CN103628473A - Composite type combined piles and construction method thereof - Google Patents
Composite type combined piles and construction method thereof Download PDFInfo
- Publication number
- CN103628473A CN103628473A CN201310511400.4A CN201310511400A CN103628473A CN 103628473 A CN103628473 A CN 103628473A CN 201310511400 A CN201310511400 A CN 201310511400A CN 103628473 A CN103628473 A CN 103628473A
- Authority
- CN
- China
- Prior art keywords
- piles
- pile
- stake
- hole
- joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention provides composite type combined piles. The composite type combination piles comprise a combination of a plurality of rectangular piles, a plurality of non-prestressed piles, a plurality of bamboo joint type piles and a plurality of prestressed pipe piles. The composite type combined piles of different pile types are combined, and every two vertical piles of the composite type combined piles of each pile type are connected in a mechanical connection method. Meanwhile, the invention provides a construction method of the composite type combined piles. The composite type combined piles have the advantages that compression bearing capacity of a single pile is high, strength of pile body concrete is brought into full play, extraction resistant performance of a pile body can be greatly improved, compression bearing capacity of the pile body is greatly improved, construction has no influence on peripheral facilities, noise and air pollution are avoided, the piles are suitable for the geological condition that a pile tip bearing stratum greatly changes, particularly, the connector part of the pile body is protected by cement inside and outside the pile body, and the pile body integration is more reliable. A pile connection method is fast, safe and stable, the bearing force of a single pile is high, and the composite type combined piles have good social benefits and popularization value.
Description
Technical field
The present invention relates to a kind of stake and work progress, particularly a kind of combined type compound pile and construction method thereof.
Background technology
Along with the fast development of urban construction, can be used for the land resources of building fewer and feweri, so building construction develops to high level, various high levels and super highrise building become the leading of current construction.For the Foundation Design of high level and super highrise building, the requirement of foundation bearing capacity is more and more higher, and building settlement deformation requirements is also more and more higher.For meeting bearing capacity and deformation requirements, design often adopts profound large-section in-situ concrete pile pile foundation.
For example, although, still there are many shortcomings: in extensive use in existing preformed pile construction: the collateral resistance performance of soft foundation king-pile week not exclusively; In soft foundation, under vertical compression load, pile strength can not be given full play to; Easily there is not pile body inclining in excavation construction, causes the infringement to pile body at that time; When improper the and pile crown structure of welding procedure is dealt with improperly, producing anti-pulling capacity cannot meet the demands; The problems such as deformation performance is not high enough, fragility destruction.
Existing preformed pile generally be take hammer piling, static pressure pile-sinking and is constructed as main, often also exists soil compaction, influential to peripheral facilities (undreground works, pipeline) in construction; Construction power consumption is high, produce noise and air pollution; While penetrating various interlayer, easily pile body is caused the infringement of macroscopic view or microcosmic during difficult construction wrong; Stake top mark is high-leveled and difficult to control, and cut the improper pile crown that easily causes of stake, destroys or the prestressed variation of pile body; Stake is long restricted, can not meet the problems such as high level or Super High requirement for bearing capacity.In addition, also there is following problem in existing castinplace pile: necking down, and mud emission becomes social concern; Pile bottom sediments etc. happen occasionally, and pile quality fluctuation is stable greatly not; The uneven phenomenon of the high easily generation of stake top mark, during excavation construction, difficulty is large; It is clean and tidy that scene is difficult to keep; Speed of application is slow, and efficiency is low; Folk prescription concrete conversion bearing capacity is only PHC stake 30% to 40%, and it is insufficient etc. that limited resources utilize.
Summary of the invention
Technological deficiency for above-mentioned existence, the object of this invention is to provide a kind of combined type compound pile and construction method thereof, be beneficial to reach energy-saving and emission-reduction shockproof, low noise, pollution-free, pile quality is good, pile extension mode quick and safe is firm, bearing capacity of single pile is high, mud emission is few, has good social benefit and the effect of promotional value.
For achieving the above object, the technical solution used in the present invention is to provide a kind of combined type compound pile, wherein: described combined type compound pile comprises many rectangular pile combinations, many non-prestressed pile tubes, square piles combine, many bamboo joint type pile tubes, square piles combine, the combination of many pile for prestressed pipe, and form the combined type compound pile of multiple piles with different type, the connected mode of every upper and lower two piles of every kind of combined type compound pile is mechanical connection.。
A kind of construction method of combined type compound pile is provided simultaneously.
Effect of the present invention is to compare with existing preformed pile and construction thereof:
Compressive Bearing Capacity of Single Pile is high, concrete strength of pile is not fully exerted, pile body extraction-resistant behavior be largely increased (available mechanical connection), the anti-horizontal bearing capacity of pile body significantly improves, without soil compaction, construction on peripheral facilities without impact, noiseless and air pollution, can pass various interlayers, adapt to bearing course at pile end and change geological conditions greatly; Can not cause the infringement that produces macroscopic view or microcosmic because of pile sinking to pile body; stake top mark height is controlled; can avoid causing because cutting stake the variation of pile crown destruction or pile body compressive pre-stress; pile body; particularly pile body blank area is subject to the protection of the inside and outside cement-soil of pile body; long durability is reliable, and pile body integrity is more reliable simultaneously.
The present invention compares with existing castinplace pile and construction thereof:
Batch production large-scale production, concrete strength can reach C80~C100, pile quality is stable, advanced technology, formation of pile Full-automatic monitoring, reliable construction quality, without cast-in-place concrete, there will not be necking, the stake end, is without sediment, guarantee that end resistance meets design requirement, with mud emission amount under bearing capacity condition, can reduce 70%, social effect is obvious, fast 4~5 times of machine-team speed of application, folk prescription bearing capacity of concrete-filled is high 2~3 times, resource is fully utilized, stake top mark height is controlled, be convenient to mechanical equivalent of light excavation construction, civilized construction, on-the-spot clean and tidy, without on-the-spot screwing steel bars etc., become pile verticality to control well, integrality is more reliable.Accompanying drawing explanation
Fig. 1 is each block diagram of mechanical connection of the present invention;
Fig. 2, Fig. 2-1 mechanical connection of the present invention have assembled figure;
Fig. 3-1-Fig. 3-6th, the various stake of the present invention type combination schematic diagram;
Fig. 4 is work progress schematic diagram of the present invention.
In figure:
1, reserved screw thread 2, steel plateelement 3, connecting hole 4, bolt 5, stake top fastening bolt
6, stake top fastening bolt hole 7, pile for prestressed pipe 8, bamboo joint type stake 9, rectangular pile
10, non-prestressed stake
The specific embodiment
By reference to the accompanying drawings and embodiment combined type compound pile of the present invention and construction method thereof are illustrated.
As shown in Fig. 1,2,2-1, combined type compound pile of the present invention, described combined type compound pile comprises many rectangular pile combinations, many non-prestressed pile tubes, square piles combine, many bamboo joint type pile tubes, square piles combine, the combination of many pile for prestressed pipe, and form the combined type compound pile of multiple piles with different type, the connected mode of every upper and lower two piles of every kind of combined type compound pile is mechanical connection.
The mechanical connecting structure of described every upper and lower two piles is to be provided with in the stake end place of an every upper and lower two piles periphery the reserved threaded bore 1 being evenly arranged, stake top fastening bolt and stake top fastening bolt hole that the stake end place of upper and lower two piles is respectively equipped with mutual correspondence and is evenly arranged; The stake outside, end place of upper and lower two piles is provided with the steel plateelement 2 with connecting hole that polylith is identical, by bolt, insert the connecting hole 3 of steel plateelement and corresponding reserved threaded bore 1, by the fastening periphery of encircling at the stake end place of described upper and lower two piles of steel plateelement 2, the stake end that forms upper and lower two piles connects, and the composite pile of piles with different type combination guarantees that the pile extension partial cross section of upper and lower two joint stakes is identical.
At the stake end place of compound pile, be provided with and arrange uniformly reserved screw thread 1, and accessory processing is provided with the steel plateelement 2 of connecting hole.The position of described connecting hole 3 is corresponding with reserved threaded bore 1.On the stake top of compound pile, be provided with a top fastening bolt 5 and stake top fastening bolt hole 6.While saving up and down stake pile extension, first stake top fastening bolt 5 is inserted in corresponding stake top fastening bolt hole 6, recycling bolt 4 is screwed in reserved threaded bore 1 through the connecting hole 3 on steel plateelement 2, thereby realize the connection of stake end, the composite pile of the piles with different type combination as shown in Fig. 3-1-Fig. 3-6.
As shown in Figure 4, work progress of the present invention is:
A. boring: according to geological condition, select suitable penetration rate, and water filling or swell soil mixed liquor, stake hole is repaired and retaining wall.During boring, tackle drilling rod verticality, plan-position, penetration rate, rig electric current, water or swell soil and mix liquid measure monitoring.Boring aperture is greater than 200mm in stake aperture, hole.
B. bearing course at pile end is confirmed: according to integration current situation of change and static sounding tendency of changes, determine bearing stratum.Penetration rate should be consistent, the load variations of monitoring current.
C. expand at the end: according to the enlarged of setting, carry out several times reaming, reaming process expands management devices by conventional automatic oil pressure and carries out Real-Time Monitoring, guarantees the accuracy of counter bore diameter.
D. inject a stake end cement paste: lifting drilling rod repeatedly up and down during slip casting, guarantee all to inject and expand position, bottom and guarantee being uniformly distributed of stake end cement paste.
E. inject all cement pastes of stake and pull out brill: injecting after stake end cement paste, start to extract drilling rod, when pulling out drilling rod, inject all cement pastes of stake and repeatedly stir, during slip casting, according to the speed that promotes drilling rod, determining the flow rate of grouting matching, guaranteeing that cement paste upper and lower integral body in hole is uniformly distributed
F. prebored hole pile extension: by two joint stake mechanical connections, form two joint compound piles in prebored hole place
G. plant stake: drilling rod is extracted rear use and utilized loop wheel machine that compound pile is hung in to a hole, utilize stake deadweight by stake implant bore to projected depth.For two joint compound piles, utilize loop wheel machine directly the two joint stakes that connect in advance to be hung out in implant bore from prebored hole; For three joint compound piles, utilize loop wheel machine directly by the two joint stakes that connect are in advance in prebored hole hangs out implantation hole, then in aperture, connect the 3rd joint stake, form three joint compound piles.
Two joint compound pile combinations are as following table:
Three joint compound pile combinations are as following table:
Claims (3)
1. a combined type compound pile, it is characterized in that: described combined type compound pile comprises many rectangular pile combinations, many non-prestressed pile tubes, square piles combine, many bamboo joint type pile tubes, square piles combine, the combination of many pile for prestressed pipe, and forming the combined type compound pile of multiple piles with different type, the connected mode of every upper and lower two piles of every kind of combined type compound pile is mechanical connection.
2. combined type compound pile according to claim 1, it is characterized in that: the mechanical connecting structure of described every upper and lower two piles is to be provided with in the stake end place of an every upper and lower two piles periphery the reserved threaded bore being evenly arranged, stake top fastening bolt and stake top fastening bolt hole that the stake end place of upper and lower two piles is respectively equipped with mutual correspondence and is evenly arranged; The stake outside, end place of upper and lower two piles is provided with the steel plateelement with connecting hole that polylith is identical, by bolt, insert the connecting hole of steel plateelement and corresponding reserved threaded bore, by the fastening periphery of encircling at the stake end place of described upper and lower two piles of steel plateelement, the stake end that forms upper and lower two piles connects, and the composite pile of piles with different type combination guarantees that the pile extension partial cross section of upper and lower two joint stakes is identical.
3. the construction method of combined type compound pile according to claim 1, steps of the method are:
A. boring: the penetration rate of selecting rig according to geological condition, and water filling or swell soil mixed liquor, stake hole is repaired and retaining wall, the amount of drilling rod verticality, plan-position, penetration rate, rig electric current, water or swell soil mixed liquor of tackling during boring is monitored, and boring aperture is greater than aperture, a hole 200mm;
B. bearing course at pile end is confirmed: according to integration current situation of change and static sounding, change, confirm bearing stratum, drill hole of drilling machine speed should be consistent, at any time the load variations of monitoring current;
C. expand at the end: according to the enlarged of setting, carry out several times reaming, and reaming process is carried out to Real-Time Monitoring, guarantee the accuracy of counter bore diameter;
D. inject a stake end cement paste: lifting borer drill rod repeatedly up and down during slip casting, guarantee all to inject and expand position, bottom and guarantee being uniformly distributed of stake end cement paste;
E. inject all cement pastes of stake and pull out brill: injecting after stake end cement paste, start to extract drilling rod, when pulling out drilling rod, inject all cement pastes of stake and repeatedly stir, during slip casting, according to the speed that promotes borer drill rod, determine the flow rate of grouting matching, guarantee that cement paste upper and lower integral body in hole is uniformly distributed;
F. prebored hole pile extension: by two joint stake mechanical connections, form two joint compound piles in prebored hole place;
G. plant stake: after borer drill rod is extracted, utilize loop wheel machine that compound pile is hung in to a hole, utilize stake deadweight by stake implant bore to projected depth, for two joint compound piles, utilize loop wheel machine directly the two joint stakes that connect in advance to be hung out in implant bore from prebored hole; For three joint compound piles, utilize loop wheel machine directly by the two joint stakes that connect are in advance in prebored hole hangs out implantation hole, then in aperture, connect the 3rd joint stake, form three joint compound piles.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310511400.4A CN103628473A (en) | 2013-10-25 | 2013-10-25 | Composite type combined piles and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310511400.4A CN103628473A (en) | 2013-10-25 | 2013-10-25 | Composite type combined piles and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103628473A true CN103628473A (en) | 2014-03-12 |
Family
ID=50209900
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310511400.4A Pending CN103628473A (en) | 2013-10-25 | 2013-10-25 | Composite type combined piles and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103628473A (en) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104264667A (en) * | 2014-09-10 | 2015-01-07 | 中建四局第六建筑工程有限公司 | Construction method for pre-stress bamboo joint piles |
GB2518135A (en) * | 2013-07-18 | 2015-03-18 | Francis & Lewis Internat Ltd | A ground pile assembly |
CN104612127A (en) * | 2015-01-30 | 2015-05-13 | 唐山工业职业技术学院 | Three-dimensional deep soft soil composite foundation and construction method |
CN104805834A (en) * | 2015-04-29 | 2015-07-29 | 上海市机械施工集团有限公司 | Cast-in-place and precast integrated pile (ICP pile) and manufacturing method thereof |
CN105040699A (en) * | 2015-08-14 | 2015-11-11 | 四川省建筑科学研究院 | Drilling pile planting method |
CN105064351A (en) * | 2015-08-14 | 2015-11-18 | 云南大学 | Pile planting method |
CN105421445A (en) * | 2015-11-01 | 2016-03-23 | 天津建城基业集团有限公司 | Construction method for non-prestressed centrifugal high-strength concrete pile planted pile |
CN105649073A (en) * | 2016-01-07 | 2016-06-08 | 中淳高科桩业股份有限公司 | Static root drilling type construction method for planting piles |
CN106351222A (en) * | 2016-08-30 | 2017-01-25 | 中国建筑西南勘察设计研究院有限公司 | Construction method of soft rock foundation bedding mortar implantation tube pile |
CN106759296A (en) * | 2017-01-17 | 2017-05-31 | 浙江工业大学 | One kind draining odd-shaped cross section ring pile tube and its can take root in formula construction method |
CN106930273A (en) * | 2017-03-17 | 2017-07-07 | 济南轨道交通集团有限公司 | Stake technique and prefabricated pile are planted in one kind drilling high pressure draught vibration |
CN109184564A (en) * | 2018-08-17 | 2019-01-11 | 上海二十冶建设有限公司 | Method for correcting error when oblique rock stratum is met in a kind of rotary drilling rig pore-forming |
CN109853524A (en) * | 2019-01-14 | 2019-06-07 | 江苏东合南岩土科技股份有限公司 | A kind of construction method of the composite special-shaped stake of enlarged footing stiffness soil cement |
CN110206046A (en) * | 2019-03-27 | 2019-09-06 | 河海大学 | The interpolation steel reinforcement cage bamboo joint pile supporting construction and its construction method of harnessing landslide |
CN110685273A (en) * | 2019-11-08 | 2020-01-14 | 马鞍山宏泰建材股份有限公司 | Resistance-increasing square pile and construction method thereof |
CN110777779A (en) * | 2019-10-25 | 2020-02-11 | 天津大学 | Offshore pile sinking construction method for concrete precast pile |
CN111395312A (en) * | 2020-03-23 | 2020-07-10 | 中铁二院工程集团有限责任公司 | Composite light pile structure, manufacturing method, construction method and pile splicing method |
CN112695744A (en) * | 2021-01-26 | 2021-04-23 | 温州大学 | Tubular pile splicing equipment and construction method thereof |
CN112900425A (en) * | 2020-12-26 | 2021-06-04 | 湖北长江路桥有限公司 | Intelligent operation method for cement soil mixing pile |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11181763A (en) * | 1997-12-24 | 1999-07-06 | Sekisui House Ltd | Steel pipe pile |
CN102002944A (en) * | 2010-10-23 | 2011-04-06 | 江苏建华管桩有限公司 | Mechanical connecting structure of anti-floating pile heads and connecting method thereof |
CN102021908A (en) * | 2010-11-30 | 2011-04-20 | 上海中技桩业股份有限公司 | Mechanical connection structure and construction method for splicing precast square piles |
CN202000343U (en) * | 2011-01-11 | 2011-10-05 | 凌德祥 | Prestressed reinforced concrete pullout-resistant hollow pile with connection structure and connector for same |
CN103266603A (en) * | 2013-05-27 | 2013-08-28 | 浙江城建建设集团有限公司 | Construction method for pre-drilling hole-forming base-expanding and grouting of prestressed concrete special-shaped pile |
CN203569564U (en) * | 2013-10-25 | 2014-04-30 | 天津建城基业集团有限公司 | Combined type composite pile |
-
2013
- 2013-10-25 CN CN201310511400.4A patent/CN103628473A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11181763A (en) * | 1997-12-24 | 1999-07-06 | Sekisui House Ltd | Steel pipe pile |
CN102002944A (en) * | 2010-10-23 | 2011-04-06 | 江苏建华管桩有限公司 | Mechanical connecting structure of anti-floating pile heads and connecting method thereof |
CN102021908A (en) * | 2010-11-30 | 2011-04-20 | 上海中技桩业股份有限公司 | Mechanical connection structure and construction method for splicing precast square piles |
CN202000343U (en) * | 2011-01-11 | 2011-10-05 | 凌德祥 | Prestressed reinforced concrete pullout-resistant hollow pile with connection structure and connector for same |
CN103266603A (en) * | 2013-05-27 | 2013-08-28 | 浙江城建建设集团有限公司 | Construction method for pre-drilling hole-forming base-expanding and grouting of prestressed concrete special-shaped pile |
CN203569564U (en) * | 2013-10-25 | 2014-04-30 | 天津建城基业集团有限公司 | Combined type composite pile |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2518135A (en) * | 2013-07-18 | 2015-03-18 | Francis & Lewis Internat Ltd | A ground pile assembly |
GB2548773B (en) * | 2013-07-18 | 2018-03-21 | Francis & Lewis International Ltd | A ground pile assembly |
GB2518135B (en) * | 2013-07-18 | 2018-02-07 | Francis & Lewis International Ltd | A ground pile assembly |
GB2548773A (en) * | 2013-07-18 | 2017-09-27 | Francis & Lewis Int Ltd | A ground pile assembly |
CN104264667A (en) * | 2014-09-10 | 2015-01-07 | 中建四局第六建筑工程有限公司 | Construction method for pre-stress bamboo joint piles |
CN104612127A (en) * | 2015-01-30 | 2015-05-13 | 唐山工业职业技术学院 | Three-dimensional deep soft soil composite foundation and construction method |
CN104805834A (en) * | 2015-04-29 | 2015-07-29 | 上海市机械施工集团有限公司 | Cast-in-place and precast integrated pile (ICP pile) and manufacturing method thereof |
CN105040699A (en) * | 2015-08-14 | 2015-11-11 | 四川省建筑科学研究院 | Drilling pile planting method |
CN105064351A (en) * | 2015-08-14 | 2015-11-18 | 云南大学 | Pile planting method |
CN105421445A (en) * | 2015-11-01 | 2016-03-23 | 天津建城基业集团有限公司 | Construction method for non-prestressed centrifugal high-strength concrete pile planted pile |
CN105649073A (en) * | 2016-01-07 | 2016-06-08 | 中淳高科桩业股份有限公司 | Static root drilling type construction method for planting piles |
CN106351222A (en) * | 2016-08-30 | 2017-01-25 | 中国建筑西南勘察设计研究院有限公司 | Construction method of soft rock foundation bedding mortar implantation tube pile |
CN106759296A (en) * | 2017-01-17 | 2017-05-31 | 浙江工业大学 | One kind draining odd-shaped cross section ring pile tube and its can take root in formula construction method |
CN106930273A (en) * | 2017-03-17 | 2017-07-07 | 济南轨道交通集团有限公司 | Stake technique and prefabricated pile are planted in one kind drilling high pressure draught vibration |
CN109184564A (en) * | 2018-08-17 | 2019-01-11 | 上海二十冶建设有限公司 | Method for correcting error when oblique rock stratum is met in a kind of rotary drilling rig pore-forming |
CN109853524A (en) * | 2019-01-14 | 2019-06-07 | 江苏东合南岩土科技股份有限公司 | A kind of construction method of the composite special-shaped stake of enlarged footing stiffness soil cement |
CN110206046A (en) * | 2019-03-27 | 2019-09-06 | 河海大学 | The interpolation steel reinforcement cage bamboo joint pile supporting construction and its construction method of harnessing landslide |
CN110777779A (en) * | 2019-10-25 | 2020-02-11 | 天津大学 | Offshore pile sinking construction method for concrete precast pile |
CN110685273A (en) * | 2019-11-08 | 2020-01-14 | 马鞍山宏泰建材股份有限公司 | Resistance-increasing square pile and construction method thereof |
CN111395312A (en) * | 2020-03-23 | 2020-07-10 | 中铁二院工程集团有限责任公司 | Composite light pile structure, manufacturing method, construction method and pile splicing method |
CN112900425A (en) * | 2020-12-26 | 2021-06-04 | 湖北长江路桥有限公司 | Intelligent operation method for cement soil mixing pile |
CN112695744A (en) * | 2021-01-26 | 2021-04-23 | 温州大学 | Tubular pile splicing equipment and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103628473A (en) | Composite type combined piles and construction method thereof | |
CN105421445A (en) | Construction method for non-prestressed centrifugal high-strength concrete pile planted pile | |
CN207296871U (en) | The structure-improved of full-sleeve twist bit | |
CN102108706A (en) | Simple manual spiral earth fetching device for reinforcing pile core of pre-stressed pipe pile | |
CN104947652B (en) | Long auger drilling cement mortar retaining wall type implanted pile tube construction device and construction method | |
CN103953030B (en) | The compacted castinplace pile of screw thread supination joint bar | |
CN102852141A (en) | Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation | |
CN107386285A (en) | A kind of novel steel tube pile foundation rock borehole anchorage method | |
CN105649073A (en) | Static root drilling type construction method for planting piles | |
CN203569564U (en) | Combined type composite pile | |
CN1963044A (en) | Construction method for withdrawal of waste pile | |
CN208545763U (en) | A kind of steel pipe pile cofferdam for bridge deepwater foundation | |
CN104074183A (en) | Drilling and concrete injected root composite pile implanting pile structure and construction method | |
CN110424896A (en) | A kind of hole stake drilling construction method and device suitable for high backfill Karst Geological Landscape | |
CN204530674U (en) | The one formula forward that fetches earth becomes twist bit lamps structure and varying pitch screw pile body | |
CN108729457A (en) | A kind of steel pipe pile cofferdam and its construction method for bridge deepwater foundation | |
CN104372793A (en) | Anti-floating method used for existing basement by adopting pre-stressed anchor cables in jet grouting pile method | |
CN203808055U (en) | Screw post-reinforced compacted pile | |
CN107700508A (en) | A kind of shaped steel stirs the construction method of water spray soil curtain support pile | |
CN204728318U (en) | Long auger cement paste dado formula implants the construction equipment of pile tube | |
CN207331690U (en) | Pile pile sunk stake machine | |
CN110273413A (en) | A kind of efficient construction method of prefabricated pile | |
CN207004431U (en) | Soft soil foundation exciting drilling device | |
CN103726673A (en) | Novel after-rooting composite pile foundation | |
CN108316288A (en) | Half casing guncreting pile construction equipment and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140312 |