CN103742157A - Method of newly building underground space under ground by pipe jacking method - Google Patents
Method of newly building underground space under ground by pipe jacking method Download PDFInfo
- Publication number
- CN103742157A CN103742157A CN201410030438.4A CN201410030438A CN103742157A CN 103742157 A CN103742157 A CN 103742157A CN 201410030438 A CN201410030438 A CN 201410030438A CN 103742157 A CN103742157 A CN 103742157A
- Authority
- CN
- China
- Prior art keywords
- pipe
- underground space
- underground
- concrete
- newly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a method of newly building an underground space under the ground by a pipe jacking method. The method provided by the invention aims to have the characteristics of small influence on surface buildings, fast construction speed and simple construction. The technical scheme is that the method of newly building the underground space under the ground by the pipe jacking method is carried out by the following steps: 1) excavating a vertical shaft or a foundation trench in a proper position around the ground corresponding to the underground space to be built, wherein either the vertical shaft or the foundation trench shall be deeper than the underground space; 2) jacking either steel pipes or concrete pipes into a to-be-built position in the underground space in either the vertical shaft or the foundation trench, wherein either all the steel pipes or the concrete pipes are mutually arranged in parallel, so as to form a pipe wall with a rectangular cross section; 3) gradually excavating soil in the pipes and soil in the rectangular pipe wall; 4) jacking either the steel pipes or the concrete pipes of small diameters in the soil layers between the adjacent steel pipes or the adjacent concrete pipes; and 5) drilling an injection pipe for grouting in an outer pipe; and solidifying to obtain the underground space.
Description
Technical field
The present invention relates to a kind of construction techniques, especially the construction method of underground building.
Background technology
Along with the quickening of urbanization process, reduce increasingly in the space that ground space can develop, and has become people's common recognition toward underground development.Because the infrastructure on ground has been tending towards saturated, therefore build the excavation form that underground building adopts and will destroy a large amount of ground installations, long in time limit, pollute greatly, bring to people's life huge constant, do not met the development need of current social.
Summary of the invention
The object of the invention is to overcome the deficiency in above-mentioned background technology, provide a kind of with pipe jacking method in the method for the underground newly-built underground space, that the method should have is little to ground Influence on Architecture, construction speed fast, the simple feature of constructing.
Technical scheme provided by the invention is: the method with pipe jacking method in the underground newly-built underground space, according to following steps, carry out:
1) first wanting to build the underground space corresponding ground periphery correct position excavating shaft or foundation ditch, the degree of depth of vertical shaft or foundation ditch should be greater than the degree of depth of the underground space;
2) in vertical shaft or foundation ditch, toward the underground space want build position level and head into steel pipe or concrete pipe, all steel pipe or concrete pipe are arranged parallel to each other, the pipe wall that to form cross section be rectangle;
3) progressively cut out earth and the rectangular tube earth within the walls in pipe;
4) in the soil layer between adjacent steel pipe or concrete pipe, then head into steel pipe or the concrete pipe that diameter is less;
5) in outer tube, pierce Grouting Pipe slip casting; After solidifying.
All steel pipes or the cylindrical of concrete pipe are tangent.
Adjacent big or small steel pipe forms an entirety by welding or connector.
The area of rectangular tube wall is greater than the cross section of design excavation.
The invention has the beneficial effects as follows: owing to excavating in the bottom of vertical shaft or foundation ditch, significantly reduced the degree that ground infrastructure is destroyed, make to repair and be more prone in the future, thereby significantly reduced cost, shortened the duration, also reduced the traffic of people's trip has been hindered, there is very high social value; The method does not also need to employ too much big machinery, and energy consumption significantly reduces; Be particularly suitable for the location excavation underground space intensive in ground infrastructure.
Accompanying drawing explanation
Fig. 1 is the excavation position view of the underground space of the present invention.
Fig. 2 is that the A-A in Fig. 1 analyses and observe structure for amplifying schematic diagram.
The specific embodiment
Below in conjunction with embodiment shown in the drawings, further illustrate.
Method with pipe jacking method in the underground newly-built underground space, according to following steps, carry out:
1) first determine and want to build the vertically ground periphery correct position of correspondence of underground space K, excavate at least one vertical shaft 1 or foundation ditch, the degree of depth of vertical shaft or foundation ditch should be greater than the degree of depth of the underground space; The length of vertical shaft or foundation ditch and width should be greater than by the steel pipe of top pressure or the length of concrete pipe;
2) vertical shaft or foundation ditch want build position level and head into steel pipe 2 or concrete pipe; The length of steel pipe or concrete pipe should be greater than the length of the horizontal plane projection of the underground space, and all steel pipe or concrete pipe are arranged parallel to each other, and forms the pipe wall that cross section (being Fig. 2) is rectangle (rectangular area is greater than the cross section of design excavation); Distance after being arranged parallel to each other should be greater than the width of the horizontal plane projection of the underground space;
All steel pipes that head into or concrete pipe should be as far as possible mutually close; Optimum selection is that the cylindrical of steel pipe or concrete pipe is tangent.
3) progressively cut out earth and the rectangular tube earth within the walls in steel pipe; Can set up on demand temporary supporting, to guarantee safety;
4) in the soil layer between adjacent steel pipe or concrete pipe, then head into steel pipe 3 or the concrete pipe that diameter is less, to be conducive to the firm of underground soil layer;
5) slip casting in the steel pipe that cuts out earth forms the concrete core steel pipe strengthening after it solidifies.
As recommendation, adjacent big or small steel-pipe welding or form an entirety by connector.
Claims (4)
1. the method in the underground newly-built underground space with pipe jacking method, according to following steps, carry out:
1) first wanting to build the underground space (K) corresponding ground periphery correct position excavating shaft (1) or foundation ditch, the degree of depth of vertical shaft or foundation ditch should be greater than the degree of depth of the underground space;
2) in vertical shaft or foundation ditch, toward the underground space want build position level and head into steel pipe (2) or concrete pipe, all steel pipe or concrete pipe are arranged parallel to each other, the pipe wall that to form cross section be rectangle;
3) progressively cut out earth and the rectangular tube earth within the walls in pipe;
4) in the soil layer between adjacent steel pipe or concrete pipe, then head into the steel pipe that diameter is less (3) or concrete pipe;
5) in outer tube, pierce Grouting Pipe slip casting; After solidifying.
2. the method for pipe jacking method in the underground newly-built underground space of using according to claim 1, is characterized in that: all steel pipes or the cylindrical of concrete pipe are tangent.
3. the method for pipe jacking method in the underground newly-built underground space of using according to claim 2, is characterized in that: adjacent big or small steel pipe forms an entirety by welding or connector.
4. the method for pipe jacking method in the underground newly-built underground space of using according to claim 3, is characterized in that: the area of rectangular tube wall is greater than the cross section of design excavation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410030438.4A CN103742157A (en) | 2014-01-23 | 2014-01-23 | Method of newly building underground space under ground by pipe jacking method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410030438.4A CN103742157A (en) | 2014-01-23 | 2014-01-23 | Method of newly building underground space under ground by pipe jacking method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103742157A true CN103742157A (en) | 2014-04-23 |
Family
ID=50499211
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410030438.4A Pending CN103742157A (en) | 2014-01-23 | 2014-01-23 | Method of newly building underground space under ground by pipe jacking method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103742157A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104265301A (en) * | 2014-07-23 | 2015-01-07 | 上海隧道工程股份有限公司 | Rectangular pipe jacking large-angle obliquely crossing in-tunnel construction method |
CN104806274A (en) * | 2015-04-20 | 2015-07-29 | 中建南方投资有限公司 | Large-span long-distance underground space main body supporting integrated structure and construction method |
CN104879144A (en) * | 2015-05-20 | 2015-09-02 | 上海市城市建设设计研究总院 | Underground excavation construction method for building underground space by array jacking pipes in soft soil area |
CN104963705A (en) * | 2015-07-20 | 2015-10-07 | 上海市机械施工集团有限公司 | Underground space excavating and constructing method |
CN105370300A (en) * | 2015-11-17 | 2016-03-02 | 中铁工程装备集团有限公司 | Two-layer or multi-layer underground space construction method |
CN106014460A (en) * | 2016-06-14 | 2016-10-12 | 中铁隧道勘测设计院有限公司 | Incremental launching type underground space group construction method and application |
CN107387092A (en) * | 2017-07-27 | 2017-11-24 | 广州市市政工程设计研究总院 | A kind of multiple rectangular top pipes are connected in parallel on the engineering method that the underground space is formed under complex environment |
CN109972725A (en) * | 2019-03-06 | 2019-07-05 | 张四海 | A method of constructing underground automatic garage structures |
CN112112167A (en) * | 2020-09-01 | 2020-12-22 | 深圳市综合交通设计研究院有限公司 | Height-limited section foundation pit supporting structure and construction method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87100318A (en) * | 1987-01-23 | 1987-08-26 | 陶义 | Secretly digging method with predisposed roof |
KR20050092881A (en) * | 2004-03-17 | 2005-09-23 | 원하종합건설 주식회사 | Steel pipe roof construction method for building underground structure, roof structure therefor, and structure of steel pipe therefor |
JP2008019608A (en) * | 2006-07-12 | 2008-01-31 | Data Tou:Kk | Steel pipe sheet pile, steel pipe sheet pile wall, steel pipe for pipe roof and pipe roof |
CN103437789A (en) * | 2013-08-15 | 2013-12-11 | 北京市轨道交通设计研究院有限公司 | Method for constructing water proof structure and constructing underground construction in water proof mode |
KR101381325B1 (en) * | 2013-05-30 | 2014-04-04 | 성은주 | The non-open cut tunnel construction method using the multistage small diameter steel pipe |
-
2014
- 2014-01-23 CN CN201410030438.4A patent/CN103742157A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87100318A (en) * | 1987-01-23 | 1987-08-26 | 陶义 | Secretly digging method with predisposed roof |
KR20050092881A (en) * | 2004-03-17 | 2005-09-23 | 원하종합건설 주식회사 | Steel pipe roof construction method for building underground structure, roof structure therefor, and structure of steel pipe therefor |
JP2008019608A (en) * | 2006-07-12 | 2008-01-31 | Data Tou:Kk | Steel pipe sheet pile, steel pipe sheet pile wall, steel pipe for pipe roof and pipe roof |
KR101381325B1 (en) * | 2013-05-30 | 2014-04-04 | 성은주 | The non-open cut tunnel construction method using the multistage small diameter steel pipe |
CN103437789A (en) * | 2013-08-15 | 2013-12-11 | 北京市轨道交通设计研究院有限公司 | Method for constructing water proof structure and constructing underground construction in water proof mode |
Non-Patent Citations (1)
Title |
---|
中国地质学会探矿工程专业委员会: "《岩土钻掘工程文集’93全国岩土钻掘工程设备与工艺学术会议》", 31 October 1993 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104265301A (en) * | 2014-07-23 | 2015-01-07 | 上海隧道工程股份有限公司 | Rectangular pipe jacking large-angle obliquely crossing in-tunnel construction method |
CN104806274A (en) * | 2015-04-20 | 2015-07-29 | 中建南方投资有限公司 | Large-span long-distance underground space main body supporting integrated structure and construction method |
CN104879144A (en) * | 2015-05-20 | 2015-09-02 | 上海市城市建设设计研究总院 | Underground excavation construction method for building underground space by array jacking pipes in soft soil area |
CN104963705A (en) * | 2015-07-20 | 2015-10-07 | 上海市机械施工集团有限公司 | Underground space excavating and constructing method |
CN104963705B (en) * | 2015-07-20 | 2017-10-27 | 上海市机械施工集团有限公司 | A kind of underground space tunneling construction method |
CN105370300A (en) * | 2015-11-17 | 2016-03-02 | 中铁工程装备集团有限公司 | Two-layer or multi-layer underground space construction method |
CN106014460A (en) * | 2016-06-14 | 2016-10-12 | 中铁隧道勘测设计院有限公司 | Incremental launching type underground space group construction method and application |
CN107387092A (en) * | 2017-07-27 | 2017-11-24 | 广州市市政工程设计研究总院 | A kind of multiple rectangular top pipes are connected in parallel on the engineering method that the underground space is formed under complex environment |
CN107387092B (en) * | 2017-07-27 | 2019-02-26 | 广州市市政工程设计研究总院 | A kind of multiple rectangular top pipes are connected in parallel on the engineering method of the formation underground space under complex environment |
CN109972725A (en) * | 2019-03-06 | 2019-07-05 | 张四海 | A method of constructing underground automatic garage structures |
CN109972725B (en) * | 2019-03-06 | 2020-10-09 | 张四海 | Method for constructing underground automatic garage structure |
CN112112167A (en) * | 2020-09-01 | 2020-12-22 | 深圳市综合交通设计研究院有限公司 | Height-limited section foundation pit supporting structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103742157A (en) | Method of newly building underground space under ground by pipe jacking method | |
CN103603342B (en) | Major diameter assembled casing super-long filling pile construction method | |
CN104805854A (en) | Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment | |
CN205260041U (en) | Method of freezing supporting construction is spouted soon to level | |
CN103114599A (en) | Deep foundation pit sealed precipitation device and construction method thereof | |
CN103541371B (en) | Bearing platform for heating pipe channels to stride reserved subway station and construction method thereof | |
CN206204972U (en) | A kind of prefabricated tubular pile as well-points dewatering | |
CN105569062A (en) | Dewatering method implemented through permeation, weakening and emission reduction | |
CN104775439A (en) | Foundation pit support and water stop integrated structure and construction method thereof | |
CN103243721B (en) | Highrise Building With Raft Foundation and Core Walls Structure excavation construction method under Unfavorable geology condition | |
CN204825923U (en) | Relay formula underground structure | |
CN104074183A (en) | Drilling and concrete injected root composite pile implanting pile structure and construction method | |
CN204282399U (en) | A kind of subway space enclosing structure | |
CN203625883U (en) | Steel sheet support pile with pipes for foundation pit construction | |
CN102220764A (en) | Deep foundation pit bracing system and construction method thereof | |
CN204609897U (en) | A kind of pipe curtain freezing process supporting and protection structure | |
CN204252119U (en) | The special-shaped supporting pile structure of X | |
CN203531010U (en) | Supporting platform of heat pipe trench and for crossing reserved subway station | |
CN103866779B (en) | A kind of construction method of sealing space enclosing structure of soft foundation building foundation pit | |
CN203113361U (en) | Deep foundation pit sealing precipitation device | |
CN202247924U (en) | Assembled steel structure open caisson in pipe jacking construction | |
CN206220100U (en) | A kind of deep foundation pit supporting structure for closing on protection building | |
CN211849527U (en) | High water pressure drop well combination plugging device | |
CN204608798U (en) | A kind of water-seal pile/within the walls inserts the foundation pit supporting construction that H profile steel and prefabricated tubular pile are formed | |
CN204532367U (en) | A kind of underground bracket stake |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140423 |
|
RJ01 | Rejection of invention patent application after publication |