CN206091001U - Assembled bathroom floor - Google Patents

Assembled bathroom floor Download PDF

Info

Publication number
CN206091001U
CN206091001U CN201620789138.9U CN201620789138U CN206091001U CN 206091001 U CN206091001 U CN 206091001U CN 201620789138 U CN201620789138 U CN 201620789138U CN 206091001 U CN206091001 U CN 206091001U
Authority
CN
China
Prior art keywords
floor
floor drain
layer
drain
bathroom floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620789138.9U
Other languages
Chinese (zh)
Inventor
吴明亮
黄卫苹
张菁
孙淳玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620789138.9U priority Critical patent/CN206091001U/en
Application granted granted Critical
Publication of CN206091001U publication Critical patent/CN206091001U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

The utility model provides an assembled bathroom floor, is equipped with built -in drainage system, including soil stack connection, floor drain, floor drain crossline setting pipe, the outlet of floor drain is passed through floor drain crossline setting pipe and is connected with the soil stack and links to each other, and the bathroom floor from top to bottom sets gradually surface course, surface course bond line, waterproof layer and structural layer. The above technical scheme is adopted in the utility model, rational in infrastructure, the cost is low, and the prefabricated bathroom of assembled can make on -the -spot or in advance, can adopt reverse construction method, and the construction realizes mechanized line production, and not high to constructor technical requirement, through simple processing, surface course and waterproof layer just can reach very good effect, adopt the jointly operation of terrace die and external mold, construction speed is very fast and construction quality is good, adopt with a layer drainage, with a layer drainage construction convenience, use health, house distinct property right, floor from top to bottom the interference less, drainage small in noise.

Description

A kind of assembled bathroom floor
Technical field:
The utility model belongs to assembled toilet technical field, and in particular to a kind of assembled bathroom floor.
Background technology:
Assembled toilet refers to the setting by factory at the scene such as base plate, wallboard, top board and pipeline, sanitary equipment of prefabrication Meter, the integral vacuum toilet being assembled.With the continuous development of society, assembled-type house has slowly become the master of dwelling construction Stream.Toilet, also can be by overall pre-production used as the requisite part of assembled-type house, then in-site installation again. All it is using first but at this stage whether the integral prefabricated boxlike of factory assembles toilet, or the toilet of site operation Casting concrete floor, then install or construct to complete the construction of accomodation ground.Toilet is completed after ground construction, or in work The integral prefabricated water-proof chassis of factory, the overall built on stilts local support in scene is installed;Or the levelling protective layer, anti-of mating formation successively of constructing at the scene Water layer and surface layer.The problem existed between conventional sanitation is the form of construction work mated formation successively for the technical requirements of workmen Higher, surface layer is difficult smooth, waterproof layer difficult treatment of mating formation.Because toilet arranges floor drain, the room gradient needs to meet Drainage requirement, the higher construction level of this kind of gradient construction requirement, and also speed of application is slow.In addition, present toilet is general Floor is passed through using the branch drain on interlayer draining, i.e. upper strata, downstairs one layer of top is connected to the pipeline of soil stack, and this makes The property right integrality shortage for obtaining privately owned house is defined, and drainage system passes through floor, also leaves hidden leakage defect, and may propagate disease Disease etc..The problem that the integral prefabricated boxlike assembling toilet of factory is present is that waterproof domain is necessarily mounted at casting concrete building On plate, clamped support point is adjusted to support by scene, prefabricated integral waterproofing chassis is overhead mounting means, and this causes following problem: One is that comfort is inadequate;Two is to need setting height(from bottom) 7-15cm, in order to ensure to flush with building ground, toilet building ground Face needs to drop plate process, and the space requirement for dropping plate does waterproof, while defining basin;Three is that boxlike toilet is not provided with itself Soil stack, soil stack is traditional structure, and the reliability of its connection is restricted;Four is the integral waterproofing of boxlike toilet There is the connection at the horizontally-arranged pipe of bathroom and scene and construction drainage pipe below domain, connection reliability is not high, human factor affects big, has Seepage is difficult to find and safeguards.
Utility model content:
The utility model is directed to the deficiencies in the prior art, there is provided a kind of assembled bathroom floor, rational in infrastructure, cost Low, it is integral prefabricated to realize bathroom floor, and work progress is simple, workmen's technical merit is required low, and speed of application is fast, Using co-layer draining, problems of the prior art are solved.
The utility model is that the technical scheme that solution above-mentioned technical problem is adopted is:
A kind of assembled bathroom floor, is provided with built-in drainage system, including soil stack connection, floor drain, floor drain are horizontally-arranged Pipe;The discharge outlet of floor drain is connected with soil stack by the horizontally-arranged pipe of floor drain and is connected, and bathroom floor from top to bottom sets gradually face Layer, surface layer adhesive layer, waterproof layer and structure sheaf.
Preferably, the floor drain includes floor drain shell and drain cover, sealing station is provided with the top of floor drain shell, with drain cover A connected bell jar is connected with upper sealing station by sealing ring sealing, and in the bottom of floor drain shell a water storage bowl is provided with, and floor drain is horizontally-arranged Pipe is connected with the drainage interface for being arranged on floor drain shell-side face.
Preferably, the floor drain shell, the horizontally-arranged pipe of floor drain and drainage interface are located in the height space of bathroom floor, are prevented Water layer is ploughed under in the upper edge of floor drain shell;The straight tube insertion of the drain cover is surrounded by the floor drain shell of waterproof layer along interior;Drain cover is straight Outside and drain cover the bottom surface of cylinder is provided with surface layer adhesive layer, and the connected connecting rod in drain cover middle part is provided with screw thread outside connecting rod, Bell jar is connected with connecting rod by nut.
Preferably, the waterproof layer lower plane is less than under 8mm, structure sheaf lower plane to surface layer to the distance of surface layer lower plane The distance of plane is less than 140mm.
Preferably, the soil stack is formed around the raised sealing platform in local, and sealing platform is sequentially provided with from outside to inside face Layer, surface layer adhesive layer, waterproof layer and structure sheaf, the structure sheaf of sealing platform is connected with floor construction layer, soil stack connection Periphery is provided with the raised sealing platform in local.
Preferably, it is provided with the structure for closing on room floors on the outside of the integral prefabricated bathroom floor surrounding sealing platform Layer.
Preferably, it is provided with installation built-in fitting in integral prefabricated bathroom floor bottom and stretches out steel for structure connection Muscle.
Preferably, the built-in fitting and anchoring piece for installing wallboard is provided with the top of sealing platform.
The utility model adopts such scheme, rational in infrastructure, low cost, and prefabricated toilet being capable of scene or advance Make, reverse form of construction work can be adopted, mechanized continuous productive process is realized in construction, not high to workmen's technical requirements, is passed through Simple process, surface layer and waterproof layer can just reach extraordinary effect;Using punch and the joint operation of external mold, speed of application is non- It is often fast and construction quality is good;Using co-layer draining, co-layer draining easy construction, using health, House Property be apparent, floor is upper and lower Interference less, draining noise it is little.
Description of the drawings:
Fig. 1 is structural representation of the present utility model.
In figure, 1, surface layer, 2, drain cover, 3, surface layer adhesive layer, 4, waterproof layer, 5, floor drain shell, 6, levelling protective layer, 7, knot Structure layer, 8, bell jar, 9, the horizontally-arranged pipe of floor drain, 10, soil stack connection, 11, sealing platform, 12, floor drain comb, 13, upper sealing station, 15, Water storage bowl, 16, drainage interface, 17, connecting rod.
Specific embodiment:
Clearly to illustrate the technical characterstic of this programme, below by specific embodiment, and with reference to its accompanying drawing, to this reality It is described in detail with new.
As shown in figure 1, the utility model is the technical scheme that solution above-mentioned technical problem is adopted being:
A kind of assembled bathroom floor, is provided with built-in drainage system, including soil stack connection 10, floor drain, floor drain horizontal stroke Comb 9;The discharge outlet of floor drain is connected 10 with soil stack and is connected by the horizontally-arranged pipe 9 of floor drain, and bathroom floor is from top to bottom successively Surface layer 1, surface layer adhesive layer 3, waterproof layer 4 and structure sheaf 7 are set.Levelling protective layer 6 can be set on structure sheaf 7, for structure It is levelling during 7 surface irregularity of layer.
The floor drain includes floor drain shell 5 and drain cover 3, sealing station 13 is provided with the top of floor drain shell 5, with drain cover 3 Connected bell jar 8 is connected with upper sealing station 13 by sealing ring sealing, and in the bottom of floor drain shell 5 water storage bowl 15, floor drain are provided with Horizontally-arranged pipe 9 is connected with the drainage interface 16 for being arranged on the side of floor drain shell 5.
The horizontally-arranged pipe 9 of the floor drain shell 5, floor drain and drainage interface 16 are located in the height space of bathroom floor, waterproof Layer 4 is ploughed under in the upper edge of floor drain shell 5;The straight tube insertion of the drain cover 2 is surrounded by the floor drain shell 5 of waterproof layer 4 along the inside;Floor drain The bottom surface of the straight tube of lid 2 outside and drain cover 2 is provided with surface layer adhesive layer 3, the connected connecting rod 17 in the middle part of drain cover 2, connecting rod 17 Outside is provided with screw thread, and bell jar 8 is connected with connecting rod 17 by nut.Because waterproof layer 4 is ploughed under in floor drain shell 5, waterproof effect is more Good, and easy construction, the surrounding of floor drain shell 5 and whole water-proof chassis are not susceptible to water, eliminate traditional method and form basin Hidden danger.Floor drain comb 12 can be set on drain cover 2, facilitate the dismounting and maintenance inside floor drain.
The lower plane of the waterproof layer 4 to the distance of the lower plane of surface layer 1 is put down for 1 time less than 8mm, the lower plane of structure sheaf 7 to surface layer The distance in face is less than 140mm.This bathroom floor using reversely construction, therefore can accomplish that each functional layer of ground is relatively thin, but It is that waterproof effect is still very good.Investment can so be reduced and accelerate speed of application.
The soil stack is formed around the raised sealing platform 11 in local, sealing platform 11 be sequentially provided with from outside to inside surface layer 1, Surface layer adhesive layer 3, waterproof layer 4, structure sheaf 7, the structure sheaf 7 of sealing platform 11 is connected with floor construction layer, and soil stack connects Connect 10 peripheries and be provided with the raised sealing platform 11 in local.Being provided with sealing platform 11 can effectively prevent contact of the soil stack with floor Place seeps water.Sealing platform is also designed construction according to the structure basically identical with bathroom floor, and speed of application is fast, quality It is guaranteed.Because sealing playscript with stage directions body need not consider the gradient, therefore levelling protective layer 6 can not be set.
The outside of the integral prefabricated bathroom floor surrounding sealing platform 11 is provided with the structure sheaf for closing on room floors.It is this kind of Structure is beneficial to the combination on ground between bathroom floor and surrounding non-hygiene, and the installation of this integral prefabricated bathroom floor.
Installation built-in fitting is provided with integral prefabricated bathroom floor bottom and stretch out reinforcing bar for structure connection.Only The top of water platform 11 is provided with the built-in fitting and anchoring piece for installing wallboard.This kind of structure is beneficial between bathroom floor and surrounding non-hygiene Ground and the connection of toilet metope, and be conducive to installation of the present utility model.
A kind of construction method of assembled bathroom floor, comprises the steps:
The first step, makes punch, and according to toilet layout requirements punch is made;
Second step, lays diaphragm, and in convex mould surface diaphragm is laid;
3rd step, puts surface layer 1, drain cover 2 and soil stack connection 10, and surface layer 1, drain cover 2 are furnished on punch Upward, surface layer 1 and the front of drain cover 2 are adjacent to diaphragm for face, surface layer 1 and the back side of drain cover 2;
4th step, applies float coat adhesive layer 3, and at the back side of surface layer 1 and the back side of drain cover 2 float coat binding is applied, and forms face Layer adhesive layer 3;
5th step, places floor drain shell 5, soil stack connection 10, and according to position floor drain shell 5, soil stack 10, waterproof are arranged Layer 4 is deployed in floor drain shell 5, installs the horizontally-arranged pipe 9 of floor drain, floor drain shell 5 is connected into 10 with soil stack and is connected;
6th step, arranges waterproof layer 4, and waterproof layer 4 is arranged on surface layer tack coat 3, and waterproof layer 4 sets according to technological requirement Put;
7th step, in the outer surface of waterproof layer 4 levelling protective layer 6 is laid;
8th step, laying structure layer reinforcing bar, the laying structure reinforcing bar at ground and sealing platform arranges external mold;
9th step, pouring structure layer 7, pouring structure layer at sealing platform 11 and on levelling protective layer 6;
Tenth step, maintains structure sheaf 7;
11st step, removes external mold;
12nd step, integrally stands up, and punch is proposed vertically upward;
13rd step, to integral prefabricated bathroom floor visual examination is carried out, and then carries out closed-water test.
The toilet layout includes toilet size, floor drain position, soil stack position, the position of door, the position of window With sealing platform position, the surface layer 1 is mosaic, stone material, wall brick and skirt.Toilet layout and surface layer 1 are according to designer The needs of design and use person can have more extensive covering scope.
Above-mentioned specific embodiment cannot function as the restriction to the utility model protection domain, for the skill of the art For art personnel, any alternate modification or conversion made to the utility model embodiment all falls within guarantor of the present utility model In the range of shield.
The utility model does not describe part in detail, is the known technology of those skilled in the art of the present technique.

Claims (8)

1. a kind of assembled bathroom floor, it is characterised in that:Be provided with built-in drainage system, including soil stack connection, floor drain, The horizontally-arranged pipe of floor drain;The discharge outlet of floor drain by the horizontally-arranged pipe of floor drain be connected with soil stack be connected, bathroom floor from top to bottom according to Secondary setting surface layer, surface layer adhesive layer, waterproof layer and structure sheaf.
2. a kind of assembled bathroom floor according to claim 1, it is characterised in that:The floor drain include floor drain shell and Drain cover, on the top of floor drain shell sealing station is provided with, and the bell jar being connected with drain cover is close by sealing ring with upper sealing station Envelope is connected, and in the bottom of floor drain shell a water storage bowl is provided with, and the horizontally-arranged pipe of floor drain is connected with the drainage interface for being arranged on floor drain shell-side face.
3. a kind of assembled bathroom floor according to claim 2, it is characterised in that:The floor drain shell, floor drain are horizontally-arranged Pipe and drainage interface are located in the height space of bathroom floor, and waterproof layer is ploughed under in the upper edge of floor drain shell;The drain cover Straight tube insertion be surrounded by the floor drain shell of waterproof layer along interior;The bottom surface of drain cover straight tube outside and drain cover is provided with surface layer bonding Layer, the connected connecting rod in drain cover middle part, is provided with screw thread outside connecting rod, bell jar is connected with connecting rod by nut.
4. a kind of assembled bathroom floor according to claim 1, it is characterised in that:The waterproof layer lower plane is to face The distance of layer lower plane is less than 140mm less than the distance of 8mm, structure sheaf lower plane to surface layer lower plane.
5. a kind of assembled bathroom floor according to claim 1 or 4, it is characterised in that:The soil stack surrounding The raised sealing platform in local is provided with, sealing platform is sequentially provided with from outside to inside surface layer, surface layer adhesive layer, waterproof layer and structure sheaf, only The structure sheaf of water platform is connected with floor construction layer, and soil stack connection periphery is provided with the raised sealing platform in local.
6. a kind of assembled bathroom floor according to claim 5, it is characterised in that:It is provided with the outside of the sealing platform Close on the structure sheaf of room floors.
7. a kind of assembled bathroom floor according to claim 1, it is characterised in that:Set in bathroom floor bottom There is installation built-in fitting and stretch out reinforcing bar for structure connection.
8. a kind of assembled bathroom floor according to claim 5, it is characterised in that:Installation is provided with the top of sealing platform The built-in fitting and anchoring piece of wallboard.
CN201620789138.9U 2016-07-25 2016-07-25 Assembled bathroom floor Expired - Fee Related CN206091001U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620789138.9U CN206091001U (en) 2016-07-25 2016-07-25 Assembled bathroom floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620789138.9U CN206091001U (en) 2016-07-25 2016-07-25 Assembled bathroom floor

Publications (1)

Publication Number Publication Date
CN206091001U true CN206091001U (en) 2017-04-12

Family

ID=58467732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620789138.9U Expired - Fee Related CN206091001U (en) 2016-07-25 2016-07-25 Assembled bathroom floor

Country Status (1)

Country Link
CN (1) CN206091001U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013566A (en) * 2016-07-25 2016-10-12 孙续畅 Assembled type bathroom floor slab and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013566A (en) * 2016-07-25 2016-10-12 孙续畅 Assembled type bathroom floor slab and construction method

Similar Documents

Publication Publication Date Title
CN106836516B (en) A kind of integrated water-proof chassis of toilet pipeline
CN106049903A (en) Assembled bathroom and construction method for same
CN106088260A (en) A kind of Homofloor drainage system of novel building toilet
CN210508509U (en) Same-floor drainage assembly type waterproof toilet system
CN206091001U (en) Assembled bathroom floor
CN203394108U (en) Fabricated bathroom
CN205296314U (en) Water drainage system on same floor
CN205063051U (en) End box on ground between whole bathroom
CN106013566A (en) Assembled type bathroom floor slab and construction method
CN206189906U (en) Bathroom room
CN108312308A (en) Interior trim formed by integrally casting prefabricated toilet and molding die and production method
CN204627039U (en) A kind of integral vacuum toilet
CN102900144A (en) Undermining floor drain automatic drainage structure capable of preventing leakage of toilet
CN202882098U (en) In-pit floor drain automatic drainage structure capable of preventing toilet from leaking
CN109797988A (en) A kind of co-layer draining hard-cover precast block toilet of outer wall provided pipe line groove hole
CN103835421B (en) Leakage-proof floor and anti-seepage construction method
CN109779322A (en) A kind of co-layer draining hard-cover integral vacuum toilet of inner wall provided pipe line groove hole
CN206554180U (en) A kind of integrated water-proof chassis of toilet pipeline
CN205591477U (en) Waterproof chassis in bathroom
CN205857311U (en) A kind of Homofloor drainage system of novel building toilet
CN212323652U (en) Horizontal pipeline separation structure of wall body
CN113931495A (en) Precast concrete toilet chassis, manufacturing method and installation method
CN2814074Y (en) Device for sealing up pipe in the wall
CN206646620U (en) toilet floor drain
CN208280410U (en) Precast concrete entirety ground floor for kitchen and toilet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170412

Termination date: 20190725

CF01 Termination of patent right due to non-payment of annual fee