CN104453131A - Building external wall heat insulation coating construction process - Google Patents

Building external wall heat insulation coating construction process Download PDF

Info

Publication number
CN104453131A
CN104453131A CN201310439198.9A CN201310439198A CN104453131A CN 104453131 A CN104453131 A CN 104453131A CN 201310439198 A CN201310439198 A CN 201310439198A CN 104453131 A CN104453131 A CN 104453131A
Authority
CN
China
Prior art keywords
coating
brushing
heat insulation
putty
brush
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310439198.9A
Other languages
Chinese (zh)
Inventor
李继升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Shousheng Industrial Co Ltd
Original Assignee
Qingdao Shousheng Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Shousheng Industrial Co Ltd filed Critical Qingdao Shousheng Industrial Co Ltd
Priority to CN201310439198.9A priority Critical patent/CN104453131A/en
Publication of CN104453131A publication Critical patent/CN104453131A/en
Pending legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a building external wall heat insulation coating construction process. The building external wall heat insulation coating construction process comprises the steps of base layer repair, sweeping treatment, putty bottoming and leveling, grinding, primer sealing, first-time coating construction, second-time coating repair construction, checkout and acceptance inspection and coating cleaning. First-time primer for sealing is firstly coated on a clean base layer in a rolling mode, the bonding force between the primer and the base layer is increased, and floating alkali is prevented. A combination brush pen is used for brushing of a second-time heat insulation coating, multiple workers are coordinated with line production, and the surface is more attractive, fine and smooth through mutual linkage.

Description

Insulating mould coating exposed wall of building construction technology
 
Technical field
The invention belongs to construction technology, be specifically related to a kind of insulating mould coating exposed wall of building construction technology.
 
Background technology
Insulating moulding coating is widely used in modern architecture industry, and from insulating moulding coating in the consistent performance of building trade, this coating will become one of most important material of future architecture industry.Insulating moulding coating has proved to have good effect of heat insulation, the heat that effectively can reduce outdoor sunshine is delivered to indoor, decrease the consumption of family to electric energy, promoting insulating moulding coating is also the Important Action that national energy-saving reduces discharging, insulating moulding coating will play best effect of heat insulation, current insulating mould coating exposed wall of building construction rough surface, form is dull.
 
Summary of the invention
In order to overcome the above-mentioned defect that prior art field exists, the object of the invention is to, provide a kind of insulating mould coating exposed wall of building construction technology, surface aesthetic is fine and smooth.
Insulating mould coating exposed wall of building construction technology provided by the invention, technological process is as follows:
A, repairing: before applying, adopt 1:3 cement mortar or polymer cement mortar to repair for the defect such as losing fangle place, hole of matrix;
B, cleaning: dust, powder use the cleaning of broom, hairbrush, grease uses neutral detergent cleaning, the removings such as mortar shovel, scraper, and mould is dried with clear water rinsing;
C, putty bottoming are levelling: repair irregular phenomenon, and prevent pore and the crack on surface, putty will easily criticize easy polishing, also should possess good intensity and persistence, carrying out filling up, local Puttying construction appropriate to the occasion thin batch and unsuitable thick brush;
D, polishing: polish to surfacing, degree of roughness consistent with emery cloth, texture texture is even;
E, bottom closing paint: roller coating bottom closing paint in clean basic unit;
The brushing of f, first pass insulating moulding coating: large area metope adopts the brushing of plush roller, the lines of outstanding metope
Adopt spread pen and painting brush brushing, substrate surface moisture content must not be greater than 8%;
The brushing of g, second time insulating moulding coating: use spread pen brushing, during large area brushing, many people coordinate continuous productive process, overlap, and from inconspicuous one, brush in proper order gradually to other end, to unobtrusively brush is received at place;
H, to inspect for acceptance: the wall covering after completing is checked thoroughly, emphasis negative and positive angle and door and window hole errorless after to apply for checking and examination receipts;
I, coating are cleared up: the material that coating all in floor and protection adopt is cleaned out scene in time and cleared up by the coating of omission.
Insulating mould coating exposed wall of building construction technology provided by the invention, its beneficial effect is, in clean basic unit, first roller coating bottom closing paint, adds the adhesion with basic unit, prevent floating alkali.Second time insulating moulding coating brushing uses spread pen brushing, and many people coordinate continuous productive process, overlap and make surface exquisiteness more attractive in appearance.
 
Detailed description of the invention
Below in conjunction with an embodiment, insulating mould coating exposed wall of building construction technology provided by the invention is described in detail.
 
Embodiment
A, repairing
1:3 cement mortar or polymer cement mortar is adopted to repair for the defect such as losing fangle place, hole of matrix before applying.Be specific practice below: hollowing---hollowing position is all rooted out, cleans out, again do basic unit and repair;
Gap---fine cracks adopts putty to carry out repairing (require during repairing thin batch and unsuitable thick brush), ties after dry with sand paper; For large crack, location of cracks can be cut a hole into " V " font gap, pointing 1:2.5 cement mortar after cleaning is clean, smears putty after dry and uses sand papering smooth again;
Hole---the hole of below 3mm below substrate surface, adopts polymer cement putty to carry out levelling, and the hole being greater than 3mm adopts cement mortar to carry out repairing and after dry, smear putty use sand papering smooth again.
In addition for new cement mortar surface, when brushing as being badly in need of, the zinc sulfate of 15%-20% concentration or burnett's solution can be adopted to be painted on cement mortar substrate surface for several times, the powder that rear removing surface to be dried is separated out and floating sand can be brushed.
B, cleaning
Dust, powder can use broom, hairbrush to clean, and grease uses neutral detergent cleaning, and mortar shovels, scrapes
The removings such as cutter, mould clear water rinsing is dried.
C, putty bottoming are levelling
Main purpose is to repair irregular phenomenon, prevents pore and the crack on surface.The requirement of putty, except easily criticizing easily polishing, also should possess good intensity and persistence, carrying out filling up, local Puttying construction time requirement, should thin batch and unsuitable thick brush.Construction technology during Puttying is as follows:
1. the gradient of instrument during blade coating is grasped, firmly evenly, to ensure that putty is full;
2. excessive for avoiding putty to shrink, occur cracking and come off, one time blade coating is not blocked up, and according to the feature of different putty, thickness is advisable with 0.5mm.Not do not come and go blade coating too much, in order to avoid occur that volume skin comes off or the sizing material in putty extruded to seal surface not easily dry;
3. fill out with putty knife and will fill up, tamp, when there are hole and a crack in basic unit, forefinger compresses blade, firmly putty is compressed into defect, is received by the putty of surrounding to scrape clean, makes the vestige minimizing as far as possible of putty.
D, polishing
Polish with emery cloth and accomplish surfacing, degree of roughness unanimously, texture texture is even.This procedure calls rechecking, polishing are until when surperficial perception is consistent.
1. can not wet-milling, polishing must be carried out after basic unit or putty drying, in order to avoid adhere to sand paper impact operation;
2. the thickness of sand paper will be determined according to by the hardness on mill surface, and sand paper is thick can produce sand trace, affects the final decorative effect of coating;
3. sand paper (cloth) should wrap on polishing cushion block by manual grinding, back and forth enforces, and only can not press against sand papering with one or two finger, with the planeness of rabbit impact polishing;
4. note the planarization on surface during polishing, putty carries out equating more if desired, thus it is consistent to reach degree of roughness;
5. for air spots, by projection with evening out, then can fill up with putty, polishing with sand paper again after waiting drying;
6., after polishing, remove surface dirt immediately, be beneficial to the construction of next process.
E, bottom closing paint
In clean basic unit, first roller coating bottom closing paint, increases the adhesion with basic unit, prevents floating alkali.
The brushing of f, first pass insulating moulding coating
Large area metope adopts the brushing of plush roller without exception, and the lines of outstanding metope then adopt spread pen and painting brush brushing,
Require that substrate surface moisture content must not be greater than 8%, as met strong wind, rain, mist must not carry out applying of investment precoat when waiting until weather.
The brushing of g, second time insulating moulding coating
Second time insulating moulding coating brushing order is identical with first pass with method, requires surface exquisiteness more attractive in appearance, must use spread pen brushing, many people should coordinate continuous productive process, overlap during large area brushing.Generally from inconspicuous one, brush in proper order to other end gradually, to unobtrusively brush is received at place, must not occur connecing stranding and brush line, if spread pen adhesion should be picked on the wall in time.
H, to inspect for acceptance
Wall covering after completing is checked thoroughly, emphasis negative and positive angle and door and window hole errorless after to apply for checking and examination receipts.
I, coating are cleared up
The material that coating all in floor and protection adopt is cleaned out scene in time and the coating of omission is carried out cleaning and carries out on-the-spot civilized construction.

Claims (1)

1. an insulating mould coating exposed wall of building construction technology, is characterized in that, technological process is as follows:
A, repairing: before applying, adopt 1:3 cement mortar or polymer cement mortar to repair for the defect such as losing fangle place, hole of matrix;
B, cleaning: dust, powder use the cleaning of broom, hairbrush, grease uses neutral detergent cleaning, the removings such as mortar shovel, scraper, and mould is dried with clear water rinsing;
C, putty bottoming are levelling: repair irregular phenomenon, and prevent pore and the crack on surface, putty will easily criticize easy polishing, also should possess good intensity and persistence, carrying out filling up, local Puttying construction appropriate to the occasion thin batch and unsuitable thick brush;
D, polishing: polish to surfacing, degree of roughness consistent with emery cloth, texture texture is even;
E, bottom closing paint: roller coating bottom closing paint in clean basic unit;
The brushing of f, first pass insulating moulding coating: large area metope adopts the brushing of plush roller, the lines of outstanding metope adopt spread pen and painting brush brushing, and substrate surface moisture content must not be greater than 8%;
The brushing of g, second time insulating moulding coating: use spread pen brushing, during large area brushing, many people coordinate continuous productive process, overlap, and from inconspicuous one, brush in proper order gradually to other end, to unobtrusively brush is received at place;
H, to inspect for acceptance: the wall covering after completing is checked thoroughly, emphasis negative and positive angle and door and window hole errorless after to apply for checking and examination receipts;
I, coating are cleared up: the material that coating all in floor and protection adopt is cleaned out scene in time and cleared up by the coating of omission.
CN201310439198.9A 2013-09-25 2013-09-25 Building external wall heat insulation coating construction process Pending CN104453131A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310439198.9A CN104453131A (en) 2013-09-25 2013-09-25 Building external wall heat insulation coating construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310439198.9A CN104453131A (en) 2013-09-25 2013-09-25 Building external wall heat insulation coating construction process

Publications (1)

Publication Number Publication Date
CN104453131A true CN104453131A (en) 2015-03-25

Family

ID=52899821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310439198.9A Pending CN104453131A (en) 2013-09-25 2013-09-25 Building external wall heat insulation coating construction process

Country Status (1)

Country Link
CN (1) CN104453131A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109594748A (en) * 2018-11-14 2019-04-09 四川伟才高新材料有限公司 Reflective heat-insulation paint and its construction technology
CN111677280A (en) * 2020-03-13 2020-09-18 福清市景士兰涂料有限公司 Construction method of exterior wall coating
CN114352055A (en) * 2021-12-23 2022-04-15 上海建工集团股份有限公司 Construction process for renovating paint on old wall
CN114673313A (en) * 2022-03-23 2022-06-28 中恒创兴建设有限公司 Method for decorating and decorating inner wall surface of building
CN114934644A (en) * 2022-06-10 2022-08-23 徐州腾美建筑装饰工程有限公司 5M construction process for building exterior wall decorative coating

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109594748A (en) * 2018-11-14 2019-04-09 四川伟才高新材料有限公司 Reflective heat-insulation paint and its construction technology
CN111677280A (en) * 2020-03-13 2020-09-18 福清市景士兰涂料有限公司 Construction method of exterior wall coating
CN114352055A (en) * 2021-12-23 2022-04-15 上海建工集团股份有限公司 Construction process for renovating paint on old wall
CN114673313A (en) * 2022-03-23 2022-06-28 中恒创兴建设有限公司 Method for decorating and decorating inner wall surface of building
CN114934644A (en) * 2022-06-10 2022-08-23 徐州腾美建筑装饰工程有限公司 5M construction process for building exterior wall decorative coating

Similar Documents

Publication Publication Date Title
CN104775575B (en) Real stone paint construction process
CN103572845B (en) A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof
CN101832015B (en) Construction process for outer wall metal fluorocarbon coating
CN104453131A (en) Building external wall heat insulation coating construction process
CN107044196A (en) A kind of concrete is plastered face emulsion paint brushing technique
CN109025356A (en) A kind of exterior wall retrofit coating process
CN101935196A (en) Putty for building external wall
CN101168988A (en) Construction method for water-based texture wallpaper paint and special-purpose tool for the same
CN103952052A (en) Travertine-like elastic texture coating and preparation method thereof
CN106592899A (en) Construction method of inner wall
CN100560667C (en) Marble paint for building, making method and construction technology thereof
CN112681643A (en) Construction method for washing stone on outer wall surface
CN104386950A (en) Exterior wall brick-imitating elastic texture coating and application process thereof
CN106760285A (en) The technique coated to indoor wall using putty in furniture factory building
CN113152814A (en) Construction method for spraying stone-like paint on outer wall
CN105298045B (en) A kind of interior wall diatom ooze coating and its painting method
CN109424135A (en) The technique that the putty of metope in building is coated
CN106869428A (en) A kind of heat insulating reflecting colored mortar construction technology
CN109555316A (en) Environment protection architecture construction method
CN114352055A (en) Construction process for renovating paint on old wall
CN109594748A (en) Reflective heat-insulation paint and its construction technology
CN107620434A (en) The technique coated in furniture factory building using putty to indoor wall
CN112576010A (en) Construction method of outer wall surface of bark texture coating
CN109750807B (en) Sandstone wall surface and construction method thereof
CN113417417A (en) Old-imitation red brick veneer structure and construction process thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150325