CN104648892A - 烧结矿直拔料装置 - Google Patents

烧结矿直拔料装置 Download PDF

Info

Publication number
CN104648892A
CN104648892A CN201410021798.8A CN201410021798A CN104648892A CN 104648892 A CN104648892 A CN 104648892A CN 201410021798 A CN201410021798 A CN 201410021798A CN 104648892 A CN104648892 A CN 104648892A
Authority
CN
China
Prior art keywords
chute
pulling
belt conveyor
mineral aggregate
discharging opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410021798.8A
Other languages
English (en)
Other versions
CN104648892B (zh
Inventor
熊兰香
黄日清
廖方才
刘华庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liuzhou Iron and Steel Co Ltd
Original Assignee
Liuzhou Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liuzhou Iron and Steel Co Ltd filed Critical Liuzhou Iron and Steel Co Ltd
Priority to CN201410021798.8A priority Critical patent/CN104648892B/zh
Publication of CN104648892A publication Critical patent/CN104648892A/zh
Application granted granted Critical
Publication of CN104648892B publication Critical patent/CN104648892B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

本发明公开了一种烧结矿直拔料装置,涉及冶金设备制造技术领域;包括有设置在第一输送皮带下方的第一溜槽和第二溜槽;在第一溜槽和第二溜槽之间设置有直拔溜槽,直拔溜槽进料端与第一溜槽相连通,直拔溜槽出料端在第二溜槽上方;第一溜槽上部设置有将矿料拔至直拔溜槽或第一溜槽出料口的翻板。本发明可以解决烧结矿输送存在转运点多,存仓时间长及落差高等造成烧结矿碎裂,大量增加细粒度,导致炉内料柱透气性变差,影响高炉稳定顺行,大幅度增加返矿转运费及返矿加工费造成生产成本增高的问题。

Description

烧结矿直拔料装置
技术领域
本发明涉及冶金机械设备制造技术领域;尤其是一种用于钢铁厂将烧结矿输送转运至高炉的装置。
背景技术
在钢铁公司烧结分厂将原料矿烧结为炼铁用的烧结矿后,烧结矿从运料装置运至炼铁高炉,运料过程如图1所示,运料路径为:第一输送皮带1--第一溜槽2--第二输送皮带3--储料仓4--第三输送皮带5--第二溜槽6--第四输送皮带4--去高炉;这种运料方式虽然在烧结矿送给量与炼铁高炉所需量不匹配时,可经过储料仓将烧结矿存储缓冲,但这种运料方式存在转运点多,在烧结矿送给量与炼铁高炉所需量匹配时,即生产顺畅时,烧结矿仍需经过储料仓;烧结矿的存仓时间长及落差高等容易造成部分烧结矿碎裂,大量增加细粒度,导致炉内料柱透气性变差,影响高炉稳定顺行,同时大幅度增加返矿转运费及返矿加工费造成生产成本的增高。
发明内容
本发明的目的是提供一种烧结矿直拔料装置,它可以解决烧结矿输送存在转运点多,存仓时间长及落差高等造成烧结矿碎裂,大量增加细粒度,导致炉内料柱透气性变差,影响高炉稳定顺行,大幅度增加返矿转运费及返矿加工费造成生产成本增高的问题。
为了解决上述问题,本发明采用的技术方案是:
这种烧结矿直拔料装置,包括有设置在第一输送皮带出料端头下方的第一溜槽,设置在所述第一溜槽出料口下方的第二输送皮带,所述第二输送皮带下方设置有接纳矿料的储料仓,所述储料仓出料口下方设置有将矿料送至第二溜槽的第三输送皮带,所述第二溜槽的出料口下方设置有将矿料送至高炉的第四输送皮带;在所述第一溜槽和所述第二溜槽之间设置有直拔溜槽,所述直拔溜槽进料端与所述第一溜槽相连通,所述直拔溜槽出料端在所述第二溜槽上方;在所述第一溜槽上部设置有将矿料拔至所述直拔溜槽或所述第一溜槽出料口的翻板。
由于采用了上述技术方案,本发明与现有技术相比具有如下有益效果:
1、采用本发明后,一烧1号机烧结矿在5、6号高炉槽上直拔料<10mm粒级较经过缓冲仓减少17.35%,其中<5mm粒级减少6.88%;二烧烧结矿在2号高炉槽上直拔料<10mm粒级较缓冲仓减少13.19%,其中<5mm粒级减少4.36%;产生的直接效益有:
1)节省二烧烧结矿返矿加工费:
 10500t/(日)×30(天)×12(月)×4.36%(降返矿率)×100元/t(加工费)=1648.08(万元)/年
2)节省一烧1号机烧结矿返矿加工费:
10500t/(日)×30(天)×12(月)×6.88%(降返矿率)×100元/t(加工费)=2600.64(万元)/年
3)节省第二输送皮带(长420.5m)输送所耗的电费:
90(KW)×24(小时)×30(天)×12(月)×0.6(元/度)=46.656(万元)/年
节省第三输送皮带(长450.60m) 输送所耗的电费:
200(KW)×24(小时)×30(天)×12(月)×0.6(元/度)=103.68(万元)/年
总直接效益(一烧1号机、二烧成品烧结矿):
1648.08(万元)+2600.64(万元)+46.656(万元)+103.68(万元)=4399.06(万元)/年
2、 本发明减少一烧1号机、二烧成品烧结矿10-5毫米粒级分别为10.47%、8.83%;高炉透气性变好。
3、 若出现入厂烧结矿质量问题可及时发现和整改,为炼铁、烧结生产提供更加及时、准确的质量信息。
附图说明
图1是传统烧结矿运料方式示意图。
图2是本发明烧结矿运料方式示意图。
图中标号表示为:1、第一输送皮带; 2、第一溜槽; 3、第二输送皮带; 4、储料仓;5、第三输送皮带;6、第二溜槽;7、第四输送皮带;8、直拔溜槽;9、翻板。
具体实施方式
下面结合附图对本发明作进一步详述:
图1是传统烧结矿运料方式示意图,烧结分厂的烧结矿转运至炼铁分厂的运料路径为:从第一输送皮带1--第一溜槽2--第二输送皮带3--储料仓4--第三输送皮带5--第二溜槽6--第四输送皮带4--去高炉;图中箭头方向即为矿料输送方向。
图2的烧结矿直拔料装置,包括有设置在第一输送皮带1出料端头下方的第一溜槽2,设置在第一溜槽2出料口下方的第二输送皮带3,第二输送皮带3下方设置有接纳矿料的储料仓4,储料仓4出料口下方设置有将矿料送至第二溜槽6的第三输送皮带5,第二溜槽6的出料口下方设置有将矿料送至高炉的第四输送皮带7,在第一溜槽2和第二溜槽6之间设置有直拔溜槽8,直拔溜槽8进料端与第一溜槽2相连通,直拔溜槽8出料端在第二溜槽6上方;在第一溜槽2上部设置有将矿料拔至直拔溜槽8或拔至第一溜槽2出料口的翻板9;大多数情况下,将翻板9拔至直拔溜槽8,让烧结分厂的烧结矿直接通过直拔溜槽8送至第四输送皮带7输向高炉,减少转运点,以及存仓时间长及落差高等造成烧结矿碎裂,大量增加细粒度的问题;只有在烧结矿送给量与炼铁高炉所需量不匹配时,才将翻板9拔至第一溜槽2出料口,将烧结矿暂时放入储料仓4存储备用;图中箭头方向即为矿料输送方向。 

Claims (1)

1.一种烧结矿直拔料装置,包括有设置在第一输送皮带(1)出料端头下方的第一溜槽(2),设置在所述第一溜槽(2)出料口下方的第二输送皮带(3),所述第二输送皮带(3)下方设置有接纳矿料的储料仓(4),所述储料仓(4)出料口下方设置有将矿料送至第二溜槽(6)的第三输送皮带(5),所述第二溜槽(6)的出料口下方设置有将矿料送至高炉的第四输送皮带(7),其特征在于:在所述第一溜槽(2)和所述第二溜槽(6)之间设置有直拔溜槽(8),所述直拔溜槽(8)进料端与所述第一溜槽(2)相连通,所述直拔溜槽(8)出料端在所述第二溜槽(6)上方;在所述第一溜槽(2)上部设置有将矿料拔至所述直拔溜槽(8)或所述第一溜槽(2)出料口的翻板(9)。
CN201410021798.8A 2014-01-17 2014-01-17 烧结矿直拔料装置 Expired - Fee Related CN104648892B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410021798.8A CN104648892B (zh) 2014-01-17 2014-01-17 烧结矿直拔料装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410021798.8A CN104648892B (zh) 2014-01-17 2014-01-17 烧结矿直拔料装置

Publications (2)

Publication Number Publication Date
CN104648892A true CN104648892A (zh) 2015-05-27
CN104648892B CN104648892B (zh) 2016-09-07

Family

ID=53240620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410021798.8A Expired - Fee Related CN104648892B (zh) 2014-01-17 2014-01-17 烧结矿直拔料装置

Country Status (1)

Country Link
CN (1) CN104648892B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105129359A (zh) * 2015-09-18 2015-12-09 山东钢铁股份有限公司 一种用于高炉原料的输送装置
CN109019081A (zh) * 2018-09-20 2018-12-18 山西煤炭运销集团晋城有限公司 一种用于配煤的下料装置
CN112474292A (zh) * 2020-11-27 2021-03-12 陕西龙门钢铁有限责任公司 一种炼钢厂用于对高炉返矿再次筛分的装置
CN114620461A (zh) * 2022-02-08 2022-06-14 广西钢铁集团有限公司 一种球团矿分级转运方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1287147A (zh) * 2000-08-29 2001-03-14 镇江焦化煤气集团公司 焦炉生产煅烧石油焦的工艺方法
CN101134530A (zh) * 2007-09-20 2008-03-05 山西义棠煤业有限责任公司 拣矸排矸、拣炭排矸装置
CN101532084A (zh) * 2009-04-23 2009-09-16 攀枝花新钢钒股份有限公司 铁矿石烧结燃料分加方法
WO2011045212A1 (de) * 2009-10-16 2011-04-21 Siemens Vai Metals Technologies Gmbh Verfahren und vorrichtung zur chargierung in ein einschmelzaggregat
CN103143295A (zh) * 2013-03-26 2013-06-12 内蒙古君正化工有限责任公司 白灰压球生产线
JP5365226B2 (ja) * 2009-02-03 2013-12-11 新日鐵住金株式会社 焼結鉱凝結材の整粒方法
CN203714571U (zh) * 2014-01-17 2014-07-16 柳州钢铁股份有限公司 烧结矿直拔料装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1287147A (zh) * 2000-08-29 2001-03-14 镇江焦化煤气集团公司 焦炉生产煅烧石油焦的工艺方法
CN101134530A (zh) * 2007-09-20 2008-03-05 山西义棠煤业有限责任公司 拣矸排矸、拣炭排矸装置
JP5365226B2 (ja) * 2009-02-03 2013-12-11 新日鐵住金株式会社 焼結鉱凝結材の整粒方法
CN101532084A (zh) * 2009-04-23 2009-09-16 攀枝花新钢钒股份有限公司 铁矿石烧结燃料分加方法
WO2011045212A1 (de) * 2009-10-16 2011-04-21 Siemens Vai Metals Technologies Gmbh Verfahren und vorrichtung zur chargierung in ein einschmelzaggregat
CN103143295A (zh) * 2013-03-26 2013-06-12 内蒙古君正化工有限责任公司 白灰压球生产线
CN203714571U (zh) * 2014-01-17 2014-07-16 柳州钢铁股份有限公司 烧结矿直拔料装置

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105129359A (zh) * 2015-09-18 2015-12-09 山东钢铁股份有限公司 一种用于高炉原料的输送装置
CN105129359B (zh) * 2015-09-18 2018-02-02 山东钢铁股份有限公司 一种用于高炉原料的输送装置
CN109019081A (zh) * 2018-09-20 2018-12-18 山西煤炭运销集团晋城有限公司 一种用于配煤的下料装置
CN112474292A (zh) * 2020-11-27 2021-03-12 陕西龙门钢铁有限责任公司 一种炼钢厂用于对高炉返矿再次筛分的装置
CN114620461A (zh) * 2022-02-08 2022-06-14 广西钢铁集团有限公司 一种球团矿分级转运方法

Also Published As

Publication number Publication date
CN104648892B (zh) 2016-09-07

Similar Documents

Publication Publication Date Title
CN104648892A (zh) 烧结矿直拔料装置
CN107119163A (zh) 一种高比例球团的高炉布料方法
CN102994680A (zh) 一种生产直接还原铁的可控气氛转底炉工艺
CN102115798A (zh) 高炉喷煤配加钒钛矿粉喷吹护炉的方法
CN102230047A (zh) 高磷鲕状贫赤铁矿转底炉熔融还原生产粒铁的炼铁方法
CN101824502A (zh) 低品位铁矿石原矿的还原焙烧磁选工艺
CN104018008A (zh) 一种红土镍矿闪速炉还原熔炼生产镍铁的方法
CN202272936U (zh) 一种分料装置
CN104120207B (zh) 一种以锡尾铁精矿和高有害元素贫杂矿配矿生产生铁的方法
CN104131120B (zh) 提高烧结矿利用效率的高炉布料方法
CN102839244B (zh) 一种转底炉金属化球团热装入高炉的装置和方法
CN203714571U (zh) 烧结矿直拔料装置
Dutta Iron ore-coal composite pellets/briquettes as new feed material for iron and steelmaking
CN105498961A (zh) 可同时生产烧结铁精粉和球团铁精粉的方法及系统
CN110653043B (zh) 一种兼顾不同硬度矿石的磨矿方法
CN203033425U (zh) 一种分料输送装置
CN103041905A (zh) 一种碳化渣的破磨方法及系统
CN1986462A (zh) 用于熔融玻璃的石油焦粉燃料的使用方法及设备
CN202265584U (zh) 高炉喷煤系统
JP2018080358A (ja) 高炉の原料装入方法
CN104946829B (zh) 一种1800立方米高炉提高烧结矿利用率的布料方法
JP5942929B2 (ja) 高炉原料の装入方法
CN204824942U (zh) 一种多出料口焦矿槽
CN102612632A (zh) 用于装料到熔化设备中的方法和装置
CN105597896B (zh) 一种矿石粉碎储存系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907