CN104563147B - Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation - Google Patents
Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation Download PDFInfo
- Publication number
- CN104563147B CN104563147B CN201410434541.5A CN201410434541A CN104563147B CN 104563147 B CN104563147 B CN 104563147B CN 201410434541 A CN201410434541 A CN 201410434541A CN 104563147 B CN104563147 B CN 104563147B
- Authority
- CN
- China
- Prior art keywords
- pile
- epimere
- concrete
- composite structure
- hypomere
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/50—Piles comprising both precast concrete portions and concrete portions cast in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a composite structure pile foundation applied to a karst area. The composite structure pile foundation comprises an upper pile section and a lower pile section and is characterized in that the upper pile section is a concrete tubular pile; the lower pile section is a reinforced concrete filled pile and penetrates through a karst cave in a rock layer; the upper end of the lower pile section stretches into the upper pile section to form the composite structure pile foundation. Compared with the prior art, the composite structure pile foundation has the advantages and effects that the upper pile section body is the concrete tubular pile and can be used as a protection cylinder of the lower filled pile section during construction; the cost of the steel protection cylinder in the conventional method in the prior art can be saved; a reinforcement cage and concrete of the lower filled pile section stretches into the upper tubular pile by a proper length, so that the upper section and the lower section are combined to be an integrated pile body and are jointly stressed; the composite structure pile foundation is convenient and quick to construct.
Description
Technical field
The invention belongs to the stake technical field in civil engineering, be specifically related to be applicable to the combinative structure pile foundation of karst region and construction method thereof.
Background technology
When karst area construction building thing bored pile foundation, when boring runs into larger solution cavity, the slurry coat method in often holing runs off rapidly and causes the hole that collapses, and causes any property loss and workmen's injures and deaths, the most also schedule delays.For preventing this type of accident from occurring, it is common practice to squeezing into steel pipe casing as enclosed structure when boring is to scar, this steel pile casting is working measure, and permanent structure stress, it is not intended that it, also cannot be taken out after pile, costly.
Summary of the invention
It is an object of the invention to provide a kind of safe and economical combinative structure pile foundation being applicable to karst region.
For reaching above-mentioned purpose, the technical solution used in the present invention is as follows: be applicable to the combinative structure pile foundation of karst region, including epimere stake and hypomere stake, it is characterized in that: epimere stake is concrete tubular pile, hypomere stake is deposited reinforced concrete pile, hypomere stake, through the solution cavity in rock stratum, becomes combinative structure pile foundation in epimere stake is stretched in hypomere stake upper end.
In technique scheme, epimere concrete tubular pile has reinforced concrete pipe pile, prestressed concrete pipe pile.
In technique scheme, epimere concrete tubular pile is positioned in soil layer.
In technique scheme, epimere concrete tubular pile is precast construction, cast-in-place structural.
In technique scheme, hypomere solid pile is boring, punching, manually digging hole filling pile.
It is another object of the present invention to the construction method of a kind of safe and economical combinative structure pile foundation being applicable to karst region.
In order to achieve the above object, technical scheme is as follows: be applicable to the construction method of the combinative structure pile foundation of karst region, it is characterised in that the method comprises the following steps: A, epimere concrete tubular pile of constructing in overlying soil;B, utilize described concrete tubular pile as casing, hypomere deposited reinforced concrete pile of constructing, make described deposited reinforced concrete pile through the solution cavity in rock stratum, and the upper end of described hypomere deposited reinforced concrete pile is stretched in epimere concrete tubular pile.
The present invention compared with prior art has following advantages and effect: epimere pile body is concrete tubular pile, can also serve as the casing of construction hypomere bored concrete pile when construction, save the steel pile casting expense in current conventional method.Hypomere filling pile cage of reinforcement and concrete all stretch into epimere pile tube suitable length, make upper and lower section to be combined into a common stress of overall pile body, easy construction, quick.The effect of steel pile casting is replaced by the present invention with concrete tubular pile, and this concrete tubular pile can be combined into the common stress of permanent structure with the bored concrete pile constructed below again simultaneously, is therefore a kind of economical and practical piling strtucture, and economic benefit will be apparent upon.
Accompanying drawing explanation
Fig. 1 is pile foundation construction schematic flow sheet.
Fig. 2 is pile foundation organigram.
Detailed description of the invention
The present invention is described in further detail below in conjunction with the accompanying drawings.
See Fig. 1, Fig. 2, epimere stake-concrete tubular pile 4 of first constructing in overlying soil 1.The concrete tubular pile that sinking again of can first holing is prefabricated, it would however also be possible to employ cast-in-place method construction concrete tubular pile.Construct again hypomere stake, first carry out boring (rush, dig) hole 5, through the solution cavity 3 in rock stratum 2, after reaching designed elevation, transferring steel reinforcement cage and concrete perfusion, complete the construction of hypomere bored concrete pile 6, two sections of pile foundations have the adapter section 7 of suitable length to be combined as overall common stress.
Epimere concrete tubular pile can be reinforced concrete pipe pile, prestressed concrete pipe pile.Epimere concrete tubular pile is precast construction, cast-in-place structural.Hypomere stake is boring, punching, manually digging hole deposited reinforced concrete pile.
Claims (4)
1. it is applicable to the combinative structure pile foundation of karst region, including epimere stake and hypomere stake, it is characterized in that: epimere stake is concrete tubular pile, hypomere stake is deposited reinforced concrete pile, hypomere stake is through the solution cavity in rock stratum, becoming combinative structure pile foundation in epimere stake is stretched in hypomere stake upper end, upper and lower section of stake is combined into a common stress of overall pile body.
2. according to the combinative structure pile foundation described in claim 1, it is characterised in that: epimere concrete tubular pile is reinforced concrete pipe pile or prestressed concrete pipe pile.
3. according to the combinative structure pile foundation described in claim 1 or 2, it is characterised in that: epimere concrete tubular pile is precast construction or cast-in-place structural.
4. it is applicable to the construction method of the combinative structure pile foundation of karst region, it is characterised in that the method comprises the following steps: A, epimere concrete tubular pile of constructing in overlying soil;B, utilize described epimere concrete tubular pile as casing, construction hypomere deposited reinforced concrete pile, make described hypomere deposited reinforced concrete pile through the solution cavity in rock stratum, and the upper end of described hypomere deposited reinforced concrete pile stretches in epimere concrete tubular pile, epimere concrete tubular pile and hypomere deposited reinforced concrete pile is made to be combined into a common stress of overall pile body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410434541.5A CN104563147B (en) | 2014-08-29 | 2014-08-29 | Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410434541.5A CN104563147B (en) | 2014-08-29 | 2014-08-29 | Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104563147A CN104563147A (en) | 2015-04-29 |
CN104563147B true CN104563147B (en) | 2017-01-11 |
Family
ID=53080159
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410434541.5A Active CN104563147B (en) | 2014-08-29 | 2014-08-29 | Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104563147B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6539566B2 (en) * | 2015-10-29 | 2019-07-03 | 大亜ソイル株式会社 | Construction method of cast-in-place concrete pile |
CN105714772B (en) * | 2016-02-22 | 2018-04-03 | 北龙建设集团有限公司 | Karst area embedded rock pile pore-forming bores concrete dado method again |
CN107339122B (en) * | 2017-08-31 | 2020-02-11 | 徐州中国矿大岩土工程新技术发展有限公司 | Construction method for treating goaf by steel pipe column |
CN107859036B (en) * | 2017-10-26 | 2019-10-11 | 湖北工业大学 | A kind of in-situ deposited prefabricated composite structure stake and its construction method suitable for karst region |
CN109707322B (en) * | 2018-12-08 | 2024-06-21 | 深圳市勘察研究院有限公司 | Karst cave isolation device and karst cave isolation method using same |
CN111335309A (en) * | 2020-04-17 | 2020-06-26 | 浙江省交通规划设计研究院有限公司 | Large-diameter pipe pile, variable-diameter single pile and construction method of variable-diameter single pile |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59126821A (en) * | 1983-01-10 | 1984-07-21 | Aoki Kensetsu:Kk | Erection work of foundation pile |
CN1490467A (en) * | 2003-08-05 | 2004-04-21 | 胡柏英 | Composite friction pile structure and constructing method thereof |
RU2276227C1 (en) * | 2004-09-08 | 2006-05-10 | Ахсар Николаевич Басиев | Method for concrete pile shoe forming |
CN201407051Y (en) * | 2009-04-01 | 2010-02-17 | 中铁二院工程集团有限责任公司 | Karst formation pile hole wall protection structure |
CN102628269B (en) * | 2012-04-27 | 2014-05-07 | 河海大学 | Technical device for reducing negative frictional resistance on driven cast-in-place pile, and application method thereof |
-
2014
- 2014-08-29 CN CN201410434541.5A patent/CN104563147B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104563147A (en) | 2015-04-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104563147B (en) | Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation | |
CN101614125B (en) | Construction method of V-level surrounding rock tunnel | |
CN107859036B (en) | A kind of in-situ deposited prefabricated composite structure stake and its construction method suitable for karst region | |
CN106351670B (en) | A kind of closed pre support tunnel structure | |
CN103758123B (en) | The construction method of manually digging hole filling pile retaining wall lining | |
CN103321244B (en) | Sand foundation existing building sets up the construction method of basement | |
WO2016058275A1 (en) | Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall thereof and manufacturing method thereof | |
CN105696602A (en) | Composite pile-anchor supporting method and structure for deepening excavation | |
CN208702421U (en) | The tunnel support structure of existing pile foundation building is worn under a kind of | |
CN105569051A (en) | Foundation pit support system of sandy pebble boulder geological stratification and construction method | |
CN105649073A (en) | Static root drilling type construction method for planting piles | |
CN203213101U (en) | Embedding grouting combined pile | |
CN101899831B (en) | Active variable-stiffness leveling pile and construction method thereof | |
CN109610473A (en) | A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration | |
CN104131566B (en) | A kind of basement is without the construction method of horizontal support foundation ditch | |
CN203222795U (en) | Manual hole digging pile | |
CN110080779A (en) | Tunnel tunnel bottom karst cave treatment construction method | |
CN204311456U (en) | Foundation ditch strengthening structure | |
CN204186396U (en) | A kind of shield tunnel surrounding formation reinforces channels configuration | |
CN105605335A (en) | Large-caliber prestressed steel cylinder concrete pipe for jacking construction | |
CN203613568U (en) | Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system | |
CN203594023U (en) | Enhanced type long auger drilling pressure-grouting concrete pile | |
CN210658340U (en) | Prefabricated dado | |
CN105002891B (en) | A kind of cast-in-situ bored pile exempts from inter-pile soil excavation construction method | |
CN204401627U (en) | To pull-type prestressed pipe pile pit supporting construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210629 Address after: 13 / F, 525 Jianguo East Road, Huangpu District, Shanghai 200025 Patentee after: SHANGHAI URBAN TRANSPORTATION DESIGN INSTITUTE Co.,Ltd. Address before: 200092 No. two, 901 North Road, Yangpu District, Shanghai, Zhongshan Patentee before: SHANGHAI MUNICIPAL ENGINEERING DESIGN INSTITUTE (Group) Co.,Ltd. |