CN104790472B - Same floor drainage structure of toilet - Google Patents

Same floor drainage structure of toilet Download PDF

Info

Publication number
CN104790472B
CN104790472B CN201510155002.2A CN201510155002A CN104790472B CN 104790472 B CN104790472 B CN 104790472B CN 201510155002 A CN201510155002 A CN 201510155002A CN 104790472 B CN104790472 B CN 104790472B
Authority
CN
China
Prior art keywords
floor drain
toilet
layer
wall
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510155002.2A
Other languages
Chinese (zh)
Other versions
CN104790472A (en
Inventor
张道真
黄瑞言
陈高杨
江为文
叶佳
肖东燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Pengqing Architecture And Planning Design Co ltd
Original Assignee
SHENZHEN TSINGHUA-YUAN ARCHITECTURAL DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN TSINGHUA-YUAN ARCHITECTURAL DESIGN Co Ltd filed Critical SHENZHEN TSINGHUA-YUAN ARCHITECTURAL DESIGN Co Ltd
Priority to CN201510155002.2A priority Critical patent/CN104790472B/en
Publication of CN104790472A publication Critical patent/CN104790472A/en
Application granted granted Critical
Publication of CN104790472B publication Critical patent/CN104790472B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/12Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
    • E03C1/122Pipe-line systems for waste water in building
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/0407Floor drains for indoor use

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Sink And Installation For Waste Water (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)
  • Floor Finish (AREA)

Abstract

The invention discloses a same floor drainage structure of a toilet. The structure comprises a wall-mounted sanitary appliance and a multi-channel floor drain, wherein a half platform is arranged on a wall provided with the wall-mounted sanitary appliance and is formed by arranging a thin and waterproof polymer rubber powder cement mortar layer outside a waterproof plate and bonding tiles in a full mortar manner, and transverse water supply and drainage pipes of the wall-mounted sanitary appliance are arranged in the half platform; a sunk groove is formed in a floor of the toilet, a transverse water drainage pipe connected with the multi-channel floor drain is arranged in the sunk groove, and the transverse water drainage pipe is connected to a vertical water drainage pipe. The structure is concise and attractive in design, dry operation is performed basically, the leakage risk is greatly reduced, the structure which cannot be maintained originally is convenient to maintain, effective utilization space is increased, and hygiene dead corners are reduced.

Description

A kind of toilet co-layer draining construction
Technical field
The invention belongs to technical field of buildings, more particularly, to a kind of toilet co-layer draining construction.
Background technology
Refuse, for solving lower floor resident family, the co-layer draining toilet that upper strata resident family enters the room maintenance and designs, have two kinds of forms; One is integrated bathroom, and two is subsided rest room.Integrated bathroom technical quality is high, but valency is high, and consumption is little;Also because Consumption does not increase, and valency just remains high, and ten several years, before being obstructed not.Subsided rest room is then defective because of specification, atlas, node Immature, whole wet trade, maintenance difficult, percolation ratio is high, and the problem brought is more than the problem solving, and enjoys and denounces.According to Wall-mounted sanitary equipment, can realize co-layer draining substantially, but floor drain setting is outstanding, therefore are not received by existing specification, atlas.
Content of the invention
The present invention provides a kind of new toilet co-layer draining construction, is not take up this layer of useful space, and does not affect lower floor Furred ceiling, during maintenance, destroys slight, easy and simple to handle, can preferably solve the problems, such as co-layer draining.
The present invention is realized by following technological means:
A kind of toilet co-layer draining construction, comprises wall-mounted sanitary equipment, is provided with setting half on the wall of wall-mounted sanitary equipment high Platform, half described plateau is completely starched stickup ceramics for splash guard peripheral hardware polymer glue powder cement waterproofing mortar thin layer and is formed, described The plumbing transverse tube of wall-mounted sanitary equipment is set in half plateau;Also contain multi-channel floor drain, setting on accomodation ground floor is sunk Groove, the dewatering horizontal tube that described multi-channel floor drain is connected is arranged in described sinking groove, and described dewatering horizontal tube is all connected to Soil stack.
Wherein, the height of described half plateau is 1.2m.Described wall-mounted sanitary equipment comprise heel row formula toilet seat and wall-mounted Hand basin, the water tank of heel row formula toilet seat and plumbing transverse tube are hidden in described half plateau, and the width of described half plateau is big In the width equal to described water tank.
Wherein, described splash guard forms for light steel keel gypsum board closing, and described plasterboard is waterproof gypsum board.
Wherein, described multi-channel floor drain is to have water seal direct burial floor drain, and material is high density polyethylene (HDPE).When described many Passage floor drain only connects shower or during bathtub draining, described multi-channel floor drain always high between 200mm-220mm, buried depth is between 250mm- 270mm, when described multi-channel floor drain connects shower or bathtub draining and washing machine drainage simultaneously, described multi-channel floor drain is always high Between 300mm-350mm, buried depth is between 350mm-400mm.Described bathtub or shower cabinet are raised 150mm and are installed, and bathtub Or the ground under shower cabinet arranges Polymer cement materials layer and sloping layer, the low spot of described sloping layer is attached in floor drain Closely, discharge opening is set and under bathtub shrouding or shower cabinet chassis.
Wherein, described accomodation ground slab thickness is not less than 100mm, and the depth of described sinking groove is less than or equal to lower floor The height of furred ceiling, described sinking groove is trapezoidal, elongated, the thick cement-based penetrant of painting 1.5mm in sinking groove wide at the top and narrow at the bottom Crystalline waterproof coating material.In described sinking groove, backfill premixing Ceramsite Concrete or cement and polystyrene form packed layer, look for slope to be not less than 5%, slope aspect floor drain;On described packed layer, the thick fiber waterproof mortar course of setting 20mm-25mm and the outer earth construction of groove are looked for Slope, upward slope, the gradient 2%, slope aspect sinking groove are put down in bottom.
The toilet co-layer draining construction of implementation above adopts heel row formula toilet seat and wall-mounted hand basin, in conventional water tank Form 1.2m plateau, interior hidden transverse tube and water tank in thickness range.The floor of floor drain position is declined grooving, groove depth controls In ceiling height.In multi-channel floor drain and its connection bathroom facilities dewatering horizontal tube hugging, after taking waterproof sealing backfill, complete water proof decorative Surface layer.Design succinct, attractive in appearance, substantially dry operation.The big fall of risk of leakage, change can not be keeped in repair for convenience of maintenance.Increase effectively utilizes Space, reduces corner or spot as yet untouched by a clean-up campaign.
Brief description
Fig. 1 is toilet integral planar schematic diagram;
Fig. 2 is toilet generalized section one;
Fig. 3 is toilet generalized section two.
Specific implementation process
Below with reference to accompanying drawing, the process that implements of the present invention is described in detail.
A kind of toilet co-layer draining construction, as shown in figure 1, comprising wall-mounted sanitary equipment, is provided with the wall of wall-mounted sanitary equipment Upper setting half plateau 1, described wall-mounted sanitary equipment comprise heel row formula toilet seat 2 and wall-mounted hand basin 3, in the present embodiment, half Plateau 1 is completely starched stickup ceramics for lightgage steel joist waterproof gypsum board peripheral hardware polymer glue powder cement waterproofing mortar thin layer and is formed.
Specifically, as shown in Figures 2 and 3, the water tank of described heel row formula toilet seat 2 and plumbing transverse tube 5 are hidden in In described half plateau, the height of described half plateau 1 is 1.2m, width is more than or equal to the width of described water tank.Heel row formula toilet seat Installation metallic framework, water tank, blow-off pipe be directly accessed soil stack, all carry out by professional requirement, soil stack should be arranged on In pipe well.
The accomodation ground floor moving towards position in multi-channel floor drain 4 and its dewatering horizontal tube sinks, formed as Fig. 2 and Sinking groove 6 shown in Fig. 3, the dewatering horizontal tube 7 that multi-channel floor drain 4 is connected is arranged in described sinking groove 6.
Described multi-channel floor drain 4 is to have water seal direct burial floor drain, and material is high density polyethylene (HDPE).As shown in Fig. 2 working as institute The multi-channel floor drain 4 stated only connects shower or during bathtub draining, described multi-channel floor drain always high between 200mm-220mm, buried depth is situated between In 250mm-270mm;As shown in figure 3, when described multi-channel floor drain 4 connects shower or bathtub draining and washing machine drainage, institute State multi-channel floor drain always high between 300mm-350mm, buried depth is between 350mm-400mm.Described bathtub or shower cabinet are raised 150mm installs.Before described bathtub or shower cabinet are installed, in the space that will be closed, carry out guarded drainage, as shown in figure 3, existing Ground setting Polymer cement materials layer 10 under bathtub or shower cabinet and sloping layer, the low spot of sloping layer is attached in floor drain Closely, and arrange under described bathtub or shower cabinet20mmx3mm discharge opening 11.
Described bathroom floor thickness is not less than 100mm, when such as from 200mm water seal direct burial multi-channel floor drain, sinks The depth of groove is 175mm, wide 275mm-175mm, is trapezoidal, elongated, the thick cement-based penetrant of interior painting 1.5mm wide at the top and narrow at the bottom Crystalline waterproof coating material, and vaporific maintenance 14 days, to ensure enough waterproof effects.
Backfill premixing Ceramsite Concrete or cement and polystyrene in described sinking groove, make real, form packed layer 9, the process of backfill Apply by the proportioning and engineering method of professional requirement.Slope is looked for be not less than 5%, slope aspect floor drain, is in outer low and inner high shape substantially;Packed layer 9 reaches To after design strength, the thicker fiber waterproof mortar compacting of laying 20mm-25mm is floating on described packed layer, and Cao Wai building Face structure looks for slope, and upward slope, the gradient 2%, sinking groove described in slope aspect are put down in bottom, and oleo stock compacting is floating.
Wherein, soil stack interface, bathroom facilities, hand basin draining housed joint mouth, in addition to being tightly connected by code requirement, seal Place all adds 50mm width import butyl sealant tightening seal with pressure.
Additionally, whole accomodation ground using 10mm-15mm thick fiber polymer cement mortar according to looking for slope line shown in Fig. 1 8 accurately look for slope levelling, and 3 thick polymer cement water-proof dry powder and mortar thin layers completely starch adhesive patch ship-and-galley tile.Resident family of lower floor installs During furred ceiling, furred ceiling anchor point should be arranged on groove bottom side outside floor and side wall on, install furred ceiling before, reply concrete defect adopt The embedding flat benefit of cement mortar is real.
In half plateau, the floor of hidden transverse tube and water tank, floor drain position declines grooving, multi-channel floor drain and its connection bath In tool dewatering horizontal tube hugging, after taking waterproof sealing backfill, complete water proof decorative surface layer, design succinct, attractive in appearance, substantially dry operation, The big fall of risk of leakage, change can not be keeped in repair for convenience of maintenance, and increases effectively utilizes space, reduces corner or spot as yet untouched by a clean-up campaign.

Claims (8)

1. a kind of toilet co-layer draining construction it is characterised in that: comprise wall-mounted sanitary equipment, be provided with the wall of wall-mounted sanitary equipment Half plateau is set, described half plateau completely starch stickup ceramics for splash guard peripheral hardware Polymer cement materials containing rubber powder thin layer and Become, the plumbing transverse tube of wall-mounted sanitary equipment is set in half described plateau;Also contain multi-channel floor drain, on accomodation ground floor Setting sinking groove, described sinking groove is that the floor of floor drain position declines the groove being formed, described multi-channel floor drain institute The dewatering horizontal tube connecting is arranged in described sinking groove, and described dewatering horizontal tube is all connected to soil stack, described multichannel ground Miss shower or bathtub draining, described bathtub or shower cabinet are raised 150mm and installed, and the ground under described bathtub or shower cabinet Face setting Polymer cement materials layer and sloping layer, the low spot of described sloping layer near floor drain, and bathtub shrouding or Discharge opening is set under shower cabinet chassis.
2. toilet co-layer draining according to claim 1 construction it is characterised in that: the height of described half plateau is 1.2m.
3. toilet co-layer draining according to claim 1 construction it is characterised in that: after described wall-mounted sanitary equipment comprise Row's formula toilet seat and wall-mounted hand basin, the water tank of heel row formula toilet seat and plumbing transverse tube are hidden in described half plateau, The width of described half plateau is more than or equal to the width of described water tank.
4. toilet co-layer draining according to claim 1 construction it is characterised in that: described splash guard is lightgage steel joist Plasterboard closing forms, and described plasterboard is waterproof gypsum board.
5. toilet co-layer draining according to claim 1 construction it is characterised in that: described multi-channel floor drain is to have water Envelope direct burial floor drain, material is high density polyethylene (HDPE).
6. toilet co-layer draining according to claim 5 construction it is characterised in that: when described multi-channel floor drain only connects Shower or during bathtub draining, described multi-channel floor drain always high between 200mm-220mm, buried depth between 250mm-270mm, when described Multi-channel floor drain connect shower or when bathtub draining and washing machine drainage simultaneously, described multi-channel floor drain always high between 300mm- 350mm, buried depth is between 350mm-400mm.
7. toilet co-layer draining according to claim 1 construction it is characterised in that: described accomodation ground slab thickness Not less than 100mm, the depth of described sinking groove is less than the height of lower floor's furred ceiling, and described sinking groove is ladder wide at the top and narrow at the bottom Shape, elongated, apply the thick cement-based capillary crystalline waterproof coating of 1.5mm in sinking groove.
8. toilet co-layer draining according to claim 1 construction it is characterised in that: in described sinking groove, backfill is pre- Mix Ceramsite Concrete or cement and polystyrene forms packed layer, look for slope to be not less than 5%, slope aspect floor drain;20mm- is arranged on described packed layer The thick fiber waterproof mortar course of 25mm and the outer earth construction of groove look for slope, and upward slope, the gradient 2%, slope aspect sinking groove are put down in bottom.
CN201510155002.2A 2015-04-02 2015-04-02 Same floor drainage structure of toilet Active CN104790472B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510155002.2A CN104790472B (en) 2015-04-02 2015-04-02 Same floor drainage structure of toilet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510155002.2A CN104790472B (en) 2015-04-02 2015-04-02 Same floor drainage structure of toilet

Publications (2)

Publication Number Publication Date
CN104790472A CN104790472A (en) 2015-07-22
CN104790472B true CN104790472B (en) 2017-02-01

Family

ID=53555619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510155002.2A Active CN104790472B (en) 2015-04-02 2015-04-02 Same floor drainage structure of toilet

Country Status (1)

Country Link
CN (1) CN104790472B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108798077A (en) * 2018-05-24 2018-11-13 重庆卓创国际工程设计有限公司 Toilet co-layer draining structural system
CN111173320A (en) * 2020-02-10 2020-05-19 殷志 Toilet with non-falling plate and same-layer drainage
CN113622486B (en) * 2021-08-19 2023-11-28 上海柏涛建筑设计咨询有限公司 Back checking type toilet water supply and drainage structure

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2228905A1 (en) * 1973-05-08 1974-12-06 Mauvais Claude Plumbing connection unit for home - has sheet metal external panels over foam core containing pipes and cables
DE2500889C3 (en) * 1975-01-10 1981-11-05 Mechel, Fridolin, Prof. Dr.rer.nat., 7031 Grafenau Wall element, especially for movable partition
DE50209748D1 (en) * 2001-03-02 2007-05-03 Geberit Technik Ag Support device for sanitary facilities
CN102127920A (en) * 2010-09-30 2011-07-20 广东联塑科技实业有限公司 Waterlogging draining method between floors
CN102767219A (en) * 2012-07-17 2012-11-07 陈金高 Same-floor water draining device
KR101404871B1 (en) * 2012-11-06 2014-06-09 송병진 Drainage System using the Wall of the Same Floor

Also Published As

Publication number Publication date
CN104790472A (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN104100011A (en) Toilet floor heating waterproof construction method and toilet floor heating waterproof system
CN112240108A (en) Construction method of assembly type building integrated bathroom system
CN208501802U (en) A kind of bathroom caisson internal drainage construction
CN104790472B (en) Same floor drainage structure of toilet
CN204435496U (en) A kind of building co-layer draining structure
CN203394108U (en) Fabricated bathroom
CN208668952U (en) A kind of kitchen drainage standpipe through-flooring structure
CN104278717A (en) Waterproof and drainage structure of sunken toilet
CN101392596A (en) Sinking toilet construction method
CN101881041B (en) Floor drain sunk same-layer drainage construction method
CN209585309U (en) Subsided rest room waterproof construction
CN102900144A (en) Undermining floor drain automatic drainage structure capable of preventing leakage of toilet
CN109779319A (en) A kind of co-layer draining blank precast block toilet of outer wall provided pipe line groove hole
CN104746902A (en) Integral bathroom
CN212561820U (en) Secondary floor drain connecting structure of sinking type toilet
TW451019B (en) Water-proof and damp-proof method for basement side wall
CN108661154A (en) Caisson type bathroom hidden pipe plant fermentation drain valve
CN203821521U (en) Soil stack connection piece for caisson type toilet
CN106703221A (en) Shower enclosure waterproof construction method
CN208380086U (en) A kind of toilet internal drainage standpipe through-flooring structure
CN206616888U (en) A kind of bathing room
CN207004112U (en) A kind of assembled toilet suitable for timber structure
CN215106940U (en) Prefabricated waterproof and drainage composite floor with integral assembly for bathroom and kitchen
CN220978680U (en) Prefabricated structure, prefabricated module, drainage system and building for same-layer drainage without lowering plate
CN206189908U (en) Bathroom room

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Zhang Daozhen

Inventor after: Huang Ruiyan

Inventor after: Chen Gaoyang

Inventor after: Jiang Weiwen

Inventor after: Ye Jia

Inventor after: Xiao Dongyan

Inventor before: Zhang Daozhen

Inventor before: Huang Ruiyan

Inventor before: Chen Gaoyang

Inventor before: Jiang Weiwen

Inventor before: Ye Jia

Inventor before: Xiao Dongyan

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20170928

Address after: 518000 Guangdong city of Shenzhen province Nanshan District City Guangdong Road residential building A (Shengdaji building) two to eight

Patentee after: SHENZHEN TSINGHUA-YUAN ARCHITECTURE AND PLANNING AND DESIGN RESEARCH CO.,LTD.

Address before: 518000 No. 106 Longcheng Road, Shenzhen, Guangdong, Nanshan District

Patentee before: SHENZHEN TSINGHUA-YUAN ARCHITECTURAL DESIGN Co.,Ltd.

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: 518000 floor 2-8, building a (shengdaji complex building), Yuehai residential community, Longcheng Road, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: Shenzhen Pengqing Architecture and Planning Design Co.,Ltd.

Address before: 518000 floor 2-8, building a (shengdaji complex building), Yuehai residential community, Longcheng Road, Nanshan District, Shenzhen City, Guangdong Province

Patentee before: SHENZHEN TSINGHUA-YUAN ARCHITECTURE AND PLANNING AND DESIGN RESEARCH CO.,LTD.

CP03 Change of name, title or address