CN206233232U - A kind of upper and lower part expansion type soil cement is combined pile tube - Google Patents
A kind of upper and lower part expansion type soil cement is combined pile tube Download PDFInfo
- Publication number
- CN206233232U CN206233232U CN201621323066.5U CN201621323066U CN206233232U CN 206233232 U CN206233232 U CN 206233232U CN 201621323066 U CN201621323066 U CN 201621323066U CN 206233232 U CN206233232 U CN 206233232U
- Authority
- CN
- China
- Prior art keywords
- pile
- cement
- concrete pipe
- epimere
- prefabricated concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
A kind of upper and lower part expands the compound pile tube of shape soil cement, including prefabricated concrete pipe pile, centre bore is set in the prefabricated concrete pipe pile, the first cement earth pile of filling in centre bore, second cement earth pile is set outside prefabricated concrete pipe pile, second cement earth pile includes upper, middle and lower segment, and the epimere of the second cement earth pile and the stake footpath of hypomere are all higher than the stake footpath in stage casing, and the second cement earth pile stage casing and epimere, hypomere between be respectively provided with the first variable diameters section and the second variable diameters section.With compared with the pile body of the single diameter of the concrete amounts such as height, bearing capacity of pile foundation of the present utility model is higher, can be on the premise of ensureing to meet design bearing capacity requirement, realize that stake is long shorter, the capability development of pile foundation side resistance simultaneously is higher, and the geological conditions of bottom soil layer is substantially better than particularly suitable for upper soil horizon.
Description
Technical field
The utility model belongs to foundation engineering technical field, and in particular to a kind of top expansion type soil cement is combined pile tube.
Background technology
With the development of building trade, construction scope increasingly increases, and the additional load of ground is increasing, high for part
Layer, high-rise building, subsoil and composite foundation can not meet ground requirement for bearing capacity, it is this under the conditions of, pile foundation is
A kind of base form for generally using.It is preferable for some areas pile foundation top and bottom soil layer engineering properties, middle part soil layer
When more weak, typically using increasing, stake is long to be penetrated soft layer or increase stake footpath raising collateral resistance to ensure pile foundation carrying pile foundation
Power, pile-type typically uses cast-in-situ bored pile or static pressure, driven precast pile etc..Bored pile construction operation is:
(1)Plant equipment and material enter job site;
(2)Measure of pile position setting-out;
(3)Embedded casing;
(4)Rig simultaneously pore-forming in place;
(5)Borehole cleaning, lifts steel reinforcement cage;
(6)Conduit, concrete perfusion are installed;
(7)Casing is removed, pile crown is cut;
(8)Pile body is detected.
Although above-mentioned technique has been commonly used, using still suffering from problems with thicker soft layer:
1)In upper soil horizon preferably, bottom soil layer.Needed during pile foundation size design deduct negative friction influence, stake footpath,
Stake corresponding increase long, causes a large amount of wastes;
2)Filling pile construction has higher requirements to filling concrete process, and filling process should ensure that continuously, otherwise easily occurs
Pile breaking phenomenon.
Utility model content
The purpose of this utility model is to provide a kind of upper and lower part expansion type soil cement compound pile tube.
Based on above-mentioned purpose, the utility model is adopted the following technical scheme that:
A kind of upper and lower part expands the compound pile tube of shape soil cement, including prefabricated concrete pipe pile, the prefabricated concrete pipe pile
Interior setting centre bore, the first cement earth pile of filling in centre bore sets the second cement earth pile outside prefabricated concrete pipe pile, and described the
Two cement earth piles include upper, middle and lower segment, and the epimere of the second cement earth pile and the stake footpath of hypomere are all higher than the stake footpath in stage casing, and
The first variable diameters section and the second variable diameters section are respectively provided between the stage casing of the second cement earth pile and epimere, hypomere.
The prefabricated concrete pipe pile includes epimere and hypomere, and the stake footpath of prefabricated concrete pipe pile epimere is more than concrete
Native pile tube hypomere, sets the 3rd variable diameters section, the height of prefabricated concrete pipe pile epimere between upper and lower section of prefabricated concrete pipe pile
Degree is highly equal with the second cement earth pile epimere, and the height of the 3rd variable diameters section is highly equal with the first variable diameters section, in advance
The bottom of concrete tubular pile processed maintains an equal level with the bottom of the second cement earth pile.
The side wall of the prefabricated concrete pipe pile is uniformly distributed muscle body, and the periphery of muscle body sets stirrup.
The trend of the muscle body is consistent with the trend of prefabricated concrete pipe pile side wall.
First cement earth pile and the second cement earth pile are cement mixing method or soil cement bored concrete pile.
The epimere of second cement earth pile and the stake footpath of hypomere are equal.
First variable diameters section, the second variable diameters section and the 3rd variable diameters section are with the angle of the axis of prefabricated concrete pipe pile not
More than 12 °.
External diameter at least 20mm of the stake footpath of second cement earth pile more than prefabricated concrete pipe pile.
The second cement earth pile epimere is located at compared with hard stratum, and stage casing is located at and is located at compared with hard stratum compared with Soft Soil Layer, hypomere.
It is described be compared with hard stratum in close-dense state layer of sand, the cohesive soil of hard plastic-hardened condition, the powder of dense state
One or more mixing in soil;Described is cohesive soil that shape is moulded in soft modeling-stream compared with Soft Soil Layer.
Compared with prior art, technique effect of the present utility model is:
1)With compared with the pile body of the single diameter of the concrete amounts such as height, bearing capacity of pile foundation of the present utility model is more
Height, can realize that stake is long shorter on the premise of ensureing to meet design bearing capacity requirement, while the capability development of pile foundation side resistance is more
Height, the geological conditions of bottom soil layer is substantially better than particularly suitable for upper soil horizon;
2)The overall presentation top of stake and the structure type that bottom stake footpath is big, middle part stake footpath is small, can make upper and lower part soil layer
Collateral resistance be effectively played;
3)Pile body uses variable diameters segment structure form, makes to form taper nature transition between composite foundation pile top and bottom,
Be conducive to upper load to transmit downwards, increase the performance of bottom pile bearing capacity, while also saving perfusion pile material;
4)Easy construction, material-saving, the prestressed-concrete pile for using are prefabricated components, can shorten live man-hour, its
Intensity is higher compared with cast-in-situ concrete poured stake, and interior equipped with prestressed steel bar, it is not easy to which cracking destruction phenomenon occurs;It is prefabricated
Without taking out after stake insertion, easy construction and effect is good;More concrete and reinforcing bar are saved under identical anti-bending bearing capacity.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is prefabricated concrete pipe pile structural representation in the utility model;
Fig. 3 is prefabricated concrete pipe pile cross-sectional view in the utility model;
Fig. 4 is construction procedure in embodiment(2)Structural representation;
Fig. 5 is construction procedure in embodiment(3)Structural representation;
Fig. 6 is construction procedure in embodiment(4)Structural representation.
Specific embodiment
A kind of upper and lower part as illustrated in figs. 1 and 2 expands the compound pile tube of shape soil cement, including prefabricated concrete pipe pile 1,
The first cement earth pile 2 of filling, prefabricated concrete pipe pile 1 in centre bore 11, centre bore 11 are set in the prefabricated concrete pipe pile
The second cement earth pile 3 of outer setting, the first cement earth pile 2 and the second cement earth pile 3 are soil cement bored concrete pile.The precast concrete
Pile tube 1, the first cement earth pile 2 and the second cement earth pile 3 are coaxially disposed.The stake footpath of second cement earth pile 3 is mixed more than prefabricated
The external diameter at least 20mm of solidifying soil pile tube 1.Second cement earth pile 3 includes upper, middle and lower segment, on second cement earth pile
Section 31 is located at the cohesive soil 4 (compared with hard stratum) of hard plastic-hardened condition, and the cohesive soil 5 that stage casing 32 is located at soft modeling-stream modeling shape is (softer
Soil layer), hypomere 33 it is close in being located at-layer of sand 6 (compared with hard stratum) of dense state.The epimere 31 of second cement earth pile 3 is with
The stake footpath of section 33 is equal, and more than the stake footpath in stage casing 32, the stake footpath of epimere 31 and hypomere 33 is 820mm, and the stake footpath in stage casing 32 is
620mm, is respectively provided with the first variable diameters section 34 and second and becomes between the stage casing 32 of the second cement earth pile 3 and epimere 31, hypomere 33
Diameter segment 35.
The prefabricated concrete pipe pile 1 includes epimere 12 and hypomere 13, and the stake footpath of the epimere 12 of prefabricated concrete pipe pile 1 is more than
Prefabricated concrete pipe pile hypomere 13, the diameter 800mm of 1 epimere of prefabricated concrete pipe pile 12, the diameter 600mm of hypomere 13, internal diameter
400mm, sets the 3rd variable diameters section 14 between upper and lower section of prefabricated concrete pipe pile 1, the epimere 12 of prefabricated concrete pipe pile 1
Height is highly equal with the epimere of the second cement earth pile 3, the height of height and the first variable diameters section 34 of the 3rd variable diameters section 14
Equal, the bottom of prefabricated concrete pipe pile 1 maintains an equal level with the bottom of the second cement earth pile 3.The side wall of the prefabricated concrete pipe pile 1
Muscle body 15 is uniformly distributed, the trend of muscle body 15 is consistent with the trend of the side wall of prefabricated concrete pipe pile 1, the periphery of muscle body 15 sets hoop
Muscle 16.The muscle body 15 is the hybrid reinforcement of prestressed steel bar or prestressed steel bar and nonprestressed reinforcement.
The axis of the first variable diameters the 34, second variable diameters of section section 35 and the 3rd variable diameters section 14 and prefabricated concrete pipe pile 1
Angle be not more than 12 °.
Its construction method, comprises the following steps:
(1)Measure of pile position setting-out;
(2)Rig creeps into the hole of drawing to form top and the bottom expanding reach, as shown in Figure 4;
(3)Premixing soil cement is irrigated in hole, as shown in Figure 5;
(4)During prefabricated concrete pipe pile 1 inserted into cement earth pile;As shown in Figure 6.
Claims (10)
1. a kind of upper and lower part expands the compound pile tube of shape soil cement, it is characterised in that described prefabricated including prefabricated concrete pipe pile
The first cement earth pile of filling in centre bore, centre bore is set in concrete tubular pile, the second cement is set outside prefabricated concrete pipe pile
Native stake, during second cement earth pile includes that upper, middle and lower segment, the epimere of the second cement earth pile and the stake footpath of hypomere are all higher than
Section stake footpath, and the second cement earth pile stage casing and epimere, hypomere between be respectively provided with the first variable diameters section and the second variable diameters
Section.
2. upper and lower part as claimed in claim 1 expands the compound pile tube of shape soil cement, it is characterised in that the precast concrete
Pile tube includes epimere and hypomere, and the stake footpath of prefabricated concrete pipe pile epimere is more than prefabricated concrete pipe pile hypomere, precast concrete
3rd variable diameters section, the height of prefabricated concrete pipe pile epimere and the first cement earth pile epimere are set between upper and lower section of pile tube
It is highly equal, height and the first variable diameters section of the 3rd variable diameters section it is highly equal, the bottom of prefabricated concrete pipe pile and
The bottom of the second cement earth pile maintains an equal level.
3. upper and lower part as claimed in claim 2 expands the compound pile tube of shape soil cement, it is characterised in that the precast concrete
The side wall of pile tube is uniformly distributed muscle body, and the periphery of muscle body sets stirrup.
4. upper and lower part as claimed in claim 3 expands the compound pile tube of shape soil cement, it is characterised in that the trend of the muscle body
Trend with prefabricated concrete pipe pile side wall is consistent.
5. upper and lower part as claimed in claim 1 expands the compound pile tube of shape soil cement, it is characterised in that first soil cement
Stake and the second cement earth pile are cement mixing method or soil cement bored concrete pile.
6. upper and lower part as claimed in claim 1 expands the compound pile tube of shape soil cement, it is characterised in that second soil cement
The epimere of stake and the stake footpath of hypomere are equal.
7. upper and lower part as claimed in claim 1 expands the compound pile tube of shape soil cement, it is characterised in that the first variable diameters section, the
Two variable diameters section and the 3rd variable diameters section are not more than 12 ° with the angle of the axis of prefabricated concrete pipe pile.
8. upper and lower part as claimed in claim 1 expands the compound pile tube of shape soil cement, it is characterised in that second soil cement
External diameter at least 20mm of the stake footpath of stake more than prefabricated concrete pipe pile.
9. the upper and lower part as described in claim 1-8 is any expands the compound pile tube of shape soil cement, it is characterised in that described second
Cement earth pile epimere is located at compared with hard stratum, and stage casing is located at and is located at compared with hard stratum compared with Soft Soil Layer, hypomere.
10. upper and lower part as claimed in claim 9 expands the compound pile tube of shape soil cement, it is characterised in that described to be compared with hard stratum
In close-dense state layer of sand, the cohesive soil of hard plastic-hardened condition, the silt of dense state in one or more
Mixing;Described is cohesive soil that shape is moulded in soft modeling-stream compared with Soft Soil Layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621323066.5U CN206233232U (en) | 2016-12-05 | 2016-12-05 | A kind of upper and lower part expansion type soil cement is combined pile tube |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621323066.5U CN206233232U (en) | 2016-12-05 | 2016-12-05 | A kind of upper and lower part expansion type soil cement is combined pile tube |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206233232U true CN206233232U (en) | 2017-06-09 |
Family
ID=58979349
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621323066.5U Active CN206233232U (en) | 2016-12-05 | 2016-12-05 | A kind of upper and lower part expansion type soil cement is combined pile tube |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206233232U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106480878A (en) * | 2016-12-05 | 2017-03-08 | 周同和 | A kind of upper and lower part expansion type soil cement is combined pile tube |
CN107859036A (en) * | 2017-10-26 | 2018-03-30 | 湖北工业大学 | A kind of in-situ deposited prefabricated combining structure stake and its construction method suitable for karst region |
-
2016
- 2016-12-05 CN CN201621323066.5U patent/CN206233232U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106480878A (en) * | 2016-12-05 | 2017-03-08 | 周同和 | A kind of upper and lower part expansion type soil cement is combined pile tube |
CN107859036A (en) * | 2017-10-26 | 2018-03-30 | 湖北工业大学 | A kind of in-situ deposited prefabricated combining structure stake and its construction method suitable for karst region |
CN107859036B (en) * | 2017-10-26 | 2019-10-11 | 湖北工业大学 | A kind of in-situ deposited prefabricated composite structure stake and its construction method suitable for karst region |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018210019A1 (en) | Pile formation method for down-the-hole impact rotary jet composite piles | |
CN206784372U (en) | Injection forming club-footed pile | |
CN105625294A (en) | Composite foundation and construction method thereof | |
CN109024651B (en) | Steel pipe concrete mixed pile foundation and construction method | |
CN105714772A (en) | Re-drilling concrete wall protecting method for hole formation of rock-socketed pile in karst region | |
CN105297717A (en) | Composite foundation pile with lower portion enlarged diameter section and construction method of composite foundation pile | |
CN106996104A (en) | Injection forming club-footed pile and its construction method | |
CN112323560B (en) | Roadbed construction settlement control system in complex soft foundation environment | |
CN106480878A (en) | A kind of upper and lower part expansion type soil cement is combined pile tube | |
CN105421445A (en) | Construction method for non-prestressed centrifugal high-strength concrete pile planted pile | |
CN105649073A (en) | Static root drilling type construction method for planting piles | |
CN102808407B (en) | Construction method of soft-foundation reinforced concrete cast-in-place pile | |
CN102134861B (en) | Method for testing precast pile in soil body | |
CN206233232U (en) | A kind of upper and lower part expansion type soil cement is combined pile tube | |
CN111254909B (en) | Construction process of composite pile foundation of soft soil area foundation | |
CN105926626B (en) | Overlength pneumatic down hole hammer vibrates jet grouting pile construction technique | |
CN206495202U (en) | A kind of top expansion type cement-soil composite pile | |
CN106759301A (en) | A kind of top expansion type cement-soil composite pile | |
CN109555127A (en) | A kind of construction for the flush type multimedium built pile that drills | |
CN103790148A (en) | Combined treatment construction method for collapsible loess foundation | |
CN110939161B (en) | Construction method of large-diameter socketed anti-floating anchor rod and drilling tool used in method | |
CN203701128U (en) | Micro pile-reinforced bridge foundation and bridge | |
CN106939596A (en) | A kind of cast-in-place slub type slurry drilled pile | |
CN102619218B (en) | Rear slotting reinforcing cage CFG and piling method thereof | |
CN102359107B (en) | Stiffening pile for reclaiming reinforcing body |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |