CN101024958A - Drilling poured-pile hole-bottom slurry-injection pile-forming method - Google Patents
Drilling poured-pile hole-bottom slurry-injection pile-forming method Download PDFInfo
- Publication number
- CN101024958A CN101024958A CN 200610009744 CN200610009744A CN101024958A CN 101024958 A CN101024958 A CN 101024958A CN 200610009744 CN200610009744 CN 200610009744 CN 200610009744 A CN200610009744 A CN 200610009744A CN 101024958 A CN101024958 A CN 101024958A
- Authority
- CN
- China
- Prior art keywords
- pile
- injection
- hole
- bottom slurry
- forming method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention is a bored pouring pile hole-bottom grouting pile forming method. In the existing building foundation engineering construction, full play can not be effectively given to the pile body intensity and pile end bearing capacity, having defects of high manufacturing cost and so on. And the invention can solve the above problem, firstly boring by spiral borer to the designed level and then grouting the borehole, drawing out drill rod and inserting reinforcement cage, and finally pouring concrete to form pile. And the invention is applied to the building foundation engineering construction.
Description
Technical field:
The present invention relates to a kind of construction that pours into reinforced concrete pile in the building foundation engineering construction field.
Background technology:
In existing building foundation engineering construction, generally adopt bored pile to handle the building that shallow foundation can not meet the demands, common bearing capacity of borehole bored concrete pile is lower, and stake end loosened soil is difficult to handle, can not effectively bring into play the bearing capacity of pile shaft concrete strength and stake end, have drawbacks such as economical cost height.The inventive method can solve above problem effectively.
Summary of the invention:
The purpose of this invention is to provide loosened soil at the bottom of a kind of consolidation pile effectively and improve the drilling poured-pile hole-bottom slurry-injection pile-forming method of the bearing capacity of stake.
Above-mentioned purpose realizes by following technical scheme:
A kind of piling method of bored pile hole-bottom slurry-injection at first with spiral drilling machine boring, is holed and inject cement paste in boring to design elevation, proposes drilling rod after the slip casting and inserts reinforcing cage, last concrete perfusion pile.
The piling method of above-mentioned bored pile hole-bottom slurry-injection, described cement injection are to inject cement paste by auger stem.
This technical scheme has following beneficial effect:
1. utilizing the inventive method institute pile is cast-in-situ concrete poured stake, and piling method is simple.
2. noiselessness pollution, friction public hazards when piling method of the present invention is constructed, job practices is easy.
3. piling method of the present invention has promptly satisfied the feature of traditional castinplace pile, and bull stick is unearthed outward, and slip casting in the bull stick has overcome the unmanageable problem of loosened soil at the bottom of traditional priming concrete pile hole, has improved the bearing capacity of stake end simultaneously again.
4. utilize piling method of the present invention, the cost that has reduced traditional castinplace pile can create very high economic benefit more than 10%, so the prospect of piling method of the present invention is very extensive.
5. utilize piling method of the present invention that the supporting capacity of stake is improved, and handle pile for remaining loosened soil at the bottom of the stake by cement paste, the inventive method can effectively be brought into play the intensity of pile concrete and the supporting capacity of stake end.
Description of drawings:
Accompanying drawing 1 is the construction schematic diagram of holing according to method of the present invention;
Accompanying drawing 2 is the construction schematic diagrames that carry out slip casting according to method of the present invention;
Accompanying drawing 3 is construction schematic diagrames of carrying brill according to method of the present invention;
Accompanying drawing 4 is construction schematic diagrames of laying reinforcing cage according to method of the present invention;
Accompanying drawing 5 is the construction schematic diagrames that carry out fluid concrete according to method of the present invention.
The specific embodiment of the present invention:
Embodiment 1:
A kind of piling method of bored pile hole-bottom slurry-injection at first with spiral drilling machine boring, is holed and inject cement paste in boring to design elevation, proposes drilling rod after the slip casting and inserts reinforcing cage, last concrete perfusion pile.
The concrete steps of the inventive method are:
1, uses auger stem in foundation soil, to hole, form the stake hole;
2, this is bored into the predetermined degree of depth, carries out slip casting according to the situation of stake end soil layer, by the degree of depth and drawing situation control grouting amount (amount of injecting cement paste is determined according to the stratum) and the grouting pressure that enters stake end soil layer;
3, carry brill and remove surflaes, pile hole;
4, lay pile cages to design elevation;
5, build the pile concrete pile that vibrates.
Embodiment 2:
The piling method of embodiment 1 described bored pile hole-bottom slurry-injection, described cement injection are to inject cement paste by auger stem inside in the stake hole.
Claims (2)
1. the piling method of a bored pile hole-bottom slurry-injection is characterized in that: at first with spiral drilling machine boring, hole and inject cement paste in boring to design elevation, propose drilling rod after the slip casting and insert reinforcing cage, last concrete perfusion pile.
2. the piling method of bored pile hole-bottom slurry-injection according to claim 1 is characterized in that: described cement injection is for injecting cement paste by auger stem.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200610009744 CN101024958A (en) | 2006-02-24 | 2006-02-24 | Drilling poured-pile hole-bottom slurry-injection pile-forming method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200610009744 CN101024958A (en) | 2006-02-24 | 2006-02-24 | Drilling poured-pile hole-bottom slurry-injection pile-forming method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101024958A true CN101024958A (en) | 2007-08-29 |
Family
ID=38743574
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200610009744 Pending CN101024958A (en) | 2006-02-24 | 2006-02-24 | Drilling poured-pile hole-bottom slurry-injection pile-forming method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101024958A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102912791A (en) * | 2012-10-15 | 2013-02-06 | 中冶交通工程技术有限公司 | Construction method of bored pile |
CN104499480A (en) * | 2014-12-12 | 2015-04-08 | 董相东 | Method for drilling and filling concrete hollow pile |
CN111809612A (en) * | 2020-07-16 | 2020-10-23 | 四川中镙工程技术有限公司 | Cast-in-place pile construction method and cast-in-place pile |
CN112081102A (en) * | 2020-07-29 | 2020-12-15 | 浙江中正岩土技术有限公司 | Large-diameter cast-in-situ bored pile and construction method thereof |
CN112854219A (en) * | 2021-01-12 | 2021-05-28 | 浙江工业大学 | Sediment solidification equipment at bottom of drilling bored concrete pile |
-
2006
- 2006-02-24 CN CN 200610009744 patent/CN101024958A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102912791A (en) * | 2012-10-15 | 2013-02-06 | 中冶交通工程技术有限公司 | Construction method of bored pile |
CN102912791B (en) * | 2012-10-15 | 2015-06-10 | 中冶交通工程技术有限公司 | Construction method of bored pile |
CN104499480A (en) * | 2014-12-12 | 2015-04-08 | 董相东 | Method for drilling and filling concrete hollow pile |
CN111809612A (en) * | 2020-07-16 | 2020-10-23 | 四川中镙工程技术有限公司 | Cast-in-place pile construction method and cast-in-place pile |
CN112081102A (en) * | 2020-07-29 | 2020-12-15 | 浙江中正岩土技术有限公司 | Large-diameter cast-in-situ bored pile and construction method thereof |
CN112854219A (en) * | 2021-01-12 | 2021-05-28 | 浙江工业大学 | Sediment solidification equipment at bottom of drilling bored concrete pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018210019A1 (en) | Pile formation method for down-the-hole impact rotary jet composite piles | |
CN104929109B (en) | Displaced type pressure is poured water the long-spiral drilling machine used in soil composite pile and its construction method and construction method | |
CN103015413B (en) | Construction method of composite pile with implanting-in rigid-body embedded into hard bearing stratum | |
CN103510510B (en) | A kind of enhancement mode long auger cast-with-pressure concrete pile and construction method | |
CN101812843B (en) | Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby | |
CN105544512A (en) | Reinforced sack grouting stone-breaking pile with heat transferring tube buried therein and construction method | |
CN206784372U (en) | Injection forming club-footed pile | |
CN111058443B (en) | Precast pile composite foundation construction method for eliminating loess collapsibility | |
CN101575852A (en) | Construction method of wall-retaining bottom-expanding sinking-pipe cast-in-situ piles | |
CN100363563C (en) | Method for prefabricating composite pile by drilling hole | |
CN104153357A (en) | Construction method of composite pile | |
CN105649073A (en) | Static root drilling type construction method for planting piles | |
CN102635110B (en) | Construction method for concrete pile | |
CN101024958A (en) | Drilling poured-pile hole-bottom slurry-injection pile-forming method | |
CN208201874U (en) | A kind of open-cell cloth bag grouting structure | |
CN105297717A (en) | Composite foundation pile with lower portion enlarged diameter section and construction method of composite foundation pile | |
CN104196013B (en) | A kind of composite Y shape stake and construction method thereof | |
CN101135157A (en) | Static pressure pipe pile settling construction technique | |
CN201874482U (en) | Semi-spiral drill rod | |
CN104141304A (en) | Extrusion formed precast pile stiffness core and cement soil combined Y-shaped pile and construction method thereof | |
CN203594023U (en) | Enhanced type long auger drilling pressure-grouting concrete pile | |
CN108049401A (en) | A kind of screw thread rammed bulb pile and its construction method | |
CN204825865U (en) | Earth composite pile that waters is pressed to replacement formula | |
CN104294817B (en) | The construction method of concrete-pile | |
CN112252312A (en) | Construction method for enhancing integral stress performance of PHC pipe pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |