CN104775439A - Foundation pit support and water stop integrated structure and construction method thereof - Google Patents

Foundation pit support and water stop integrated structure and construction method thereof Download PDF

Info

Publication number
CN104775439A
CN104775439A CN201510185268.1A CN201510185268A CN104775439A CN 104775439 A CN104775439 A CN 104775439A CN 201510185268 A CN201510185268 A CN 201510185268A CN 104775439 A CN104775439 A CN 104775439A
Authority
CN
China
Prior art keywords
foundation pit
wall
construction method
concrete
pit supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510185268.1A
Other languages
Chinese (zh)
Other versions
CN104775439B (en
Inventor
邝利军
肖龙鸽
陈举飞
李继超
苏守一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Infrastructure Co Ltd
Original Assignee
China Construction South Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction South Investment Co Ltd filed Critical China Construction South Investment Co Ltd
Priority to CN201510185268.1A priority Critical patent/CN104775439B/en
Publication of CN104775439A publication Critical patent/CN104775439A/en
Application granted granted Critical
Publication of CN104775439B publication Critical patent/CN104775439B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Abstract

The invention discloses a foundation pit support and water stop integrated structure and a construction method thereof. The foundation pit support and water stop integrated structure comprises a concrete wall, wherein the concrete wall is arranged under the ground of the periphery of a foundation pit, and a plurality of cylindrical reinforcement cages are vertically arranged in the concrete wall. The construction method of the foundation pit support and water stop integrated structure is characterized by comprising the following steps of excavating a guide channel, casting a guide wall, forming a channel in the channel section, arranging the reinforcement cages, casting concrete, and the like. The foundation pit support and water stop integrated structure and the construction method have the characteristics that the rigidity of an underground continuous wall is large, and the water stop effect is good; the installation of the reinforcement cages of a row pile support structure is convenient and rapid, the technology difficulty is low, the construction is rapid, the quality can be easily controlled, and the foundation pit support and water stop integrated structure is especially suitable for water-rich sandy gravel ground layers.

Description

A kind of pattern foundation pit supporting structure sealing integral structure and construction method thereof
Technical field
The present invention relates to the realm of building construction, particularly relate to a kind of pattern foundation pit supporting structure sealing integral structure and construction method thereof.
Background technology
Along with the scale of underground space development is increasing, build under Complex Hydrogeological Conditions the underground space due to water level high, permeability is large, and causes the situation of foundation pit supporting construction seepage commonplace, quality is wayward, causes difficulty also to the progress of underground space main structure construction.
Vertical support system conventional at present has campshed, hole-drilling interlocking pile, diaphragm wall, cement soil wall etc.Although campshed support system cost is low, but discontinuous due to stake, generally will increase the safe handling of the measures of preventing water guarantee systems such as water-stop curtain, have that operation is many, occupied ground and a large problem of permanent space, and there is hidden danger in the combination of stake and water-stopping structure always, after campshed, increase the way of curtain, stake and curtain are respectively integrated, discontinuity, Guan Liang is needed to link between stake and stake, when curtain has a leakage point after stake, not easily discover, be also difficult to repair; , easily there is the problem of stake position sideslip and cutting deformation in hole-drilling interlocking pile system, once stake position sideslip and distortion, can have influence on supporting and the stagnant water effect of bitten pile support system in construction; The supporting of diaphragm wall system is safe and reliable, but amount of reinforcement is large, and in groove section, place the hanging device that bulky square reinforcing cage needs to take up an area greatly, lifting capacity is large in construction, will take double-machine lifting crane operating type for preventing square reinforcing cage to be out of shape simultaneously; Although cement wall support system continuity is better, can effective sealing, but the intensity of cement-soil is very low, generally need a large amount of shaped steel of increase and a large amount of anchor poles to make up the deficiency of intensity in using, not only waste economically, and a large amount of anchor pole of constructing below phreatic line, also there is certain potential safety hazard in itself in work progress.
Summary of the invention
For overcoming the deficiencies in the prior art, order of the present invention is to provide a kind of pattern foundation pit supporting structure sealing integral structure and construction method thereof, it not only has the feature that rigidity is large, stagnant water effect is good of diaphragm wall, also Row Piles Supporting Structure reinforcing cage is had to lay advantage easily, technology difficulty is little, quick construction, and quality easily controls, be particularly useful for rich water sand-pebble layer, do not need separately to establish water stop curtain structure of constructing separately.
For achieving the above object, present invention employs following technical scheme:
A kind of pattern foundation pit supporting structure sealing integral structure, it comprises the concrete wall being arranged at below foundation ditch peripheral ground, is provided with the cylindrical reinforcing steel cage of multiple vertical placement in concrete wall.
A construction method for pattern foundation pit supporting structure sealing integral structure, comprises the following steps:
1) at earth's surface excavation guide groove;
2) wall is led at guide groove sidewall concreting;
3) in guide groove, capture the earthwork with groover and form cuboid groove section, in cuboid groove section, use mud off;
4), bottom cuboid groove section after scarfing cinder, vertically in cuboid groove section cylindrical reinforcing steel cage is placed and fixing;
5) in cylindrical reinforcing steel cage, transfer cast conduit, and carry out the second time clear end;
6) by pouring into a mould conduit fluid concrete until concrete liquid level is to cuboid groove section top;
7) according to step 1)-6) circulation construction, until form whole pattern foundation pit supporting structure water-stopping structure.
Further, for described step 1), first will carry out levelling of the land and surveying and locating before guide groove excavation, guide groove can with hand excavation or mechanical equivalent of light excavation, channel widths=treat excavation cuboid groove section width+lead wall width.
Further, for described step 2), leading wall is reinforced concrete structure, first wants assembling reinforcement and formwork before building, and leading wall height is 1000-1500mm, leads wall end face 50-100mm above ground level; Leading between wall after having built arranges interim wood support every 1-3m.
Further, for described step 4), by the mud circulation clear end, sediment thickness is not more than 5cmm, and described cylindrical reinforcing steel cage can carrying out step 1)-3) time makes.
Further, for described step 5), described cast catheter diameter is 4 ~ 10 times of concrete coarse aggregate particle diameter.
Further, for described step 6), strength grade of concrete is not less than C2O.
Beneficial effect of the present invention: (1) by campshed, diaphragm wall, water-stop curtain closes three is one, makes full use of that groove section inner concrete is built and the overall structure that formed reaches the object that support water stop realizes simultaneously; (2) the cylindrical reinforcing steel cage that design pitch is placed is pressed in groove section, avoiding and adopt conventional diaphragm wall support system in groove section, place the hanging device that occupation of land is large, lifting capacity is large required for square reinforcing cage, avoiding as preventing square reinforcing cage to be out of shape and the double-machine lifting crane operating type taked simultaneously; (3) use the grooving of grooving machinery to have grooving mechanization degree high, avoid the easy collapse hole of campshed formula supporting and protection structure pore-forming, the impact in pore forming process between adjacent holes; (4) compared with employing soldier pile+water stop curtain structure form, operation is avoided many, the large problem of occupied ground and permanent space; (5) compared with hole-drilling interlocking pile, lower to the requirement of concrete performance, it also avoid the leakage problems because boring dislocation causes simultaneously.
Accompanying drawing explanation
Fig. 1 is step 1) floor map;
Fig. 2 is step 1) generalized section;
Fig. 3 is step 2) floor map;
Fig. 4 is step 2) generalized section;
Fig. 5 is step 3) floor map;
Fig. 6 is step 3) generalized section;
Fig. 7 is step 4) floor map;
Fig. 8 is step 4) generalized section;
Fig. 9 is step 6) floor map;
Figure 10 is step 6) generalized section.
In figure: 1-concrete wall; 2-cylindrical reinforcing steel cage; 3-guide groove; 4-leads wall; 5-cuboid groove section; 6-mud; 7-concrete; The 8-soil body.
Detailed description of the invention
As shown in figs. 9-10, a kind of pattern foundation pit supporting structure sealing integral structure, comprises the concrete wall 1 being arranged at below foundation ditch peripheral ground, is provided with the cylindrical reinforcing steel cage 2 of multiple vertical placement in concrete wall 1.
As Figure 1-10 shows, a kind of construction method of pattern foundation pit supporting structure sealing integral structure, comprises the following steps:
1) at earth's surface excavation guide groove 3;
2) wall 4 is led at guide groove sidewall concreting;
3) in guide groove, capture the earthwork with groover and form cuboid groove section 5, in cuboid groove section 5, use mud 6 retaining wall;
4), bottom cuboid groove section 5 after scarfing cinder, vertically in cuboid groove section 5 cylindrical reinforcing steel cage 6 is placed and fixing;
5) in cylindrical reinforcing steel cage 2, transfer cast conduit, and carry out the second time clear end;
6) by pouring into a mould conduit fluid concrete until concrete liquid level is to cuboid groove section top;
7) according to step 1)-6) circulation construction, until form whole pattern foundation pit supporting structure water-stopping structure.
For described step 1), guide groove 3 first will carry out levelling of the land and surveying and locating before excavating, and guide groove can with hand excavation or mechanical equivalent of light excavation, channel widths=treat box cut section width+lead wall width.
For described step 2), lead wall 4 for reinforced concrete structure, first want assembling reinforcement and formwork before building, leading wall height is 1000-1500mm, leads wall end face 50-100mm above ground level; Leading between wall after having built arranges interim wood support every 1-3m.
For described step 4), by the mud circulation clear end, sediment thickness is not more than 5cmm.
For described step 5), described cast catheter diameter is 4 ~ 10 times of concrete coarse aggregate particle diameter.
For described step 6), strength grade of concrete is not less than C2O.

Claims (7)

1. a pattern foundation pit supporting structure sealing integral structure, is characterized in that comprising the concrete wall (1) being arranged at below foundation ditch peripheral ground, is provided with the cylindrical reinforcing steel cage (2) of multiple vertical placement in concrete wall (1).
2. a construction method for pattern foundation pit supporting structure sealing integral structure, is characterized in that comprising the following steps:
1) on earth's surface excavation guide groove (3);
2) wall (4) is led at guide groove sidewall concreting;
3) in guide groove, capture the earthwork with groover and form cuboid groove section (5), in cuboid groove section (5), use mud (6) retaining wall;
4), after cuboid groove section (5) bottom scarfing cinder, vertical placement cylindrical reinforcing steel cage (2) in cuboid groove section (5) is also fixing;
5) in cylindrical reinforcing steel cage (2), transfer cast conduit, and carry out the second time clear end;
6) by pouring into a mould conduit fluid concrete until concrete liquid level is to cuboid groove section top;
7) according to step 1)-6) circulation construction, until form whole pattern foundation pit supporting structure water-stopping structure.
3. the construction method of a kind of pattern foundation pit supporting structure sealing integral structure according to claim 2, it is characterized in that, for described step 1), first levelling of the land and surveying and locating will be carried out before guide groove (3) excavation, guide groove can with hand excavation or mechanical equivalent of light excavation, channel widths=treat excavation cuboid groove section width+lead wall width.
4. the construction method of a kind of pattern foundation pit supporting structure sealing integral structure according to Claims 2 or 3, it is characterized in that, for described step 2), leading wall (4) is reinforced concrete structure, first assembling reinforcement is wanted and formwork before building, leading wall height is 1000-1500mm, leads wall end face 50-100mm above ground level; Leading between wall after having built arranges interim wood support every 1-3m.
5. the construction method of a kind of pattern foundation pit supporting structure sealing integral structure according to any one of claim 2-4, it is characterized in that, for described step 4), by the mud circulation clear end, sediment thickness is not more than 5cmm, and described cylindrical reinforcing steel cage can carrying out step 1)-3) time makes.
6. the construction method of a kind of pattern foundation pit supporting structure sealing integral structure according to any one of claim 2-5, is characterized in that, for described step 5), described cast catheter diameter is 4 ~ 10 times of concrete coarse aggregate particle diameter.
7. the construction method of a kind of pattern foundation pit supporting structure sealing integral structure according to any one of claim 2-6, it is characterized in that, for described step 6), strength grade of concrete is not less than C2O.
CN201510185268.1A 2015-04-20 2015-04-20 A kind of pattern foundation pit supporting structure sealing integral structure and its construction method Active CN104775439B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510185268.1A CN104775439B (en) 2015-04-20 2015-04-20 A kind of pattern foundation pit supporting structure sealing integral structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510185268.1A CN104775439B (en) 2015-04-20 2015-04-20 A kind of pattern foundation pit supporting structure sealing integral structure and its construction method

Publications (2)

Publication Number Publication Date
CN104775439A true CN104775439A (en) 2015-07-15
CN104775439B CN104775439B (en) 2017-03-15

Family

ID=53617179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510185268.1A Active CN104775439B (en) 2015-04-20 2015-04-20 A kind of pattern foundation pit supporting structure sealing integral structure and its construction method

Country Status (1)

Country Link
CN (1) CN104775439B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544556A (en) * 2015-12-29 2016-05-04 湖北中南勘察基础工程有限公司 Foundation pit supporting construction technology combining equal-thickness cement-soil diaphragm wall and tubular piles
CN105937218A (en) * 2016-04-27 2016-09-14 中国建筑第五工程局有限公司 Construction method of underground diaphragm wall
CN105970916A (en) * 2016-06-30 2016-09-28 中铁十八局集团第五工程有限公司 Construction method for plain concrete underground diaphragm wall of deep foundation pit
CN108049393A (en) * 2017-11-24 2018-05-18 中建铁投轨道交通建设有限公司 For the attached building enclosure construction technology in subway station under the conditions of rich water thick sand bed
CN110106888A (en) * 2019-04-02 2019-08-09 刘侨 It is a kind of to exempt from horizontally-supported self-stabilization type foundation pit enclosure support construction construction method

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1136284A (en) * 1997-07-24 1999-02-09 Shimizu Corp Work execution method for underground continuous wall
CN101343869A (en) * 2008-08-19 2009-01-14 上海建工股份有限公司 Underground continuous wall construction method of city-across pipeline
CN101487261A (en) * 2009-01-21 2009-07-22 浙江中成建工集团有限公司 Profiled bar freezing wall foundation ditch combined enclosure method and its structure
CN102220764A (en) * 2011-04-19 2011-10-19 威海建设集团股份有限公司 Deep foundation pit bracing system and construction method thereof
JP2012154162A (en) * 2011-05-24 2012-08-16 ▲徳▼翰智慧科技有限公司 Steel pipe pile and pile foundation construction method using the steel pipe pile
WO2012149670A1 (en) * 2011-04-30 2012-11-08 安徽省高速公路控股集团有限公司 Construction method for root-type foundation anchorage and bored, root-type cast in-situ pile with anchor bolts
CN103469801A (en) * 2013-09-03 2013-12-25 上海建科工程咨询有限公司 Method for constructing foundation pit enclosure structure on basis of prefabricated ground walls
CN103615001A (en) * 2013-11-27 2014-03-05 宁波盛宏建设工程有限公司 Bored pile construction method for reinforcing cage framework layered installation
CN203684233U (en) * 2013-12-27 2014-07-02 中铁大桥局集团第一工程有限公司 Circular support structure for deep foundation pit
CN203878562U (en) * 2014-06-05 2014-10-15 北京住总集团有限责任公司 Underground diaphragm wall corner end blocking structure
WO2015019017A2 (en) * 2013-08-06 2015-02-12 Soletanche Freyssinet Sealing device and structure for a reinforced concrete element comprising said device

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1136284A (en) * 1997-07-24 1999-02-09 Shimizu Corp Work execution method for underground continuous wall
CN101343869A (en) * 2008-08-19 2009-01-14 上海建工股份有限公司 Underground continuous wall construction method of city-across pipeline
CN101487261A (en) * 2009-01-21 2009-07-22 浙江中成建工集团有限公司 Profiled bar freezing wall foundation ditch combined enclosure method and its structure
CN102220764A (en) * 2011-04-19 2011-10-19 威海建设集团股份有限公司 Deep foundation pit bracing system and construction method thereof
WO2012149670A1 (en) * 2011-04-30 2012-11-08 安徽省高速公路控股集团有限公司 Construction method for root-type foundation anchorage and bored, root-type cast in-situ pile with anchor bolts
JP2012154162A (en) * 2011-05-24 2012-08-16 ▲徳▼翰智慧科技有限公司 Steel pipe pile and pile foundation construction method using the steel pipe pile
WO2015019017A2 (en) * 2013-08-06 2015-02-12 Soletanche Freyssinet Sealing device and structure for a reinforced concrete element comprising said device
CN103469801A (en) * 2013-09-03 2013-12-25 上海建科工程咨询有限公司 Method for constructing foundation pit enclosure structure on basis of prefabricated ground walls
CN103615001A (en) * 2013-11-27 2014-03-05 宁波盛宏建设工程有限公司 Bored pile construction method for reinforcing cage framework layered installation
CN203684233U (en) * 2013-12-27 2014-07-02 中铁大桥局集团第一工程有限公司 Circular support structure for deep foundation pit
CN203878562U (en) * 2014-06-05 2014-10-15 北京住总集团有限责任公司 Underground diaphragm wall corner end blocking structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544556A (en) * 2015-12-29 2016-05-04 湖北中南勘察基础工程有限公司 Foundation pit supporting construction technology combining equal-thickness cement-soil diaphragm wall and tubular piles
CN105937218A (en) * 2016-04-27 2016-09-14 中国建筑第五工程局有限公司 Construction method of underground diaphragm wall
CN105970916A (en) * 2016-06-30 2016-09-28 中铁十八局集团第五工程有限公司 Construction method for plain concrete underground diaphragm wall of deep foundation pit
CN108049393A (en) * 2017-11-24 2018-05-18 中建铁投轨道交通建设有限公司 For the attached building enclosure construction technology in subway station under the conditions of rich water thick sand bed
CN110106888A (en) * 2019-04-02 2019-08-09 刘侨 It is a kind of to exempt from horizontally-supported self-stabilization type foundation pit enclosure support construction construction method

Also Published As

Publication number Publication date
CN104775439B (en) 2017-03-15

Similar Documents

Publication Publication Date Title
CN104196034A (en) Foundation pit construction method employing steel sheet piles as support cofferdam
CN101509263A (en) Digging method foundation pit structure of steel cover and plate cover, and construction method
CN104775439A (en) Foundation pit support and water stop integrated structure and construction method thereof
CN100510281C (en) Semi-inverse construction method of super large diameter, ultra-burial depth storage pond
CN202689031U (en) Deep foundation pit retaining and protecting retaining wall
CN111236241B (en) Weak water-rich stratum subway foundation pit reinforcing excavation method based on half-cover excavation method
CN109797769B (en) Collapsible loess area underground comprehensive pipe gallery foundation structure and construction method thereof
CN101793023A (en) Foundation pit construction method
CN104264663A (en) Hard cutting construction technology for secant piles
CN110847199A (en) Construction method for drainage of underground water of deep foundation pit
CN110468938A (en) A kind of municipal drain pipeline construction method
CN104895093A (en) Semi-prefabricated underground continuous wall and construction method thereof
CN104264683A (en) Concave ultra-deep foundation pit zoned supporting method for three-side surrounded cultural protection building
CN209923959U (en) Open caisson structure for dry-process operation of high-groundwater-level soft soil field
CN104652444A (en) Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation
CN114575355A (en) Soil protection and descent construction method
CN202202335U (en) Flow guiding and water draining structure in deep foundation pit
CN112282029B (en) Connection construction method for urban high-water-level large-diameter reinforced concrete sewage pipeline
CN110387889A (en) A kind of multi-arch type foundation pit supporting method for strip deep basal pit
CN110117959B (en) Construction method for foundation pit support near river
CN209585079U (en) The Yield rainfall relation building enclosure of beam is turned under a kind of subway station
CN107313454B (en) Construction method of underground garage
CN216108526U (en) Underground continuous wall structure for foundation pit support
CN104846837A (en) Construction method for ultra-deep well pit in surface drainage foundation pit
AU2020100004A4 (en) A Method Of Constructing A Column, A Subterranean Structure, And A Structure Made From The Method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200408

Address after: 100000 No. three Li River Road, Beijing, Haidian District, 9

Patentee after: CHINA CONSTRUCTION BASE BACILITIES Co.,Ltd.

Address before: 518022, room 13, building 2105, Zhongjian building, No. 1302 Shennan East Road, Shenzhen, Guangdong, Luohu District

Patentee before: CHINA CONSTRUCTION SOUTH INVESTMENT Co.,Ltd.

TR01 Transfer of patent right