CN104074183A - Drilling and concrete injected root composite pile implanting pile structure and construction method - Google Patents

Drilling and concrete injected root composite pile implanting pile structure and construction method Download PDF

Info

Publication number
CN104074183A
CN104074183A CN201410313816.XA CN201410313816A CN104074183A CN 104074183 A CN104074183 A CN 104074183A CN 201410313816 A CN201410313816 A CN 201410313816A CN 104074183 A CN104074183 A CN 104074183A
Authority
CN
China
Prior art keywords
pile
concrete
hole
pile tube
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410313816.XA
Other languages
Chinese (zh)
Inventor
叶喆宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG TIANRUN CONSTRUCTION CO Ltd
GUODING (NANTONG) PIPE PILES CO Ltd
Original Assignee
ZHEJIANG TIANRUN CONSTRUCTION CO Ltd
GUODING (NANTONG) PIPE PILES CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG TIANRUN CONSTRUCTION CO Ltd, GUODING (NANTONG) PIPE PILES CO Ltd filed Critical ZHEJIANG TIANRUN CONSTRUCTION CO Ltd
Priority to CN201410313816.XA priority Critical patent/CN104074183A/en
Publication of CN104074183A publication Critical patent/CN104074183A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a drilling and concrete injected root composite pile implanting pile structure. The drilling and concrete injected root composite pile implanting pile structure comprises a pile hole, a pipe pile which is implanted into the pile hole and concrete layers between the pipe pile and the pile hole and inside the pipe pile walls. The implanting pile structure construction method comprises the following steps of (1) drilling the pile hole with the diameter larger than that of the pipe pile in a required pile position in the foundation through drilling machinery; (2) pouring concrete into the pile hole root through a grouting pipe; (3) inserting a prepared pipe pile into the pile hole which is poured with concrete, enabling the concrete to move upward along the pipe wall of the pipe pile and a gap between the pipe pile and the pile hole and performing concrete consolidation forming after pile implanting is achieved. The composite pile implanting pile structure has a high bearing capacity as a drilling pipe and is superior to the drilling pipe in cost. The implanting pile structure construction method needs no mud retaining wall, is environmental friendly in construction progress and shortens the construction days.

Description

A kind of boring and root inject the compound pile of concrete and plant pilework and construction method
Technical field
The present invention relates to building material technical field, relate to the compound pile that a kind of boring and root inject concrete and plant pilework, also relate to this compound pile and plant the construction method of pilework.
Background technology
Along with the development of concrete technology, the technology of concrete tubular pile also reaches its maturity, and except being applied to industry, civilian construction, is also widely used in each fields such as bridge, harbour, railway or hydraulic engineering.At present, along with the scale in city constantly increases, along with the fast development of urban construction, the land resources that can be used for construction is fewer and feweri, and therefore building construction develops to high level, and various high levels and super highrise building become the leading of current construction.For the Foundation Design of high level and super highrise building, the requirement of foundation bearing capacity is more and more higher, and building settlement deformation requirements is also more and more higher.For meeting bearing capacity and deformation requirements, design often adopts profound large-section in-situ concrete pile pile foundation.
For example, although, still there are many shortcomings: in extensive use in existing preformed pile construction: the collateral resistance performance of soft foundation king-pile week not exclusively; In soft foundation, under vertical compression load, pile strength can not be given full play to; Easily there is not pile body inclining in excavation construction, causes the infringement to pile body at that time; When improper the and pile crown structure of welding procedure is dealt with improperly, producing anti-pulling capacity cannot meet the demands; The problems such as deformation performance is not high enough, fragility destruction.
Existing preformed pile is generally constructed as main taking hammer piling, static pressure pile-sinking, often also exists soil compaction, in construction, peripheral facilities (undreground works, pipeline) is had to impact; Construction power consumption is high, produce noise and air pollution; While penetrating various interlayer, easily pile body is caused the infringement of macroscopic view or microcosmic when difficult construction wrong; Stake top mark is high-leveled and difficult to control, and destroys or the prestressed variation of pile body and cut the improper pile crown that easily causes of stake; Stake is long restricted, can not meet the problem such as high level or Super High requirement for bearing capacity.In addition, also there is following problem in existing castinplace pile: necking down, and mud emission becomes social concern; Pile bottom sediments etc. happen occasionally, and pile quality fluctuation is stable greatly not; The uneven phenomenon of the high easily generation of stake top mark, when excavation construction, difficulty is large; It is clean and tidy that scene is difficult to keep; Speed of application is slow, and efficiency is low; Folk prescription concrete conversion bearing capacity is only PHC stake 30% to 40%, and it is insufficient etc. that limited resources utilize.
Summary of the invention
The object of the invention is to for deficiency of the prior art, the compound pile that provides a kind of boring and root to inject concrete is planted pilework, adopts part drilled pile equipment, has higher bearing capacity, energy-saving and emission-reduction, and speed of application is accelerated.
For solving the problems of the technologies described above, the technical solution used in the present invention is: a kind of boring and root inject the compound pile of concrete and plant pilework, comprises the layer of concrete between pile tube, pile tube and the stake hole in a hole, embedded pile hole and in pile tube wall.
Further, described pile tube comprises one or more in steel pipe pile, PHC pile tube, PC pile tube, TSC pile tube.
Another object of the present invention is to provide a kind of boring and root to inject the construction method of the compound pile of concrete, comprise the following steps:
(1) boring: guide pile hole, utilize drilling machine required stake position in ground to get out the stake hole that a diameter is greater than pile tube, be drilled into design hole depth, rig shifts out a hole, and residue in cleaning hole;
(2) note concrete: by Grouting Pipe to stake hole root concrete perfusion;
(3) plant stake: ready pile tube is inserted to fill with to be had in concrete stake hole, can insert successively as required more piece pile tube, concrete moves up with the gap between stake hole along tube wall and the pile tube of pile tube, plant complete after concrete setting moulding.
The diameter in the hole of further, boring in soil in described step (1) is than the diameter 10cm of pile tube.
Further, the concrete in described step (2) is C25~C35 concrete.
Further, in described step (3), the diameter of pile tube is 400~1200mm.
Beneficial effect of the present invention:
1, the high-bearing capacity of planting pilework and have drilled pile of compound pile of the present invention;
2, compound pile of the present invention adopts equipment and the part technique of drilled pile, but its cost has more advantage compared with drilled pile;
3, the present invention is without mud off, not only work progress environmental protection more, and shortened the duration, the whole duration has been saved approximately 25% left and right compared with drilled pile.
Brief description of the drawings
Fig. 1 be compound pile of the present invention plant pilework structural representation.
Detailed description of the invention
Below in conjunction with specific embodiment, technical scheme of the present invention is elaborated.
Refer to Fig. 1, plant pilework for the compound pile of a kind of boring of the present invention and root injection concrete, comprise the layer of concrete 3 between pile tube 2, pile tube 2 and the stake hole 1 in a hole 1, embedded pile hole and in pile tube 1 wall.Wherein pile tube 2 comprises one or more in steel pipe pile, PHC pile tube, PC pile tube, TSC pile tube.
A kind of boring of the present invention and root inject the construction method of the compound pile of concrete, comprise the following steps:
(1) boring: guide pile hole, utilize drilling machine required stake position in ground to get out the stake hole that a diameter is greater than the diameter 10cm of pile tube, be drilled into design hole depth, rig shifts out a hole, and residue in cleaning hole;
(2) note concrete: to stake hole root concrete perfusion, concrete is C25~C35 concrete by Grouting Pipe;
(3) plant stake: the pile tube that is 400~1200mm by ready specification inserts to fill with to be had in concrete stake hole, can insert successively as required more piece pile tube, concrete moves up along the gap between the tube wall of pile tube and pile tube and stake hole, plant stake complete after concrete setting moulding.
embodiment 1
(1) boring: guide pile hole, utilize drilling machine required stake position in ground to get out the stake hole that a diameter is greater than the diameter 10cm of pile tube, be drilled into design hole depth, rig shifts out a hole, and residue in cleaning hole;
(2) note concrete: to stake hole root concrete perfusion, concrete is C25 concrete by Grouting Pipe;
(3) plant stake: the PHC pile tube that is 500mm by ready specification inserts to fill with to be had in concrete stake hole, inserts a pipe joint stake, concrete moves up with the gap between stake hole along tube wall and the pile tube of pile tube, plant complete after concrete setting moulding.
embodiment 2
(1) boring: guide pile hole, utilize drilling machine required stake position in ground to get out the stake hole that a diameter is greater than the diameter 10cm of pile tube, be drilled into design hole depth, rig shifts out a hole, and residue in cleaning hole;
(2) note concrete: to stake hole root concrete perfusion, concrete is C35 concrete by Grouting Pipe;
(3) plant stake: the PHC that is 1000 by ready specification and the compound pile of steel pipe pile insert to fill with to be had in concrete stake hole, insert successively 2-section pipe stake, concrete moves up along the gap between the tube wall of pile tube and pile tube and stake hole, plant stake complete after concrete setting moulding.

Claims (6)

1. the compound pile of boring and root injection concrete is planted a pilework, it is characterized in that: comprise the layer of concrete between pile tube, pile tube and the stake hole in a hole, embedded pile hole and in pile tube wall.
2. the compound pile of a kind of boring according to claim 1 and root injection concrete is planted pilework, it is characterized in that: described pile tube comprises one or more in steel pipe pile, PHC pile tube, PC pile tube, TSC pile tube.
3. boring claimed in claim 1 and root inject a construction method for the compound pile of concrete, it is characterized in that: comprise the following steps:
(1) boring: guide pile hole, utilize drilling machine required stake position in ground to get out the stake hole that a diameter is greater than pile tube, be drilled into design hole depth, rig shifts out a hole, and residue in cleaning hole;
(2) note concrete: by Grouting Pipe to stake hole root concrete perfusion;
(3) plant stake: ready pile tube is inserted to fill with to be had in concrete stake hole, can insert successively as required more piece pile tube, concrete moves up with the gap between stake hole along tube wall and the pile tube of pile tube, plant complete after concrete setting moulding.
4. a kind of boring according to claim 3 and root inject the construction method of the compound pile of concrete, it is characterized in that: the diameter in the hole of boring in soil in described step (1) is than the diameter 10cm of pile tube.
5. a kind of boring according to claim 3 and root inject the construction method of the compound pile of concrete, it is characterized in that: the concrete in described step (2) is C25~C35 concrete.
6. a kind of boring according to claim 3 and root inject the construction method of the compound pile of concrete, it is characterized in that: in described step (3), the diameter of pile tube is 400~1200mm.
CN201410313816.XA 2014-07-03 2014-07-03 Drilling and concrete injected root composite pile implanting pile structure and construction method Pending CN104074183A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410313816.XA CN104074183A (en) 2014-07-03 2014-07-03 Drilling and concrete injected root composite pile implanting pile structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410313816.XA CN104074183A (en) 2014-07-03 2014-07-03 Drilling and concrete injected root composite pile implanting pile structure and construction method

Publications (1)

Publication Number Publication Date
CN104074183A true CN104074183A (en) 2014-10-01

Family

ID=51595759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410313816.XA Pending CN104074183A (en) 2014-07-03 2014-07-03 Drilling and concrete injected root composite pile implanting pile structure and construction method

Country Status (1)

Country Link
CN (1) CN104074183A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064351A (en) * 2015-08-14 2015-11-18 云南大学 Pile planting method
CN106351222A (en) * 2016-08-30 2017-01-25 中国建筑西南勘察设计研究院有限公司 Construction method of soft rock foundation bedding mortar implantation tube pile
CN113123329A (en) * 2021-05-13 2021-07-16 黄伟志 Post-grouting process for implanted tubular pile
CN114482042A (en) * 2022-03-15 2022-05-13 中铁四局集团有限公司 Construction method of stiff composite isolation pile structure
CN114808945A (en) * 2022-04-28 2022-07-29 中铁时代建筑设计院有限公司 Cast-in-place large-diameter tubular pile for foundation pit support and tubular pile construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1050421A (en) * 1990-11-12 1991-04-03 中国建筑科学研究院珠海科研设计部 The piling method of casting prefabricated composite pile
JPH1046573A (en) * 1996-08-02 1998-02-17 Sato Kigyo:Kk Bottom enlarged cast-in-place pile and its construction method
JP2004092025A (en) * 2002-08-29 2004-03-25 Daia Soil Kk Foundation pile and construction method thereof
CN203213101U (en) * 2013-03-19 2013-09-25 浙江天润建设有限公司 Embedding grouting combined pile

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1050421A (en) * 1990-11-12 1991-04-03 中国建筑科学研究院珠海科研设计部 The piling method of casting prefabricated composite pile
JPH1046573A (en) * 1996-08-02 1998-02-17 Sato Kigyo:Kk Bottom enlarged cast-in-place pile and its construction method
JP2004092025A (en) * 2002-08-29 2004-03-25 Daia Soil Kk Foundation pile and construction method thereof
CN203213101U (en) * 2013-03-19 2013-09-25 浙江天润建设有限公司 Embedding grouting combined pile

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张忠亭等: "《钻孔灌注桩设计与施工》", 28 February 2007, article "钻孔压浆桩", pages: 207-208 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064351A (en) * 2015-08-14 2015-11-18 云南大学 Pile planting method
CN106351222A (en) * 2016-08-30 2017-01-25 中国建筑西南勘察设计研究院有限公司 Construction method of soft rock foundation bedding mortar implantation tube pile
CN113123329A (en) * 2021-05-13 2021-07-16 黄伟志 Post-grouting process for implanted tubular pile
CN114482042A (en) * 2022-03-15 2022-05-13 中铁四局集团有限公司 Construction method of stiff composite isolation pile structure
CN114808945A (en) * 2022-04-28 2022-07-29 中铁时代建筑设计院有限公司 Cast-in-place large-diameter tubular pile for foundation pit support and tubular pile construction method

Similar Documents

Publication Publication Date Title
CN103628473A (en) Composite type combined piles and construction method thereof
CN104074183A (en) Drilling and concrete injected root composite pile implanting pile structure and construction method
CN104389315B (en) Consolidation grouting drilled pile wall and construction method thereof
CN105421445A (en) Construction method for non-prestressed centrifugal high-strength concrete pile planted pile
CN104164873B (en) Prestressed pipe pile and construction method thereof
CN105649073A (en) Static root drilling type construction method for planting piles
CN103742157A (en) Method of newly building underground space under ground by pipe jacking method
CN102660955A (en) Quick construction method for foundation pit slope support
CN104532714A (en) Roadbed structure for treating deep soft soil karst foundation
CN206204967U (en) A kind of double perfusion pile cofferdam
CN105133641A (en) Thin-wall continuous-wall-type foundation reinforcing structure and method
CN105369799A (en) Concrete precast pile of precast pile underground diaphragm wall and construction method of precast pile underground diaphragm wall
CN205875193U (en) Assembled stake integral structure
CN101575855A (en) Non soil taking hole guiding process for sinking prestressed pipe pile or prefabricated square pile
CN208201874U (en) A kind of open-cell cloth bag grouting structure
CN204626474U (en) Strong stirring loosens soil stress release wall
CN206800431U (en) A kind of sealing bottom type caisson wall
CN204000848U (en) A kind of socketed pile for subaqueous construction
CN102220764A (en) Deep foundation pit bracing system and construction method thereof
CN105040707A (en) Combined densely-arrayed pile deep foundation pit supporting and enclosure structure used as basement external wall
CN104831735B (en) The sealing supporting construction of a kind of curtain unification and construction method thereof and construction equipment
CN203977433U (en) Soft Deep Foundation Pit engineering composite supporting construction
CN204252119U (en) The special-shaped supporting pile structure of X
CN110306529A (en) A kind of method that bridge pile foundation solution cavity layering throwing blocks
CN205399438U (en) Karst area embedded rock pile pore -forming bores concrete dado structure again

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20141001

RJ01 Rejection of invention patent application after publication