CN111206596B CN202010143214.XA CN202010143214A CN111206596B CN 111206596 B CN111206596 B CN 111206596B CN 202010143214 A CN202010143214 A CN 202010143214A CN 111206596 B CN111206596 B CN 111206596B
Authority
CN
China
Prior art keywords
rod
sleeve
grouting
anchor
sections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202010143214.XA
Other languages
Chinese (zh)
Other versions
CN111206596A (en
Inventor
顿志元
卢天喜
梁雪
杜鹏
卢丽红
李维娜
华四良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaozuo university
Original Assignee
Jiaozuo university
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaozuo university filed Critical Jiaozuo university
Priority to CN202010143214.XA priority Critical patent/CN111206596B/en
Publication of CN111206596A publication Critical patent/CN111206596A/en
Application granted granted Critical
Publication of CN111206596B publication Critical patent/CN111206596B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a deep foundation pit slope support anchor rod, a support structure and a construction method, wherein the support anchor rod structure comprises an inner core and a sleeve, and the tail part of the inner core is provided with a tray and a lockset; the sleeve is formed by connecting a plurality of sections of barrels, an expansion rod is connected between adjacent barrels, the expansion rod comprises two sections of rod bodies which are hinged with each other, the cross section of each rod body is semicircular, one end of each rod body is an opening end, and the other end of each rod body is a sealing end; the closed ends of the two sections of rod bodies are hinged with each other, the open ends of the rod bodies are hinged with the barrel, and the two sections of rod bodies can be enclosed to form a tubular body after being folded; the barrel is provided with a semicircular notch along the position of the hinged rod body, the outer part of the inner core is provided with a guide frame, and the guide frame is sleeved with the sleeve in a sliding manner. The invention can effectively provide the reliability of deep foundation pit side slope support, and can effectively prevent the side slope from collapsing when the deep foundation pit side slope support is used for loose soil layers.

Description

Deep foundation pit slope support anchor rod, support structure and construction method
Technical Field
The invention relates to a deep foundation pit slope support anchor rod, a support structure and a construction method, and belongs to the technical field of building construction.
Background
In urban construction projects, excavation and supporting work of a foundation pit is often involved, for example, in subway station construction, the depth of the foundation pit is large, the construction range is small, the difficulty of side slope excavation and supporting is large, and the requirement on supporting reliability is high. In the prior art, the concrete row piles and anchor rods are generally combined for supporting. However, under the geological condition of loose soil texture, when the deep foundation pit is supported by the conventional supporting structure, the slope collapse accident may occur due to the huge bearing pressure.
Disclosure of Invention
Aiming at the problems, the invention firstly provides a deep foundation pit slope support anchor rod, and the scheme is that the deep foundation pit slope support anchor rod comprises an inner core and a sleeve, wherein the tail part of the inner core is provided with a tray and a lockset; the sleeve is formed by connecting a plurality of sections of barrels, an expansion rod is connected between adjacent barrels, the expansion rod comprises two sections of rod bodies which are hinged with each other, the cross section of each rod body is semicircular, one end of each rod body is an opening end, and the other end of each rod body is a sealing end; the closed ends of the two sections of rod bodies are hinged with each other, the open ends of the rod bodies are hinged with the barrel, and the two sections of rod bodies can be enclosed to form a tubular body after being folded; the barrel body is provided with a semicircular notch along the position of the hinged rod body, the outer part of the inner core is provided with a guide frame, and the sleeve is sleeved outside the guide frame in a sliding manner; a plurality of radial partition plates are arranged on the outer circumference of the guide frame, and the partition plates and the inner wall of the sleeve enclose to form a primary grouting channel and a secondary grouting channel; the lateral wall of the rod body is provided with a primary grouting opening, the primary grouting opening is communicated with the primary grouting channel, the lateral wall of the barrel body is provided with a secondary grouting opening, and the secondary grouting opening is communicated with the secondary grouting channel.
The invention further provides a deep foundation pit side slope supporting structure which comprises row piles arranged on the outer side of a side slope, anchor rods inserted in soil layers and concrete surface layers arranged along the slope surface of the side slope, wherein the anchor rods adopt the deep foundation pit side slope supporting anchor rods; the anchor rods are connected between the row piles and the concrete surface layer; the expansion rod of the anchor rod is vertically inserted into the soil layer around the sleeve, a high-permeability grouting layer is arranged around the expansion rod, and a low-permeability grouting layer is arranged around the sleeve.
Furthermore, two anchor rods adjacent along the horizontal direction are arranged in a V shape in the horizontal projection plane.
Further, the tray of stock is the diplopore tray, and two adjacent stocks in the horizontal direction are connected with same tray.
Further, the inclination directions of the anchor rods adjacent in the height direction on the horizontal projection plane are opposite.
The invention also provides a deep foundation pit slope support construction method, which uses the deep foundation pit slope support anchor rod and comprises the following steps:
1) punching along the soil layer outside the side slope, and pouring concrete into the soil layer to form a pile;
2) drilling an anchor hole along the slope surface of the side slope, inserting the anchor rod along the anchor hole, extruding a sleeve of the anchor rod, pressing the sleeve along the inner core, expanding the expansion rod outwards at the same time, inserting the expansion rod into a soil layer around the sleeve, injecting high-permeability grouting slurry into the primary grouting channel, and injecting low-permeability grouting slurry into the secondary grouting channel after the completion;
3) and laying a metal net on the slope surface of the side slope, pouring concrete to form a concrete surface layer, and fixing the anchor rod by using the tray and the lock.
Further, the high-permeability grouting material is a solution type grouting material, and the low-permeability grouting material is a cement slurry.
The invention has the advantages that: the invention can effectively provide the reliability of deep foundation pit side slope support, and can effectively prevent the side slope from collapsing when the deep foundation pit side slope support is used for loose soil layers.
Drawings
FIG. 1 is a schematic view of the construction of the anchor of the present invention;
FIG. 2 is a schematic cross-sectional view of a rock bolt of the present invention;
FIG. 3 is a schematic cross-sectional view of the body of an expansion rod of the present invention;
FIG. 4 is a schematic cross-sectional view of a deep foundation pit slope supporting structure according to the present invention;
fig. 5 is a schematic top view of the deep foundation pit slope supporting structure of the present invention.
Detailed Description
Example 1
As shown in fig. 1-3, the deep foundation pit slope support anchor rod of the embodiment comprises an inner core 1 and a sleeve 2, wherein a tray 3 and a lock 4 are arranged at the tail part of the inner core; the sleeve is formed by connecting a plurality of sections of barrels, 4 sections of barrels are shown in fig. 1, an expansion rod 5 is connected between adjacent barrels, the expansion rod comprises two sections of rod bodies hinged to each other, as shown in fig. 3, the cross section of each rod body is semicircular, one end of each rod body is an open end 501, and the other end of each rod body is a closed end 502; the sealing ends of the two sections of rod bodies are hinged with each other, the opening ends of the rod bodies are hinged with the barrel body, the two sections of rod bodies can be closed to form a tubular body after being closed, the diameter of the closed tubular body can be selected to be 1/4-1/6 of the diameter of the barrel body, in addition, as shown in figure 2, each two adjacent sections of barrel bodies are connected with 3 expansion rods 5, and the 3 expansion rods 5 are distributed around the outer circumference of the barrel body at equal intervals; the barrel body is provided with a semicircular notch along the position of the hinged rod body, the outer part of the inner core 1 is provided with a guide frame 6, and the sleeve is sleeved outside the guide frame 6 in a sliding manner; a plurality of radial partition plates 7 are arranged on the outer circumference of the guide frame 6, and the partition plates and the inner wall of the sleeve enclose to form a primary grouting channel 8 and a secondary grouting channel 9; the lateral wall of the rod body is provided with a primary grouting opening 10, the primary grouting opening 10 is communicated with a primary grouting channel 8, the lateral wall of the barrel body is provided with a secondary grouting opening 11, and the secondary grouting opening 11 is communicated with a secondary grouting channel 9. The principle of this scheme is, through flexible multistage barrel, can realize that the expansion pole opens and shuts, the expansion pole with fold back, constitute the tubulose, the tubulose realizes through the breach on the barrel that corresponds with a slip casting mouth and a slip casting passageway's intercommunication.
Example 2
As shown in fig. 4, the deep foundation pit slope supporting structure of this embodiment includes row piles 12 arranged outside the slope, anchor rods 13 inserted into the soil layer, and a concrete surface layer 14 arranged along the slope surface of the slope, where the anchor rods are the deep foundation pit slope supporting anchor rods of embodiment 1; the anchor rods are connected between the row piles 12 and the concrete surface layer 14; the expansion rod 5 of the anchor rod is vertically inserted into the soil layer around the sleeve, a high-permeability grouting layer 15 is arranged around the expansion rod 5, and a low-permeability grouting layer 16 is arranged around the sleeve. Wherein, the expansion rod 5 is vertically inserted into the soil layer around the sleeve, so that the bonding strength of the anchor rod and the soil layer can be improved. In addition, the high-permeability grouting layer around the expansion rod can bond and solidify the soil layer around the anchor rod, and particularly for loose soil layers, the high-permeability grouting material is combined with the structure of the expansion rod, so that the soil layer in a large range can be solidified, and the flowability of the loose soil layer is effectively reduced.
As an improvement of the scheme, two anchor rods 13 adjacent along the horizontal direction are arranged in a V shape on the horizontal projection surface. That is, the anchors in the same horizontal direction are finally arranged in the horizontal projection plane to form a W shape. Gaps exist among pile bodies of the row piles, and in loose soil layers, the pile bodies cannot block the soil layers among the gaps. The W-shaped arrangement is adopted, and the anchor rods form a net structure, so that soil layers between gaps of the pile bodies can be solidified.
In addition, corresponding to the scheme, the trays of the anchor rods are double-hole trays, and two anchor rods adjacent in the horizontal direction are connected with the same tray 3.
On the basis of the improved scheme, the inclination directions of the anchor rods adjacent in the height direction on the horizontal projection plane are opposite. As shown in fig. 5, the upper layer anchor rods 18 and the lower layer anchor rods 17 form a staggered three-dimensional net structure, so that the curing effect on loose soil layers is further improved.
Example 3
The invention also provides a deep foundation pit slope support construction method, which uses the deep foundation pit slope support anchor rod of the embodiment 1 and comprises the following steps:
1) punching holes along the soil layer on the outer side of the side slope, pouring concrete and arranging piles, wherein the pile body gaps of the arranged piles are implemented according to conventional technical parameters;
2) drilling an anchor hole along the slope surface of the side slope, inserting the anchor rod along the anchor hole, extruding a sleeve of the anchor rod, pressing the sleeve along the inner core, expanding the expansion rod outwards at the same time, inserting the expansion rod into a soil layer around the sleeve, injecting high-permeability grouting slurry into the primary grouting channel, and injecting low-permeability grouting slurry into the secondary grouting channel after the completion; when drilling anchor holes, the drilling direction of the anchor holes can correspond to the anchor rod distribution mode of embodiment 2.
3) And laying a metal net on the slope surface of the side slope, pouring concrete to form a concrete surface layer, and fixing the anchor rod by using the tray and the lock.
Wherein the high-permeability grouting material is a solution type grouting material, such as epoxy resin grouting material. The low-permeability grouting slurry is a conventional cement slurry.

Claims (3)

1. The utility model provides a deep basal pit side slope supporting construction, including the campshed of locating the side slope outside, insert the stock in the soil layer and along the domatic concrete surface course that sets up of side slope, its characterized in that: the tail part of the inner core is provided with a tray and a lockset; the sleeve is formed by connecting a plurality of sections of barrels, an expansion rod is connected between adjacent barrels, the expansion rod comprises two sections of rod bodies which are hinged with each other, the cross section of each rod body is semicircular, one end of each rod body is an opening end, and the other end of each rod body is a sealing end; the closed ends of the two sections of rod bodies are hinged with each other, the open ends of the rod bodies are hinged with the barrel, and the two sections of rod bodies can be enclosed to form a tubular body after being folded; the barrel body is provided with a semicircular notch along the position of the hinged rod body, the outer part of the inner core is provided with a guide frame, and the sleeve is sleeved outside the guide frame in a sliding manner; a plurality of radial partition plates are arranged on the outer circumference of the guide frame, and the partition plates and the inner wall of the sleeve enclose to form a primary grouting channel and a secondary grouting channel; the side wall of the rod body is provided with a primary grouting opening which is communicated with the primary grouting channel, the side wall of the barrel body is provided with a secondary grouting opening which is communicated with the secondary grouting channel;
the anchor rods are connected between the row piles and the concrete surface layer; the expansion rod of the anchor rod is vertically inserted into the soil layer around the sleeve, a high-permeability grouting layer is arranged around the expansion rod, and a low-permeability grouting layer is arranged around the sleeve; two anchor rods adjacent along the horizontal direction are arranged in a V shape on the horizontal projection surface; the trays of the anchor rods are double-hole trays, and two anchor rods adjacent in the horizontal direction are connected with the same tray; the inclination directions of the anchor rods adjacent in the height direction on the horizontal projection plane are opposite.
2. A deep foundation pit slope support construction method using the anchor rod as claimed in claim 1, characterized by comprising the steps of:
1) punching along the soil layer outside the side slope, and pouring concrete into the soil layer to form a pile;
2) drilling an anchor hole along the slope surface of the side slope, inserting the anchor rod along the anchor hole, extruding a sleeve of the anchor rod, pressing the sleeve along the inner core, expanding the expansion rod outwards at the same time, inserting the expansion rod into a soil layer around the sleeve, injecting high-permeability grouting slurry into the primary grouting channel, and injecting low-permeability grouting slurry into the secondary grouting channel after the completion;
3) and laying a metal net on the slope surface of the side slope, pouring concrete to form a concrete surface layer, and fixing the anchor rod by using the tray and the lock.
3. The deep foundation pit slope support construction method according to claim 2, characterized in that: the high-permeability grouting material is a solution type grouting material, and the low-permeability grouting material is a cement slurry.
CN202010143214.XA 2020-03-04 2020-03-04 Deep foundation pit slope support anchor rod, support structure and construction method Expired - Fee Related CN111206596B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010143214.XA CN111206596B (en) 2020-03-04 2020-03-04 Deep foundation pit slope support anchor rod, support structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010143214.XA CN111206596B (en) 2020-03-04 2020-03-04 Deep foundation pit slope support anchor rod, support structure and construction method

Publications (2)

Publication Number Publication Date
CN111206596A CN111206596A (en) 2020-05-29
CN111206596B true CN111206596B (en) 2021-04-09

Family

ID=70785859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010143214.XA Expired - Fee Related CN111206596B (en) 2020-03-04 2020-03-04 Deep foundation pit slope support anchor rod, support structure and construction method

Country Status (1)

Country Link
CN (1) CN111206596B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827259B (en) * 2020-07-29 2022-04-22 重庆交通大学 Grouting pipe reinforcing and grouting structure and construction method thereof
CN113668574B (en) * 2021-08-31 2022-05-17 安徽农业大学 Slope supporting device and slope supporting method
CN117005428B (en) * 2023-06-08 2024-01-30 西南交通大学 Slope reinforcement structure, construction method and anchor cable size determining method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001077493A1 (en) * 2000-04-10 2001-10-18 Bfp Technologies Pty Ltd. Rock bolt and method of manufacture and installation
CN106320346A (en) * 2016-08-24 2017-01-11 陕西建工第六建设集团有限公司 Construction method for supporting deep foundation pit through grouting after pile arrangement and anchor cable mounting
CN207131339U (en) * 2017-06-26 2018-03-23 深圳宏业基岩土科技股份有限公司 The reaming bit of Soft Soil Layer anchor bolt construction
CN208899492U (en) * 2018-07-25 2019-05-24 江苏铭城建筑设计院有限公司 Composite supporting construction for soft soil foundation pit

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001077493A1 (en) * 2000-04-10 2001-10-18 Bfp Technologies Pty Ltd. Rock bolt and method of manufacture and installation
CN106320346A (en) * 2016-08-24 2017-01-11 陕西建工第六建设集团有限公司 Construction method for supporting deep foundation pit through grouting after pile arrangement and anchor cable mounting
CN207131339U (en) * 2017-06-26 2018-03-23 深圳宏业基岩土科技股份有限公司 The reaming bit of Soft Soil Layer anchor bolt construction
CN208899492U (en) * 2018-07-25 2019-05-24 江苏铭城建筑设计院有限公司 Composite supporting construction for soft soil foundation pit

Also Published As

Publication number Publication date
CN111206596A (en) 2020-05-29

Similar Documents

Publication Publication Date Title
CN111206596B (en) Deep foundation pit slope support anchor rod, support structure and construction method
CN102493437B (en) Grouting-type micro steel pipe pile and grouting reinforcement method
CN100434597C (en) Construction method of immersed tube club-footed bored concrete pile
CN104452749B (en) The constructional method of a kind of reinforced concrete cast-in-situ pile tube
CN104074186B (en) The casing device of pore-forming and construction method thereof in a kind of building lot
CN108716216B (en) Long spiral drilling pressure-grouting pile forming construction method and auxiliary reinforcing device thereof
CN107268604B (en) Construction system and construction method of hollow precast pile
EP2700750B1 (en) Foundation pile for offshore structures and method for constructing a foundation pile for offshore structures
CN104563147B (en) Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation
CN103233464A (en) Manual hole digging pile and construction method thereof
CN105649073A (en) Static root drilling type construction method for planting piles
CN105672255A (en) Double pile casing construction method for controlling perpendicularity
CN102635110B (en) Construction method for concrete pile
CN109024562A (en) A kind of long prefabricated tubular pile of major diameter and its construction method of classification propulsion
CN203222795U (en) Manual hole digging pile
CN105369799A (en) Concrete precast pile of precast pile underground diaphragm wall and construction method of precast pile underground diaphragm wall
CN108411904B (en) Reinforced concrete cloth bag pile structure for local filling of large karst stratum and process
CN212563239U (en) Tunnel bottom composite reinforcing structure for penetrating through large-scale full-filling karst cave
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
US6749372B2 (en) Underground shell-pile continuous wall job practice and its special drill
CN101649611A (en) Wing-added hole-expanding pile and wing-added hole expander
CN112855225A (en) High-safety soft rock tunnel support construction method
CN201406687Y (en) Deep foundation pit supporting structure
KR101951684B1 (en) Expandable cast-in-place pile construction method
CN209025070U (en) A kind of long prefabricated tubular pile of major diameter that classification promotes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210409

CF01 Termination of patent right due to non-payment of annual fee