CN206625609U - Quick decoration system - Google Patents

Quick decoration system Download PDF

Info

Publication number
CN206625609U
CN206625609U CN201621373708.2U CN201621373708U CN206625609U CN 206625609 U CN206625609 U CN 206625609U CN 201621373708 U CN201621373708 U CN 201621373708U CN 206625609 U CN206625609 U CN 206625609U
Authority
CN
China
Prior art keywords
integrated
wallboard
toilet
floor
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621373708.2U
Other languages
Chinese (zh)
Inventor
闫俊杰
梅能敏
赵静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Renju Technology Group Co ltd
Original Assignee
TIANJIN DAYIN BUILDING MATERIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN DAYIN BUILDING MATERIAL Co Ltd filed Critical TIANJIN DAYIN BUILDING MATERIAL Co Ltd
Priority to CN201621373708.2U priority Critical patent/CN206625609U/en
Application granted granted Critical
Publication of CN206625609U publication Critical patent/CN206625609U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of quick decoration system, in being fitted up applied to assembled, the quick decoration system specifically includes integrated Toilet system, integrated water supply system, integrated drainage system, integrated heating system, integrated partition wall system, integrated hanging plate system, integrated ceiling system and integrated kitchen system.Above-mentioned subsystem in quick decoration system of the present utility model, although being had nothing in common with each other in manufacture, assembly technology, it is respectively provided with, and assembling is quick, and the characteristics of the technical merit of assembling quality, efficiency independent of worker.Quick decoration system of the present utility model provides the solution of system for assembled finishing.

Description

Quick decoration system
Technical field
It the utility model is related to assembled decoration technology field, more particularly to a kind of quick decoration system.
Background technology
Assembled finishing be a kind of component part by industrialized production by reliable assembly method, pressed by industrial worker The fitment process of dry construction is used according to standardized program.Assembled finishing is mostly dry construction based on construction characteristic, passes through branch Efficiently separating for support body and obturator, makes house have structure durability, interior space flexibility and obturator updatability. Supporter and obturator in being fitted up due to assembled is more prefabricated in the factory, is then assembled at the scene, so that dress Technical merit of the quality and efficiency repaiied independent of skilled worker.
In fact, implement the supporter that is processed in the factory of enterprise or the obturator of assembled finishing to be considered whole The component part of individual product, or the component part as " equipment " can be regarded as, when carrying out assembled finishing, will can construct It is the assembling process of product or the general assembly process of " equipment " that journey, which is regarded as,.
According to described above, the implemented assembled finishing simply part component in prefabricated " equipment " mostly in the prior art Part, installation fitting is not produced more, not overall assembling scheme
Therefore, it is necessary to provide a kind of assembled finished system, solves assembled finishing for comprehensive and system offer The scheme of efficiency and quality problems.
Utility model content
For above-mentioned technical problem present in prior art, embodiment of the present utility model provides a kind of quick decoration System, the quick decoration system disclosure satisfy that the demand of assembled finishing.
In order to solve the above technical problems, the technical scheme that embodiment of the present utility model uses is:
A kind of quick decoration system, including:
Integrated Toilet system, it include toilet wallboard, bathroom floor and be installed in the toilet wallboard and WC Facilities on the bathroom floor, wherein, formed with wallboard between the toilet wallboard and toilet structural wall Stilt layer, formed with floor Stilt layer between bathroom floor and the toilet structure foundation;
Integrated water supply system, it is arranged in the wallboard Stilt layer, the integrated water supply system include water main and The multiple distributive pipes being connected with the water main, the water inlet of the WC Facilities pass through in the wallboard Stilt layer Water inlet pipe connects with the distributive pipe;
Integrated drainage system, it is arranged in the floor Stilt layer, the discharge outlet of the WC Facilities by located at Drainpipe in the floor Stilt layer connects with the integrated drainage system.
Preferably, in addition to integrated partition wall system, the integrated partition wall system include two partition plates, located at two partition walls Between plate and for the damp-proof separator layer that supports the keel shoe of the partition plate and be pasted on the keel shoe.
Preferably, in addition to integrated hanging plate system, the integrated hanging plate system include indoor wallboard and for adjusting State the first adjustment component of indoor wallboard position, the first adjustment component includes being fixed on guide rail on indoor wall, can The adjustment part for sliding and being fixed on the guide rail along the guide rail, the support member being fixed on the adjustment part;It is described Indoor wallboard is fixed on the support member.
Preferably, in addition to integrated ceiling system, the integrated ceiling system include top plate and hang the top plate Ceiling joist, the ceiling joist includes keelson and main joist, and the keelson is used for the overlapping edges of the top plate On wallboard, the main joist is used for top plate described in support.
Preferably, in addition to integrated heating system, the integrated heating system include multiple floor heating modules and are multiple What the floor heating module supplied water divides water water collector, and multiple floor heating module assembly are to form floor heating layer, each floor heating mould Block includes the structure with cavity volume, the obturator being arranged in the cavity volume, the floor heating pipe being laid in the obturator, The floor heating module is erected on structure foundation by foundation bolt to form floor heating Stilt layer.
Preferably, in addition to integrated kitchen system, the integrated kitchen system include cabinet, and the cabinet is by prefabricated plate Bar grafting is formed.
Preferably, overall chassis is additionally provided with the bathroom floor, the edge on the overall chassis is provided with gear Water edge, the upper surface on the overall chassis are provided with anti-skid bulge.
Preferably, the toilet wallboard is installed on the toilet wall by the second adjustment component, and described second Swollen bolt that adjustment component includes being fixed in the toilet wall, it is fixedly connected and perpendicular to the toilet with the swollen bolt The support column of wall, the free end for being fixed on the support column and the support block for supporting the toilet wallboard.
Preferably, floor drain is provided with the overall chassis, the floor drain includes the first cylinder and the second cylinder being arranged, First cylinder and second cylinder-shaped circularize passage, and draining is blocked to enable water to retain in the circular passage Pipe.
Preferably, the integrated partition wall system also includes fast-assembling door, and the fast-assembling door includes door pocket and door leaf, the door pocket Including vertical set and top cover, the vertical set be located on wall, and the wall includes two wallboards be arrangeding in parallel, two wallboards it Between form packing space, the vertical set includes mounting framework, supporter and embedded body, and the mounting framework has for distinguishing The bearing surface abutted with two wallboards and the first mounting surface for installing door leaf, the supporter are arranged on the installation On skeleton, wherein, the embedded body be fixed on the supporter and it is at least part of stretch into the packing space, to pass through The filler being filled in the packing space is fixedly connected with the wall.
Compared with prior art, quick decoration system of the present utility model and the beneficial effect of fast-assembling door are:This practicality is new Above-mentioned subsystem in the quick decoration system of type, although being had nothing in common with each other in manufacture, assembly technology, it is fast that it is respectively provided with assembling Speed, and the characteristics of the technical merit of assembling quality, efficiency independent of worker.Quick decoration system of the present utility model is assembling Formula fits up the solution for the system that provides.
Brief description of the drawings
Fig. 1 is the toilet wall of the integrated Toilet system in the quick decoration system that embodiment of the present utility model provides The mounting structure schematic diagram of plate.
The toilet of integrated Toilet system in the quick decoration system that Fig. 2 provides for embodiment of the present utility model The mounting structure schematic diagram of plate.
Fig. 3 is the overall chassis of the integrated Toilet system in the quick decoration system that embodiment of the present utility model provides Structural representation.
Fig. 4 is the knot of the floor drain of the integrated Toilet system in the quick decoration system that embodiment of the present utility model provides Structure schematic diagram.
Fig. 5 is the structural representation of the integrated water supply system in the quick decoration system that embodiment of the present utility model provides Figure.
Fig. 6 is the structural representation of the integrated drainage system in the quick decoration system that embodiment of the present utility model provides Figure.
Fig. 7 is the structural representation of the integrated partition wall system in the quick decoration system that embodiment of the present utility model provides (partition plate is not installed).
Fig. 8 is the structural representation of the integrated partition wall system in the quick decoration system that embodiment of the present utility model provides (partition plate is installed).
Fig. 9 is the structural representation of the integrated hanging plate system in the quick decoration system that embodiment of the present utility model provides Figure.
Figure 10 is the structural representation of the integrated ceiling system in the quick decoration system that embodiment of the present utility model provides Figure.
Figure 11 is the structural representation of the integrated heating system in the quick decoration system that embodiment of the present utility model provides Figure.
Figure 12 is the door pocket in the integrated partition wall system in the quick decoration system that embodiment of the present utility model provides Structural representation.
In figure:
11- toilets wallboard;12- toilets structural wall;13- wallboard Stilt layers;14- second adjusts component;141- is swollen Bolt;142- support columns;143- support blocks;15- toilets structure foundation;16- bathroom floors;17- floors Stilt layer;18- is whole Body chassis;181- dash edge;19- water inlet pipes;20- floor heating modules;21- structures;22- obturators;23- floor heating pipes;24- is put down Weigh layer;25- indoor floors;26- floor heating Stilt layers;27- foundation bolts;200- floor drains;201- floor drain bodies;202- second Body;The cylinders of 203- first;204- circular passages;205- aqueducts;30- integrates water supply system;31- water mains;32- distributive pipes; 33- snap joints;40- integrates drainage system;41- main sewers;42- divides drainpipe;61- first adjusts component;611- is led Rail;612- adjustment parts;613- support members;62- doors structure walls;63- indoor wallboards;71- keelsons;72- main joists;73- is drawn Bar;74- top plates;The vertical sets of 80-;81- mounting frameworks;82- door leafs;83- fillers;84- buries body;100- doors structure grounds.
Embodiment
It is below in conjunction with the accompanying drawings and specific real to make those skilled in the art be better understood from the technical solution of the utility model Mode is applied to elaborate to the utility model.
As shown in Fig. 1 to 12, embodiment of the present utility model discloses a kind of quick decoration system, is filled applied to assembled In repairing, the quick decoration system specifically includes integrated Toilet system, integrated water supply system 30, integrates drainage system 40, be integrated Heating system, integrated partition wall system, integrated hanging plate system, integrated ceiling system and integrated kitchen system.
As depicted in figs. 1 and 2, integrated Toilet system specifically includes toilet wallboard 11, bathroom floor 16 and dress WC Facilities on toilet wallboard 11 and bathroom floor 16, wherein, toilet wallboard 11 and toilet structural wall Formed with wallboard Stilt layer 13 between 12, formed with floor Stilt layer between bathroom floor 16 and toilet structure foundation 15 17;Wallboard Stilt layer 13 and floor Stilt layer 17 are used for the pipeline of accommodating integrated water supply system 30 and integrated drainage system 40, from And pipeline is hidden, and bathroom floor 16 and toilet wallboard 11 play soundproof effect to the current in pipeline.
As shown in figure 5, integrated water supply system 30 specifically includes water main 31 and distributive pipe 32, the water main 31 and floor Water inlet manifold is connected, and distributive pipe 32 is connected by snap joint 33 with water main 31, and the distributive pipe 32 in toilet with using water Facility connects, to provide water source (be such as closestool, water heater provide cold water or hot water) with drainage facility in toilet;The collection Main body into water supply system 30 is arranged in wallboard Stilt layer 13, so that integrated water supply system 30 is hidden without exposed so that Toilet outward appearance is preferable, and used snap joint 33 is by the way of grafting, and specifically, the snap joint 33 is formed with slotting Manage, sealing ring is arranged in the intubation, after insertion comes in and goes out water pipe, sealing ring plays sealing function to splicing position, so that water pipe Between realize fast sealing connection, and snap joint 33 cause technical merit of the grafting effect independent of worker.Therefore, Easy disassembly, short construction period, installation effectiveness are high.Avoid the time-consuming and hidden danger of quality of conventional coupling arrangement.
As shown in fig. 6, integrated drainage system 40 specifically include be connected with main sewer 41 divide drainpipe 42, this point is arranged Water pipe 42 is arranged in floor Stilt layer 17, the discharge outlet of WC Facilities by the drainpipe in floor Stilt layer 17 with Integrated drainage system 40 connects, and because all drainpipes may be contained within floor Stilt layer 17, is set using the draining in toilet The not direct passing through floors of (such as closestool and floor drain 200) discharge outlet are applied, but pass through the horizontally-arranged of floor Stilt layer 17 that be laid in Drainpipe is pooled in the main sewer 41 of vertical row.The maintenance and maintenance of pipeline are all carried out in this layer, will not give resident family of lower floor band It is inconvenient to come, and the property right for enjoying true work is independent.And connected between drainpipe using hot melt with flexible socket joint, connection is reliable, nothing is oozed Leakage, prevents flange, never hangs dirty, avoids blocking, and ensures 50 years service life.
As shown in Figure 7 and Figure 8, integrating partition wall system includes two partition plates 55, between two partition plates 55 and for branch The damp-proof separator layer 54 for supportting the keel shoe of partition plate 55 and being pasted on keel shoe.Wherein, keel shoe includes:Respectively apical grafting in The day ground joist 51 and vertical keel connected vertically with day ground joist 52 of top plate 74 and structure foundation;Damp-proof separator layer 54 Sticked on puigging 53 on two sides of keel frame;Pacified respectively in top/bottom part in a manner of horizontal on damp-proof separator layer 54 Equipped with lateral keel, and lateral keel is connected on vertical keel or day ground joist 51 so that damp-proof separator layer 54 to be compressed;Top Drift angle keel strip and lower margin keel strip are respectively equipped with bottom horizontal keel, drift angle keel strip in lower margin keel strip groove with laterally inserting Enter multiple seamless spliced partition plates 55, drift angle keel strip is with distinguishing spiral-lock corner angle staff and base anchor on lower margin keel strip.In this way, Partition plate 55 is supported and fixed by keel shoe, and the whole partition wall formed is stably mounted on indoor floor 25.This is integrated Partition wall system simplifies partition wall construction technology, erection & lift efficiency and quality using keel shoe;Damp-proof separator layer 54 solves keel Frame waterproof, protection against the tide, it is anti-mildew, the problems such as;Veneered surfaces are that UV applications have anti-pollution, scrubbing resistance, acid and alkali-resistance characteristic;It is overall Partition wall quality is strong, intensity is high, sound insulation is excellent;The system uses raw material energy-conserving and environment-protective and recoverable.
As shown in figure 9, integrated hanging plate system include indoor wallboard 63 and for adjusting the position of indoor wallboard 63 first Adjust component 61, first adjustment component 61 include be fixed on doors structure wall 62 guide rail 611, can be slided along guide rail 611 And adjustment part 612, the support member 613 that is fixed on adjustment part 612 that can be fixed on guide rail 611;Indoor wallboard 63 is fixed On support member 613.Specifically, support member 613 is followed closely by environment-friendlyadhesive adhesive and quickly fixed with indoor wallboard 63, and guide rail 611 is logical Gluing or fastener is crossed quickly to fix with doors structure wall 62.In this way, after indoor wallboard 63 and support member 613 are fixed, pass through Adjustment part 612 slided on guide rail 611 adjust the position of indoor wallboard 63 so that the position sign of indoor wallboard 63 attach together with will Ask.Because the adjustment of indoor wallboard 63 can be achieved by mobile adjustment part 612, therefore so that the installation matter of indoor wallboard 63 Amount and technical merit of the efficiency independent of skilled worker, so as to improve installation effectiveness and quality;And indoor wall need not Perforate reduces the destruction to structure wall, avoids operational error;Can both horizontally and vertically it adjusted by the first adjustment component 61 Save levelling.Support member 613 and the design optimization of adjustment part 612, are balanced installation keel and the gravity of indoor wallboard 63.It is preferred that Ground, can also be realized by internal corner component, external corner strip, plug connector between indoor wallboard 63 assembled, close spelling between indoor wallboard 63, from The functions such as lock closing in.Fixation, splicing, the connector for connecting indoor wallboard 63 or the keel of indoor wallboard 63 are that standardization is set Meter, factory is mass customized, normalized construction, lifts total quality, reduces field operation, saves work efficiency liberation labour.
As shown in Figure 10, integrated ceiling system includes top plate 74 and the ceiling joist for hanging top plate 74, ceiling joist Including keelson 71 and main joist 72, keelson 71 is inserted formed with a confession by indoor wallboard 63 or toilet wallboard 11 One faying surface overlapped for top plate 74 of inserting groove and formation, the side of top plate 74 are overlapped on faying surface, and opposite side is by main dragon The support of bone 72, and the main joist 72 is lifted on roof by a pull bar 73.Keelson 71 is used for the overlapping edges of top plate 74 Indoors on wallboard 63, main joist 72 is used for support top plate 74.
As shown in figure 11, integrated heating system includes multiple floor heating modules 20 and is what multiple floor heating modules 20 supplied water Divide water water collector (not shown), multiple floor heating modules 20 are assembled to form floor heating layer, and each floor heating module 20 includes tool There are the structure 21, the obturator 22 being arranged in cavity volume, the floor heating pipe 23 being laid in obturator 22 of cavity volume, floor heating module 20 It is erected at by foundation bolt 27 on doors structure ground 100 to form floor heating Stilt layer 26.Wherein, the obturator 22 is by heat conduction Material is made, and heat-insulation layer is set in the bottom of cavity volume, to prevent heat from being shed from the bottom of structure 21.When multiple floor heating modules After the completion of 20 assembly and erection, at least one layer of balance layer 24 is also laid on floor heating module 20, re-lays ground on the balance layer 24 Plate, the balance layer 24 is used to prevent from trampling or weight is so that floor heating pipe 23 damages or prevented the function of collapsing.Each floor heating module Floor heating pipe 23 in 20 is by repeatedly bending or spiraling, and form delivery port and water inlet, and the delivery port and water inlet are with dividing The outlet pipe and water inlet pipe 19 of water water collector connect so that hot water enters from water inlet, then by radiating, heat reduce after from Delivery port flows out.In the integrated heating system, the floor heating module 20 supported by foundation bolt 27 meets that specification is equal Cloth load, load requirement, while the bottom of foundation bolt 27 is equipped with Rubber shock-absorbing pad and plays sound insulation and noise reduction effect.Structure Body 21 can by galvanized iron sheet punch forming, and by balance layer 24 by heat-insulation layer, floor heating pipe 23 carry out parcel play it is moistureproof, anti- Fire increases the service life, and adjacent two pieces of delivery ports of floor heating module 20 open up jagged outfit floor heating pipe 23 with water inlet and protected Sheath.An indoor Stilt layer is actually formed between floor heating module 20 and doors structure ground 100, the indoor Stilt layer is row Line stringing provides enough spaces, solves pipeline and the cross-cutting issue of the arrangement of floor heating pipe 23.Balance layer 24 is furnished with c-type Buckle is easy to structure 21 to be connected and fixed with balance layer 24.Any glue is not used in the factory's manufacturing process of floor heating module 20, is subtracted Few environmental pollution.The flat pin of support in foundation bolt 27 can pass through ground with diagonal brace lower margin after floor heating module 20 all installs The secondary levelling regulation of adjustment hole of the edge of heating module 20 improves installation accuracy.Adjacent two pieces of floor heating modules 20 are consolidated by U-shaped buckle It is locked due on the flange of two adjacent structure bodies 21, and by screw and the flat pin of support, is allowed to the shock resistance that is connected firmly Property is excellent.Balance layer 24 offers c-type card and is reserved as groove milling, make c-type card fix after the integral smoothness of floor heating module 20 more preferably.Floor Cement fibrolite plate with balance layer 24 is same material, improves thermal conductivity factor, and integrated rapid installing integrated heating ground system has quality Gently, intensity is high, installation is fast, the uniform effect of radiating.
Integrated kitchen system includes cabinet, and cabinet is formed by prefabricated lath grafting.
In a preferred embodiment of the present utility model, as shown in Figures 2 and 3, it is additionally provided with bathroom floor 16 Overall chassis 18, the edge on overall chassis 18 are provided with dash along 181, and the upper surface on overall chassis 18 is provided with anti-skidding convex Rise.The design of overall chassis 18 on bathroom floor 16, which forms overall capillary groove, has dash along 181, and sewage is intercepted whole In body chassis 18, compared with the tiling technique of ground:It is dry operation while leakproof is solved with draining, without using cement The floating installation of mortar is more efficient;Overall chassis 18 is that batch production mould processing customed product can flexibly be arranged according to house type functional requirement Cloth bulk, scene need not cut perforate and use any power-driven tool, pollution-free to operating environment;Overall chassis 18 belongs to flexible Material surface is non slip surface, and such as in toilet, imprudence falls down overall chassis 18 and effectively prevents secondary injury;Due to integral bottom Disk 18 is provided with concaveconvex structure, improves bulk strength, so that thickness is only 4mm, so as to effectively solve occupancy health Between absolute altitude problem.
In a preferred embodiment of the present utility model, toilet wallboard 11 is installed in by the second adjustment component 14 On toilet wall, swollen bolt 141 that the second adjustment component 14 includes being fixed in toilet wall, it is fixedly connected with swollen bolt 141 And support column 142 perpendicular to toilet wall, it is fixed on the free end of support column 142 and for supporting toilet wallboard 11 Support block 143.Wherein, support block 143 can be made up of galvanized sheet, and be fixed by structure glue and toilet wallboard 11.Its In, the water inlet pipe 19 of closestool is arranged between toilet wall and toilet wallboard 11.
In a preferred embodiment of the present utility model, as shown in Figure 3 and Figure 4, floor drain is provided with overall chassis 18 200, specifically, the floor drain 200 includes floor drain body 201 and the core of floor drain 200, the side of floor drain body 201 are provided with aqueduct 205, the aqueduct 205 is horizontally disposed, and is connected with the inner space of floor drain body 201, and the core of floor drain 200 is arranged on floor drain body In 201 inner space, sewage is set to initially enter the core of floor drain 200, but enter by the core of floor drain 200 in outside the core of floor drain 200 In portion space, subsequently into aqueduct 205.Specifically, the core of floor drain 200 includes the first cylinder 203 and the second cylinder 202, the One cylinder 203 and the second cylinder 202 are vertically arranged, the lower end of the first cylinder 203 be bonded with the bottom wall of floor drain body 201 so as to Blocked, and between the lower end of the second cylinder 202, the second cylinder 202 and the first cylinder 203, the upper end three of the first cylinder 203 Person forms the passage connected for sewage by and with aqueduct 205.Specifically,
The upper end of first cylinder 203 is open, and the lower end of the second cylinder 202 is extend into the first cylinder 203, so that first A circular passage 204 is surrounded between the cylinder 202 of cylinder 203 and second, and the lower end of the second cylinder 202 is higher than the first cylinder 203 lower end, the gap of both lower ends form the water inlet of circular passage 204, and the upper end of the first cylinder 203 is less than second The upper end of cylinder 202, the difference in height of both upper ends form the delivery port of circular passage 204.In this way, when draining, sewage from The upper end of second cylinder 202 enters in the second cylinder 202, then sewage entering from the circular passage 204 of the lower end of the second cylinder 202 The mouth of a river enters in circular passage 204, and sewage flows up in circular passage 204, then from the ring of the upper end of the first cylinder 203 The delivery port outflow of shape passage 204, the sewage of outflow enters in the inner space outside the core of floor drain 200, subsequently into aqueduct In 205, outdoor is discharged by aqueduct 205.After indoor sewage is drained, the water surface in circular passage 204 is due to by first The height limitation of the upper end of body 203, water surface elevation terminate in the upper end of first passage, and the water due to circular passage 204 and first Water in cylinder 203 connects, and the height of the water in circular passage 204 is equal all the time with the height of the water in the first cylinder 203, Aqueduct 205 and the indoor unique passage connected have been blocked up in the water seal, so that caused odor air can not in aqueduct 205 Get in, i.e., circular passage 204 blocks odor air in aqueduct 205.
The core of floor drain 200 in the utility model is set by the dislocation in the height of the first cylinder 203 and the second cylinder 202 Put, so that the core of floor drain 200 forms a linker, so as to block up aqueduct 205 and interior by the water seal in linker Unique passage, so as to effectively preventing gas with foreign flavor from getting in, improve the air quality of interior.
In a preferred embodiment of the present utility model, as shown in figure 12, integrated partition wall system also includes fast-assembling door, soon Dress door includes door pocket and door leaf 82, and door pocket includes vertical set 80 and top cover, and vertical set 80 be located on wall, and wall includes be arrangeding in parallel Two indoor wallboards 63, form packing space between two indoor wallboards 63, vertical set 80 includes mounting framework 81, supporter and buried If body 84, mounting framework 81 have be used for the bearing surface that is abutted respectively with two indoor wallboards 63 and for installing door leaf 82 the One mounting surface, supporter are arranged on mounting framework 81, wherein, embedded body 84 is fixed on supporter and at least part of stretched into In packing space, to be fixedly connected by the filler 83 being filled in packing space with wall.In this way, by packing space The middle filling filler 83 such as asbestos, make it is embedded body 84 is at least part of is embedded in asbestos so that embedded body 84 and asbestos shape Into an entirety, deviate from so as to effectively prevent embedded body 84 from asbestos, so that vertical set 80 is stably fixed to wall On.
Above-mentioned subsystem in quick decoration system of the present utility model, although being had nothing in common with each other in manufacture, assembly technology, But it is respectively provided with assembling quickly, and the characteristics of the technical merit of assembling quality, efficiency independent of worker.It is of the present utility model fast Fast finished system compensate for the defects of product class is not complete in the prior art.
Above example is only exemplary embodiment of the present utility model, is not used in limitation the utility model, and this practicality is new The protection domain of type is defined by the claims.Those skilled in the art can be in essence of the present utility model and protection domain It is interior, various modifications or equivalent substitution are made to the utility model, this modification or equivalent substitution also should be regarded as new in this practicality In the protection domain of type.

Claims (10)

  1. A kind of 1. quick decoration system, it is characterised in that including:
    Integrated Toilet system, it includes toilet wallboard, bathroom floor and is installed in the toilet wallboard and described WC Facilities on bathroom floor, wherein, maked somebody a mere figurehead between the toilet wallboard and toilet structural wall formed with wallboard Layer, formed with floor Stilt layer between bathroom floor and the toilet structure foundation;
    Integrated water supply system, it is arranged in the wallboard Stilt layer, the integrated water supply system include water main and with institute Multiple distributive pipes of water main connection are stated, the water inlet of the WC Facilities passes through the water inlet in the wallboard Stilt layer Pipe connects with the distributive pipe;
    Integrated drainage system, it is arranged in the floor Stilt layer, and the discharge outlet of the WC Facilities passes through located at described Drainpipe in the Stilt layer of floor connects with the integrated drainage system.
  2. 2. quick decoration system according to claim 1, it is characterised in that also include integrated partition wall system, it is described integrated Partition wall system includes two partition plates, between two partition plates and for supporting the keel shoe of the partition plate and sticking In the damp-proof separator layer on the keel shoe.
  3. 3. quick decoration system according to claim 1, it is characterised in that also include integrated hanging plate system, it is described integrated Hanging plate system includes indoor wallboard and the first adjustment component for adjusting the indoor wallboard position, the first adjustment group Part includes the guide rail being fixed on indoor wall, the adjustment that can be slided and can be fixed on the guide rail along the guide rail Part, the support member being fixed on the adjustment part;The indoor wallboard is fixed on the support member.
  4. 4. quick decoration system according to claim 1, it is characterised in that described integrated also including integrated ceiling system Ceiling system, which includes top plate and the ceiling joist for hanging the top plate, the ceiling joist, includes keelson and main joist, The keelson is used to the overlapping edges of the top plate being used for top plate described in support in wallboard, the main joist.
  5. 5. quick decoration system according to claim 1, it is characterised in that described integrated also including integrated heating system Heating system includes multiple floor heating modules and divides water water collector, multiple floor heating moulds for what multiple floor heating modules supplied water To form floor heating layer, each floor heating module includes the structure with cavity volume, is arranged in the cavity volume for block assembly Obturator, the floor heating pipe being laid in the obturator, the floor heating module by foundation bolt be erected on structure foundation with Form floor heating Stilt layer.
  6. 6. quick decoration system according to claim 1, it is characterised in that described integrated also including integrated kitchen system Kitchen system includes cabinet, and the cabinet is formed by prefabricated lath grafting.
  7. 7. quick decoration system according to claim 1, it is characterised in that be additionally provided with entirety on the bathroom floor Chassis, the edge on the overall chassis are provided with dash edge, and the upper surface on the overall chassis is provided with anti-skid bulge.
  8. 8. quick decoration system according to claim 1, it is characterised in that the toilet wallboard passes through the second adjustment group Part is installed on the toilet wall, the second adjustment component include being fixed on swollen bolt in the toilet wall, with The swollen bolt is fixedly connected and the support column perpendicular to the toilet wall, is fixed on the free end of the support column and is used for Support the support block of the toilet wallboard.
  9. 9. quick decoration system according to claim 7, it is characterised in that be provided with floor drain on the overall chassis, institute The first cylinder and the second cylinder that floor drain includes being arranged are stated, first cylinder and second cylinder-shaped circularize passage, with Enable water to retain in the circular passage and block drainpipe.
  10. 10. quick decoration system according to claim 2, it is characterised in that the integrated partition wall system also includes fast-assembling Door, the fast-assembling door include door pocket and door leaf, and the door pocket includes vertical set and top cover, and the vertical set be located on wall, described Wall includes two wallboards be arrangeding in parallel, and packing space is formed between two wallboards, and the vertical set includes mounting framework, support Body and embedded body, the mounting framework is with the bearing surface for being used to abut with two wallboards respectively and for installing door leaf The first mounting surface, the supporter is arranged on the mounting framework, wherein, the embedded body is fixed on the supporter And it is at least part of stretch into the packing space, to be consolidated by the filler being filled in the packing space and the wall Fixed connection.
CN201621373708.2U 2016-12-14 2016-12-14 Quick decoration system Active CN206625609U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621373708.2U CN206625609U (en) 2016-12-14 2016-12-14 Quick decoration system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621373708.2U CN206625609U (en) 2016-12-14 2016-12-14 Quick decoration system

Publications (1)

Publication Number Publication Date
CN206625609U true CN206625609U (en) 2017-11-10

Family

ID=60213216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621373708.2U Active CN206625609U (en) 2016-12-14 2016-12-14 Quick decoration system

Country Status (1)

Country Link
CN (1) CN206625609U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499221A (en) * 2016-12-14 2017-03-15 天津达因建材有限公司 Quick decoration system
CN109330485A (en) * 2018-08-28 2019-02-15 深圳市建筑设计研究总院有限公司 Automatic cleaning equipment and its automatic cleaning method, toilet applied to toilet

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499221A (en) * 2016-12-14 2017-03-15 天津达因建材有限公司 Quick decoration system
CN109330485A (en) * 2018-08-28 2019-02-15 深圳市建筑设计研究总院有限公司 Automatic cleaning equipment and its automatic cleaning method, toilet applied to toilet

Similar Documents

Publication Publication Date Title
CN101654927B (en) Main structure of combined type house and assembly method thereof
CN101070713A (en) Environment-protection energy-saving ventilating air-conditioning sound-insulating novel building and construction method
CN103397790A (en) Assembled bathroom and installation process
EP3358096A1 (en) Method for producing a wall or roof panel having installations included, walls or roofs pre-fabricated using said method and joints between the wall and roof panels
CN104712151A (en) Unit bathroom
CN106480977A (en) Passive type house
CN206625609U (en) Quick decoration system
WO2020206501A1 (en) Panel and panel assembly for modular wet area construction
CN106499221A (en) Quick decoration system
KR20100070745A (en) Structure of prefabricated bathroom
EP2241691A2 (en) Fasade thermal wall and a method for its construction
CN110359738B (en) Assembly type construction method for ecological industrial factory building
US20090193739A1 (en) Modular Basement Finishing System
CN104712152A (en) Unit bathroom
CN201276755Y (en) Major structure of combined house
CN104746593A (en) Integral bathroom
CN212078168U (en) Assembly type building pipeline embedded part
RU2312191C1 (en) Method for modular building erection (variants)
CN112237394A (en) Embedded bathtub for assembled toilet and installation method thereof
CN103883046B (en) Bridge insulation thermal resistance gravity-flow ventilation separate unit formula curtain wall system
CN206329065U (en) A kind of steady type modularization case room provided with insulation Stilt layer
CN206328873U (en) A kind of modularization case room with Stilt layer
CN104763175A (en) Integrated bathroom
CN219974012U (en) Assembled bathroom
CN204626540U (en) A kind of integral bathroom

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 300456 Building 1, zone 1, Ronghui business park, Binhai Zhongguancun Science Park, Tianjin Economic and Technological Development Zone, Binhai New Area, Tianjin

Patentee after: Heneng renju Technology (Tianjin) Group Co.,Ltd.

Address before: 300270 Tianjin Economic and Technological Development Zone (Nangang Industrial Zone) No. 7 Workshop at the Junction of Textile 4th Road and Light 2nd Street, Central District

Patentee before: TIANJIN DAYIN BUILDING MATERIAL Co.,Ltd.

CP03 Change of name, title or address
CP01 Change in the name or title of a patent holder

Address after: 300456 Building 1, zone 1, Ronghui business park, Binhai Zhongguancun Science Park, Tianjin Economic and Technological Development Zone, Binhai New Area, Tianjin

Patentee after: Huaneng Renju Technology Group Co.,Ltd.

Address before: 300456 Building 1, zone 1, Ronghui business park, Binhai Zhongguancun Science Park, Tianjin Economic and Technological Development Zone, Binhai New Area, Tianjin

Patentee before: Heneng renju Technology (Tianjin) Group Co.,Ltd.

CP01 Change in the name or title of a patent holder