CN105821834B - A kind of construction method of concrete-pile - Google Patents

A kind of construction method of concrete-pile Download PDF

Info

Publication number
CN105821834B
CN105821834B CN201610150695.0A CN201610150695A CN105821834B CN 105821834 B CN105821834 B CN 105821834B CN 201610150695 A CN201610150695 A CN 201610150695A CN 105821834 B CN105821834 B CN 105821834B
Authority
CN
China
Prior art keywords
concrete
stake holes
pile
stake
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610150695.0A
Other languages
Chinese (zh)
Other versions
CN105821834A (en
Inventor
杨涅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610150695.0A priority Critical patent/CN105821834B/en
Publication of CN105821834A publication Critical patent/CN105821834A/en
Application granted granted Critical
Publication of CN105821834B publication Critical patent/CN105821834B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of construction method of concrete-pile, pore-forming forms stake holes to projected depth at the stake position in ground;Drilling rod propose stake holes simultaneously in stake holes concrete perfusion to the first predetermined altitude;By tubular cylinder again insertable into desired depth in concrete;Cylinder is lifted from the concrete while concrete perfusion again, at the same into stake holes concrete perfusion to the second predetermined altitude.The indefinite shape thing of concrete of the oriented soil around pile protrusion in concrete pile body side after being molded by above-mentioned steps, so that pile body side and its coarse, snap-in between the outwardly part of pile body and soil, stretch out equivalent to pile body and be much branched off into the soil body, so as to form the anchoring relation of pile body and surrounding soil, stake is set to obtain big bearing capacity.

Description

A kind of construction method of concrete-pile
Technical field
The present invention relates to field of civil engineering, more particularly to a kind of construction method of concrete-pile.
Background technology
In the basement process of building, bored concrete pile is conventional base form, its mainly by pile body side friction and Part end resistance improves the bearing capacity of stake, therefore is running into the higher building of requirement for bearing capacity, or weak soil in ground During the deeper situation of layer, it is necessary to by way of increasing pile body diameter and pile body length, to meet building demand, therefore it is aobvious Write increase construction cost and construction period.Accordingly, it is desirable to it is a kind of give full play to soil support force, improve pile bearing capacity, into Originally the construction method of concrete-pile that is relatively low, can still meeting the demand.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of construction method for the concrete-pile for increasing pile body bearing capacity.
The technical scheme that the present invention solves above-mentioned technical problem is as follows:A kind of construction method of concrete-pile, this method bag Include following step:
Step S1, pore-forming forms stake holes to projected depth at the stake position in ground;
Step S2, in the stake holes, concrete perfusion is to the first predetermined altitude;
Step S3, drilling rod is inserted into desired depth in the concrete;
Step S4, the drilling rod is lifted from the concrete, and irrigated simultaneously by drilling rod hole into the stake holes Concrete is to the second predetermined altitude;
Step S5, repeat step S3 and step S4.
The beneficial effects of the invention are as follows:What the oriented soil around pile in concrete pile body side after being molded by above-mentioned steps protruded The indefinite shape thing of concrete so that pile body side and its coarse, snap-in between the outwardly part of pile body and soil, equivalent to pile body Stretching is much branched off into the soil body, so as to form the anchoring relation of pile body and surrounding soil, stake is obtained big bearing capacity.
On the basis of above-mentioned technical proposal, the present invention can also do following improvement.
Further, the stake holes in the step S1 passes through mode pore-forming or the soil compaction mode pore-forming of fetching earth.
Further, when performing the step S2 since the bottom of the stake holes reverse upward concrete perfusion.
Further, the section of the drilling rod is identical with the section of the stake holes.
The technical problems to be solved by the invention are to provide a kind of construction method for the concrete-pile for increasing pile body bearing capacity.
The technical scheme that the present invention solves above-mentioned technical problem is as follows:The section of the drilling rod and the section phase of the stake holes Together.
The technical scheme that the present invention solves above-mentioned technical problem is as follows:A kind of construction method of concrete-pile, this method bag Include following step:
Step S1, pore-forming forms stake holes to projected depth at the stake position in ground;
Step S2, in the stake holes, concrete perfusion is to the first predetermined altitude;
Step S3, prefabricated pile is inserted into desired depth in the concrete.
The beneficial effects of the invention are as follows:What the oriented soil around pile in concrete pile body side after being molded by above-mentioned steps protruded The indefinite shape thing of concrete so that pile body side and its coarse, snap-in between the outwardly part of pile body and soil, equivalent to pile body Stretching is much branched off into the soil body, so as to form the anchoring relation of pile body and surrounding soil, stake is obtained big bearing capacity.
On the basis of above-mentioned technical proposal, the present invention can also do following improvement.
Further, the stake holes in the step S1 passes through mode pore-forming or the soil compaction mode pore-forming of fetching earth.
Further, when performing the step S2 since the bottom of the stake holes reverse upward concrete perfusion.
Further, the section of the prefabricated pile is identical with the section of the stake holes.
Brief description of the drawings
Fig. 1 is a kind of construction method flow chart of concrete-pile provided in an embodiment of the present invention;
Fig. 2 is the schematic diagram by drilling rod into stake holes;
Fig. 3 is that drilling rod is lifted up and simultaneously toward the schematic diagram of concrete perfusion in stake holes;
Fig. 4 be drilling rod insert in the stake holes after concrete perfusion after, concrete is by the schematic diagram after pressure;
Drilling rod is lifted up and simultaneously toward concrete perfusion in stake holes after Fig. 5 is Fig. 4, until drilling rod proposes the signal of stake holes Figure;
Fig. 6 be prefabricated pile insert in the stake holes after concrete perfusion after, concrete is by the schematic diagram after pressure.
In accompanying drawing, the list of parts representated by each label is as follows:
1st, drilling rod, 2, stake holes, 3, prefabricated pile.
Embodiment
The principle and feature of the present invention are described below in conjunction with accompanying drawing, the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the present invention.
Embodiment one
Shown as shown in Figure 1 to Figure 5, wherein, Fig. 2 is the schematic diagram by drilling rod 1 into stake holes 2;Fig. 3 is that drilling rod 1 is lifted up simultaneously Simultaneously toward the schematic diagram of concrete perfusion in stake holes 2;Fig. 4 is after drilling rod 1 is inserted in the stake holes 2 after concrete perfusion, to mix Solidifying soil is by the schematic diagram after pressure;Drilling rod 1 is lifted up and simultaneously toward concrete perfusion in stake holes 2 after Fig. 5 is Fig. 4, until boring Bar 1 proposes the schematic diagram of stake holes.What the arrow in figure represented is the direction of motion of drilling rod 1.
A kind of construction method of concrete-pile, this method comprise the steps:
Step S1, pore-forming forms stake holes to projected depth at the stake position in ground.
Here can be by that into stake holes, can be mechanically or manually the mode of fetching earth into stake holes or soil compaction mode into stake holes.
Step S2, in the stake holes, concrete perfusion is to the first predetermined altitude.
Concrete perfusion in toward stake holes, can stretch into the bottom of stake holes by drilling rod herein, and drilling rod is lifted up same When by drilling rod hole toward concrete perfusion in stake holes, reverse perfusion upwards, certain high when being irrigated in stake holes since stake holes bottom Stop concrete perfusion after all perfusion is full in the concrete or stake holes of degree.The perfusion depth of control concrete as needed, Need how many concrete how deep by squeezed just perfusion.
Step S3, drilling rod is inserted into desired depth in the concrete.Concrete in stake holes is extruded to lateral squeezed.
The diameter of drilling rod is equal with the diameter of stake holes;Drilling rod is inserted in concrete, bottom can be inserted into, can also be less than Bottom;Control according to the actual requirements.In the process, the drilling rod that the concrete being poured in for the first time in stake holes is inserted into extrudes by force In soil around pile beyond to stake holes diameter, the origin-location soil body is partly or entirely replaced so that the soil body is extruded more closely knit (such as adopt With soil compaction mode pore-forming, then the soil body around stake holes has been extruded once in pore-forming, and concrete is inserted again by drilling rod Extruding, improve the shearing strength, compactness, reduction void ratio of the soil body), concrete is in close contact completely with the soil body, after shaping Pile body side provide more large lateral pressure power and increase the bearing capacity of stake.The concrete being extruded run into stake holes surrounding soil it is local compared with During soft or fissare situation, squeeze into that relatively soft, compactness is more loose or the fissare soil body in, substitute loose earth, tamp Crack, uncertain shape is formed, with compact earth snap-in, improve support force of the soil body to the pile body after shaping.Due to drilling rod Diameter is equal with the diameter of stake holes, ensure that concrete when being extruded by drilling rod mainly moved into pile peripheral earth rather than to On emerge.
Step S4, the drilling rod is lifted from the concrete, and simultaneously by drilling rod hole into the stake holes again Concrete perfusion is to the second predetermined altitude.
When in using drilling rod insertion concrete, stop after drilling rod inserts desired depth.Drilling rod hole (apex point can be passed through The door gone out) toward concrete perfusion in stake holes, while slowly be lifted up while drilling rod continuing toward concrete perfusion in stake holes; Or first drilling rod somewhat can also be lifted after some toward concrete perfusion in stake holes.
Stop concrete perfusion after the concrete irrigated again to the second predetermined altitude.Second predetermined altitude is according to construction Demand freely determines.
The concrete of second of perfusion forms part pile body, and the concrete irrigated for the first time forms protrusion in pile body periphery , the uncertain evagination pile body of shape (equivalent to the rivet anchored into the soil body), but the concrete irrigated twice will not separate, What is formed is an entirety.Overall shape is exactly the indefinite concrete holdfast of a side convex shape or tumor type pile body.So that stake Body side and its coarse, snap-in between the projection and soil of pile body, stretch out equivalent to pile body side and be much branched off into the soil body, from And support force of the soil around pile to pile body is greatly improved, pile body is obtained big bearing capacity.
Implement the operation of concrete direction finding pressure extrusion in pile body lower end, stake end major part is formed in the bottom of pile body.In pile body Concrete pressure extrusion operation is implemented in lower end, and pressure has also been carried out to pile body lower end bottom surface and has filled operation, ensures stake bottom without loosened soil, quite In pile-end post-grouting technique.
In order to further improve the pile body lateral area and surface roughness after shaping, and then improve the carrying of pile body Power, step S3 and step S4 can be repeated several times.
Embodiment two
As shown in Figure 1, Figure 2, shown in described in Fig. 3 and Fig. 6, Fig. 6 is in the stake holes 2 after prefabricated pile inserts concrete perfusion Afterwards, concrete is by the schematic diagram after pressure.
The present embodiment and the difference of embodiment one are when step S3 is performed, and are not to fill drilling rod inserting step S2 Note in the concrete in stake holes, and prefabricated prefabricated pile inserting step S2 is poured in the concrete in stake holes.
The section of prefabricated pile is identical with the section of stake holes, and prefabricated pile is inserted in concrete, can be inserted into bottom, can also not On earth;Control according to the actual requirements.In the process, the prefabricated pile that the concrete being poured in for the first time in stake holes is inserted into is by force It is expressed in the soil around pile beyond stake holes diameter, partly or entirely replaces the origin-location soil body so that the soil body is extruded more closely knit (as used soil compaction mode pore-forming, then the soil body around stake holes has been extruded once in pore-forming, is extruded again now, is improved Shearing strength, compactness, the reduction void ratio of the soil body), concrete is in close contact completely with the soil body, to the pile body side after shaping More large lateral pressure power is provided and increases the bearing capacity of stake.It is local softer or have crack that the concrete being extruded runs into stake holes surrounding soil Situation when, squeeze into that relatively soft, compactness is more loose or the fissare soil body in, substitute loose earth, tamp crack, formed not Shape is determined, with compact earth snap-in, improves support force of the soil body to the pile body after shaping.Due to the diameter and stake holes of prefabricated pile Diameter it is equal, ensure that concrete when being extruded by drilling rod mainly move into pile peripheral earth rather than emerge upwards.It is mixed Solidifying soil solidification is enough, will not be separated with the prefabricated pile of rear insertion, and formation is an entirety.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent substitution and improvements made etc., it should be included in the scope of the protection.

Claims (6)

1. a kind of construction method of concrete-pile, it is characterised in that this method comprises the steps:
Step S1, pore-forming forms stake holes to projected depth at the stake position in ground;
Step S2, in the stake holes, concrete perfusion is to the first predetermined altitude;
Step S3, drilling rod is inserted into desired depth in the concrete;
Step S4, the drilling rod is lifted from the concrete, and irrigated again into the stake holes by drilling rod hole simultaneously Concrete is to the second predetermined altitude;
Step S5, repeat step S3 and step S4;
Wherein, the section of the drilling rod is identical with the section of the stake holes.
A kind of 2. construction method of concrete-pile according to claim 1, it is characterised in that the stake in the step S1 Hole passes through mode pore-forming or the soil compaction mode pore-forming of fetching earth.
A kind of 3. construction method of concrete-pile according to claim 1, it is characterised in that when performing the step S2 from The bottom of the stake holes starts reverse upward concrete perfusion.
4. a kind of construction method of concrete-pile, it is characterised in that this method comprises the steps:
Step S1, pore-forming forms stake holes to projected depth at the stake position in ground;
Step S2, in the stake holes, concrete perfusion is to the first predetermined altitude;
Step S3, prefabricated pile is inserted into desired depth in the concrete;
Wherein, the section of the prefabricated pile is identical with the section of the stake holes.
A kind of 5. construction method of concrete-pile according to claim 4, it is characterised in that the stake in the step S1 Hole passes through mode pore-forming or the soil compaction mode pore-forming of fetching earth.
A kind of 6. construction method of concrete-pile according to claim 4, it is characterised in that when performing the step S2 from The bottom of the stake holes starts reverse upward concrete perfusion.
CN201610150695.0A 2016-03-16 2016-03-16 A kind of construction method of concrete-pile Expired - Fee Related CN105821834B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610150695.0A CN105821834B (en) 2016-03-16 2016-03-16 A kind of construction method of concrete-pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610150695.0A CN105821834B (en) 2016-03-16 2016-03-16 A kind of construction method of concrete-pile

Publications (2)

Publication Number Publication Date
CN105821834A CN105821834A (en) 2016-08-03
CN105821834B true CN105821834B (en) 2018-03-30

Family

ID=56523845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610150695.0A Expired - Fee Related CN105821834B (en) 2016-03-16 2016-03-16 A kind of construction method of concrete-pile

Country Status (1)

Country Link
CN (1) CN105821834B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107639731A (en) * 2017-08-11 2018-01-30 汤始建华建材(苏州)有限公司 A kind of manufacture method of longitudinal load-bearing concrete-pile

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0715167B2 (en) * 1992-06-16 1995-02-22 丸五基礎工業株式会社 Method for constructing cast-in-place concrete reinforced concrete pile and reinforced basket used for this method
CN101220592A (en) * 2008-02-04 2008-07-16 王继忠 Construction method of concrete pile
CN201730091U (en) * 2010-08-05 2011-02-02 上海中技桩业股份有限公司 Cast-in-situ pile
CN102635110B (en) * 2012-05-09 2014-01-29 王继忠 Construction method for concrete pile
CN103711123B (en) * 2013-12-17 2016-01-27 上海岩土工程勘察设计研究院有限公司 The construction method of bamboo joint type mortar pile

Also Published As

Publication number Publication date
CN105821834A (en) 2016-08-03

Similar Documents

Publication Publication Date Title
CN104929109B (en) Displaced type pressure is poured water the long-spiral drilling machine used in soil composite pile and its construction method and construction method
CN103452100A (en) Construction method of post-grouting squeezing and expanding combination cast-in-place bored pile
CN103114578B (en) Grouting molding pedestal pile and construction method thereof and pedestal expanding device
KR20090094734A (en) The method of wall stability by extension of bond diameter
CN105649073A (en) Static root drilling type construction method for planting piles
CN105821834B (en) A kind of construction method of concrete-pile
CN105155517A (en) Drilling extrusion bearing type capsular branch pile construction method
CN107012861A (en) A kind of discrete material core expansive concrete stake and its construction method
CN102635110B (en) Construction method for concrete pile
CN201943069U (en) Precast compacting-enlarging pile
CN101936004A (en) Precast expanding pile as well as construction method and construction mechanical equipment thereof
CN208201874U (en) A kind of open-cell cloth bag grouting structure
JP2003105745A (en) Improvement work method of soft ground
CN104632259B (en) End-head self-expansion enlarging type anchoring method for soft and weak stratum
CN104213554A (en) Construction method of slip-casting variable-cross section steel pipe pile and expansion and extrusion device of slip-casting variable-cross section steel pipe pile
CN105951825B (en) It is a kind of hollow from base expanding and base expanding crab-bolt and its installation method
CN106087993A (en) A kind of Novel threaded bored concrete pile and pouring construction method
JP4101724B2 (en) Steel pipe pile construction method
CN104404947A (en) Construction method for composite pile
CN214193981U (en) Roadbed structure is widened to side slope road fill side
JP3934116B2 (en) Improvement method for soft ground
CN111058442A (en) Tensile type anchor suitable for two segmentation echelonment anchor eye
CN210238495U (en) Drilling tubular pile structure
CN111088795A (en) High-resistance anchoring device suitable for two-section type stepped anchor hole
CN206319315U (en) Multi-section type variable cross-section grouted anchor bar

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180330