 1 is characterized in that: it also comprises bearing diagonal; Outer post leg is higher than internal layer post leg, and outer post leg top is affixed with bearing diagonal and internal layer post leg, and the angle of bearing diagonal and ground line is not less than 45 °, and two sides of sanitary equipment support respectively are provided with 1 bearing diagonal.
3. light separating-wall hidden installation sanitary equipment hanging device according to claim 1 and 2, it is characterized in that: described sanitary equipment are lavatory pan and cistern thereof, cistern is a flat pattern, supporting use finished product support of while, cistern fixedly is positioned in the prefabricated groove in finished product support top, and finished product support outside is outsourcing sanitary equipment support again, welding is fixing between two stands, and pad is not less than 5 points, last 1 point, about each 2 point.
4. light separating-wall hidden installation sanitary equipment hanging device according to claim 1, it is characterized in that: described mount on the steel plate 2-4 of welding mount the bolt of sanitary equipment or have 2-4 with the supporting installing hole of sanitary equipment, the described steel plate thickness that mounts is not less than 8mm, requires undersized in the size of sanitary equipment by the wall side;
5. mount job practices as claim 1 or 2 or 3 described light separating-wall hidden installation sanitary equipments, it is characterized in that: construction successively according to the following steps,
A. each component processing of sanitary equipment support
Each parts of sanitary equipment support include: the post leg, and stull, suspension column mounts steel plate, and bearing diagonal is selected materials earlier, blanking, the brush rustproof paint is transported to the erecting bed again;
B., suspension column, post leg are installed
Post leg bottom surface is connected with suspension column, suspension column is fixedlyed connected with bloated bolt or built-in fitting with the building structure plate top surface on flooring or ground, post leg and suspension column are by inside and outside two-layer setting, and outer post leg is concordant with the light partition wall keel outside with suspension column, and internal layer post leg and suspension column are in light partition wall;
C., stull is installed, the installation bearing diagonal of bearing diagonal is arranged
Be fixedly connected into rectangular frame at top and middle and lower part with stull between the post leg, be the sanitary equipment support, the sanitary equipment support all is positioned in the light partition wall, for concealed type is installed,
Outer post leg is higher than internal layer post leg, and affixed mutually with bearing diagonal between outer post leg top and internal layer post leg, the angle of bearing diagonal and ground line is not less than 45 °, and two sides of sanitary equipment support respectively are provided with 1 bearing diagonal;
D. whether the field trial firmness is qualified
Check solder joint and tie point, on the sanitary equipment support, mount approachingly that greater than the weight of sanitary equipment weight, and it is severe to apply dynamic load, simulates its maximum load state, the defective step a that returns of firmness, the qualified next step that carries out with the sanitary equipment size;
E., sanitary equipment are installed are mounted a stull
On near sanitary equipment mount a position the outer post leg stull can be installed separately again;
F. pour into a mould alley
The foot of a wall place, light partition wall medial and lateral concrete pouring alley on the building structure plate top surface is highly looked the buildings waterproof requirement for height, generally is not less than 15cm, and inside and outside layer post leg bottom and suspension column together are poured into alley;
G. install and mount steel plate
Mounting the external surface that steel plate is fixed in outer post leg installs on the position of sanitary equipment, mounting on the steel plate 2-4 of welding mounts the bolt of sanitary equipment or has the installing hole supporting with sanitary equipment, mount steel plate thickness and be not less than 8mm, can not surpass final decorated wall surface, require undersized in the size of sanitary equipment by the wall side;
Water closet or washbowl might cause the displacement of sanitary equipment because of human factor, and fixedly water closet or washbowl and the stressed strong point set up is the dynamic load stress point are installed at the dynamic load stress point and mounted steel plate.
H. anticorrosive construction
Pad brush rustproof paint falls the lacquer place individually and mends the brush rustproof paint.
I. metope shrouding
Light partition wall exposes except that mounting steel plate, and other surface location is all sealed with the light partition wall panel, and the light partition wall panel can be gypsum plank;
J. light partition wall surface construction
But the partition wall panel outside swabbing or the subsides ceramic tile of plastering carry out wall decoration, and coating is epoxy coating preferably, and at gypsum plank outside round brush, its surface is irregular fine granularity;
K. mount sanitary equipment
Sanitary equipment are mounted on the light partition wall outside via the installing hole or the bolt that mount on the steel plate.
CNA2008101035360A 2008-04-08 2008-04-08 Hanging device and construction method for light separating-wall hidden installation sanitary equipment Pending CN101250892A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008101035360A CN101250892A (en) 2008-04-08 2008-04-08 Hanging device and construction method for light separating-wall hidden installation sanitary equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008101035360A CN101250892A (en) 2008-04-08 2008-04-08 Hanging device and construction method for light separating-wall hidden installation sanitary equipment

Publications (1)

Publication Number Publication Date
CN101250892A true CN101250892A (en) 2008-08-27

Family

ID=39954473

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008101035360A Pending CN101250892A (en) 2008-04-08 2008-04-08 Hanging device and construction method for light separating-wall hidden installation sanitary equipment

Country Status (1)

Country Link
CN (1) CN101250892A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102191802A (en) * 2010-03-16 2011-09-21 莱克德利五金股份公司 Frame for fixing sanitary fixtures to a wall
CN107724494A (en) * 2017-11-07 2018-02-23 中建局集团建设发展有限公司 Electromechanical module pin-connected panel toilet system and its construction method
CN114326870A (en) * 2021-11-10 2022-04-12 江苏华洋新思路能源装备股份有限公司 Adjustable hot water flow testing arrangement

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102191802A (en) * 2010-03-16 2011-09-21 莱克德利五金股份公司 Frame for fixing sanitary fixtures to a wall
CN107724494A (en) * 2017-11-07 2018-02-23 中建局集团建设发展有限公司 Electromechanical module pin-connected panel toilet system and its construction method
CN107724494B (en) * 2017-11-07 2023-10-24 中建一局集团建设发展有限公司 Electromechanical modularized assembled toilet system and construction method thereof
CN114326870A (en) * 2021-11-10 2022-04-12 江苏华洋新思路能源装备股份有限公司 Adjustable hot water flow testing arrangement

Similar Documents

Publication Publication Date Title
CN104712151A (en) Unit bathroom
CN101250892A (en) Hanging device and construction method for light separating-wall hidden installation sanitary equipment
CN204531496U (en) A kind of integral bathroom
CN102230339A (en) Prefabricated kitchen and construction and installation method thereof
CN104727395A (en) Integrated bathroom
CN204645720U (en) A kind of integral bathroom
CN104746902A (en) Integral bathroom
CN104712152A (en) Unit bathroom
CN102777032A (en) Installation method of prefabricated toilet
CN111794451A (en) Eave structure
CN104763176A (en) Integrated bathroom
CN204492245U (en) A kind of integral bathroom
CN204492243U (en) A kind of integral bathroom
CN204510897U (en) A kind of integral bathroom
CN204492247U (en) A kind of integral bathroom
CN204510909U (en) A kind of integral bathroom
CN204627034U (en) A kind of integral bathroom
CN212478293U (en) Eave structure
CN204510911U (en) A kind of integral bathroom
CN204492253U (en) A kind of integral bathroom
CN204510898U (en) A kind of integral bathroom
CN204492242U (en) A kind of integral bathroom
CN204510912U (en) A kind of integral bathroom
CN204645719U (en) A kind of integral bathroom
CN102777033A (en) Method for mounting prefabricated kitchen

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication