CN216690508U - Leveling mechanism suitable for integral bathroom chassis - Google Patents

Leveling mechanism suitable for integral bathroom chassis Download PDF

Info

Publication number
CN216690508U
CN216690508U CN202123447677.4U CN202123447677U CN216690508U CN 216690508 U CN216690508 U CN 216690508U CN 202123447677 U CN202123447677 U CN 202123447677U CN 216690508 U CN216690508 U CN 216690508U
Authority
CN
China
Prior art keywords
chassis
integral
integral bathroom
leveling
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123447677.4U
Other languages
Chinese (zh)
Inventor
徐立
董鑫
邱泽平
郝敬峰
朱福兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Grandland Group Co ltd
Original Assignee
Shenzhen Grandland Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Grandland Group Co ltd filed Critical Shenzhen Grandland Group Co ltd
Priority to CN202123447677.4U priority Critical patent/CN216690508U/en
Application granted granted Critical
Publication of CN216690508U publication Critical patent/CN216690508U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of interior decoration, and particularly relates to a leveling mechanism suitable for an integral bathroom chassis, which comprises an integral bathroom wallboard, wherein an integral bathroom waterproof chassis is fixedly arranged at the bottom of the integral bathroom wallboard, high-strength screws are embedded at four sides inside the integral bathroom waterproof chassis at equal intervals, the top and the bottom of each high-strength screw extend to the outside of the integral bathroom waterproof chassis, embedded height-adjusting nuts are arranged at the bottoms of the high-strength screws, the interval between every two adjacent embedded height-adjusting nuts is 100mm, and a fixing component is fixedly arranged at the tops of the embedded height-adjusting nuts. The high-strength screw can be directly rotated to level during leveling, so that the process that the integral bathroom chassis is repeatedly conveyed and leveled on the chassis during installation is avoided, the leveling efficiency during installation is improved, and the defects of labor waste, time waste, inaccurate leveling and the like of the existing leveling technology are overcome.

Description

Leveling mechanism suitable for integral bathroom chassis
Technical Field
The utility model belongs to the technical field of interior decoration, and particularly relates to a leveling mechanism suitable for an integral bathroom chassis.
Background
At present, in the industry, the decoration base layer and the decoration surface layer are integrated into a whole in a factory by adopting an assembly design and a processing technology in an assembly type integral bathroom, so that the field dry construction and the rapid installation are realized, the traditional decoration field is changed to carry out waterproof construction, the field ceramic tiles or stones are paved and pasted in a large area, the current situations of large-scale cutting and wet operation are changed, and the integral bathroom has the advantages of convenience in construction, water saving, material saving, health, environmental protection and the like. The assembled integral bathroom can be divided into four systems of a ceiling, a wall surface and a ground as unit modules and a side-closing and closing system according to construction positions, under the condition that the flatness of some site construction conditions is poor, the chassis needs to be leveled, the chassis leveling is very important, the chassis flatness needs to be controlled within 2MM, if the leveling error is large, the installation difficulty can occur in the installation process of the wallboard, the installation is not finished, even the height difference of the wallboard occurs, the wall surface and the ground occur, the gap between the wall surface and the ceiling is too large, and therefore the chassis leveling is one of the core links of the integral bathroom installation.
The problems existing in the prior art are as follows:
the prior integral bathroom accessories need to be leveled when being installed, most of the leveling base plates of the integral bathroom accessories on the market are leveled by steel supports and plastic supports, the integral sanitary ware base plate is heavy in the installation process, about 4 persons are needed for carrying, the base plate needs to be placed after the support is leveled, the support is easy to displace in the process of placing the chassis, the support needs to be repeatedly carried and leveled, the labor and the time are wasted, the leveling is not accurate, the potential quality hazard exists after the installation is finished, or when the device is installed, an indoor small crane is installed, the integral bathroom chassis is hoisted by a rope, a worker stands below the basin bottom to adjust the height of each supporting leg, after the height is adjusted according to experience and feeling, the waterproof basin is put down to test the level, and is lifted up again to be adjusted again if not needed, and the water basin is adjusted to be close to the level again and again, because three points determine a plane, this approach is unlikely to allow all of the support feet to be simultaneously supported to ground.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a leveling mechanism suitable for an integral bathroom chassis, which avoids the process that the integral bathroom chassis is repeatedly carried and leveled on the chassis during the installation process, thereby improving the leveling efficiency during the installation process and overcoming the defects of labor waste, time waste, inaccurate leveling and the like of the existing leveling technology.
The technical scheme adopted by the utility model is as follows:
the utility model provides a be applicable to whole bathroom chassis levelling mechanism, includes whole bathroom wallboard, the fixed whole bathroom waterproof chassis that is provided with in bottom of whole bathroom wallboard, the equidistant pre-buried high strength screw rod that is provided with in inside four sides department of whole bathroom waterproof chassis, the top and the bottom of high strength screw rod all extend to the outside on whole bathroom waterproof chassis, and the bottom of high strength screw rod is provided with pre-buried heightening nut, and the interval between the adjacent pre-buried heightening nut is 100mm, the fixed maintenance subassembly that is provided with in top of pre-buried heightening nut.
The waterproof chassis of whole bathroom is provided with the metal frame all around outside, be provided with the rubber strip that is used for sealing on the metal frame.
The back of the joint when the integral bathroom wallboard is installed is provided with a T-shaped wall code.
The maintenance subassembly includes the connecting rod, connecting rod fixed connection is in the top of high strength screw rod, the top dead lever of connecting rod is connected with the connecting block, the outside that the connecting block bottom just is located the connecting rod rotates and is connected with the spring, the bottom fixedly connected with sliding sleeve of spring, sliding sleeve sliding connection is in the outside of connecting rod, the both sides of sliding sleeve bottom are provided with grafting subassembly.
The inserting assembly comprises two inserting blocks, the inserting blocks are symmetrically and fixedly arranged at the bottom of the sliding sleeve, a retaining groove is formed in the position, corresponding to the inserting blocks, of the top of the integral bathroom waterproof chassis, and the bottom of the inserting blocks extends to the inside of the retaining groove to be inserted into the retaining groove.
The front and the back of the inner wall of the sliding sleeve are symmetrically and fixedly provided with sliding blocks, the sliding blocks are connected with the outer wall of the connecting rod in a sliding mode, the outer wall of the connecting rod is symmetrically and fixedly provided with limiting blocks located on two sides of the sliding blocks, and one side, opposite to the sliding blocks, of each limiting block is connected with the sliding blocks in a sliding mode.
The utility model has the technical effects that:
(1) the high-strength screw rod can be directly rotated to level during leveling, so that the process that the whole bathroom chassis is repeatedly conveyed and leveled when the chassis is placed in the installation process is avoided, the leveling efficiency during installation is improved, and the defects of labor waste, time waste, inaccurate leveling and the like of the existing leveling technology are overcome.
(2) In the process of installing the high-strength screw rod into the inside of the embedded heightening nut, press the sliding sleeve, the sliding sleeve is made to drive the spring to shrink, after the high-strength screw rod is installed to the designated position, the sliding sleeve and the connecting rod are rotated, the sliding sleeve is made to drive the sliding block to rotate to the position corresponding to the retention groove, the sliding sleeve is loosened at the same time, the sliding sleeve is made to drive the inserting block to be inserted into the retention groove under the action of spring elasticity, the sliding sleeve drives the sliding block to slide between the two limiting blocks in the process, the integral bathroom waterproof chassis is positioned through the mutual matching of the inserting block and the retention groove, the high-strength screw rod is more stably connected with the embedded heightening nut, the probability that the high-strength screw rod and the embedded heightening nut are loosened due to the vibration is reduced, and the effect after the leveling is effectively maintained.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of the utility model at A in FIG. 1;
fig. 3 is a top view of the sliding sleeve of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. an integral bathroom wall panel;
2. a high-strength screw; 201. a connecting rod; 202. connecting blocks; 203. a retention groove; 204. a limiting block; 205. a slider; 206. a spring; 207. a sliding sleeve; 208. inserting a block;
3. the integral sanitary waterproof chassis;
4. and (6) embedding the height-adjusting nut.
Detailed Description
In order that the objects and advantages of the utility model will be more clearly understood, the following description is given in conjunction with the accompanying examples. It is to be understood that the following text is merely illustrative of one or more specific embodiments of the utility model and does not strictly limit the scope of the utility model as specifically claimed.
As shown in fig. 1-3, a mechanism suitable for leveling a whole bathroom chassis comprises a whole bathroom wallboard 1, a whole bathroom waterproof chassis 3 is fixedly arranged at the bottom of the whole bathroom wallboard 1, high-strength screws 2 are pre-embedded at four sides inside the whole bathroom waterproof chassis 3 at equal intervals, the top and the bottom of each high-strength screw 2 extend to the outside of the whole bathroom waterproof chassis 3, pre-embedded height-adjusting nuts 4 are arranged at the bottom of each high-strength screw 2, the interval between every two adjacent pre-embedded height-adjusting nuts 4 is 100mm, and a retention component is fixedly arranged at the top of each pre-embedded height-adjusting nut 4.
According to the structure, the high-strength screw 2 can be directly rotated to level during leveling, so that the process that the whole bathroom chassis is repeatedly carried and leveled when the chassis is placed in the installation process is avoided, the leveling efficiency during installation is improved, and the defects of labor waste, time waste, inaccurate leveling and the like of the existing leveling technology are overcome.
Referring to the attached figure 1, a metal frame is arranged around the outer side of the integral bathroom waterproof chassis 3, and a rubber strip for sealing is arranged on the metal frame.
Referring to the attached drawing 1, the back of the junction when whole bathroom wallboard 1 installation is installed "T" type wall sign indicating number to fixed wallboard and assurance guarantee the roughness, "T" type wall sign indicating number vertical arrangement 3 simultaneously, through the screw fixation on a lateral wall board fossil fragments.
Referring to fig. 2 and 3, the fixing assembly includes a connecting rod 201, the connecting rod 201 is fixedly connected to the top of the high-strength screw rod 2, the top fixing rod of the connecting rod 201 is connected with a connecting block 202, the bottom of the connecting block 202 and the outer side of the connecting rod 201 are rotatably connected with a spring 206, the bottom of the spring 206 is fixedly connected with a sliding sleeve 207, the sliding sleeve 207 is slidably connected to the outer side of the connecting rod 201, two sides of the bottom of the sliding sleeve 207 are provided with an inserting assembly, the inserting assembly includes two inserting blocks 208, the two inserting blocks 208 are symmetrically and fixedly arranged at the bottom of the sliding sleeve 207, the fixing groove 203 is arranged at the position of the top of the integrated bathroom waterproof chassis 3 corresponding to the inserting blocks 208, the bottom of the inserting blocks 208 extends to the inside of the fixing groove 203 to be inserted into the fixing groove 203, the front surface and the back surface of the inner wall of the sliding sleeve 207 are symmetrically and fixedly provided with a sliding block 205, the sliding block 205 is slidably connected with the outer wall of the connecting rod 201, the outer wall of the connecting rod 201 and the two sides of the sliding block 205 are symmetrically and fixedly provided with limiting blocks 204, and one side of each limiting block 204, which is opposite to the sliding block 205, is connected with the sliding block 205 in a sliding manner.
According to the structure, in the process of installing the high-strength screw 2 into the embedded heightening nut 4, the sliding sleeve 207 is pressed to enable the sliding sleeve 207 to drive the spring 206 to contract, after the high-strength screw 2 is installed to a specified position, the sliding sleeve 207 and the connecting rod 201 are rotated to enable the sliding sleeve 207 to drive the sliding block 205 to rotate to the position corresponding to the retention groove 203, meanwhile, the sliding sleeve 207 is loosened to enable the sliding sleeve 207 to drive the insert block 208 to be inserted into the retention groove 203 under the action of the elastic force of the spring 206, in the process, the sliding sleeve 207 drives the sliding block 205 to slide between the two limiting blocks 204, so that the integral bathroom waterproof chassis 3 is positioned through the mutual matching of the insert block 208 and the retention groove 203, the high-strength screw 2 and the embedded heightening nut 4 are connected more stably, and the probability that the high-strength screw 2 and the embedded heightening nut 4 are loosened due to vibration is reduced, thereby effectively maintaining the effect after leveling.
The above structure is preferably installed inside a toilet.
The working principle of the utility model is as follows:
(1) the utility model discloses combine the difficulty and the installation defect of the play of whole bathroom chassis at the in-process of construction installation leveling, carry out the leveling through high strength screw rod 2, high strength screw rod 2 principle is when whole bathroom chassis is pour in the mill, and threaded connection is in pre-buried heightening nut 4 of pre-buried, and the pre-buried internut of whole bathroom four sides is apart from being 100 MM.
(2) A manufacturer manufactures a template according to a drawing to perform on-site hole opening positioning, the manufacturer manufactures the integral bathroom waterproof chassis 3 and installs the integral bathroom ground drainage point position according to the template, and the manufactured integral bathroom waterproof chassis 3 is conveyed to the position corresponding to the drainage hole to be accurately placed and accurately corresponds to the position of the floor drain.
(3) Leveling is carried out according to an indoor decoration one-meter line, a gasket is added at the bottom of the base plate at the position of the embedded heightening nut 4, the high-strength screw rod 2 in the embedded heightening nut 4 is rotated by an electric screwdriver during leveling, so that the high-strength screw rod 2 is extended or shortened, the leveling is finished, and rubber strips are installed on metal frames around the base plate to play a role in sealing and waterproofing the joint of the base plate and the wall plate.
(4) Carry out the wallboard installation according to the serial number order of dispatching from the factory during installation, wallboard junction back installation "T" type wall sign indicating number, fixed wallboard and guarantee to guarantee the roughness, 3 vertical arrangement, the screw fixation is on one side wallboard fossil fragments.
(5) The wall plates are connected with each other through the stacking pieces, one end of each stacking piece is fixed on a keel hole position during construction, the wall plates to be installed are lifted and clamped downwards, and the upper portion of each wall plate close to the wall surface is fixed with the wall surface through a metal piece.
(6) And after the wall plate is installed, the whole ceiling is installed, and the tail end water and electricity are connected in point locations.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that those skilled in the art can make various improvements and modifications without departing from the principle of the present invention, and these improvements and modifications should also be construed as the protection scope of the present invention. Structures, devices, and methods of operation not specifically described or illustrated herein are generally practiced in the art without specific recitation or limitation.

Claims (6)

1. The utility model provides a be applicable to whole bathroom chassis levelling mechanism, includes whole bathroom wallboard (1), its characterized in that: the fixed waterproof chassis of whole bathroom (3) that is provided with in bottom of whole bathroom wallboard (1), the equidistant pre-buried high strength screw rod (2) that is provided with in four sides department inside the waterproof chassis of whole bathroom (3), the top and the bottom of high strength screw rod (2) all extend to the outside on the waterproof chassis of whole bathroom (3), and the bottom of high strength screw rod (2) is provided with pre-buried heightening nut (4), and the interval between adjacent pre-buried heightening nut (4) is 100mm, the fixed maintenance subassembly that is provided with in top of pre-buried heightening nut (4).
2. The leveling mechanism for the integral sanitary ware chassis according to claim 1, wherein: the waterproof integral bathroom chassis (3) is characterized in that a metal frame is arranged on the periphery of the outer side of the waterproof integral bathroom chassis (3), and a rubber strip for sealing is arranged on the metal frame.
3. The leveling mechanism for the integral sanitary ware chassis according to claim 1, wherein: t-shaped wall codes are arranged on the back of the joint of the integral bathroom wallboard (1) during installation.
4. The leveling mechanism for the integral sanitary ware chassis according to claim 1, wherein: the maintenance subassembly includes connecting rod (201), connecting rod (201) fixed connection is in the top of high strength screw rod (2), the top dead lever of connecting rod (201) is connected with connecting block (202), the outside that connecting block (202) bottom just is located connecting rod (201) is rotated and is connected with spring (206), the bottom fixedly connected with sliding sleeve (207) of spring (206), sliding sleeve (207) sliding connection is in the outside of connecting rod (201), the both sides of sliding sleeve (207) bottom are provided with the grafting subassembly.
5. The leveling mechanism for the integral sanitary ware chassis according to claim 4, wherein: the inserting assembly comprises two inserting blocks (208), the two inserting blocks (208) are symmetrically and fixedly arranged at the bottom of the sliding sleeve (207), the position, corresponding to the inserting blocks (208), of the top of the integral bathroom waterproof chassis (3) is provided with a retaining groove (203), and the bottom of the inserting blocks (208) extends to the inside of the retaining groove (203) to be inserted into the retaining groove (203).
6. The leveling mechanism for the integral sanitary ware chassis according to claim 4, wherein: the front and the back of the inner wall of the sliding sleeve (207) are symmetrically and fixedly provided with sliding blocks (205), the sliding blocks (205) are in sliding connection with the outer wall of the connecting rod (201), the outer wall of the connecting rod (201) is symmetrically and fixedly provided with limiting blocks (204) on two sides of the sliding blocks (205), and one sides of the limiting blocks (204) opposite to the sliding blocks (205) are in sliding connection with the sliding blocks (205).
CN202123447677.4U 2021-12-30 2021-12-30 Leveling mechanism suitable for integral bathroom chassis Active CN216690508U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123447677.4U CN216690508U (en) 2021-12-30 2021-12-30 Leveling mechanism suitable for integral bathroom chassis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123447677.4U CN216690508U (en) 2021-12-30 2021-12-30 Leveling mechanism suitable for integral bathroom chassis

Publications (1)

Publication Number Publication Date
CN216690508U true CN216690508U (en) 2022-06-07

Family

ID=81817102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123447677.4U Active CN216690508U (en) 2021-12-30 2021-12-30 Leveling mechanism suitable for integral bathroom chassis

Country Status (1)

Country Link
CN (1) CN216690508U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115056942A (en) * 2022-07-08 2022-09-16 上海外高桥造船有限公司 Method, device, equipment and storage medium for leveling ship sanitary unit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115056942A (en) * 2022-07-08 2022-09-16 上海外高桥造船有限公司 Method, device, equipment and storage medium for leveling ship sanitary unit
CN115056942B (en) * 2022-07-08 2024-01-19 上海外高桥造船有限公司 Leveling method, device, equipment and storage medium for ship sanitary units

Similar Documents

Publication Publication Date Title
CN102121315B (en) Hole reserving construction method for tightly-fixed steel sleeve
CN210659165U (en) Architectural decoration wallboard installation device
CN216690508U (en) Leveling mechanism suitable for integral bathroom chassis
CN211867720U (en) PC component is repaired and is used strutting arrangement
CN205024993U (en) Whole stair
CN202324501U (en) Full clamping piece connecting member for mounting low carbon board on building outer brim
CN112412011B (en) Adjustable support frame for building templates
CN203783097U (en) Integrated bathroom ground
CN103982042B (en) The assembling process of the assembled engineering of a kind of quick house ornamentation
CN111134557A (en) Mounting structure of integral bathroom chassis
CN210032102U (en) Support for mounting external hanging piece of building
CN204023953U (en) A kind of wallboard installation system
CN218523154U (en) Pipeline supporting structure for municipal engineering construction
CN110729949A (en) Device convenient for mounting solar panel roof and using method thereof
CN201202362Y (en) Structure for connecting main frame and auxiliary frame of aluminum alloy window
CN214760799U (en) Adjusting mechanism
CN212213612U (en) Mounting structure of integral bathroom chassis
CN220539051U (en) Ancient building tile plasterboard
CN213902620U (en) Electronic scale for researching and developing vertical pipe floor-penetrating construction technology
CN212602677U (en) Positioning device for stone machining
CN210724638U (en) Device convenient to solar panel roof installation
CN112956930A (en) Adjusting mechanism and mounting method of bathroom base
CN219887326U (en) Assembled prefabricated slab for high-rise building
CN217494098U (en) Mounting tool for decoration board
CN217778074U (en) Building energy saving curtain surface decoration lithography apparatus