CN205577171U - Cast -in -place light composite wall that builds of assembled non -bearing - Google Patents
Cast -in -place light composite wall that builds of assembled non -bearing Download PDFInfo
- Publication number
- CN205577171U CN205577171U CN201620224684.8U CN201620224684U CN205577171U CN 205577171 U CN205577171 U CN 205577171U CN 201620224684 U CN201620224684 U CN 201620224684U CN 205577171 U CN205577171 U CN 205577171U
- Authority
- CN
- China
- Prior art keywords
- wall
- surface layer
- calcium silicate
- silicate board
- filling body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Building Environments (AREA)
Abstract
装配式非承重现浇筑轻质复合墙体,它包括墙体结构,墙体结构包括第一硅酸钙板墙面层、第二硅酸钙板墙面层、网格体和第一填充体,第一硅酸钙板墙面层与第二硅酸钙板墙面层之间等间距平行布置,第一填充体填装在第一硅酸钙板墙面层和第二硅酸钙板墙面层之间的中空区域,且第一填充体与所述面层连接处粘结,网格体与所述面层平行且网格体设置在中空区域的中部,且网格体贯穿在第一填充体的内部。本实用新型采用现代标准化、机械化浇筑成型,降低了建筑物重量,免去抹灰工序,提高了墙体整体性能,实现了墙体无缝隙、不裂缝,本实用新型技术应用的可行性对建筑节能及环保都具有重要的意义。
Prefabricated non-load-bearing cast-in-place lightweight composite wall, which includes a wall structure, the wall structure includes a first calcium silicate board wall surface layer, a second calcium silicate board wall surface layer, a grid body and a first filling body, the first calcium silicate board wall surface layer and the second calcium silicate board wall surface layer are arranged in parallel at equal intervals, and the first filling body is filled in the first calcium silicate board wall surface layer and the second calcium silicate board wall surface layer. The hollow area between the surface layers of the board wall, and the first filling body is bonded to the joint of the surface layer, the grid body is parallel to the surface layer and the grid body is set in the middle of the hollow area, and the grid body runs through inside the first filler. The utility model adopts modern standardized and mechanized pouring molding, which reduces the weight of the building, eliminates the plastering process, improves the overall performance of the wall, and realizes the wall without gaps and cracks. Energy saving and environmental protection are of great significance.
Description
技术领域 technical field
本实用新型属于建筑领域,具体涉及装配式非承重现浇筑轻质复合墙体。 The utility model belongs to the construction field, in particular to an assembled non-load-bearing cast-in-place lightweight composite wall.
背景技术 Background technique
目前在建筑领域常采用的墙体构造形式有:1、浇筑混凝土墙体:该种墙体混凝土容重2300kg/m3,因其原材料容重较高,成型的墙体重量高,增加了建筑物的自重,造成建筑物钢材用量大,从而增加了建筑成本,同时通过工程应用发现,该墙体还具有隔音效果差,装饰装修中对墙体处理复杂装修后的墙体容易起皮、脱落等诸多弊病; At present, the wall structure forms commonly used in the construction field are: 1. Pouring concrete wall: the concrete density of this kind of wall is 2300kg/m3, because of the high bulk density of raw materials, the weight of the formed wall is high, which increases the weight of the building , resulting in a large amount of steel used in the building, which increases the construction cost. At the same time, it is found through engineering applications that the wall also has poor sound insulation effect, and the wall is complicated to deal with in the decoration. The wall after decoration is easy to peel and fall off, etc. ;
2、加气砌块砌筑墙体:该种墙体墙面不易挂重物,给用户的后期安装空调带来困扰,造成的原因是,产品的原材料及工艺因素致使加气混凝土砌块自身质地松软所致;另外该种墙体开裂、起皮、脱落,混凝土砌块在生产养护期间表面内部的水分蒸发,失水过多出现干缩,在砌筑时二次水化反应使砌块体积膨胀,而使墙面开裂,还有砌块砌筑成型后,墙体需要找平抹灰,因砌块的属性与抹面砂浆属性不相容性而引起墙体开裂,面层脱落起皮;还有该种墙体隔音性能差:砌块在砌筑时施工工艺形成的缝隙等因素致使墙体隔音性能差,而且施工工序多,难度大,质量难以控制,墙面的整体性差皆是混凝土加砌块的缺点。 2. Aerated block masonry wall: This kind of wall is not easy to hang heavy objects, which brings troubles to users in the later installation of air conditioners. The reason is that the raw materials and process factors of the product cause the aerated concrete block itself The texture is soft; in addition, this kind of wall cracks, peels, and falls off. During the production and maintenance of the concrete block, the water inside the surface evaporates, and excessive water loss causes shrinkage. The secondary hydration reaction during masonry makes the block The volume expands, which makes the wall crack, and after the blocks are formed, the wall needs to be leveled and plastered. Due to the incompatibility between the properties of the blocks and the properties of the plastering mortar, the wall cracks and the surface layer peels off; There is also poor sound insulation performance of this kind of wall: the gaps formed by the construction process of the blocks during masonry and other factors lead to poor sound insulation performance of the wall, and there are many construction procedures, which are difficult and difficult to control, and the integrity of the wall is poor. The disadvantage of adding blocks.
3、预制轻质墙板墙体:该种墙体施工工序多,成本高,墙体整体牢固性差,隔音性能差,拼接缝开裂等缺点;究其原因是墙板的规格以2.4米×0.6米为主规格,建筑物墙体的墙体一般都在高2.8米,宽2米以上,因其规格尺寸制约,轻质墙板墙体在拼接时会施工繁琐工序多,墙体的尺寸不一致使在拼接中易产生损耗,生成建筑垃圾,增加了建筑成本拼装接缝的过多又会使墙体整体牢固性差,施工时墙体平整度难以控制。 3. Prefabricated lightweight wallboard wall: This kind of wall has many construction procedures, high cost, poor overall firmness of the wall, poor sound insulation performance, cracking of seams and other shortcomings; the reason is that the specification of the wallboard is 2.4 meters × The main specification is 0.6 meters. The walls of the building walls are generally 2.8 meters high and more than 2 meters wide. Due to the size constraints, the construction of light wallboard walls will be cumbersome during splicing. The size of the wall Inconsistency makes it easy to cause loss during splicing, generate construction waste, and increase construction costs. Too many splicing seams will make the overall firmness of the wall poor, and it is difficult to control the flatness of the wall during construction.
最难解决的是轻质墙板的接缝开裂问题,常规的轻质墙板墙体的接缝是采用玻璃纤维网格布贴缝,但硅酸盐水泥或耐水腻子与玻璃纤维网格布会有化学反应,遇水膨胀,降低了了条板之间的结合而引起墙面开裂,同时由于化学反应缓慢,有较强的隐蔽性,经过一段时间后,墙面吸水或受潮就会出现空鼓开裂,此类事例在轻质墙板墙体中屡见不鲜,属轻质墙板墙体的通病。 The most difficult problem to solve is the cracking of the joints of lightweight wall panels. The joints of conventional lightweight wall panels are made of glass fiber mesh cloth, but Portland cement or water-resistant putty and glass fiber mesh cloth There will be a chemical reaction, which will swell when it meets water, which will reduce the bond between the slats and cause the wall to crack. At the same time, due to the slow chemical reaction, it has strong concealment. After a period of time, the wall will absorb water or be damp. Hollow cracking, such cases are not uncommon in light-weight wallboard walls, which is a common problem in light-weight wallboard walls.
不论是加气混凝土砌块墙体还是轻质墙板墙体都是‘产、供、销’的方式,是现在工厂预制,后将成品运送至工地,后二次施工,在使用过程中易产生建筑垃圾,造成环境污染,不环保,不符合国家住建部门提倡的‘绿色建筑’,四节一环保建筑理念。 Whether it is aerated concrete block walls or lightweight wall panels, they are all in the way of "production, supply, and sales". They are prefabricated in the factory, and then the finished products are transported to the construction site, and the secondary construction is carried out. It is easy to use during use. It produces construction waste, causes environmental pollution, is not environmentally friendly, and does not conform to the "green building" advocated by the national housing and construction department, four sections and one environmental protection building concept.
发明内容 Contents of the invention
本实用新型的目的在于提供一种装配式非承重现浇筑轻质复合墙体。该墙体结构简单,且使建筑内墙总成本降低,提高了施工进度,缩短了工期,减少了人工费用支出,降低了传统施工中产生的建筑垃圾,其技术应用的可行性对建筑节能及环保都具有重要的意义。 The purpose of the utility model is to provide an assembled non-load-bearing cast-in-place lightweight composite wall. The structure of the wall is simple, and the total cost of the inner wall of the building is reduced, the construction progress is improved, the construction period is shortened, the labor cost is reduced, and the construction waste generated in the traditional construction is reduced. Environmental protection is of great significance.
本实用新型采用的技术方案: The technical scheme that the utility model adopts:
装配式非承重现浇筑轻质复合墙体,它包括墙体结构,所述墙体结构包括网格体和第一填充体,所述第一填充体按模具填充成型,所述网格体贯穿在第一填充体的内部。 The assembled non-load-bearing cast-in-place lightweight composite wall includes a wall structure, the wall structure includes a grid body and a first filling body, the first filling body is filled and formed according to a mold, and the grid body penetrating through the interior of the first filling body.
进一步地,还包括第一硅酸钙板墙面层和第二硅酸钙板墙面层,第一硅酸钙板墙面层与第二硅酸钙板墙面层之间等间距平行布置,第一填充体填装在第一硅酸钙板墙面层和第二硅酸钙板墙面层之间的中空区域,且第一填充体与所述面层连接处粘结,网格体与所述面层平行且网格体设置在所述中空区域的中部,且网格体贯穿在第一填充体的内部。 Further, it also includes a first calcium silicate board wall surface layer and a second calcium silicate board wall surface layer, and the first calcium silicate board wall surface layer and the second calcium silicate board wall surface layer are arranged in parallel at equal intervals , the first filling body is filled in the hollow area between the first calcium silicate board wall surface layer and the second calcium silicate board wall surface layer, and the first filling body is bonded to the joint of the surface layer, and the grid The body is parallel to the surface layer, the grid body is arranged in the middle of the hollow area, and the grid body runs through the inside of the first filling body.
进一步地,第一填充体是由聚苯颗粒、水泥、粉煤灰和外加剂混合成型在一体的与所述中空区域形状一致的实体结构。 Further, the first filling body is a solid structure which is formed by mixing polyphenylene particles, cement, fly ash and additives and is consistent with the shape of the hollow area.
进一步地,网格体是铁丝网或工程塑料网中的一种。 Further, the mesh body is one of wire mesh or engineering plastic mesh.
进一步地,还包括T形墙结构,所述T形墙结构与所述墙体结构连接,所述T形墙结构由第一拉筋、立板和第二填充体,其中,三个以上的第一拉筋沿立板长度方向垂直地设置在立板的一侧,所述第一拉筋的另一端固定在所述墙体结构的内部,第二填充体按模具填充成型,且第一拉筋和立板设置在了第二填充体的内部。 Further, it also includes a T-shaped wall structure, the T-shaped wall structure is connected with the wall structure, and the T-shaped wall structure is composed of a first tie bar, a vertical plate and a second filling body, wherein more than three The first tie bar is vertically arranged on one side of the stand plate along the length direction of the stand plate, the other end of the first tie bar is fixed inside the wall structure, the second filling body is filled and formed according to the mold, and the first tie bar is fixed on the inside of the wall structure. Tie bars and risers are set inside the second infill.
进一步地,还包括硅酸钙板墙侧面层,在第一拉筋和立板的左右两侧面和前面通过硅酸钙板墙侧面层围成一中空结构,第二填充体设置在所述中空结构的中部,第二填充体与硅酸钙板墙侧面层连接处粘接,且第一拉筋和立板设置在了第二填充体的内部。 Further, it also includes the side layer of the calcium silicate board wall, a hollow structure is surrounded by the side layer of the calcium silicate board wall on the left and right sides and the front of the first tie bars and the vertical board, and the second filling body is arranged in the hollow In the middle of the structure, the second filling body is bonded to the joint of the side layer of the calcium silicate board wall, and the first tie bars and vertical plates are arranged inside the second filling body.
进一步地,所述第一拉筋为一端端部带钩状的钢筋,所述立板为槽型钢或工字钢。 Further, the first tie bar is a steel bar with a hook at one end, and the vertical plate is a channel steel or an I-beam.
进一步地,第二填充体是由聚苯颗粒、水泥、粉煤灰和外加剂混合成型在一体的与所述中空结构形状一致的实体结构。 Further, the second filling body is a solid structure which is formed by mixing polystyrene particles, cement, fly ash and admixtures and is consistent with the shape of the hollow structure.
进一步地,还包括门窗结构,所述门窗结构由过梁、立柱和第二拉筋组成,过梁两端连接有立柱组成,在过梁和立柱上均设置有至少两个第二拉筋;所述墙体结构上预留有门或窗的框架,所述门窗结构设置在门或窗的框架处的墙体结构内。 Further, it also includes a door and window structure, the door and window structure is composed of a lintel, a column and a second tie bar, the two ends of the lintel are connected with a column, and at least two second tie bars are arranged on the lintel and the column; A door or window frame is reserved on the wall structure, and the door and window structure is arranged in the wall structure at the frame of the door or window.
进一步地,所述第二拉筋为一端端部带钩状的钢筋,所述立柱为槽型钢或工字钢。 Further, the second tie bar is a steel bar with a hook at one end, and the upright column is a channel steel or an I-beam.
本实用新型与现有技术相比其有益效果是:①本实用新型的墙面层采用硅酸钙板材料,硅酸钙板具有防火、防潮、隔音、隔热等特点,通过大比例的粉煤灰聚苯颗粒和外加剂的搅拌混合,这些物质与硅钙板强有力的粘合,解决了传统墙体易开裂和不能挂重物的缺点,又 因现浇混凝土是以聚苯颗粒泡沫为骨料,水泥、粉煤灰及外加剂作胶凝材料,聚苯颗粒在混凝土内形成多孔状,而达到良好的隔音、吸音功能。将搅拌好的聚苯颗粒混凝土通过高压泵输送浇筑于由墙体模具架硅酸钙板组成的墙体模具箱中,经过24小时的混凝土凝固,拆除模具架,即可形成一面建筑物非承重墙;②本实用新型在门窗框架和T型墙处均内置有与墙体加固连接作用的钢筋和槽钢,在墙体结构内内置有钢丝网,使墙体更加牢固;③本实用新型采用现代标准化、机械化浇筑成型,降低了建筑物重量,免去抹灰工序,提高了墙体整体性能,实现了墙体无缝隙、不裂缝。改善了墙体的平整度、牢固性、安全性。使建筑内墙总成本降低,提高了施工进度,缩短了工期,减少了人工费用支出,降低了传统施工中产生的建筑垃圾,其技术应用的可行性对建筑节能及环保都具有重要的意义。总之,本实用新型必将是民用建筑大力推广的一种新型绿色建材。 Compared with the prior art, the utility model has the beneficial effects as follows: ① The wall layer of the utility model adopts calcium silicate board material, and the calcium silicate board has the characteristics of fire prevention, moisture resistance, sound insulation, heat insulation, etc., and through a large proportion of powder Stirring and mixing of coal ash polyphenylene particles and admixtures, these substances are strongly bonded to the silicon-calcium board, which solves the shortcomings of the traditional wall that is easy to crack and cannot hang heavy objects, and because the cast-in-place concrete is made of polyphenylene particle foam As aggregate, cement, fly ash and admixtures are used as cementing materials. Polyphenylene particles form a porous shape in the concrete to achieve good sound insulation and sound absorption functions. The well-mixed polyphenylene granular concrete is conveyed and poured into the wall mold box composed of calcium silicate boards by the wall mold frame through a high-pressure pump. After 24 hours of concrete solidification, the mold frame is removed to form a non-load-bearing building. wall; ② the utility model has built-in steel bars and channel steels for strengthening and connecting with the wall at the door and window frames and the T-shaped wall, and a steel wire mesh is built in the wall structure to make the wall more firm; ③ the utility model adopts Modern standardized and mechanized pouring molding reduces the weight of the building, eliminates the plastering process, improves the overall performance of the wall, and realizes the wall without gaps and cracks. The flatness, firmness and safety of the wall are improved. It reduces the total cost of building interior walls, improves construction progress, shortens construction period, reduces labor costs, and reduces construction waste generated in traditional construction. The feasibility of its technical application is of great significance to building energy conservation and environmental protection. In a word, the utility model will definitely be a new type of green building material widely promoted in civil buildings.
附图说明 Description of drawings
图1为本实用新型墙体结构剖切后的俯视图; Fig. 1 is the plan view after the wall structure of the utility model is cut;
图2为图1中墙体结构的立体结构示意图; Fig. 2 is the three-dimensional schematic diagram of the wall structure in Fig. 1;
图3为T形墙结构的结构示意图; Fig. 3 is the structural representation of T-shaped wall structure;
图4为门窗结构的结构示意图; Fig. 4 is the structural representation of door and window structure;
图5为门窗结构在墙体结构内的结构示意图。 Fig. 5 is a structural schematic diagram of the door and window structure in the wall structure.
具体实施方式 detailed description
下面结合具体实施例对本实用新型作进一步说明。 Below in conjunction with specific embodiment the utility model is further described.
一种装配式非承重现浇筑轻质复合墙体,如图1和图2所示,它包括墙体结构1,所述墙体结构1包括第一硅酸钙板墙面层2、第二硅酸钙板墙面层3、网格体4和第一填充体5,第一硅酸钙板墙面层2与第二硅酸钙板墙面层3之间等间距平行布置,第一填充体5填装在第一硅酸钙板墙面层2和第二硅酸钙板墙面层3之间的中空区域,且第一填充体5与所述面层连接处粘结,网格体4与所述面层平行且网格体4设置在所述中空区域的中部,且网格体4贯穿在第一填充体5的内部。 An assembled non-load-bearing cast-in-place lightweight composite wall, as shown in Figure 1 and Figure 2, it includes a wall structure 1, the wall structure 1 includes a first calcium silicate board wall surface layer 2, a second Calcium silicate board wall surface layer 3, grid body 4 and first filling body 5, the first calcium silicate board wall surface layer 2 and the second calcium silicate board wall surface layer 3 are arranged in parallel at equal intervals, the second A filling body 5 is filled in the hollow area between the first calcium silicate board wall surface layer 2 and the second calcium silicate board wall surface layer 3, and the first filling body 5 is bonded to the joint of the surface layer, The grid body 4 is parallel to the surface layer, and the grid body 4 is arranged in the middle of the hollow area, and the grid body 4 runs through the inside of the first filling body 5 .
其中,第一填充体5是由聚苯颗粒、水泥、粉煤灰和外加剂混合成型在一体的与所述中空区域形状一致的实体结构,网格体4是铁丝网或工程塑料网中的一种。 Wherein, the first filling body 5 is a solid structure that is formed by mixing polystyrene particles, cement, fly ash and admixtures and is consistent with the shape of the hollow area, and the grid body 4 is one of wire mesh or engineering plastic mesh. kind.
施工时,先根据施工要求放线,固定钢丝网片,再根据高度和宽度利用模具架固定好硅酸钙板墙面层,再拼装固定模具架并调整到施工要求的墙体厚度,并将模具架连接在一起,检验模具旋转合理后,将搅拌好的聚苯颗粒混凝土通过高压泵输送浇筑于由墙体模具架硅酸钙板组成的墙体模具箱中,经过24小时的混凝土凝固,拆除模具架,即可形成一面建筑物 非承重墙。 During construction, first lay out the wires according to the construction requirements, fix the steel wire mesh, then use the mold frame to fix the wall surface layer of the calcium silicate board according to the height and width, then assemble the fixed mold frame and adjust it to the wall thickness required by the construction, and place The mold frames are connected together, and after checking that the mold rotation is reasonable, the stirred polystyrene granular concrete is poured through a high-pressure pump into the wall mold box composed of calcium silicate boards for the wall mold frame. After 24 hours of concrete solidification, By removing the mold frame, a non-load-bearing wall of the building can be formed.
如图3所示,根据空间布局要求,本实用新型还可设置T形墙结构6,所述T形墙结构6与所述墙体结构1或承重混凝土连接,所述T形墙结构6由第一拉筋7、立板8、硅酸钙板墙侧面层9和第二填充体10,其中,三个以上的第一拉筋7沿立板8长度方向垂直地设置在立板8的一侧,所述第一拉筋7的另一端固定在所述墙体结构1的内部,在第一拉筋7和立板8的左右两侧面和前面通过硅酸钙板墙侧面层9围成一中空结构,第二填充体10设置在所述中空结构的中部,第二填充体10与硅酸钙板墙侧面层9连接处粘接,且第一拉筋7和立板8设置在了第二填充体10的内部。 As shown in Figure 3, according to the spatial layout requirements, the utility model can also be provided with a T-shaped wall structure 6, and the T-shaped wall structure 6 is connected with the wall structure 1 or load-bearing concrete, and the T-shaped wall structure 6 is composed of The first tie bar 7, the vertical plate 8, the calcium silicate board wall side layer 9 and the second filling body 10, wherein more than three first tie bars 7 are vertically arranged on the vertical plate 8 along the longitudinal direction of the vertical plate 8 On one side, the other end of the first tie bar 7 is fixed inside the wall structure 1, and is surrounded by a calcium silicate board wall side layer 9 on the left and right sides and the front of the first tie bar 7 and the vertical plate 8 Form a hollow structure, the second filling body 10 is arranged in the middle part of the hollow structure, the second filling body 10 is bonded to the joint of the side layer 9 of the calcium silicate board wall, and the first tie bars 7 and the vertical plate 8 are arranged on the The inside of the second filling body 10 is covered.
其中,所述第一拉筋7为一端端部带钩状的钢筋,所述立板8为槽型钢或工字钢。第二填充体10是由聚苯颗粒、水泥、粉煤灰和外加剂混合成型在一体的与所述中空结构形状一致的实体结构。 Wherein, the first tie bar 7 is a steel bar with a hook at one end, and the vertical plate 8 is a channel steel or an I-beam. The second filling body 10 is a solid structure consistent with the shape of the hollow structure formed by mixing polystyrene particles, cement, fly ash and admixtures.
施工时,将连接好的第一拉筋7和立板8结构中的第一拉筋7头固定在所要固定的墙体内,利用模具架固定好硅酸钙板墙面层,并将模具架连接在一起,检验模具旋转合理后,将搅拌好的聚苯颗粒混凝土通过高压泵输送浇筑于由墙体模具架硅酸钙板组成的墙体模具箱中,经过24小时的混凝土凝固,拆除模具架,T型墙成型。 During construction, fix the first tie bars 7 in the structure of the connected first tie bars 7 and the vertical plate 8 in the wall to be fixed, use the mold frame to fix the wall surface layer of the calcium silicate board, and place the mold The frame is connected together, and after checking that the mold rotates reasonably, the polystyrene granular concrete that has been stirred is transported and poured through a high-pressure pump into the wall mold box composed of calcium silicate boards for the wall mold frame, and after 24 hours of concrete solidification, it is removed Die racks, T-wall molding.
如图4和图5所示,本实用新型还包括门窗结构11,所述门窗结构11由过梁12、立柱13和第二拉筋14组成,过梁12两端连接有立柱13组成,在过梁12和立柱13上均设置有至少两个第二拉筋14;所述墙体结构1上预留有门或窗的框架,所述门窗结构11设置在门或窗的框架处的墙体结构1内。 As shown in Figures 4 and 5, the utility model also includes a door and window structure 11, the door and window structure 11 is composed of a lintel 12, a column 13 and a second tie bar 14, and the two ends of the lintel 12 are connected with a column 13 to form. Both the lintel 12 and the column 13 are provided with at least two second tie bars 14; the frame of the door or window is reserved on the wall structure 1, and the door and window structure 11 is arranged on the wall at the frame of the door or window. body structure 1.
其中,所述第二拉筋14为一端端部带钩状的钢筋,所述立柱13为槽型钢或工字钢。 Wherein, the second tie bar 14 is a steel bar with a hook at one end, and the column 13 is a channel steel or an I-beam.
在施工门窗结构11时,施工方法与设置墙体结构1时方法一致,只是在需要留门或窗的地方,在模具架内放置好本实用新型的门窗结构11,再根据施工要求利用模具架固定好硅酸钙板墙面层,将搅拌好的聚苯颗粒混凝土通过高压泵输送浇筑于由墙体模具架硅酸钙板组成的墙体模具箱中,经过24小时的混凝土凝固,拆除模具架,即可成型。 When constructing the door and window structure 11, the construction method is consistent with the method when the wall structure 1 is set, but the door and window structure 11 of the present utility model is placed in the mold frame where the door or window needs to be left, and then the mold frame is used according to the construction requirements. Fix the wall surface layer of the calcium silicate board, transport the mixed polystyrene granular concrete through a high-pressure pump and pour it into the wall mold box composed of the calcium silicate board of the wall mold frame, after 24 hours of concrete solidification, remove the mold frame, ready to be molded.
本实用新型根据国家宏观政策的导向要求,未来的建筑节能、节材、节地、节水,四节一环保型的建筑材料将是未来建筑市场的趋势,本项目顺应国家政策导向可达到: According to the guiding requirements of the national macro policy, the utility model will be the trend of the future construction market in the future building energy saving, material saving, land saving, water saving, four saving and one environment-friendly building materials. This project conforms to the national policy guidance and can achieve:
⑴、节能:节约能源,墙体保温隔热轻质是节能的功效之一,现浇筑非承重轻质墙体的混凝土原材料所特有的隔热保温功能可节约原煤和电的能耗,达到节能减耗的目的; ⑴ Energy saving: energy saving, heat insulation and light weight of the wall is one of the effects of energy saving. The unique heat insulation and heat preservation function of the concrete raw material of the cast-in-place non-load-bearing light wall can save the energy consumption of raw coal and electricity, and achieve energy saving the purpose of reducing consumption;
⑵、节材:现场浇筑的方式可解决传统材料的原料浪费损耗等问题,同时墙体超轻质可减轻建筑的载荷减少建筑物的钢材用量,从而达到节材的目的; (2) Material saving: The method of on-site pouring can solve the problems of waste and loss of raw materials of traditional materials, and at the same time, the ultra-light wall can reduce the load of the building and reduce the amount of steel used in the building, so as to achieve the purpose of material saving;
⑶、节地:高效的隔音效果,可减小了墙体的厚度,增加了建筑使用面积,达到节地的目的; ⑶. Land saving: efficient sound insulation effect can reduce the thickness of the wall, increase the building use area, and achieve the purpose of saving land;
⑷、节水:现场一次成型浇筑,避免了工厂化生产中水的消耗及到现场的二次用水,达到节水目的; ⑷. Water saving: one-time forming and pouring on site, avoiding the consumption of water in factory production and the secondary water on site, so as to achieve the purpose of water saving;
⑸、环保:轻质墙体原料中将一定比例的粉煤灰、煤渣成为可利用资源,变废为宝。同时由原来的“场地销”变为“销地产”的方式应用的转变,现场材料采用封闭储存是解决传统施工中原料污染(生产扬尘、运输污染、废料处置污染)的最佳方案,因此,现浇筑轻质墙体是一种真正达到利废、绿色、节能的建筑墙体技术。 ⑸Environmental protection: A certain proportion of fly ash and coal cinders in the light wall materials will become available resources, turning waste into treasure. At the same time, the original "site sales" has been changed to "real estate sales". The closed storage of on-site materials is the best solution to solve the raw material pollution (production dust, transportation pollution, and waste disposal pollution) in traditional construction. Therefore, The cast-in-place lightweight wall is a building wall technology that truly achieves waste utilization, greenness and energy saving.
以上所述,仅为本实用新型的较佳实施例而已,故不能以此限定本实用新型实施的范围,即依本实用新型申请专利范围及说明书内容所作的等效变化与修饰,皆应仍属本实用新型专利涵盖的范围内。 The above is only a preferred embodiment of the utility model, so the scope of implementation of the utility model cannot be limited with this, that is, equivalent changes and modifications made according to the patent scope of the utility model and the content of the specification should still be carried out. It belongs to the scope covered by the utility model patent.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620224684.8U CN205577171U (en) | 2016-03-22 | 2016-03-22 | Cast -in -place light composite wall that builds of assembled non -bearing |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620224684.8U CN205577171U (en) | 2016-03-22 | 2016-03-22 | Cast -in -place light composite wall that builds of assembled non -bearing |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205577171U true CN205577171U (en) | 2016-09-14 |
Family
ID=56866527
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620224684.8U Expired - Lifetime CN205577171U (en) | 2016-03-22 | 2016-03-22 | Cast -in -place light composite wall that builds of assembled non -bearing |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205577171U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108589959A (en) * | 2017-12-22 | 2018-09-28 | 思力佳特种环保材料(深圳)有限公司 | A kind of building non-load bearing wall cast-in-place method |
-
2016
- 2016-03-22 CN CN201620224684.8U patent/CN205577171U/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108589959A (en) * | 2017-12-22 | 2018-09-28 | 思力佳特种环保材料(深圳)有限公司 | A kind of building non-load bearing wall cast-in-place method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103015574B (en) | Form-removal-free cast-in-place light-weight insulated wall and construction method thereof | |
| CN102182260B (en) | A foam concrete composite armored thermal insulation wall and its construction method | |
| CN103074936A (en) | Low-density AAC (autoclaved aerated concrete) precise-masonry self-thermal insulation system and construction method | |
| CN114592643A (en) | Reinforced truss and surface layer reinforced aluminum alloy panel facing foamed ceramic composite wall panel and its method | |
| CN107989238A (en) | A kind of cast-in-place sandwiched heat-preservation shear wall structure, assembled architecture and engineering method | |
| CN108035485A (en) | Assembled CF steam pressures porcelain powder air entrained concrete shear wall Side fascia and production method | |
| CN205653934U (en) | Cast -in -place lightweight concrete wall body of green energy -conserving integration | |
| CN102433958A (en) | Prefabricated wall board construction member | |
| CN104032895A (en) | High-performance cement mortar formwork heat preservation recycled concrete L-shaped column without demolition and its method | |
| CN102535841A (en) | Construction technology of prefabricated wall panel | |
| CN103590515B (en) | A kind of self-balancing precast surface, cast-in-place core filler wall | |
| CN207959692U (en) | A kind of assembled CF steam pressures porcelain powder air entrained concrete shear wall Side fascia | |
| CN205712703U (en) | Unilateral composite thermal self-insulation building block | |
| CN204456534U (en) | Self-insulation superimposed shear wall structure | |
| CN107246106A (en) | A kind of surface cuts shaping haydite concrete prefabricated panel | |
| CN207954884U (en) | A kind of assembled CF steam pressures porcelain powder aerated concrete outer wall hanging plate | |
| CN110878600A (en) | Desulfurized gypsum based composite light wallboard and splicing method thereof | |
| CN104196232A (en) | Manufacturing and erecting method of removal-free fireproof and heat-insulating building component formwork | |
| CN204151917U (en) | The double combined wall self-insulation system that a kind of insulation blocks is built by laying bricks or stones | |
| CN203247752U (en) | Self-insulation building block and self-insulation wall body composed of same | |
| CN202689241U (en) | Construction structure at retention place of self-heat conserving autoclaved aerated concrete building block exterior wall constructional column | |
| CN201241422Y (en) | Heat insulation and heat preservation sound-and-fire proof light composite wall board | |
| CN201588338U (en) | Porous sandwich rubber sand insulation block | |
| CN202370161U (en) | Constructing member of prefabricated wallboard | |
| CN207211512U (en) | A kind of combined wall board provided with extruded polystyrene board laminboard layer |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160914 |