CN102635110B - Construction method for concrete pile - Google Patents

Construction method for concrete pile Download PDF

Info

Publication number
CN102635110B
CN102635110B CN201210142430.8A CN201210142430A CN102635110B CN 102635110 B CN102635110 B CN 102635110B CN 201210142430 A CN201210142430 A CN 201210142430A CN 102635110 B CN102635110 B CN 102635110B
Authority
CN
China
Prior art keywords
hole
stake
job practices
mentioned
concrete pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210142430.8A
Other languages
Chinese (zh)
Other versions
CN102635110A (en
Inventor
王继忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING PUISSANT GEOTECHNICAL ENGINEERING Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210142430.8A priority Critical patent/CN102635110B/en
Publication of CN102635110A publication Critical patent/CN102635110A/en
Application granted granted Critical
Publication of CN102635110B publication Critical patent/CN102635110B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention aims to provide a construction method for a concrete pile. Concrete pile with higher bearing capacity can be manufactured at a lower cost in harder sand layer foundation through the construction method to meet the requirements of buildings having higher demand on bearing capacity; the construction method comprises the steps of: 1) drilling holes at the pile position in the foundation by a helical drilling rod until reaching the designed depth; 2) lifting the helical drilling rod up, and pressing and filling mortar into the pile holes at the same time until pressing and filling mortar into the top of the piles; 3) drilling holes again by the helical drilling rod until reaching the designed depth; and 4) constructing the pile body.

Description

The job practices of concrete pile
Technical field
The present invention relates to the construction technology of foundation, particularly relate to the construction technology of concrete pile.
Background technology
In the ground of building is processed, often run into such situation, under earth's surface there is the layer of sand that density is larger in certain depth place, and the water content of layer of sand is uneven, the uneven thickness of layer of sand.The pile body pore-forming of this geological conditions during to pile foundation construction causes great difficulty, and when particularly low, the thickness of the water content when layer of sand is larger, the conventional modes such as vibration sinking tube, static pressure or heavy tamping, are all difficult to form a hole substantially to projected depth at present.Even very difficult formation the stake hole of certain depth, after proposing outer tube or casing, the chiltern of hole wall all can form and cave in, and a hole is stopped up again.And if above-mentioned geological conditions adopts the method for manually digging hole limit, limit retaining wall, its construction costs again can be very expensive.Building major part is now all highrise building, more and more higher to the requirement for bearing capacity of pile foundation, and limited due to hole forming method of above-mentioned several construction technology has been difficult to applicable in above-mentioned geological conditions.Therefore, people are desirable to provide a kind of these needs that meet, and cost is the construction technology of lower stake still.
Summary of the invention
The present invention proposes in order to solve the above problems, object is to provide a kind of job practices of concrete pile, by this job practices, can in harder sand-layer foundation, with lower cost, make the higher concrete pile of bearing capacity, to meet the requirement of the building that requirement for bearing capacity is higher.
To achieve these goals, the job practices of concrete pile of the present invention comprises the steps:
1) place, stake position in ground, holes until projected depth by auger stem;
2) above-mentioned auger stem is upwards proposed on one side, to stake hole in press filling mortar on one side, until place, stake top;
3) again by auger stem, hole until projected depth;
4) carry out the construction of pile body.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 2), in, mortar forms with cement and sand and water mix.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 3), in, the diameter of auger stem is equal to or less than above-mentioned steps 1) in the diameter of auger stem.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 3) in, again by auger stem, hole, at mortar, tentatively solidify after possessing some strength and carry out.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 3) in, while again holing by auger stem, stake after auger boring is for the first time stopped up in hole when not serious, can substitute by the casing of with stake point being directly drowned in mortar to the mode of projected depth.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 4) in, the construction of pile body comprises by repeatedly filler and heavy tamping in stake hole, the stake end soil body reinforced compacted, makes the carrier of stake bottom.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 4) in, the construction of pile body is included in placement reinforcing cage in a hole, and forms pile body after pouring into a mould vibrated concrete.
Best, in the job practices of above-mentioned concrete pile, above-mentioned steps 4), in, the construction of pile body comprises precast pile is directly inserted in a hole, and concrete perfusion in the gap between preformed pile and stake hole.
The characteristics and advantages of the concrete pile forming by above method is: 1. pore-forming is simply rapid.Spiral draws the mode in hole can carry out rapidly pore-forming in harder layer of sand, after pore-forming, press again filling mortar to carry out retaining wall, even hole wall is also in the obstruction stake hole that caves in after retaining wall, by the time the water in mortar just provides some strength after being absorbed by surrounding soil, now again carry out spiral and draw hole, the intensity raising due to mortar, obviously improves than the effect of primary retaining wall, effectively avoided the obstruction of caving in of hole wall, the success rate of pore-forming and work efficiency are significantly improved.2. supporting capacity is high.The mode that spiral draws hole is convenient to form the stake that diameter is larger, and effectively after pore-forming, can at stake end, carry out the construction of carrier, give full play to foundation soil body participate in stressed, to improve bearing capacity of pile tip.Also can take directly to insert the mode of precast pile.3. with respect to methods such as manually digging holes, the advantage of the high and low cost of work efficiency is comparatively outstanding.
Accompanying drawing explanation
Fig. 1 has a process chart for the job practices of the concrete pile of the embodiment of end carrier as one of the present invention.
The specific embodiment
As one of the present invention, there is a job practices for the concrete pile of the embodiment of end carrier, it comprises the steps, first, as shown in Figure 1a, place, stake position in ground, by auger stem 1, hole to projected depth, then, as shown in Figure 1 b, above-mentioned auger stem 1 is upwards proposed on one side, in stake hole, press filling mortar 2 on one side, until place, stake top, then, as shown in Fig. 1 c, when mortar 2 tentatively solidifies while possessing some strength, again by auger stem 1 boring identical or slightly minor diameter, until projected depth, then, as shown in Figure 1 d, in stake hole, put into casing 3, in casing 3, insert a certain amount of prose style free from parallelism inserts 5, then, as shown in Fig. 1 e, the movement of falling object by weight 4 in casing 3, to the prose style free from parallelism inserts 5 of inserting, carry out compacted, then, as shown in Figure 1 f, repeatedly carry out filler and compacted operation, the certain depth of stake end below and the foundation soil body of scope are carried out to continuous ground extruding, until meet the requirement of compactness, then, as shown in Figure 1 g, to casing 3 bottom gradation, fill the harsh concrete 6 of scheduled volume and undertaken compacted by weight 4, then, as shown in Fig. 1 i, at the required concrete eight of the rear perfusion pile body of the interior placement reinforcing cage 7 of casing 3.Finally, as shown in Fig. 1 j, casing 3 is proposed, vibration compacting concrete eight.

Claims (8)

1. a job practices for concrete pile, this job practices comprises the steps:
1) place, stake position in ground, holes until projected depth by auger stem;
2) above-mentioned auger stem is upwards proposed on one side, to stake hole in press filling mortar on one side, until place, stake top;
3) again by auger stem, hole until projected depth;
4) carry out the construction of pile body.
2. the job practices of concrete pile according to claim 1, is characterized in that above-mentioned steps 2) in, above-mentioned mortar forms with cement and sand and water mix.
3. the job practices of concrete pile according to claim 1, is characterized in that above-mentioned steps 3) in, the diameter of above-mentioned auger stem is equal to or less than above-mentioned steps 1) in the diameter of auger stem.
4. the job practices of concrete pile according to claim 1, is characterized in that above-mentioned steps 3) in, above-mentionedly again by auger stem, hole, at mortar, tentatively solidify after possessing some strength and carry out.
5. the job practices of concrete pile according to claim 1, it is characterized in that above-mentioned steps 3) in, above-mentionedly again by auger stem, hole, stake after auger boring is for the first time stopped up in hole when not serious, can substitute by the casing of with stake point being directly drowned in mortar to the mode of projected depth.
6. the job practices of concrete pile according to claim 1, is characterized in that above-mentioned steps 4) in, the construction of above-mentioned pile body comprises by repeatedly filler and heavy tamping in stake hole, the stake end soil body reinforced compacted, makes the carrier of stake bottom.
7. the job practices of concrete pile according to claim 1, is characterized in that above-mentioned steps 4) in, the construction of above-mentioned pile body is included in placement reinforcing cage in a hole, and forms pile body after pouring into a mould vibrated concrete.
8. the job practices of concrete pile according to claim 1, is characterized in that above-mentioned steps 4) in, the construction of above-mentioned pile body comprises precast pile is directly inserted in a hole, and concrete perfusion in the gap between preformed pile and stake hole.
CN201210142430.8A 2012-05-09 2012-05-09 Construction method for concrete pile Active CN102635110B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210142430.8A CN102635110B (en) 2012-05-09 2012-05-09 Construction method for concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210142430.8A CN102635110B (en) 2012-05-09 2012-05-09 Construction method for concrete pile

Publications (2)

Publication Number Publication Date
CN102635110A CN102635110A (en) 2012-08-15
CN102635110B true CN102635110B (en) 2014-01-29

Family

ID=46619677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210142430.8A Active CN102635110B (en) 2012-05-09 2012-05-09 Construction method for concrete pile

Country Status (1)

Country Link
CN (1) CN102635110B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900080A (en) * 2012-09-05 2013-01-30 上海中技桩业股份有限公司 Soil-squeezing-free preformed pile soil sampling and embedding method
CN104711973A (en) * 2015-01-07 2015-06-17 朱奎 Construction method for small-diameter pile composite foundation
CN105821834B (en) * 2016-03-16 2018-03-30 杨涅 A kind of construction method of concrete-pile
CN108411896B (en) * 2018-03-06 2020-04-17 中建五局华东建设有限公司 Foundation reinforcing device of building
CN111720142A (en) * 2020-05-28 2020-09-29 三明学院 Man-excavated pile advanced support method suitable for karst stratum
CN112144516A (en) * 2020-10-16 2020-12-29 王继忠 Construction method of concrete pile

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1126264A (en) * 1994-12-26 1996-07-10 石寅生 Making method for non-annular borehole cast-in-place pile
CN2239446Y (en) * 1996-04-10 1996-11-06 王继忠 Construction appts. for tamping super-short shaped pile by use of building garbage
CN1152650A (en) * 1996-09-01 1997-06-25 李波扬 Screw pile forming technology by pouring
CN1191257A (en) * 1998-03-20 1998-08-26 王继忠 Method for construction of concrete pile

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59224721A (en) * 1983-06-03 1984-12-17 Hiroshi Watanabe Embedding work of concrete pile
DE69510916D1 (en) * 1994-01-06 1999-08-26 Roxbury Ltd IMPROVEMENTS REGARDING A PILE MAKING DEVICE
NL1000558C2 (en) * 1994-06-16 1995-12-18 Heiwerken P Van T Wout Waddinx In situ concrete piling method for use in built up areas
JP2003147766A (en) * 2001-11-09 2003-05-21 Asahi Kasei Corp Burying method for steel pipe pile
AU2008100106A4 (en) * 2007-02-05 2008-04-03 Catawa Pty Ltd Drills for piles

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1126264A (en) * 1994-12-26 1996-07-10 石寅生 Making method for non-annular borehole cast-in-place pile
CN2239446Y (en) * 1996-04-10 1996-11-06 王继忠 Construction appts. for tamping super-short shaped pile by use of building garbage
CN1152650A (en) * 1996-09-01 1997-06-25 李波扬 Screw pile forming technology by pouring
CN1191257A (en) * 1998-03-20 1998-08-26 王继忠 Method for construction of concrete pile

Also Published As

Publication number Publication date
CN102635110A (en) 2012-08-15

Similar Documents

Publication Publication Date Title
CN102635110B (en) Construction method for concrete pile
CN104074186B (en) The casing device of pore-forming and construction method thereof in a kind of building lot
CN102733376B (en) Composite pile and its construction method
CN102733378B (en) Construction method of concrete pile
WO2018210019A1 (en) Pile formation method for down-the-hole impact rotary jet composite piles
CN102733377B (en) Method for constructing concrete pile
CN101768970B (en) Construction method of concrete pile
CN108118698A (en) The construction method of stake and special Static pressure pile driver
CN106192999A (en) The construction method of uplift pile
CN101220592A (en) Construction method of concrete pile
CN104294818A (en) Construction method for concrete pile
CN111851479B (en) Method for constructing immersed tube rammed cast-in-place pile in sand layer or gravel layer
CN104099925A (en) Construction device for concrete pile and construction method thereof
CN101575852A (en) Construction method of wall-retaining bottom-expanding sinking-pipe cast-in-situ piles
CN104404956A (en) Construction method for pedestal piles
CN104153357A (en) Construction method of composite pile
CN105064332A (en) Construction method for bearing base piles of square pile bodies
CN101397793A (en) Rammed concrete stiffening cement mixing pile and construction method thereof
CN101024958A (en) Drilling poured-pile hole-bottom slurry-injection pile-forming method
CN205776209U (en) The construction equipment of concrete-pile
CN104294817B (en) The construction method of concrete-pile
CN108049401A (en) A kind of screw thread rammed bulb pile and its construction method
CN110080314B (en) Method for reducing side friction resistance of pile foundation
CN112323836A (en) Construction method of combined assembly type deep foundation pile
CN206495202U (en) A kind of top expansion type cement-soil composite pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BEIJING PUISSANT GEOTECHNICAL ENGINEERING CO., LTD

Free format text: FORMER OWNER: WANG JIZHONG

Effective date: 20140715

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140715

Address after: 102218, Beijing, Changping District East small town Taiping homes, building 31

Patentee after: BEIJING PUISSANT GEOTECHNICAL ENGINEERING CO., LTD.

Address before: 102218, Beijing, Changping District East small town Taiping homes, building 31

Patentee before: Wang Jizhong