JPS6397712A - Soil cement composite pile - Google Patents
Soil cement composite pileInfo
- Publication number
- JPS6397712A JPS6397712A JP24191786A JP24191786A JPS6397712A JP S6397712 A JPS6397712 A JP S6397712A JP 24191786 A JP24191786 A JP 24191786A JP 24191786 A JP24191786 A JP 24191786A JP S6397712 A JPS6397712 A JP S6397712A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- soil cement
- tip
- cement composite
- composite pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004568 cement Substances 0.000 title abstract 3
- 239000002689 soil Substances 0.000 title abstract 3
- 239000002131 composite material Substances 0.000 title 1
- 229910000831 Steel Inorganic materials 0.000 abstract 1
- 238000010276 construction Methods 0.000 abstract 1
- 239000010959 steel Substances 0.000 abstract 1
Abstract
PURPOSE: To effectively utilize the strength of supporting piles as well as raising the closing effect of the pile tip by providing projections for the inner surface of the tip of a pile.
CONSTITUTION: A soil cement column 1 is formed in the ground, and a steel tubular pile 3 is constructed in the column 1. In this case, projections 4 are formed on the inner surface of the tip of the pile 3. The closing effect of the pile tip and the horizontal resistance can thus be raised and the strength of the supporting pile can be effectively utilized by the soil cement construction method.
COPYRIGHT: (C)1988,JPO&Japio
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP24191786A JPS6397712A (en) | 1986-10-14 | 1986-10-14 | Soil cement composite pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP24191786A JPS6397712A (en) | 1986-10-14 | 1986-10-14 | Soil cement composite pile |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS6397712A true JPS6397712A (en) | 1988-04-28 |
Family
ID=17081472
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP24191786A Pending JPS6397712A (en) | 1986-10-14 | 1986-10-14 | Soil cement composite pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6397712A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04185813A (en) * | 1990-11-20 | 1992-07-02 | Kubota Corp | Formation of soil-cement composite pile |
JP2009114845A (en) * | 2007-10-16 | 2009-05-28 | Jfe Steel Corp | Friction pile |
CN104404947A (en) * | 2014-11-20 | 2015-03-11 | 张红 | Construction method for composite pile |
CN104499480A (en) * | 2014-12-12 | 2015-04-08 | 董相东 | Method for drilling and filling concrete hollow pile |
CN104929110A (en) * | 2015-05-20 | 2015-09-23 | 孙文 | Novel variable stiffness composite pile, construction method of novel variable stiffness composite pile, and long spiral drilling machine adopted in construction method |
CN104929109A (en) * | 2015-05-20 | 2015-09-23 | 骆嘉成 | Replaceable press-grouted cement soil composite pile, construction method of replaceable press-grouted cement soil composite pile and long twist drill employed in construction method |
CN105544525A (en) * | 2015-12-11 | 2016-05-04 | 陈明 | Uplift pile with unfolding barb and construction method thereof |
-
1986
- 1986-10-14 JP JP24191786A patent/JPS6397712A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04185813A (en) * | 1990-11-20 | 1992-07-02 | Kubota Corp | Formation of soil-cement composite pile |
JP2009114845A (en) * | 2007-10-16 | 2009-05-28 | Jfe Steel Corp | Friction pile |
CN104404947A (en) * | 2014-11-20 | 2015-03-11 | 张红 | Construction method for composite pile |
CN104499480A (en) * | 2014-12-12 | 2015-04-08 | 董相东 | Method for drilling and filling concrete hollow pile |
CN104929110A (en) * | 2015-05-20 | 2015-09-23 | 孙文 | Novel variable stiffness composite pile, construction method of novel variable stiffness composite pile, and long spiral drilling machine adopted in construction method |
CN104929109A (en) * | 2015-05-20 | 2015-09-23 | 骆嘉成 | Replaceable press-grouted cement soil composite pile, construction method of replaceable press-grouted cement soil composite pile and long twist drill employed in construction method |
CN105544525A (en) * | 2015-12-11 | 2016-05-04 | 陈明 | Uplift pile with unfolding barb and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR890006931A (en) | Steel pipe pile, its manufacturing method and pile method | |
JPS5985028A (en) | Steel pipe pile and laying work thereof | |
JPH03158525A (en) | High horizontal load bearing foundation practice using solidification method | |
JPS55142815A (en) | Liquefaction preventing method for sandy ground | |
JPS6475715A (en) | Soil cement composite pile | |
JPS615125A (en) | Foundation of building | |
JPH0295489A (en) | Final garbage disposal method in garbage disposal plant | |
JPS59126821A (en) | Erection work of foundation pile | |
JPH03202599A (en) | Reinforced structure of twin tunnels | |
JPS55114717A (en) | Combination method of support and foundation | |
JPH04124317A (en) | Improvement of foundation ground for building | |
JPH01131715A (en) | Ground improving work by horizontal injection of chemical grout | |
JPS5869923A (en) | Construction of underground continuous wall with drain layer | |
JPH03202598A (en) | Reinforced structure of eye-glass shaped tunnel | |
JPS6327625A (en) | Foundation construction work for underwater structure | |
JPH0381422A (en) | Caisson method | |
JPH03206211A (en) | Drain material, soft ground improving structure using drain material and foundation pillar using the same structure | |
JPS6383316A (en) | Embeding method for pile | |
JPS55122914A (en) | Method for early improvement of soft ground | |
JPS63535A (en) | Earthquake-proof fortifying work for existing structure | |
JPS57155433A (en) | Method of caisson construction of underground structure | |
JPH01312118A (en) | Strength-applied backfilled material and backfilling construction with its material | |
JPS621930A (en) | Foundation structure of underground structure | |
JPS6383314A (en) | Method for preparing cast-in place pile | |
JPS62268418A (en) | Formation of pile |