CN104499480A - Method for drilling and filling concrete hollow pile - Google Patents
Method for drilling and filling concrete hollow pile Download PDFInfo
- Publication number
- CN104499480A CN104499480A CN201410758857.XA CN201410758857A CN104499480A CN 104499480 A CN104499480 A CN 104499480A CN 201410758857 A CN201410758857 A CN 201410758857A CN 104499480 A CN104499480 A CN 104499480A
- Authority
- CN
- China
- Prior art keywords
- pile
- hollow pile
- concrete hollow
- inner core
- drill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0007—Production methods using a mold
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The invention provides a method for drilling and filling a concrete hollow pile. The method comprises the following steps: drilling by using a long spiral drilling machine; arranging a steel bar cage in a drilled hole; keeping a protection layer between the steel bar cage and a hole wall; filling concrete into the drilled hole; sinking an inner core pipe into the drilled hole and keeping for the first pre-set time; and pulling out the hollow core pipe after second pre-set time to form the concrete hollow pile. The method provided by the invention has the beneficial effects that the inner core pipe is sunk into a concrete pile so that a pile body of the concrete pile and a soil body beside the pile are compacted; meanwhile, the pile diameter of the concrete pile is increased so that the aim of improving the pile bearing force is achieved.
Description
Technical field
The present invention relates to building field, be specifically related to the method for drill-pouring concrete hollow pile.
Background technology
Castinplace pile system refers to and in foundation soil, forms stake holes at engineering site by means such as machine drilling, steel pipe soil compaction or manpower excavations, and place reinforcing cage, concrete perfusion and the stake of making within it, different according to hole forming method, castinplace pile can be divided into several classes such as tube-sinking cast-in-situ pile, bored pile and digging hole filling pile again.Bored pile is by piling method classification and a kind of pile-type of definition.
The pile body of existing bored pile contacts more loose with Pile side soil body, and pile capacity is less.
Summary of the invention
The invention provides a kind of method of drill-pouring concrete hollow pile, comprising: utilize long screw auger to hole; In described boring, lay reinforcing cage, between described reinforcing cage and described hole wall, leave topping; Concrete is poured in described boring; Inner core tube to be sunk in described stake holes and to keep for first scheduled time; After second scheduled time, extract described hollow pipe form concrete hollow pile.
Further, above-mentioned first scheduled time is two hours.
Further, above-mentioned second scheduled time is twenty four hours.
Further, above-mentioned inner core tube outer wall does anti-stick process.
Further, the method for above-mentioned drill-pouring concrete hollow pile, adopts crane or hammering and pulling-out machine described inner core tube are sling or extract in concrete stake, adopts rig or hammering and pulling-out machine described inner core tube vibration to be sunk in described stake holes.
The present invention also provides the another kind of method to drill-pouring concrete hollow pile, comprising: utilize long screw auger to hole; Long screw auger is proposed, in described boring, pours into concrete; In described boring, lay reinforcing cage, between described reinforcing cage and described hole wall, leave topping; Inner core tube to be sunk in described stake holes and to keep for first scheduled time; After second scheduled time, extract described hollow pipe form concrete hollow pile.
Further, above-mentioned first scheduled time is two hours.
Further, above-mentioned second scheduled time is twenty four hours.
Further, above-mentioned inner core tube outer wall does anti-stick process.
Further, the method for above-mentioned drill-pouring concrete hollow pile, adopts crane or hammering and pulling-out machine described inner core tube are sling or extract in concrete stake, adopts rig or hammering and pulling-out machine described inner core tube vibration to be sunk in described stake holes.
Beneficial effect of the present invention is: by inner core tube being sunk in concrete stake, make the pile body of concrete stake and Pile side soil body compacted, also increase the stake footpath of concrete stake, to reach the object improving pile capacity simultaneously.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of drill-pouring concrete hollow pile method first embodiment of the present invention.
Fig. 2 is the schematic diagram of drill-pouring concrete hollow pile method second embodiment of the present invention.
Detailed description of the invention
Hereafter will describe embodiments of the invention in detail by reference to the accompanying drawings.It should be noted that the combination of technical characteristic or the technical characteristic described in following embodiment should not be considered to isolated, they can mutually be combined thus be reached better technique effect.In the accompanying drawing of following embodiment, the identical label that each accompanying drawing occurs represents identical feature or parts, can be applicable in different embodiment.
Fig. 1 is the schematic diagram of drill-pouring concrete hollow pile method first embodiment of the present invention.
Drill-pouring concrete hollow pile method of the present invention comprises the steps:
Completion of Drilling Hole, namely utilizes long-spiral drilling machine to hole;
Lay reinforcing cage, namely in described boring, lay reinforcing cage, between described reinforcing cage and described hole wall, leave topping;
Perfusion concrete, namely pours into concrete in described boring;
Sink to core pipe, to sink in described stake holes by inner core tube and kept for first scheduled time;
Extract core pipe pile, after second scheduled time, namely extract described hollow pipe form concrete hollow pile.
In the present embodiment, described first scheduled time is two hours; Described second scheduled time is twenty four hours.Described inner core tube outer wall does anti-stick process, and reduce the frictional force with concrete, core pipe is drawn out easily.Adopt crane or hammering and pulling-out machine described inner core tube are sling or extract in concrete stake, adopt rig or hammering and pulling-out machine described inner core tube vibration to be sunk in described stake holes.
Fig. 2 is the schematic diagram of drill-pouring concrete hollow pile method second embodiment of the present invention.
Completion of Drilling Hole, namely utilizes long screw auger to hole;
Carry brill pump-injecting concrete, propose by long screw auger, in described boring, pour into concrete;
Lay reinforcing cage, namely in described boring, lay reinforcing cage, between described reinforcing cage and described hole wall, leave topping;
Sink to core pipe, to sink in described stake holes by inner core tube and kept for first scheduled time;
Extract core pipe pile, after second scheduled time, namely extract described core pipe form concrete hollow pile.
In the present embodiment, described first scheduled time is two hours; Described second scheduled time is twenty four hours.Described inner core tube outer wall does anti-stick process, and reduce the frictional force with concrete, core pipe is drawn out easily.Adopt crane or hammering and pulling-out machine described inner core tube are sling or extract in concrete stake, adopt rig or hammering and pulling-out machine described inner core tube vibration to be sunk in described stake holes.
Beneficial effect of the present invention is: by inner core tube being sunk in concrete stake, make the pile body of concrete stake and Pile side soil body compacted, also increase the stake footpath of concrete stake, to reach the object improving pile capacity simultaneously.
Although give some embodiments of the present invention, it will be understood by those of skill in the art that without departing from the spirit of the invention herein, can change embodiment herein.Above-described embodiment is exemplary, should using embodiment herein as the restriction of interest field of the present invention.
Claims (10)
1. a method for drill-pouring concrete hollow pile, is characterized in that, comprising:
Long-spiral drilling machine is utilized to hole;
In described boring, lay reinforcing cage, between described reinforcing cage and described hole wall, leave topping;
Concrete is poured in described boring;
Inner core tube to be sunk in described stake holes and to keep for first scheduled time;
After second scheduled time, extract described hollow pipe form concrete hollow pile.
2. the method for drill-pouring concrete hollow pile as claimed in claim 1, it is characterized in that, described first scheduled time is two hours.
3. the method for drill-pouring concrete hollow pile as claimed in claim 2, it is characterized in that, described second scheduled time is twenty four hours.
4. the method for drill-pouring concrete hollow pile as claimed in claim 3, it is characterized in that, described inner core tube outer wall does anti-stick process.
5. the method for drill-pouring concrete hollow pile as claimed in claim 4, is characterized in that, adopts crane or hammering and pulling-out machine described inner core tube are sling or extract in concrete stake, adopts rig or hammering and pulling-out machine described inner core tube vibration to be sunk in described stake holes.
6. a method for drill-pouring concrete hollow pile, is characterized in that, comprising:
Long-spiral drilling machine is utilized to hole;
Long screw auger is proposed, in described boring, pours into concrete;
In described boring, lay reinforcing cage, between described reinforcing cage and described hole wall, leave topping;
Inner core tube to be sunk in described stake holes and to keep for first scheduled time;
After second scheduled time, extract described hollow pipe form concrete hollow pile.
7. the method for drill-pouring concrete hollow pile as claimed in claim 6, it is characterized in that, described first scheduled time is two hours.
8. the method for drill-pouring concrete hollow pile as claimed in claim 7, it is characterized in that, described second scheduled time is twenty four hours.
9. the method for drill-pouring concrete hollow pile as claimed in claim 8, it is characterized in that, described inner core tube outer wall does anti-stick process.
10. the method for drill-pouring concrete hollow pile as claimed in claim 9, is characterized in that, adopts crane or hammering and pulling-out machine described inner core tube are sling or extract in concrete stake, adopts rig or hammering and pulling-out machine described inner core tube vibration to be sunk in described stake holes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410758857.XA CN104499480A (en) | 2014-12-12 | 2014-12-12 | Method for drilling and filling concrete hollow pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410758857.XA CN104499480A (en) | 2014-12-12 | 2014-12-12 | Method for drilling and filling concrete hollow pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104499480A true CN104499480A (en) | 2015-04-08 |
Family
ID=52940923
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410758857.XA Pending CN104499480A (en) | 2014-12-12 | 2014-12-12 | Method for drilling and filling concrete hollow pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104499480A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6397712A (en) * | 1986-10-14 | 1988-04-28 | Nkk Corp | Soil cement composite pile |
CN1186141A (en) * | 1997-12-25 | 1998-07-01 | 叶长生 | Bored concrete piles and its construction |
CN1259605A (en) * | 1999-11-26 | 2000-07-12 | 王光明 | Extruded dense hollow pouring pile |
CN1676761A (en) * | 2005-04-18 | 2005-10-05 | 祁春伟 | Long-spiral post-joint-bar bored concrete pile construction method |
JP2006022623A (en) * | 2004-07-09 | 2006-01-26 | Kubota Corp | Soil cement composite pile and its construction method |
CN101024958A (en) * | 2006-02-24 | 2007-08-29 | 董相东 | Drilling poured-pile hole-bottom slurry-injection pile-forming method |
CN103422495A (en) * | 2013-07-25 | 2013-12-04 | 科达集团股份有限公司 | Hollow cast-in-place pile and construction method thereof |
-
2014
- 2014-12-12 CN CN201410758857.XA patent/CN104499480A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6397712A (en) * | 1986-10-14 | 1988-04-28 | Nkk Corp | Soil cement composite pile |
CN1186141A (en) * | 1997-12-25 | 1998-07-01 | 叶长生 | Bored concrete piles and its construction |
CN1259605A (en) * | 1999-11-26 | 2000-07-12 | 王光明 | Extruded dense hollow pouring pile |
JP2006022623A (en) * | 2004-07-09 | 2006-01-26 | Kubota Corp | Soil cement composite pile and its construction method |
CN1676761A (en) * | 2005-04-18 | 2005-10-05 | 祁春伟 | Long-spiral post-joint-bar bored concrete pile construction method |
CN101024958A (en) * | 2006-02-24 | 2007-08-29 | 董相东 | Drilling poured-pile hole-bottom slurry-injection pile-forming method |
CN103422495A (en) * | 2013-07-25 | 2013-12-04 | 科达集团股份有限公司 | Hollow cast-in-place pile and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104452749B (en) | The constructional method of a kind of reinforced concrete cast-in-situ pile tube | |
CN104074186B (en) | The casing device of pore-forming and construction method thereof in a kind of building lot | |
CN103603342A (en) | Construction method of ultra-long bored concrete pile with large-diameter casing combination | |
CN104727308B (en) | Immersed tube compaction pile or cast-in-place concrete pile construction device and method | |
CN104563147B (en) | Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation | |
CN104631442B (en) | Full-sleeve fetches earth and vibrates squeezed cast-in-place pile construction method | |
CN102953372A (en) | Steel pipe pile and construction method thereof | |
CN105649073A (en) | Static root drilling type construction method for planting piles | |
CN111206596B (en) | Deep foundation pit slope support anchor rod, support structure and construction method | |
CN103742157A (en) | Method of newly building underground space under ground by pipe jacking method | |
CN105297717A (en) | Composite foundation pile with lower portion enlarged diameter section and construction method of composite foundation pile | |
CN105220714A (en) | Core compound prestress pile tube float Structure construction method filled with by built-in anchor cable | |
CN102635110B (en) | Construction method for concrete pile | |
CN103953030A (en) | Threaded screwing inserting bar compaction filling pile | |
CN203222795U (en) | Manual hole digging pile | |
CN107100160A (en) | A kind of construction technology for lower storage reservoir check dam vibro-replacement stone column | |
CN104196021A (en) | Uplift pile structure and construction method thereof | |
CN106480878A (en) | A kind of upper and lower part expansion type soil cement is combined pile tube | |
CN202969370U (en) | Novel steel pipe pile | |
CN105155575A (en) | Non-excavation cantilever retaining wall with embedded steel pipe and construction method of non-excavation cantilever retaining wall | |
CN104389305A (en) | Sand-filled bamboo-joint pile and construction method thereof | |
CN104264679A (en) | Construction method of tower transmission iron tower foundation large-diameter underwater cast-in-place piles | |
CN203808055U (en) | Screw post-reinforced compacted pile | |
CN206233232U (en) | A kind of upper and lower part expansion type soil cement is combined pile tube | |
CN104499480A (en) | Method for drilling and filling concrete hollow pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150408 |