CN105421826A - Assembly-type integrated bathroom and construction method thereof - Google Patents

Assembly-type integrated bathroom and construction method thereof Download PDF

Info

Publication number
CN105421826A
CN105421826A CN201510895502.XA CN201510895502A CN105421826A CN 105421826 A CN105421826 A CN 105421826A CN 201510895502 A CN201510895502 A CN 201510895502A CN 105421826 A CN105421826 A CN 105421826A
Authority
CN
China
Prior art keywords
foam cement
combined wall
wall board
board
wedge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510895502.XA
Other languages
Chinese (zh)
Other versions
CN105421826B (en
Inventor
樊立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Lyujian Plate Industry Co Ltd
Hengyuan Building Plate Industry Co Ltd
BEIJING TAIKONG PANEL INDUSTRY CORP
Original Assignee
Changzhou Lyujian Plate Industry Co Ltd
Hengyuan Building Plate Industry Co Ltd
BEIJING TAIKONG PANEL INDUSTRY CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Lyujian Plate Industry Co Ltd, Hengyuan Building Plate Industry Co Ltd, BEIJING TAIKONG PANEL INDUSTRY CORP filed Critical Changzhou Lyujian Plate Industry Co Ltd
Priority to CN201510895502.XA priority Critical patent/CN105421826B/en
Publication of CN105421826A publication Critical patent/CN105421826A/en
Priority to SG11201804065RA priority patent/SG11201804065RA/en
Priority to CN201680070072.0A priority patent/CN110494618A/en
Priority to PCT/CN2016/100634 priority patent/WO2017097018A1/en
Priority to JP2018528643A priority patent/JP6606286B2/en
Application granted granted Critical
Publication of CN105421826B publication Critical patent/CN105421826B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/125Small buildings, arranged in other buildings
    • E04H1/1266Cubicles for dressing; Toilets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles

Abstract

The invention relates to an assembly-type integrated bathroom and a construction method thereof. The assembly-type integrated bathroom comprises foaming cement composite bottom plates, foaming cement composite wall plates, foaming cement composite top plates and bathroom equipment; dovetail groove type steel frame edge ribs are arranged in the plates, and each dovetail groove type steel frame edge rib is composed of an upper wing flange, a lower wing flange and a dovetail groove edge rib groove; an embedded part wedge block is arranged in each dovetail groove edge rib groove; all the plates are fixedly connected through bolts, connecting parts and the wedge blocks arranged in the dovetail groove edge rib grooves of the plates. The assembly-type integrated bathroom has the advantages that the foaming cement composite plates obtained through industrialized production are adopted, the fire resistance duration is larger than or equal to 4 hours, the sound insulation is larger than or equal to 42 decibels, raw materials forming the plates adopt inorganic materials and are non-combustible, and the comprehensive properties of energy conservation and environment protection, bearing and thermal insulation, heat insulation, fire resistance, durability, shock resistance, small mass, high strength and the like are achieved; installing operation is easy and convenient, rapidness and firmness are achieved, and environmental pollution and noise emission caused by traditional bathroom construction are reduced. The assembly-type integrated bathroom is an energy-saving and environment-protecting green building product.

Description

A kind of assembling integral vacuum toilet and construction method thereof
Technical field
The invention belongs to building field, refer in particular to a kind of assembling integral vacuum toilet and construction method thereof.
Background technology
At present, traditional in building field integral vacuum toilet form has: glass fiber reinforced plastics composite material compression molding and reinforced concrete prefabricated integral vacuum toilet.By the integral vacuum toilet of glass fiber reinforced plastics composite material compression molding, its main weak point is that fireproof performance is low, soundproof effect is poor, and user cannot change the sanitary equipment of inside and facility; And by the integral vacuum toilet of prefabricated concrete, its main weak point is conducted oneself with dignity too large, single integral vacuum toilet deadweight can reach 8-12 ton, and tower crane cannot be adopted to lift.
Summary of the invention
The object of the invention is to overcome prior art not enough and provide a kind of by foam cement composite board prefabricated, simple and fast, the assembling integral vacuum toilet that can realize suitability for industrialized production and construction method thereof.Integral vacuum toilet of the present invention has light weight, load bearing heat preserving, heat insulation, durable, antidetonation and excellent fireproof performance and sound insulation property, and it is a kind of green building product of energy-conserving and environment-protective.
Technical scheme of the present invention is:
A kind of assembling integral vacuum toilet, it comprises: foam cement composite bottom board, foam cement combined wall board, foam cement compound roof and sanitary bath equipment, is characterized in that: in described foam cement composite bottom board, foam cement combined wall board, foam cement compound roof, be provided with dovetail groove type steel frame limit rib respectively; Described dovetail groove type steel frame limit rib, is made up of upper bottom flange and dovetail trough rim costal fovea groove; And insert portion wedge is provided with in described dovetail trough rim costal fovea groove;
Connection between described foam cement combined wall board and described foam cement composite bottom board is that the wedge by being provided with in bolt, connector and sheet material dovetail trough rim costal fovea groove is connected and fixed;
Connection between described foam cement combined wall board and described foam cement combined wall board is that the wedge by being provided with in bolt, connector and sheet material dovetail trough rim costal fovea groove is connected and fixed;
Connection between described foam cement combined wall board and described foam cement compound roof is that the wedge by being provided with in bolt, connector and sheet material dovetail trough rim costal fovea groove is connected and fixed.
Wherein, described foam cement composite bottom board, is made up of steel frame, steel bar girder, gauze wire cloth, inorganic foamed cement core, up and down cement screedn compound; Wherein, gauze wire cloth and steel frame are connected and fixed; According to design requirement, gauze wire cloth can overallly lay or part is laid.Can sewer pipe fitting be provided with in foam cement composite bottom board, comprise: gutter, floor drain etc.
Foam cement combined wall board, is made up of steel frame, up and down gauze wire cloth, several steel rings socketed with upper and lower gauze wire cloth, inorganic foamed cement core, upper and lower cement screedn compound; Wherein, gauze wire cloth and steel frame are connected and fixed; According to design requirement, gauze wire cloth can overallly lay or part is laid.Can be provided with in foam cement combined wall board upper hose, on water swivel, toilet draining via hole, switch magazine, conduit; Combined wall board can be left a door unlocked in advance, window hole.
The another kind of structure of foam cement combined wall board is, is made up of steel frame, gauze wire cloth, steel bar girder, inorganic foamed cement core, up and down cement screedn compound; Wherein, gauze wire cloth and steel frame are connected and fixed; According to design requirement, gauze wire cloth can overallly lay or part is laid.Can be provided with in foam cement combined wall board upper hose, on water swivel, toilet draining via hole, switch magazine, conduit; Combined wall board can be left a door unlocked in advance, window hole.
Foam cement compound roof, is made up of steel frame, gauze wire cloth, steel bar girder, inorganic foamed cement core, up and down cement screedn compound; Wherein, gauze wire cloth and steel frame are connected and fixed; According to design requirement, gauze wire cloth can overallly lay or part is laid.Socket magazine, pipeline can be provided with in foam cement compound roof; And ventilation, maintenance hole can be reserved.
In described dovetail trough rim costal fovea groove, the wedge that is provided with is slidably, so that capturing position and Fast Installation.
The shape of described wedge matches with groove shapes.
Described wedge can be placed in the groove of dovetail trough rim rib in advance, also can be placed in the groove of dovetail trough rim rib when mounted.
The hole coordinated with bolt is provided with in described wedge; And be provided with can the fluting of placing nut.
Another structure of described wedge is in described wedge, be provided with the screwed hole coordinated with bolt.
Described connector is right angle type connector; And on connector, be provided with the via hole matched with bolt.
In described assembling integral vacuum toilet, outside, can adopt various decorating and renovating material to fit up, to meet the washroom decorations requirement of different-style.
In described assembling integral vacuum toilet, the waterproofing materials of various coating class or coiled material class can be adopted to carry out toilet warterproof process, to meet different toilet warterproof requirements.
A construction method for assembling integral vacuum toilet, its method step comprises:
According to client's actual demand, the foam cement composite bottom board adopted, foam cement combined wall board, foam cement compound roof all carry out industrialized customized production in factory, and according to designing requirement by pre-to upper and lower conduit part, consumer, Yi Jimen, window hole etc. in foam cement composite board; As playing with building blocks, foam cement composite bottom board, foam cement combined wall board, foam cement compound roof to be carried out precisely, quick-assembling, and adopt mechanical system to be connected and fixed; And sanitary bath equipment is installed, and be built into integrated bathroom; Again integral vacuum toilet is transported to job site; Use lifting crane gear, by integral vacuum toilet installation in position.
Wherein, described integral vacuum toilet, can complete waterproof according to demand in factory and interior and exterior finishes is constructed.
Bathroom device equipment set in described integral vacuum toilet, also can complete installation at the construction field (site).
A construction method for assembling integral vacuum toilet, its method step comprises:
A, according to designing requirement, make foam cement composite bottom board, foam cement combined wall board, foam cement compound roof; Wherein, in described foam cement composite bottom board, foam cement combined wall board, foam cement compound roof, dovetail groove type steel frame limit rib is provided with respectively; Described dovetail groove type steel frame limit rib, is made up of upper bottom flange and dovetail trough rim costal fovea groove; And insert portion wedge is provided with in described dovetail trough rim costal fovea groove;
B, foam cement composite bottom board are connected with foam cement combined wall board:
First, foam cement composite bottom board is positioned on horizontal basal plane, by designing requirement, then foam cement combined wall board is vertically positioned on foam cement composite bottom board relative position; Respectively the wedge being placed with nut is put into the dovetail trough rim costal fovea groove that foam cement composite bottom board and foam cement combined wall board are provided with; Again respectively by bolt through connector, and to be connected and fixed with the nut be placed in wedge, utilize wedge and dovetail groove type steel frame limit rib fastening, thus foam cement composite bottom board and foam cement combined wall board are connected and fixed; Successively remaining foam cement combined wall board and foam cement composite bottom board are connected to a fixed by this method;
C, foam cement combined wall board are connected with foam cement combined wall board:
First second piece of foam cement combined wall board is vertically positioned on foam cement composite bottom board relative position, and adjusts the relative position of second block of wallboard and first block of wallboard, complete the connection of second piece of foam cement combined wall board and foam cement composite bottom board by step B;
Again first block of wallboard is connected with second block of wallboard: the wedge being placed with nut is put into the dovetail trough rim costal fovea groove that foam cement combined wall board is provided with; Respectively bolt is passed connector again, and be connected and fixed with the nut be placed in wedge, utilize wedge and dovetail groove type steel frame limit rib fastening, thus foam cement combined wall board is connected with foam cement combined wall board: remaining foam cement combined wall board and foam cement combined wall board are connected to a fixed successively by this method;
D, foam cement combined wall board are connected with foam cement compound roof:
Foam cement compound roof is positioned on foam cement combined wall board, respectively the wedge being placed with nut is put into the dovetail trough rim costal fovea groove that foam cement compound roof and foam cement combined wall board are provided with; Respectively bolt is passed connector again, and be connected and fixed with the nut be placed in wedge, utilize wedge and dovetail groove type steel frame limit rib fastening, thus foam cement combined wall board is connected with foam cement compound roof: remaining wallboard and top board are connected to a fixed successively by this method; Overall assembling construction completes;
E, according to designing requirement, carry out waterproof operation;
F, according to designing requirement, carry out interior;
G, installation sanitary bath equipment, comprising: water closet, washbasin, bath apparatus; And bathroom door is installed.
Above-mentioned E, F, G step, also can complete at the construction field (site).
Wherein, described wedge is slidably in dovetail trough rim costal fovea groove, so that capturing position and Fast Installation.
The hole coordinated with bolt and can the fluting of placing nut is provided with in described wedge.
Another structure of described wedge is in described wedge, be provided with the screwed hole coordinated with bolt.
The invention has the advantages that: the foam cement composite plate adopting suitability for industrialized production in the present invention, its fire endurance >=4 hour; Sound insulation >=42 decibel, to form raw material be inorganic material, be non-combustible, there is energy-conserving and environment-protective, load bearing heat preserving, heat insulation, fire-resistant, durable, antidetonation, light weight, the combination property such as high-strength.Therefore assembling integral vacuum toilet of the present invention has load bearing heat preserving, heat insulation, durable, antidetonation, light weight (integral vacuum toilet deadweight is only 3-4 ton), excellent fireproof performance and sound insulation property.Assembling integral vacuum toilet fitting operation of the present invention is easy, fast, firmly, greatly reduces the wet practice of job site between conventional sanitation, the environment pollution that reducing constructs between conventional sanitation causes and noise emissions.The present invention is a kind of green building product of energy-conserving and environment-protective.
Accompanying drawing explanation
Fig. 1 is assembling integral vacuum toilet structural representation of the present invention.
Fig. 2-1 is the structural representation of foam cement composite bottom board in the embodiment of the present invention.
Fig. 2-2 is the structural representation of foam cement combined wall board in the embodiment of the present invention.
Fig. 2-3 is the structural representation of foam cement compound roof in the embodiment of the present invention.
Fig. 2-4 is dovetail groove type limit rib sectional view in assembling integral vacuum toilet foam cement composite plate of the present invention.
Fig. 3-1, Fig. 3-2, Fig. 3-3 are wedge structural representation in the embodiment of the present invention.
Fig. 4 is the connecting joint structure schematic diagram of foam cement combined wall board and foam cement composite bottom board in the embodiment of the present invention 1.
Fig. 5 is the connecting joint structure schematic diagram of foam cement combined wall board and foam cement combined wall board in the embodiment of the present invention 1.
Fig. 6 is the connecting joint structure schematic diagram of foam cement combined wall board and foam cement compound roof in the embodiment of the present invention 1.
Fig. 7-1, Fig. 7-2 are wedge structural representation in the embodiment of the present invention 2.
Fig. 8 is the connecting joint structure schematic diagram of foam cement combined wall board and foam cement composite bottom board in the embodiment of the present invention 2.
Fig. 9 is formula limit rib sectional view of rising as high as the banks in the embodiment of the present invention 3.
Figure 10-1, Figure 10-2 are the connecting joint structure schematic diagram of foam cement combined wall board and foam cement composite bottom board in the embodiment of the present invention 3.
Figure 11 is the connecting joint structure schematic diagram of foam cement combined wall board and foam cement combined wall board in the embodiment of the present invention 3.
Figure 12-1, Figure 12-2 are the connecting joint structure schematic diagram of foam cement combined wall board and foam cement compound roof in the embodiment of the present invention 3.
Figure 13 is the connecting joint structure schematic diagram of foam cement combined wall board and foam cement combined wall board in the embodiment of the present invention 4.
Figure 14 is the connecting joint structure schematic diagram of foam cement combined wall board and foam cement compound roof in the embodiment of the present invention 4.
Figure 15-1, Figure 15-2, Figure 15-3 are the connecting joint structure schematic diagram of foam cement combined wall board and foam cement composite bottom board in the embodiment of the present invention 4.
Figure 16 is the connecting joint structure schematic diagram of foam cement combined wall board and foam cement composite bottom board (waterproof bead dovetail groove type limit rib) in the embodiment of the present invention 5.
Figure 17 is the connecting joint structure schematic diagram of foam cement combined wall board and foam cement composite bottom board in the embodiment of the present invention 5 (waterproof bead rise as high as the banks formula steel frame limit rib).
Drawing reference numeral illustrates:
Foam cement composite bottom board 1,1 '; Foam cement combined wall board 2,2 ';
Foam cement compound roof 3,3 '; Steel frame 101; Steel bar girder 102; Inorganic foamed cement core 103; Upper and lower cement screedn 104; Gauze wire cloth 105; Connector 106;
Bathroom door 4; Bath apparatus 51; Water closet 52; Washbasin 53;
Dovetail groove type limit rib 6; Groove 61; Rectangular tube 62;
Wedge 7; Hole 70; Fluting 71;
Screwed hole 72; Nut 73; Bolt 74; Bolt sleeve 75; Cover plate 76;
Right angle type connector 8; Via hole 81;
Formula of rising as high as the banks steel frame limit rib 9; Rise as high as the banks 91; Hole 92; Cavity 93; Perforation 94;
Waterproof bead dovetail groove type limit rib 10; Waterproof bead is risen as high as the banks formula steel frame limit rib 11.
Detailed description of the invention
Below in conjunction with Figure of description and embodiment, the invention will be further described.
Embodiment 1:
As shown in Figures 1 to 6, assembling integral vacuum toilet of the present invention, mainly comprises: foam cement composite bottom board 1, foam cement combined wall board 2, foam cement compound roof 3 and sanitary bath equipment: bath apparatus 51, water closet 52, washbasin 53.
Dovetail groove type steel frame limit rib 6 is provided with respectively in described foam cement composite bottom board 1, foam cement combined wall board 2, foam cement compound roof 3; Described dovetail groove type steel frame limit rib 6, is made up of upper bottom flange and dovetail trough rim costal fovea groove 61; And insert portion wedge 7 is provided with in described dovetail trough rim costal fovea groove 61; And in described wedge 7, be provided with the hole 70 that coordinates with bolt 74 and can the fluting 71 of placing nut 73.
Connection between described foam cement composite bottom board 1 and described foam cement combined wall board 2 is connected and fixed through right angle type connector 8 and the interior nut 73 placed of wedge 7 by bolt 74;
Connection between described foam cement combined wall board 2 and described foam cement combined wall board 2 ' is connected and fixed through right angle type connector 8 and the interior nut 73 placed of wedge 7 by bolt 74;
Connection between described foam cement combined wall board 2 and described foam cement compound roof 3 is connected and fixed through right angle type connector 8 and the interior nut 73 placed of wedge 7 by bolt 74.
Wherein, described right angle type connector 8 is provided with the via hole 81 matched with bolt.
As shown in Fig. 2-1, Fig. 2-2, Fig. 2-3, Fig. 2-4 to Figure 17, in embodiments of the present invention, described foam cement composite bottom board 1 or foam cement composite bottom board 1 ', formed by steel frame 101, steel bar girder 102, gauze wire cloth 105, inorganic foamed cement core 103, up and down cement screedn 104 compound; Wherein, gauze wire cloth 105 and steel frame 101 are connected and fixed; According to design requirement, gauze wire cloth 105 can overallly lay or part is laid.Can sewer pipe fitting be provided with in foam cement composite bottom board 1, comprise: gutter, floor drain etc.
Described foam cement combined wall board 2 or foam cement combined wall board 2 ', formed by steel frame 101, steel bar girder 102, inorganic foamed cement core 103, up and down gauze wire cloth 105, several connectors 106 socketed with upper and lower gauze wire cloth 105, upper and lower cement screedn 104 compound; Wherein, gauze wire cloth 105 and steel frame 101 are connected and fixed; According to design requirement, gauze wire cloth 105 can overallly lay or part is laid.Can be provided with in foam cement combined wall board 2 upper hose, on water swivel, toilet draining via hole, switch magazine, conduit; Combined wall board can be left a door unlocked in advance, window hole.
Described foam cement compound roof 3 or foam cement compound roof 3 ', formed by steel frame 101, gauze wire cloth 105, steel bar girder 102, inorganic foamed cement core 103, up and down cement screedn 104 compound; Wherein, gauze wire cloth 105 and steel frame 101 are connected and fixed; According to design requirement, gauze wire cloth 105 can overallly lay or part is laid.Socket magazine, pipeline can be provided with in foam cement compound roof 3; And ventilation, maintenance hole can be reserved.
In described dovetail trough rim costal fovea groove 61, the wedge that is provided with 6 is slidably, so that capturing position and Fast Installation.
Shape and groove 61 matching form of described wedge 6 close.
Described wedge 7 can be placed in the groove 61 of dovetail trough rim rib 6 in advance, also can be placed on when mounted in the groove 61 of dovetail trough rim rib 6.
The construction method of the embodiment of the present invention 1 assembling integral vacuum toilet, its method step comprises:
A, according to designing requirement, make foam cement composite bottom board 1, foam cement combined wall board 2, foam cement compound roof 3; Wherein, in described foam cement composite bottom board 1, foam cement combined wall board 2, foam cement compound roof 3, dovetail groove type steel frame limit rib 6 is provided with respectively; Described dovetail groove type steel frame limit rib 6, is made up of upper bottom flange and dovetail trough rim costal fovea groove 61; And insert portion wedge 7 is provided with in described dovetail trough rim costal fovea groove 61; The hole 70 that coordinates with bolt 74 and can the fluting 71 of placing nut 73 is provided with in wedge 7.
B, foam cement composite bottom board 1 are connected with foam cement combined wall board 2:
First, foam cement composite bottom board 1 is positioned on horizontal basal plane, by designing requirement, then foam cement combined wall board 2 is vertically positioned on foam cement composite bottom board 1 relative position; Respectively the wedge 7 being placed with nut 73 is put into the dovetail trough rim costal fovea groove 61 that foam cement composite bottom board 1 and foam cement combined wall board 2 are provided with; Respectively bolt 73 is passed right angle type connector 8 again, and is connected and fixed with the nut 73 be placed in wedge 7, utilize wedge 7 and dovetail groove type steel frame limit rib 6 fastening, thus foam cement composite bottom board 1 is connected with foam cement combined wall board 2:
C, foam cement combined wall board 2 are connected with foam cement combined wall board 2:
First second piece of foam cement combined wall board 2 is vertically positioned on foam cement composite bottom board 1 relative position, adjust the relative position of second block of wallboard and first block of wallboard, complete the connection of second piece of foam cement combined wall board 2 and foam cement composite bottom board 1 by step B;
Again first piece of foam cement combined wall board 2 is connected with second piece of foam cement combined wall board 2: the wedge 7 being placed with nut 73 is put into the dovetail trough rim costal fovea groove 61 that foam cement combined wall board 2 is provided with; Respectively bolt 74 is passed right angle type connector 8 again, and be connected and fixed with the nut 73 be placed in wedge 7, utilize wedge 7 and dovetail groove type steel frame limit rib 6 fastening, thus foam cement combined wall board 2 is connected with foam cement combined wall board 2: successively remaining foam cement combined wall board and foam cement combined wall board are connected to a fixed by this method;
D, foam cement combined wall board 2 are connected with foam cement compound roof 3:
Foam cement compound roof 3 is positioned on foam cement combined wall board 2, respectively the wedge 7 being placed with nut 73 is put into the dovetail trough rim costal fovea groove 61 that foam cement compound roof 3 and foam cement combined wall board 2 are provided with; Respectively bolt 74 is passed right angle type connector 8 again, and be connected and fixed with the nut 73 be placed in wedge 7, utilize wedge 7 and dovetail groove type steel frame limit rib 6 fastening, thus foam cement combined wall board 2 is connected with foam cement compound roof 3: successively remaining wallboard and top board are connected to a fixed by this method; Overall assembling construction completes;
E, according to designing requirement, carry out waterproof operation;
F, according to designing requirement, carry out interior;
G, installation sanitary bath equipment, comprising: bath apparatus 51; Water closet 52; Washbasin 53; Bathroom door 4 is installed.
Above-mentioned E, F, G step, also can complete at the construction field (site).
Embodiment 2:
As shown in Figure 1, Figure 2-1 to Fig. 2-4, shown in Fig. 7-1, Fig. 7-2, Fig. 8, assembling integral vacuum toilet of the present invention, mainly comprises: foam cement composite bottom board 1, foam cement combined wall board 2, foam cement compound roof 3 and sanitary bath equipment: bath apparatus 51, water closet 52, washbasin 53.
Dovetail groove type steel frame limit rib 6 is provided with respectively in described foam cement composite bottom board 1, foam cement combined wall board 2, foam cement compound roof 3; Described dovetail groove type steel frame limit rib 6, is made up of upper bottom flange and dovetail trough rim costal fovea groove 61; And insert portion wedge 7 is provided with in described dovetail trough rim costal fovea groove 61; And in wedge 7, be provided with the screwed hole 72 coordinated with bolt 74.
Connection between described foam cement composite bottom board 1 and described foam cement combined wall board 2 is connected and fixed through the wedge 7 be provided with in right angle type connector 8 and sheet material dovetail trough rim costal fovea groove 6 by bolt 74.
Connection between described foam cement combined wall board 2 and described foam cement combined wall board 2 ' is connected and fixed through the wedge 7 be provided with in right angle type connector 8 and sheet material dovetail trough rim costal fovea groove 6 by bolt 74.
Connection between described foam cement combined wall board 2 and described foam cement compound roof 3 is connected and fixed through the wedge 7 be provided with in right angle type connector 8 and sheet material dovetail trough rim costal fovea groove 6 by bolt 74.
The construction method of the embodiment of the present invention 2 assembling integral vacuum toilet, its method step comprises:
A, according to designing requirement, make foam cement composite bottom board 1, foam cement combined wall board 2, foam cement compound roof 3; Wherein, in described foam cement composite bottom board 1, foam cement combined wall board 2, foam cement compound roof 3, dovetail groove type steel frame limit rib 6 is provided with respectively; Described dovetail groove type steel frame limit rib 6, is made up of upper bottom flange and dovetail trough rim costal fovea groove 61; And insert portion wedge 7 is provided with in described dovetail trough rim costal fovea groove 61; Wedge 7 is provided with the screwed hole 72 coordinated with bolt 74;
B, foam cement composite bottom board 1 are connected with foam cement combined wall board 2:
First, foam cement composite bottom board 1 is positioned on horizontal basal plane, by designing requirement, then foam cement combined wall board 2 is vertically positioned on foam cement composite bottom board 1 relative position; Respectively the wedge 7 being placed with nut 73 is put into the dovetail trough rim costal fovea groove 61 that foam cement composite bottom board 1 and foam cement combined wall board 2 are provided with; Respectively bolt 74 is passed right angle type connector 8 again, and be connected and fixed with the screwed hole 72 in wedge 7, utilize wedge 7 and dovetail groove type steel frame limit rib 6 fastening, thus foam cement composite bottom board 1 and foam cement combined wall board 2 are connected and fixed; Successively remaining foam cement combined wall board and foam cement composite bottom board are connected to a fixed by this method;
C, foam cement combined wall board 2 are connected with foam cement combined wall board 2:
First second piece of foam cement combined wall board 2 is vertically positioned on foam cement composite bottom board 1 relative position, completes the connection of second piece of foam cement combined wall board 2 and foam cement composite bottom board 1 by step B;
Again first piece of foam cement combined wall board 2 is connected with second piece of foam cement combined wall board 2: the wedge 7 being placed with nut 73 is put into the dovetail trough rim costal fovea groove 61 that foam cement combined wall board 2 is provided with; Respectively bolt 74 is passed right angle type connector 8 again, and be connected and fixed with the screwed hole 72 in wedge 7, utilize wedge 7 and dovetail groove type steel frame limit rib 6 fastening, thus foam cement combined wall board 2 and foam cement combined wall board 2 are connected and fixed; Successively remaining foam cement combined wall board and foam cement combined wall board are connected to a fixed by this method;
D, foam cement combined wall board 2 are connected with foam cement compound roof 3:
Foam cement compound roof 3 is positioned on foam cement combined wall board 2, respectively the wedge 7 being placed with nut 73 is put into the dovetail trough rim costal fovea groove 61 that foam cement compound roof 3 and foam cement combined wall board 2 are provided with; Respectively bolt 73 is passed right angle type connector 8 again, and be connected and fixed with the screwed hole 72 in wedge 7, utilize wedge 7 and dovetail groove type steel frame limit rib 6 fastening, thus foam cement combined wall board 2 is connected with foam cement compound roof 3: successively remaining wallboard and top board are connected to a fixed by this method; Overall assembling construction completes;
E, according to designing requirement, carry out waterproof operation;
F, according to designing requirement, carry out interior;
G, installation sanitary bath equipment, comprising: bath apparatus 51; Water closet 52; Washbasin 53; Bathroom door 4 is installed;
Above-mentioned E, F, G step, also can complete at the construction field (site).
Embodiment 3:
As shown in Figure 1, Figure 2-1 to Fig. 2-4, shown in Fig. 9, Figure 10-1, Figure 10-2, Figure 11, Figure 12-1, Figure 12-2, assembling integral vacuum toilet of the present invention, mainly comprises: foam cement composite bottom board 1 ', foam cement combined wall board 2 or foam cement combined wall board 2 ', foam cement compound roof 3 ' and sanitary bath equipment: bath apparatus 51, water closet 52, washbasin 53.
Described foam cement composite bottom board 1 ' or described foam cement compound roof 3 ', be provided with formula steel frame limit rib 9 of rising as high as the banks, and 91 to be made up of upper bottom flange and rising as high as the banks; And on the edge of a wing, be provided with hole 70; Rising as high as the banks, stile place is provided with hole 93; The cavity 94 closed by steel plate or shaped steel is provided with, so that put into bolt 74 by hole 93 in rising as high as the banks in hole 93.
Described foam cement combined wall board 2, is provided with dovetail groove type steel frame limit rib 6; Described dovetail groove type steel frame limit rib 6, is made up of upper bottom flange and dovetail trough rim costal fovea groove 61; And insert portion wedge 7 is provided with in described dovetail trough rim costal fovea groove 61; And in described wedge 7, be provided with the hole 70 that coordinates with bolt 74 and can the fluting 71 of placing nut 73.
Foam cement combined wall board 2 ', is provided with dovetail groove type steel frame limit rib 6; Described dovetail groove type steel frame limit rib 6, is made up of upper bottom flange and dovetail trough rim costal fovea groove 61; Described upper bottom flange is provided with hole 70; And a rectangular tube 62 is provided with in dovetail groove type steel frame limit rib 6.
Connection between described foam cement composite bottom board 1 ' and described foam cement combined wall board 2 is connected and fixed through hole 70 and the interior nut 73 arranged of wedge 7 by bolt 74.
Connection between described foam cement combined wall board 2 and described foam cement combined wall board 2 ' is connected and fixed through hole 70 and the interior nut 73 arranged of wedge 7 by bolt 74.
Connection between described foam cement combined wall board 2 and described foam cement compound roof 3 ' is connected and fixed through hole 70 and the interior nut 73 arranged of wedge 7 by bolt 74.
The construction method of the embodiment of the present invention 3 assembling integral vacuum toilet, its method step comprises:
A, according to designing requirement, make foam cement composite bottom board 1 ', foam cement combined wall board 2 and foam cement combined wall board 2 ', foam cement compound roof 3 ';
B, foam cement composite bottom board 1 ' are connected with foam cement combined wall board 2:
First, foam cement composite bottom board 1 ' is positioned on horizontal basal plane, by designing requirement, then foam cement combined wall board 2 is vertically positioned on foam cement composite bottom board 1 ' relative position; The wedge 7 being placed with nut 73 is put into the dovetail trough rim costal fovea groove 61 that foam cement combined wall board 2 is provided with; Again from hole 92, bolt 74 is connected and fixed through hole 70 and the interior nut 73 arranged of wedge 7; Successively remaining foam cement combined wall board and foam cement composite bottom board are connected to a fixed by this method;
C, foam cement combined wall board 2 are connected with foam cement combined wall board 2 ':
First second piece of foam cement combined wall board 2 is vertically positioned on foam cement composite bottom board 1 ' relative position, adjust the relative position of second block of wallboard and first block of wallboard, complete the connection of second piece of foam cement combined wall board 2 and foam cement composite bottom board 1 ' by step B;
Again first piece of foam cement combined wall board 2 is connected with second piece of foam cement combined wall board 2 ': the wedge 7 being placed with nut 73 is put into the dovetail trough rim costal fovea groove 61 that foam cement combined wall board 2 is provided with; Respectively bolt 74 is connected and fixed through hole 70 and the interior nut 73 arranged of wedge 7 again; Successively remaining foam cement combined wall board and foam cement combined wall board are connected to a fixed by this method;
D, foam cement combined wall board 2 are connected with foam cement compound roof 3 ':
Foam cement compound roof 3 ' is positioned on foam cement combined wall board 2, the wedge 7 being placed with nut 73 is put into the dovetail trough rim costal fovea groove 61 that foam cement combined wall board 2 is provided with; Again from hole 92, bolt 74 is connected and fixed through hole 70 and the interior nut 73 arranged of wedge 7; Successively remaining wallboard and top board are connected to a fixed by this method; Overall assembling construction completes;
E, according to designing requirement, carry out waterproof operation;
F, according to designing requirement, carry out interior;
G, installation sanitary bath equipment, comprising: bath apparatus 51; Water closet 52; Washbasin 53; Bathroom door 4 is installed.
Above-mentioned E, F, G step, also can complete at the construction field (site).
Embodiment 4:
As shown in Figure 1, Figure 2-1 to Fig. 2-4, shown in Fig. 7, Fig. 9, Figure 13, Figure 14, Figure 15-1 to Figure 15-3, assembling integral vacuum toilet of the present invention, mainly comprises: foam cement composite bottom board 1 ', foam cement combined wall board 2 or foam cement combined wall board 2 ', foam cement compound roof 3 ' and sanitary bath equipment: bath apparatus 51, water closet 52, washbasin 53.
Dovetail groove type steel frame limit rib 6 is provided with in described foam cement combined wall board 2; Described dovetail groove type steel frame limit rib 6, is made up of upper bottom flange and dovetail trough rim costal fovea groove 61; And insert portion wedge 7 is provided with in described dovetail trough rim costal fovea groove 61; And in described wedge 7, be provided with the hole 70 that coordinates with bolt 74 and can the fluting 71 of placing nut 73.
Be equipped with formula steel frame limit rib 9 of rising as high as the banks in described foam cement combined wall board 2 ' or foam cement compound roof 3 ', 91 be made up of upper bottom flange and rising as high as the banks; Be provided with perforation 94 rising as high as the banks in 91; And bolt sleeve 75 is provided with in perforation 94; Rising as high as the banks, 91 top flanges are provided with cover plate 76, and the shape of cover plate 76 is identical with bolt sleeve 75; And cover plate 76 is provided with perforate 70.
Described foam cement composite bottom board 1 ', is provided with formula steel frame limit rib 9 of rising as high as the banks, and 91 to be made up of upper bottom flange and rising as high as the banks; And on the edge of a wing, be provided with hole 70; Rectangular tube 62 (as shown in Figure 15-2,15-2) is provided with in rising as high as the banks.
Connection between described foam cement composite bottom board 1 ' and described foam cement combined wall board 2 is connected and fixed with the interior nut 73 arranged of wedge 7 through hole 70, bolt sleeve 75 by bolt 74.
Connection between described foam cement combined wall board 2 and described foam cement combined wall board 2 ' is connected and fixed with the interior nut 73 arranged of wedge 7 through hole 70, rectangular tube 62 by bolt 74.
Connection between described foam cement combined wall board 2 and described foam cement compound roof 3 ' is connected and fixed with the interior nut 73 arranged of wedge 7 through hole 70, bolt sleeve 75 by bolt 74.
The construction method of the embodiment of the present invention 4 assembling integral vacuum toilet, its method step comprises:
A, according to designing requirement, make foam cement composite bottom board 1 ', foam cement combined wall board 2 and foam cement combined wall board 2 ', foam cement compound roof 3 ';
B, foam cement composite bottom board 1 ' are connected with foam cement combined wall board 2:
First, foam cement composite bottom board 1 ' is positioned on horizontal basal plane, by designing requirement, then foam cement combined wall board 2 is vertically positioned on foam cement composite bottom board 1 ' relative position; The wedge 7 being placed with nut 73 is put into the dovetail trough rim costal fovea groove 61 that foam cement combined wall board 2 is provided with; Bolt 74 is connected and fixed with the interior nut 73 arranged of wedge 7 through hole 70, rectangular tube 62; Successively remaining foam cement combined wall board and foam cement composite bottom board are connected to a fixed by this method;
C, foam cement combined wall board 2 are connected with foam cement combined wall board 2 ':
First second piece of foam cement combined wall board 2 is vertically positioned on foam cement composite bottom board 1 ' relative position, adjust the relative position of second block of wallboard and first block of wallboard, complete the connection of second piece of foam cement combined wall board 2 and foam cement composite bottom board 1 ' by step B;
Again first piece of foam cement combined wall board 2 is connected with second piece of foam cement combined wall board 2 ': the wedge 7 being placed with nut 73 is put into the dovetail trough rim costal fovea groove 61 that foam cement combined wall board 2 is provided with; Respectively bolt 74 is connected and fixed with the interior nut 73 arranged of wedge 7 through hole 70, bolt sleeve 75 again; Successively remaining foam cement combined wall board and foam cement combined wall board are connected to a fixed by this method;
D, foam cement combined wall board 2 are connected with foam cement compound roof 3 ':
Foam cement compound roof 3 ' is positioned on foam cement combined wall board 2, the wedge 7 being placed with nut 73 is put into the dovetail trough rim costal fovea groove 61 that foam cement combined wall board 2 is provided with; Again from hole 92, bolt 74 is connected and fixed with the interior nut 73 arranged of wedge 7 through hole 70, bolt sleeve 75; Successively remaining wallboard and top board are connected to a fixed by this method; Overall assembling construction completes;
E, according to designing requirement, carry out waterproof operation;
F, according to designing requirement, carry out interior;
G, installation sanitary bath equipment, comprising: bath apparatus 51; Water closet 52; Washbasin 53; Bathroom door 4 is installed.
Above-mentioned E, F, G step, also can complete at the construction field (site).
Embodiment 5:
As shown in figure 16, except the foam cement composite bottom board structure feature described in above-described embodiment 1 to 4, waterproof bead dovetail groove type limit rib 10 is provided with in the foam cement composite bottom board 1 of the present embodiment 5, with when described foam cement composite bottom board 1 is connected with foam cement combined wall board 2, waterproof action can be played, utilize base plate to roll up vertically upward, avoid water in washroom and infiltrate in the seam of wallboard and base plate.The further feature of the present embodiment is same as the previously described embodiments, therefore is not repeating.
As shown in figure 17, except the foam cement composite bottom board structure feature described in above-described embodiment 1 to 4, in the foam cement composite bottom board 1 ' of the present embodiment 5, be provided with waterproof bead to rise as high as the banks formula steel frame limit rib 11, with when described foam cement composite bottom board 1 ' is connected with foam cement combined wall board 2, waterproof action can be played.The further feature of the present embodiment is same as the previously described embodiments, therefore is not repeating.
For a person skilled in the art, according to different design requirements, the connected mode in the embodiment of the present invention between foam cement composite board can be carried out independent assortment.Above-described embodiment is the preferred embodiments of the present invention, but is not limited to above-mentioned several mode.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (29)

1. an assembling integral vacuum toilet, it comprises: foam cement composite bottom board, foam cement combined wall board, foam cement compound roof and sanitary bath equipment, is characterized in that: in described foam cement composite bottom board, foam cement combined wall board, foam cement compound roof, be provided with dovetail groove type steel frame limit rib respectively; Described dovetail groove type steel frame limit rib, is made up of upper bottom flange and dovetail trough rim costal fovea groove; And insert portion wedge is provided with in described dovetail trough rim costal fovea groove;
Connection between described foam cement combined wall board and described foam cement composite bottom board is that the wedge by being provided with in bolt, connector and sheet material dovetail trough rim costal fovea groove is connected and fixed;
Connection between described foam cement combined wall board and described foam cement combined wall board is that the wedge by being provided with in bolt, connector and sheet material dovetail trough rim costal fovea groove is connected and fixed;
Connection between described foam cement combined wall board and described foam cement compound roof is that the wedge by being provided with in bolt, connector and sheet material dovetail trough rim costal fovea groove is connected and fixed.
2. an assembling integral vacuum toilet, mainly comprise: foam cement composite bottom board, foam cement combined wall board, foam cement compound roof and sanitary bath equipment, it is characterized in that: described foam cement composite bottom board or described foam cement compound roof, be provided with formula steel frame limit rib of rising as high as the banks, be made up of upper bottom flange and rising as high as the banks; And hole is provided with on the edge of a wing; Rising as high as the banks, stile place is provided with hole; The cavity closed by steel plate or shaped steel is provided with, so that put into bolt by hole in rising as high as the banks in hole;
Described foam cement combined wall board, is provided with dovetail groove type steel frame limit rib; Described dovetail groove type steel frame limit rib, is made up of upper bottom flange and dovetail trough rim costal fovea groove; And insert portion wedge is provided with in described dovetail trough rim costal fovea groove;
Another block foam cement combined wall board, is provided with dovetail groove type steel frame limit rib; Described dovetail groove type steel frame limit rib, is made up of upper bottom flange and dovetail trough rim costal fovea groove; Described upper bottom flange is provided with hole; And a rectangular tube is provided with in the rib of dovetail groove type steel frame limit;
Connection between described foam cement composite bottom board and described foam cement combined wall board is connected and fixed through the nut arranged in hole and wedge by bolt;
Connection between described foam cement combined wall board and another block foam cement combined wall board is connected and fixed through the nut arranged in hole and wedge by bolt;
Connection between described foam cement combined wall board and described foam cement compound roof is connected and fixed through the nut arranged in hole and wedge by bolt.
3. an assembling integral vacuum toilet, mainly comprise: foam cement composite bottom board, foam cement combined wall board, foam cement compound roof and sanitary bath equipment, is characterized in that: in described foam cement combined wall board, be provided with dovetail groove type steel frame limit rib; Described dovetail groove type steel frame limit rib, is made up of upper bottom flange and dovetail trough rim costal fovea groove; And insert portion wedge is provided with in described dovetail trough rim costal fovea groove;
Be equipped with formula steel frame limit rib of rising as high as the banks in described foam cement combined wall board or foam cement compound roof, be made up of upper bottom flange and rising as high as the banks; Perforation is provided with in rising as high as the banks; And bolt sleeve is provided with in perforation; Rising as high as the banks, top flange is provided with cover plate, and the shape of cover plate is identical with bolt sleeve; And cover plate is provided with perforate;
Described foam cement composite bottom board, is provided with formula steel frame limit rib of rising as high as the banks, and is made up of upper bottom flange and rising as high as the banks; And hole is provided with on the edge of a wing; Rectangular tube is provided with in rising as high as the banks;
Connection between described foam cement composite bottom board and described foam cement combined wall board is connected and fixed through the nut arranged in hole, bolt sleeve and wedge by bolt;
Connection between described foam cement combined wall board and another block foam cement combined wall board is connected and fixed through the nut arranged in hole, rectangular tube and wedge by bolt;
Connection between described foam cement combined wall board and described foam cement compound roof is connected and fixed through the nut arranged in hole, bolt sleeve and wedge by bolt.
4. the assembling integral vacuum toilet according to claims 1 to 3, is characterized in that: described foam cement composite bottom board, is made up of steel frame, steel bar girder, gauze wire cloth, inorganic foamed cement core, up and down cement screedn compound; Wherein, gauze wire cloth and steel frame are connected and fixed; According to design requirement, gauze wire cloth can overallly lay or part is laid; Can sewer pipe fitting be provided with in foam cement composite bottom board, comprise: gutter, floor drain.
5. the assembling integral vacuum toilet according to claims 1 to 3, it is characterized in that: described foam cement combined wall board, be made up of steel frame, up and down gauze wire cloth, several connectors socketed with upper and lower gauze wire cloth, inorganic foamed cement core, upper and lower cement screedn compound; Wherein, gauze wire cloth and steel frame are connected and fixed; According to design requirement, gauze wire cloth can overallly lay or part is laid; Can be provided with in foam cement combined wall board upper hose, on water swivel, toilet draining via hole, switch magazine, conduit; Combined wall board can be left a door unlocked in advance, window hole.
6. the assembling integral vacuum toilet according to claims 1 to 3, is characterized in that: described foam cement combined wall board, is made up of steel frame, gauze wire cloth, steel bar girder, inorganic foamed cement core, up and down cement screedn compound; Wherein, gauze wire cloth and steel frame are connected and fixed; According to design requirement, gauze wire cloth can overallly lay or part is laid.Can be provided with in foam cement combined wall board upper hose, on water swivel, toilet draining via hole, switch magazine, conduit; Combined wall board can be left a door unlocked in advance, window hole.
7. the assembling integral vacuum toilet according to claims 1 to 3, is characterized in that: described foam cement compound roof, is made up of steel frame, gauze wire cloth, steel bar girder, inorganic foamed cement core, up and down cement screedn compound; Wherein, gauze wire cloth and steel frame are connected and fixed; According to design requirement, gauze wire cloth can overallly lay or part is laid; Socket magazine, pipeline can be provided with in foam cement compound roof; And ventilation, maintenance hole can be reserved.
8. the assembling integral vacuum toilet according to claims 1 to 3, is characterized in that: in described dovetail trough rim costal fovea groove, the wedge that is provided with is slidably, so that capturing position and Fast Installation.
9. the assembling integral vacuum toilet according to claims 1 to 3, is characterized in that: described wedge can be placed in the groove of dovetail trough rim rib in advance, also can be placed in the groove of dovetail trough rim rib when mounted.
10. the assembling integral vacuum toilet according to claims 1 to 3, is characterized in that: the shape of described wedge matches with groove shapes.
11. assembling integral vacuum toilets according to claims 1 to 3, is characterized in that: in described wedge, be provided with the hole coordinated with bolt and can the fluting of placing nut.
12. assembling integral vacuum toilets according to claims 1 to 3, is characterized in that: in described wedge, be provided with the screwed hole coordinated with bolt.
13. assembling integral vacuum toilets according to claims 1 to 3, is characterized in that: described connector is right angle type connector; And on connector, be provided with the via hole matched with bolt.
14. assembling integral vacuum toilets according to claims 1 to 3, is characterized in that: outside in described assembling integral vacuum toilet, can adopt various decorating and renovating material to fit up, to meet the washroom decorations requirement of different-style.
15. assembling integral vacuum toilets according to claims 1 to 3, it is characterized in that: the decorating and renovating material that outside is used in described assembling integral vacuum toilet, before washroom assembling, can carry out decoration construction in advance on foam cement composite bottom board, foam cement combined wall board, foam cement compound roof, complete assembling in washroom after, decorations complete.
16. assembling integral vacuum toilets according to claims 1 to 3, it is characterized in that: in described assembling integral vacuum toilet, the waterproofing materials of various coating class or coiled material class can be adopted to carry out toilet warterproof process, waterproof construction can be constructed at foam cement composite bottom board before washroom assembling, also can construct, to meet different toilet warterproof requirements after integral vacuum toilet assembling.
17. assembling integral vacuum toilets according to claims 1 to 3, it is characterized in that: in foam cement composite bottom board, be provided with waterproof bead dovetail groove type limit rib, base plate is utilized to roll up vertically upward, with when described foam cement composite bottom board is connected with foam cement combined wall board, can play waterproof action, the water avoiding washroom infiltrates in the seam of wallboard and base plate.
18. assembling integral vacuum toilets according to claims 1 to 3, it is characterized in that: be provided with waterproof bead in foam cement composite bottom board and rise as high as the banks formula steel frame limit rib, with when described foam cement composite bottom board is connected with foam cement combined wall board, waterproof action can be played.
The construction method of 19. 1 kinds of assembling integral vacuum toilets, its method step comprises:
According to client's actual demand, the foam cement composite bottom board adopted, foam cement combined wall board, foam cement compound roof all carry out industrialized customized production in factory, and according to designing requirement by pre-to upper and lower conduit part, consumer, Yi Jimen, window hole etc. in foam cement composite board; As playing with building blocks, foam cement composite bottom board, foam cement combined wall board, foam cement compound roof to be carried out precisely, quick-assembling, and adopt mechanical system to be connected and fixed; And sanitary bath equipment is installed, and be built into integrated bathroom; Again integral vacuum toilet is transported to job site; Use lifting crane gear, by integral vacuum toilet installation in position.
The construction method of 20. assembling integral vacuum toilets according to claim 18, is characterized in that: described integral vacuum toilet, can complete waterproof according to demand and interior and exterior finishes is constructed in factory.
The construction method of 21. assembling integral vacuum toilets according to claim 18, is characterized in that: bathroom device equipment set in described integral vacuum toilet, also can complete installation at the construction field (site).
The construction method of 22. 1 kinds of assembling integral vacuum toilets, its method step comprises:
A, according to designing requirement, make foam cement composite bottom board, foam cement combined wall board, foam cement compound roof; Wherein, in described foam cement composite bottom board, foam cement combined wall board, foam cement compound roof, dovetail groove type steel frame limit rib is provided with respectively; Described dovetail groove type steel frame limit rib, is made up of upper bottom flange and dovetail trough rim costal fovea groove; And insert portion wedge is provided with in described dovetail trough rim costal fovea groove;
B, foam cement composite bottom board are connected with foam cement combined wall board:
First, foam cement composite bottom board is positioned on horizontal basal plane, by designing requirement, then foam cement combined wall board is vertically positioned on foam cement composite bottom board relative position; Respectively the wedge being placed with nut is put into the dovetail trough rim costal fovea groove that foam cement composite bottom board and foam cement combined wall board are provided with; Again respectively by bolt through connector, and to be connected and fixed with the nut be placed in wedge, utilize wedge and dovetail groove type steel frame limit rib fastening, thus foam cement composite bottom board and foam cement combined wall board are connected and fixed; Successively remaining foam cement combined wall board and foam cement composite bottom board are connected to a fixed by this method;
C, foam cement combined wall board are connected with foam cement combined wall board:
First second piece of foam cement combined wall board is vertically positioned on foam cement composite bottom board relative position, and adjusts the relative position of second block of wallboard and first block of wallboard, complete the connection of second piece of foam cement combined wall board and foam cement composite bottom board by step B;
Again first block of wallboard is connected with second block of wallboard: the wedge being placed with nut is put into the dovetail trough rim costal fovea groove that foam cement combined wall board is provided with; Respectively bolt is passed connector again, and be connected and fixed with the nut be placed in wedge, utilize wedge and dovetail groove type steel frame limit rib fastening, thus foam cement combined wall board is connected with foam cement combined wall board: remaining foam cement combined wall board and foam cement combined wall board are connected to a fixed successively by this method;
D, foam cement combined wall board are connected with foam cement compound roof:
Foam cement compound roof is positioned on foam cement combined wall board, respectively the wedge being placed with nut is put into the dovetail trough rim costal fovea groove that foam cement compound roof and foam cement combined wall board are provided with; Respectively bolt is passed connector again, and be connected and fixed with the nut be placed in wedge, utilize wedge and dovetail groove type steel frame limit rib fastening, thus foam cement combined wall board is connected with foam cement compound roof: remaining wallboard and top board are connected to a fixed successively by this method; Overall assembling construction completes;
E, according to designing requirement, carry out waterproof operation;
F, according to designing requirement, carry out interior;
G, installation sanitary bath equipment; And bathroom door is installed.
Above-mentioned E, F, G step, also can complete at the construction field (site); Or above-mentioned E, F step, also can fulfil ahead of schedule at base plate, wallboard, top board before assembly.
The construction method of 23. assembling integral vacuum toilets according to claim 21, is characterized in that: described wedge, is slidably in dovetail trough rim costal fovea groove, so that capturing position and Fast Installation.
The construction method of 24. assembling integral vacuum toilets according to claim 21, is characterized in that: in described wedge, be provided with the hole coordinated with bolt and can the fluting of placing nut.
The construction method of 25. assembling integral vacuum toilets according to claim 22, is characterized in that: in described wedge, be provided with the screwed hole coordinated with bolt.
The construction method of 26. 1 kinds of assembling integral vacuum toilets, its method step comprises:
A, according to designing requirement, make foam cement composite bottom board, foam cement combined wall board, foam cement compound roof;
B, foam cement composite bottom board are connected with foam cement combined wall board:
First, foam cement composite bottom board is positioned on horizontal basal plane, by designing requirement, then foam cement combined wall board is vertically positioned on foam cement composite bottom board relative position; The wedge being placed with nut is put into the dovetail trough rim costal fovea groove that foam cement combined wall board is provided with; Again from hole, bolt is connected and fixed through the nut arranged in hole and wedge; Successively remaining foam cement combined wall board and foam cement composite bottom board are connected to a fixed by this method;
C, foam cement combined wall board are connected with second piece of foam cement combined wall board:
First second piece of foam cement combined wall board is vertically positioned on foam cement composite bottom board relative position, adjusts the relative position of second block of wallboard and first block of wallboard, complete the connection of second piece of foam cement combined wall board and foam cement composite bottom board by step B;
Again first piece of foam cement combined wall board is connected with second piece of foam cement combined wall board: the wedge being placed with nut is put into the dovetail trough rim costal fovea groove that foam cement combined wall board is provided with; Respectively bolt is connected and fixed through the nut arranged in hole and wedge again; Successively remaining foam cement combined wall board and foam cement combined wall board are connected to a fixed by this method;
D, foam cement combined wall board are connected with foam cement compound roof:
Foam cement compound roof is positioned on foam cement combined wall board, the wedge being placed with nut is put into the dovetail trough rim costal fovea groove that foam cement combined wall board is provided with; Again from hole, bolt is connected and fixed through the nut arranged in hole and wedge; Successively remaining wallboard and top board are connected to a fixed by this method; Overall assembling construction completes;
E, according to designing requirement, carry out waterproof operation;
F, according to designing requirement, carry out interior;
G, installation sanitary bath equipment and installation bathroom door.
Above-mentioned E, F, G step, also can complete at the construction field (site); Or above-mentioned E, F step, also can fulfil ahead of schedule at base plate, wallboard, top board before assembly.
The construction method of 27. 1 kinds of assembling integral vacuum toilets, its method step comprises:
A, according to designing requirement, make foam cement composite bottom board, foam cement combined wall board, foam cement compound roof;
B, foam cement composite bottom board are connected with foam cement combined wall board:
First, foam cement composite bottom board is positioned on horizontal basal plane, by designing requirement, then foam cement combined wall board is vertically positioned on foam cement composite bottom board relative position; The wedge being placed with nut is put into the dovetail trough rim costal fovea groove that foam cement combined wall board is provided with; Bolt is connected and fixed through the nut arranged in hole, rectangular tube and wedge; Successively remaining foam cement combined wall board and foam cement composite bottom board are connected to a fixed by this method;
C, foam cement combined wall board are connected with second piece of foam cement combined wall board:
First second piece of foam cement combined wall board is vertically positioned on foam cement composite bottom board relative position, adjusts the relative position of second block of wallboard and first block of wallboard, complete the connection of second piece of foam cement combined wall board and foam cement composite bottom board by step B;
Again first piece of foam cement combined wall board is connected with second piece of foam cement combined wall board: the wedge being placed with nut is put into the dovetail trough rim costal fovea groove that foam cement combined wall board is provided with; Respectively bolt is connected and fixed through the nut arranged in hole, bolt sleeve and wedge again; Successively remaining foam cement combined wall board and foam cement combined wall board are connected to a fixed by this method;
D, foam cement combined wall board are connected with foam cement compound roof:
Foam cement compound roof is positioned on foam cement combined wall board, the wedge being placed with nut is put into the dovetail trough rim costal fovea groove that foam cement combined wall board is provided with; Again from hole, bolt is connected and fixed through the nut arranged in hole, bolt sleeve and wedge; Successively remaining wallboard and top board are connected to a fixed by this method; Overall assembling construction completes;
E, according to designing requirement, carry out waterproof operation;
F, according to designing requirement, carry out interior;
G, installation sanitary bath equipment; Bathroom door is installed.
Above-mentioned E, F, G step, also can complete at the construction field (site); Or above-mentioned E, F step, also can fulfil ahead of schedule at base plate, wallboard, top board before assembly.
The construction method of 28. assembling integral vacuum toilets according to claim 18,21,25 or 26, it is characterized in that: in foam cement composite bottom board, be provided with waterproof bead dovetail groove type limit rib, base plate is utilized to roll up vertically upward, with when described foam cement composite bottom board is connected with foam cement combined wall board, can waterproof action be played, avoid water in washroom and infiltrate in the seam of wallboard and base plate.
The construction method of 29. assembling integral vacuum toilets according to claim 18,21,25 or 26, it is characterized in that: be provided with waterproof bead in foam cement composite bottom board and rise as high as the banks formula steel frame limit rib, with when described foam cement composite bottom board is connected with foam cement combined wall board, waterproof action can be played.
CN201510895502.XA 2015-12-08 2015-12-08 A kind of assembled integral vacuum toilet and its method of construction Active CN105421826B (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201510895502.XA CN105421826B (en) 2015-12-08 2015-12-08 A kind of assembled integral vacuum toilet and its method of construction
SG11201804065RA SG11201804065RA (en) 2015-12-08 2016-09-28 Prefabricated integrated bathroom and construction method thereof
CN201680070072.0A CN110494618A (en) 2015-12-08 2016-09-28 A kind of assembled integral vacuum toilet and its method of construction
PCT/CN2016/100634 WO2017097018A1 (en) 2015-12-08 2016-09-28 Assembly-type integrated bathroom and construction method therefor
JP2018528643A JP6606286B2 (en) 2015-12-08 2016-09-28 Unit bus and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510895502.XA CN105421826B (en) 2015-12-08 2015-12-08 A kind of assembled integral vacuum toilet and its method of construction

Publications (2)

Publication Number Publication Date
CN105421826A true CN105421826A (en) 2016-03-23
CN105421826B CN105421826B (en) 2018-11-27

Family

ID=55500331

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201510895502.XA Active CN105421826B (en) 2015-12-08 2015-12-08 A kind of assembled integral vacuum toilet and its method of construction
CN201680070072.0A Pending CN110494618A (en) 2015-12-08 2016-09-28 A kind of assembled integral vacuum toilet and its method of construction

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201680070072.0A Pending CN110494618A (en) 2015-12-08 2016-09-28 A kind of assembled integral vacuum toilet and its method of construction

Country Status (4)

Country Link
JP (1) JP6606286B2 (en)
CN (2) CN105421826B (en)
SG (1) SG11201804065RA (en)
WO (1) WO2017097018A1 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401212A (en) * 2016-11-08 2017-02-15 张爱民 Integrated bathroom device
WO2017097018A1 (en) * 2015-12-08 2017-06-15 北京太空板业股份有限公司 Assembly-type integrated bathroom and construction method therefor
CN107060378A (en) * 2017-01-06 2017-08-18 合肥国瑞集成建筑科技有限公司 A kind of lightweight steel construction assembled bio-toilet and its manufacture method
CN107269041A (en) * 2017-08-09 2017-10-20 广州市海帕智能家居有限公司 Modular assembly formula sanitary unit
CN107288374A (en) * 2017-06-26 2017-10-24 上海毅匹玺建筑科技有限公司 Assembled toilet overall architecture
CN107448013A (en) * 2017-08-09 2017-12-08 广州市海帕智能家居有限公司 The wall top attachment structure node of modular assembly formula sanitary unit
CN110522331A (en) * 2019-07-19 2019-12-03 北京工业大学 A kind of assembly bathroom chassis
CN110815511A (en) * 2019-11-14 2020-02-21 安徽海龙建筑工业有限公司 Integral toilet box mold and manufacturing and mounting method thereof
EP3623599A1 (en) 2018-09-11 2020-03-18 RENAULT s.a.s. Acoustic protection device for a motor vehicle engine
WO2020211023A1 (en) * 2019-04-15 2020-10-22 长沙远大住宅工业集团股份有限公司 Integrated kitchen and bathroom structure and manufacturing method therefor

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222554A (en) * 2017-12-30 2018-06-29 浙江亚厦装饰股份有限公司 toilet frame, toilet frame assembly method
CN108798084A (en) * 2018-09-03 2018-11-13 湖南建工集团有限公司 A kind of coaxial socket joint type toilet structural system
CN112761384B (en) * 2020-12-25 2022-05-17 蓝城乐居建设管理集团有限公司 Assembled laboratory for detecting heat insulation performance of building door and window
CN114800901A (en) * 2022-05-07 2022-07-29 中建八局第二建设有限公司 Assembled toilet positioning and hole-opening device and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20012641U1 (en) * 2000-07-21 2000-09-21 Ibt Ingenieurbuero Fuer Befest Device for corner fixing a reveal panel
CN1873167A (en) * 2006-06-15 2006-12-06 山东嘉源玻璃钢有限公司 Integral toilet
JP2008069584A (en) * 2006-09-15 2008-03-27 Mitsubishi Plastics Ind Ltd Fitting structure of cover plate for partition wall corner part
CN101265723A (en) * 2008-05-07 2008-09-17 樊立 Architecture structure system assembled by composite building board and building method
WO2015109591A1 (en) * 2014-01-27 2015-07-30 欧建宗 A hollow groove pipe structure
CN104947848A (en) * 2015-06-18 2015-09-30 北京大工简筑科技有限公司 Assembly type house light steel composite wallboard and mounting method thereof
CN205348844U (en) * 2015-12-08 2016-06-29 北京太空板业股份有限公司 Whole bathroom of assembled

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0119686Y2 (en) * 1983-07-26 1989-06-07
AT406064B (en) * 1993-06-02 2000-02-25 Evg Entwicklung Verwert Ges COMPONENT
JPH07317339A (en) * 1993-12-17 1995-12-05 Inax Corp Module for plumbing equipment
CN1141472C (en) * 2000-01-24 2004-03-10 樊志 Assembly-type light partition
CN1181955C (en) * 2002-12-31 2004-12-29 北京太空板业股份有限公司 Foamed cement composite slab and its production method
JP2006183440A (en) * 2004-12-28 2006-07-13 Toto Ltd Wall panel connecting structure and unit room
CN201021548Y (en) * 2007-03-08 2008-02-13 陈地清 A combined whole toilet
CN202326557U (en) * 2011-11-15 2012-07-11 朱祯祥 Connecting piece for detachable panel furniture
CN102561513A (en) * 2012-02-02 2012-07-11 赵冰洋 Unit cabin type building system
CN202831362U (en) * 2012-09-01 2013-03-27 海伦市广厦陶粒砖厂 Foam cement compound wallboard
CN105421826B (en) * 2015-12-08 2018-11-27 太空智造股份有限公司 A kind of assembled integral vacuum toilet and its method of construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20012641U1 (en) * 2000-07-21 2000-09-21 Ibt Ingenieurbuero Fuer Befest Device for corner fixing a reveal panel
CN1873167A (en) * 2006-06-15 2006-12-06 山东嘉源玻璃钢有限公司 Integral toilet
JP2008069584A (en) * 2006-09-15 2008-03-27 Mitsubishi Plastics Ind Ltd Fitting structure of cover plate for partition wall corner part
CN101265723A (en) * 2008-05-07 2008-09-17 樊立 Architecture structure system assembled by composite building board and building method
WO2015109591A1 (en) * 2014-01-27 2015-07-30 欧建宗 A hollow groove pipe structure
CN104947848A (en) * 2015-06-18 2015-09-30 北京大工简筑科技有限公司 Assembly type house light steel composite wallboard and mounting method thereof
CN205348844U (en) * 2015-12-08 2016-06-29 北京太空板业股份有限公司 Whole bathroom of assembled

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017097018A1 (en) * 2015-12-08 2017-06-15 北京太空板业股份有限公司 Assembly-type integrated bathroom and construction method therefor
CN106401212A (en) * 2016-11-08 2017-02-15 张爱民 Integrated bathroom device
CN107060378A (en) * 2017-01-06 2017-08-18 合肥国瑞集成建筑科技有限公司 A kind of lightweight steel construction assembled bio-toilet and its manufacture method
CN107288374A (en) * 2017-06-26 2017-10-24 上海毅匹玺建筑科技有限公司 Assembled toilet overall architecture
CN107269041A (en) * 2017-08-09 2017-10-20 广州市海帕智能家居有限公司 Modular assembly formula sanitary unit
CN107448013A (en) * 2017-08-09 2017-12-08 广州市海帕智能家居有限公司 The wall top attachment structure node of modular assembly formula sanitary unit
EP3623599A1 (en) 2018-09-11 2020-03-18 RENAULT s.a.s. Acoustic protection device for a motor vehicle engine
WO2020211023A1 (en) * 2019-04-15 2020-10-22 长沙远大住宅工业集团股份有限公司 Integrated kitchen and bathroom structure and manufacturing method therefor
CN110522331A (en) * 2019-07-19 2019-12-03 北京工业大学 A kind of assembly bathroom chassis
CN110522331B (en) * 2019-07-19 2021-11-16 北京工业大学 Assembled bathroom chassis
CN110815511A (en) * 2019-11-14 2020-02-21 安徽海龙建筑工业有限公司 Integral toilet box mold and manufacturing and mounting method thereof

Also Published As

Publication number Publication date
WO2017097018A1 (en) 2017-06-15
SG11201804065RA (en) 2018-06-28
CN105421826B (en) 2018-11-27
JP6606286B2 (en) 2019-11-13
CN110494618A (en) 2019-11-22
JP2019504945A (en) 2019-02-21

Similar Documents

Publication Publication Date Title
CN105421826A (en) Assembly-type integrated bathroom and construction method thereof
CN204386019U (en) A kind of precast wall panel and the assembling type outer wall system of being assembled by this side fascia
CN202644775U (en) Prefabricated sandwich external wall panel with thermal insulation concrete
CN106522359A (en) Total-prefabricated rural residential class composite wall structure system and construction method thereof
WO2015120794A1 (en) Building component replacing plaster layer with prefabricated panel protection layer
CN104695662A (en) Stone facing prefabricated external wall plate as well as production method and external wall system thereof
CN2931627Y (en) Framework and wall panel combination floor
CN203499163U (en) GRC (glass fiber-reinforced concrete) decorative concrete outer wallboard
CN205116541U (en) Foaming light aggregate concrete partition plate
CN205348844U (en) Whole bathroom of assembled
CN206693447U (en) A kind of lightgage steel joist expanded metal lath composite partition
CN206205140U (en) A kind of full assembled villages and small towns local-style dwelling houses class composite wall structure system
CN206337672U (en) A kind of useless brick facing prefabricated thermal insulation exterior wall plate
CN205171752U (en) Prefabricated light steel partition wall and mounting structure thereof
CN106958358A (en) The industrialization commercial residential buildings of energy-conserving and environment-protective
CN213806285U (en) Heat preservation decoration integrated plate, heat preservation decoration external wall plate and connection joint of external wall plate
CN205134993U (en) Prefabricated whole bathroom
CN204491984U (en) Stone facing precast wall panel and external wall system
CN204491990U (en) The heat insulation integrated side fascia of a kind of glaze decorating
CN206681418U (en) The industrialization commercial residential buildings of energy-conserving and environment-protective
CN209907850U (en) Layered flue for high-rise building
CN208039610U (en) Assembled integrated heat-insulation wall plate
CN206706994U (en) Lightweight steel construction villa
CN201635294U (en) Hollow steel-wire rack concrete heat-preserving outer wall board
CN216041960U (en) Light combined integral prefabricated internal partition wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 100070 12, 3 building, 1 nuclear Road, Science City, Fengtai District, Beijing.

Applicant after: Taikong Intelligent Construction Co.,Ltd.

Applicant after: HENGYUAN BUILDING PLATE INDUSTRY CO., LTD.

Applicant after: CHANGZHOU LYUJIAN PLATE INDUSTRY CO., LTD.

Address before: 100070 12, 3 building, 1 nuclear Road, Science City, Fengtai District, Beijing.

Applicant before: Beijing Taikong Panel Industry Corp.

Applicant before: HENGYUAN BUILDING PLATE INDUSTRY CO., LTD.

Applicant before: CHANGZHOU LYUJIAN PLATE INDUSTRY CO., LTD.

GR01 Patent grant
GR01 Patent grant