CN109555316A - Environment protection architecture construction method - Google Patents
Environment protection architecture construction method Download PDFInfo
- Publication number
- CN109555316A CN109555316A CN201811351202.5A CN201811351202A CN109555316A CN 109555316 A CN109555316 A CN 109555316A CN 201811351202 A CN201811351202 A CN 201811351202A CN 109555316 A CN109555316 A CN 109555316A
- Authority
- CN
- China
- Prior art keywords
- metope
- wall surface
- treated
- mortar
- putty
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Application Of Or Painting With Fluid Materials (AREA)
- Finishing Walls (AREA)
Abstract
The invention discloses environment protection architecture construction methods, include the following steps step 1, preparation of construction: a. tool prepares, including degumming agent, scraper plate, sand paper, bandage, guiding ruler, clearance gauge, angle grinder, land plaster, latex solution, cellulose aqueous solution etc.;Step 2, wall surface leveling: a. to step 1 treated metope does corner protector, corner protector 1:2 cement mortar, mortar slightly receive it is dry after smear into fillet with smoothing out with the fingers angle device;Step 3, metope cleans: a. is to pasting one layer of glass grid cloth or silk item at step 2 treated gap;Step 4, wall plaster: a. first sprays one of glue or varnish back cover to the inner wall surface in step 3;Step 5, sprayed coating wall surface spraying: is carried out with spray gun to step 4 treated metope.By the construction techniques of multi-step in the present invention, the buildings waterproof effect after making construction is improved, while the flat and smooth degree in inner wall of building face being made to be improved, to guarantee the normal use of building.
Description
Technical field
The present invention relates to technical field of building construction more particularly to environment protection architecture construction methods.
Background technique
Sponge city is a kind of urban construction new concept that country proposes.National house and town and country construction portion are required to 2020
The area in south, 20% or more completed region of the city reaches target call, and the area to 80% or more the year two thousand thirty reaches target call.
It can thus be seen that country improve resident living environment and Urban Water Environment there is an urgent need to sponge city requirement city is under
Have the function of infiltration, stagnant, storage, net, use, row when rain.It is key point for the problem of saving after rainwater-collecting, it is effective to guarantee
Saving for rainwater avoids effect of the water resource waste in sponge city extremely important.
But construction techniques is relatively simple in existing sponge city, the buildings waterproof effect after construction is poor, together
When inner wall of building face flat and smooth degree it is lower, thus influence building normal use.
Summary of the invention
1. technical problems to be solved
The purpose of the present invention is to solve construction techniques in sponge city in the prior art is relatively simple, after construction
Buildings waterproof effect it is poor, while the lower problem of the flat and smooth degree in inner wall of building face, and the environment protection architecture construction party proposed
Method.
2. technical solution
To achieve the goals above, present invention employs following technical solutions:
Environment protection architecture construction method, includes the following steps:
Step 1, preparation of construction:
A. tool prepare, including degumming agent, scraper plate, sand paper, bandage, guiding ruler, clearance gauge, angle grinder, land plaster, latex solution,
Cellulose aqueous solution etc. hang vertical according to the smooth vertical case of substrate surface;
B. substrate surface is thoroughly scrubbed, is washed;
C. the base after scrubbing is carried out smearing bedding mortar, bottom is uniformly plated in using cement mixed mortar, with ruler school
Rough hair face is scraped in direct join;
Step 2, wall surface leveling:
A. to step 1 treated metope does corner protector, corner protector 1:2 cement mortar, mortar slightly receive it is dry after smeared with smoothing out with the fingers angle device
At fillet;
B. to step 1 treated metope float coat mortar, surface layer mortar is laid using 1:2:4 cement mortar, is then used
Gently trowel smears out flat and smooth surface to trowel;
C. inner wall surface is handled, will be filled and led up at gap and uneven with gypsum putty, and tamp floating with putty,
It is polished after putty is dry with sand paper or angle grinder, and floating dust is swept only in time, as mended with putty again there are also at uneven
It is flat;
Step 3, metope cleans:
A. to one layer of glass grid cloth or silk item is pasted at step 2 treated gap, cloth is sticked to crack with lotion
On, cloth should be straightened in when stick, it is flat to paste;
B. to step 2, treated that inner wall surface is further handled, and applies degumming agent thorough at the greasy dirt adhered to
Bottom is removed, then clean with scour without sediment motion;
C. the metope in step 2 is checked, it is ensured that metope substantially dry;
Step 4, wall plaster:
A. one of glue or varnish back cover first sprayed to the inner wall surface in step 3, when spray uniformly must not should have omission, glue
Mixing ratio by weight is clear water: latex=3:1, then using the gypsum putty in step 3 to step 3 treated inner wall surface into
Row painting first pass putty;
B. after step 3, treated after metope is completely dried, and polishes flat to inner wall surface, then carries out painting second
All over putty, room short side direction is parallel to big plate and carries out granted full, thickness are as follows: 3~4mm, to the gypsum putty 6~7 in step 3
At it is dry when, press polish is carried out to inner cavity surface with rubber flap and is had a shave, keeps inner wall surface surface layer smooth bright and clean, lines is straight, color is uniform
Unanimously, firmly answer it is light and even, and must not worn out paint film, surface is cleaned up after mill;
Step 5, wall surface spraying;
Sprayed coating carried out with spray gun to step 4 treated metope, specking is uniform when spraying, and moving distance is all suitable
In, when spraying since inconspicuous one, gradually moved in proper order to other end, until unobtrusively brush is received at place, there is not allowed that
Connect raft.
Preferably, it in the step 1, after being scrubbed to substrate surface, and spills clear water and keeps 1 hour or more wet.
Preferably, the ratio of cement mixed mortar is 1:2:3 in the step 1.
Preferably, described, gypsum putty proportion is land plaster: latex solution: cellulose aqueous solution=80:55 in step 2:
70。
Preferably, in the step 3, base's moisture content is not greater than 5%.
Preferably, in the step 4, wall edge direction should be parallel to when painting first pass putty and is successively constructed, thickness
Are as follows: 6~7mm, as wall once brush cannot from it is upper on earth when, should at many levels up and down simultaneously operation.
Preferably, the pressure of spray gun are as follows: 0.6~0.7N/mm2, and nozzle and facing are in 90 °, distance are as follows: 850px.
3. beneficial effect
Compared with the prior art, the present invention has the advantages that
In the present invention, by the construction techniques of multi-step, the buildings waterproof effect after making construction is improved, together
When so that the flat and smooth degree in inner wall of building face is improved, thus guarantee building normal use.
Specific embodiment
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation
Example is only a part of the embodiment of the present invention, instead of all the embodiments.
Embodiment 1:
Environment protection architecture construction method, includes the following steps:
Step 1, preparation of construction:
A. tool prepare, including degumming agent, scraper plate, sand paper, bandage, guiding ruler, clearance gauge, angle grinder, land plaster, latex solution,
Cellulose aqueous solution etc. hang vertical according to the smooth vertical case of substrate surface;
B. substrate surface is thoroughly scrubbed, is washed, after being scrubbed to substrate surface, and spilt clear water and keep wet 1
Hour or more;
C. the base after scrubbing is carried out smearing bedding mortar, bottom is uniformly plated in using cement mixed mortar, with ruler school
Rough hair face is scraped in direct join;
Step 2, wall surface leveling:
A. to step 1 treated metope does corner protector, corner protector 1:2 cement mortar, mortar slightly receive it is dry after smeared with smoothing out with the fingers angle device
At fillet;
B. to step 1 treated metope float coat mortar, surface layer mortar is laid using 1:2:4 cement mortar, is then used
Gently trowel smears out flat and smooth surface to trowel;
C. inner wall surface is handled, will be filled and led up at gap and uneven with gypsum putty, and tamp floating with putty,
It is polished after putty is dry with sand paper or angle grinder, and floating dust is swept only in time, as mended with putty again there are also at uneven
It is flat;
Step 3, metope cleans:
A. to one layer of glass grid cloth or silk item is pasted at step 2 treated gap, cloth is sticked to crack with lotion
On, cloth should be straightened in when stick, it is flat to paste;
B. to step 2, treated that inner wall surface is further handled, and applies degumming agent thorough at the greasy dirt adhered to
Bottom is removed, then clean with scour without sediment motion;
C. the metope in step 2 is checked, it is ensured that metope substantially dry;
Step 4, wall plaster:
A. one of glue or varnish back cover first sprayed to the inner wall surface in step 3, when spray uniformly must not should have omission, glue
Mixing ratio by weight is clear water: latex=3:1, then using the gypsum putty in step 3 to step 3 treated inner wall surface into
Row painting first pass putty;
B. after step 3, treated after metope is completely dried, and polishes flat to inner wall surface, then carries out painting second
All over putty, room short side direction is parallel to big plate and carries out granted full, thickness are as follows: 3~4mm, to the gypsum putty 6~7 in step 3
At it is dry when, press polish is carried out to inner cavity surface with rubber flap and is had a shave, keeps inner wall surface surface layer smooth bright and clean, lines is straight, color is uniform
Unanimously, firmly answer it is light and even, and must not worn out paint film, surface is cleaned up after mill;
Step 5, wall surface spraying;
Sprayed coating carried out with spray gun to step 4 treated metope, specking is uniform when spraying, and moving distance is all suitable
In, when spraying since inconspicuous one, gradually moved in proper order to other end, until unobtrusively brush is received at place, there is not allowed that
Connect raft.
Embodiment 2
Environment protection architecture construction method, includes the following steps:
Step 1, preparation of construction:
A. tool prepare, including degumming agent, scraper plate, sand paper, bandage, guiding ruler, clearance gauge, angle grinder, land plaster, latex solution,
Cellulose aqueous solution etc. hang vertical according to the smooth vertical case of substrate surface;
B. substrate surface is thoroughly scrubbed, is washed, after being scrubbed to substrate surface, and spilt clear water and keep wet 1
Hour or more;
C. the base after scrubbing is carried out smearing bedding mortar, bottom is uniformly plated in using cement mixed mortar, with ruler school
Rough hair face is scraped in direct join, and the ratio of cement mixed mortar is 1:2:3;
Step 2, wall surface leveling:
A. to step 1 treated metope does corner protector, corner protector 1:2 cement mortar, mortar slightly receive it is dry after smeared with smoothing out with the fingers angle device
At fillet;
B. to step 1 treated metope float coat mortar, surface layer mortar is laid using 1:2:4 cement mortar, is then used
Gently trowel smears out flat and smooth surface to trowel;
C. inner wall surface is handled, will be filled and led up at gap and uneven with gypsum putty, and tamp floating with putty,
It is polished after putty is dry with sand paper or angle grinder, and floating dust is swept only in time, as mended with putty again there are also at uneven
It is flat;
Step 3, metope cleans:
A. to one layer of glass grid cloth or silk item is pasted at step 2 treated gap, cloth is sticked to crack with lotion
On, cloth should be straightened in when stick, it is flat to paste;
B. to step 2, treated that inner wall surface is further handled, and applies degumming agent thorough at the greasy dirt adhered to
Bottom is removed, then clean with scour without sediment motion;
C. the metope in step 2 is checked, it is ensured that metope substantially dry;
Step 4, wall plaster:
A. one of glue or varnish back cover first sprayed to the inner wall surface in step 3, when spray uniformly must not should have omission, glue
Mixing ratio by weight is clear water: latex=3:1, then using the gypsum putty in step 3 to step 3 treated inner wall surface into
Row painting first pass putty;
B. after step 3, treated after metope is completely dried, and polishes flat to inner wall surface, then carries out painting second
All over putty, room short side direction is parallel to big plate and carries out granted full, thickness are as follows: 3~4mm, to the gypsum putty 6~7 in step 3
At it is dry when, press polish is carried out to inner cavity surface with rubber flap and is had a shave, keeps inner wall surface surface layer smooth bright and clean, lines is straight, color is uniform
Unanimously, firmly answer it is light and even, and must not worn out paint film, surface is cleaned up after mill;
Step 5, wall surface spraying;
Sprayed coating carried out with spray gun to step 4 treated metope, specking is uniform when spraying, and moving distance is all suitable
In, when spraying since inconspicuous one, gradually moved in proper order to other end, until unobtrusively brush is received at place, there is not allowed that
Connect raft.
Embodiment 3
Environment protection architecture construction method, includes the following steps:
Step 1, preparation of construction:
A. tool prepare, including degumming agent, scraper plate, sand paper, bandage, guiding ruler, clearance gauge, angle grinder, land plaster, latex solution,
Cellulose aqueous solution etc. hang vertical according to the smooth vertical case of substrate surface;
B. substrate surface is thoroughly scrubbed, is washed, after being scrubbed to substrate surface, and spilt clear water and keep wet 1
Hour or more;
C. the base after scrubbing is carried out smearing bedding mortar, bottom is uniformly plated in using cement mixed mortar, with ruler school
Rough hair face is scraped in direct join, and the ratio of cement mixed mortar is 1:2:3;
Step 2, wall surface leveling:
A. to step 1 treated metope does corner protector, corner protector 1:2 cement mortar, mortar slightly receive it is dry after smeared with smoothing out with the fingers angle device
At fillet, the every side width of fillet is not less than 7cm;
B. to step 1 treated metope float coat mortar, surface layer mortar is laid using 1:2:4 cement mortar, is then used
Gently trowel smears out flat and smooth surface to trowel;
C. inner wall surface is handled, will be filled and led up at gap and uneven with gypsum putty, gypsum putty proportion is stone
Cream powder: latex solution: cellulose aqueous solution=80:55:70, and floating is tamped with putty, sand paper or angle grinder are used after putty is dry
It polishes, and floating dust is swept only in time, as used putty filling-in again there are also at uneven;
Step 3, metope cleans:
A. to one layer of glass grid cloth or silk item is pasted at step 2 treated gap, cloth is sticked to crack with lotion
On, cloth should be straightened in when stick, it is flat to paste;
B. to step 2, treated that inner wall surface is further handled, and applies degumming agent thorough at the greasy dirt adhered to
Bottom is removed, then clean with scour without sediment motion;
C. the metope in step 2 is checked, it is ensured that metope substantially dry;
Step 4, wall plaster:
A. one of glue or varnish back cover first sprayed to the inner wall surface in step 3, when spray uniformly must not should have omission, glue
Mixing ratio by weight is clear water: latex=3:1, then using the gypsum putty in step 3 to step 3 treated inner wall surface into
Row painting first pass putty;
B. after step 3, treated after metope is completely dried, and polishes flat to inner wall surface, then carries out painting second
All over putty, room short side direction is parallel to big plate and carries out granted full, thickness are as follows: 3~4mm, to the gypsum putty 6~7 in step 3
At it is dry when, press polish is carried out to inner cavity surface with rubber flap and is had a shave, keeps inner wall surface surface layer smooth bright and clean, lines is straight, color is uniform
Unanimously, firmly answer it is light and even, and must not worn out paint film, surface is cleaned up after mill;
Step 5, wall surface spraying;
Sprayed coating carried out with spray gun to step 4 treated metope, specking is uniform when spraying, and moving distance is all suitable
In, when spraying since inconspicuous one, gradually moved in proper order to other end, until unobtrusively brush is received at place, there is not allowed that
Connect raft.
Embodiment 4
Environment protection architecture construction method, includes the following steps:
Step 1, preparation of construction:
A. tool prepare, including degumming agent, scraper plate, sand paper, bandage, guiding ruler, clearance gauge, angle grinder, land plaster, latex solution,
Cellulose aqueous solution etc. hang vertical according to the smooth vertical case of substrate surface;
B. substrate surface is thoroughly scrubbed, is washed, after being scrubbed to substrate surface, and spilt clear water and keep wet 1
Hour or more;
C. the base after scrubbing is carried out smearing bedding mortar, bottom is uniformly plated in using cement mixed mortar, with ruler school
Rough hair face is scraped in direct join, and the ratio of cement mixed mortar is 1:2:3;
Step 2, wall surface leveling:
A. to step 1 treated metope does corner protector, corner protector 1:2 cement mortar, mortar slightly receive it is dry after smeared with smoothing out with the fingers angle device
At fillet, the every side width of fillet is not less than 7cm;
B. to step 1 treated metope float coat mortar, surface layer mortar is laid using 1:2:4 cement mortar, is then used
Gently trowel smears out flat and smooth surface to trowel;
C. inner wall surface is handled, will be filled and led up at gap and uneven with gypsum putty, gypsum putty proportion is stone
Cream powder: latex solution: cellulose aqueous solution=80:55:70, and floating is tamped with putty, sand paper or angle grinder are used after putty is dry
It polishes, and floating dust is swept only in time, as used putty filling-in again there are also at uneven;
Step 3, metope cleans:
A. to one layer of glass grid cloth or silk item is pasted at step 2 treated gap, cloth is sticked to crack with lotion
On, cloth should be straightened in when stick, it is flat to paste;
B. to step 2, treated that inner wall surface is further handled, and applies degumming agent thorough at the greasy dirt adhered to
Bottom is removed, then clean with scour without sediment motion;
C. the metope in step 2 is checked, it is ensured that metope substantially dry, base's moisture content are not greater than 5%;
Step 4, wall plaster:
A. one of glue or varnish back cover first sprayed to the inner wall surface in step 3, when spray uniformly must not should have omission, glue
Mixing ratio by weight is clear water: latex=3:1, then using the gypsum putty in step 3 to step 3 treated inner wall surface into
Row painting first pass putty, should be parallel to wall edge direction when painting first pass putty and successively construct, thickness are as follows: 6~7mm,
As wall once brush cannot from it is upper on earth when, should at many levels up and down simultaneously operation;
B. after step 3, treated after metope is completely dried, and polishes flat to inner wall surface, then carries out painting second
All over putty, room short side direction is parallel to big plate and carries out granted full, thickness are as follows: 3~4mm, to the gypsum putty 6~7 in step 3
At it is dry when, press polish is carried out to inner cavity surface with rubber flap and is had a shave, keeps inner wall surface surface layer smooth bright and clean, lines is straight, color is uniform
Unanimously, firmly answer it is light and even, and must not worn out paint film, surface is cleaned up after mill;
Step 5, wall surface spraying;
Sprayed coating, the pressure of spray gun are as follows: 0.6~0.7N/mm are carried out with spray gun to step 4 treated metope2, and
Nozzle is in 90 ° with facing, distance are as follows: 850px, specking is uniform when spraying, and moving distance is all moderate, from inconspicuous when spraying
One beginning, is gradually moved to other end in proper order, until unobtrusively brush is received at place, there is not allowed that connecing raft.
By the construction techniques of multi-step in the embodiment of the present invention, the buildings waterproof effect after making construction is mentioned
Height, while the flat and smooth degree in inner wall of building face being made to be improved, to guarantee the normal use of building.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (8)
1. environment protection architecture construction method, which comprises the steps of:
Step 1, preparation of construction:
A. tool prepares, including degumming agent, scraper plate, sand paper, bandage, guiding ruler, clearance gauge, angle grinder, land plaster, latex solution, fiber
Plain aqueous solution etc. hang vertical according to the smooth vertical case of substrate surface;
B. substrate surface is thoroughly scrubbed, is washed;
C. the base after scrubbing is carried out smearing bedding mortar, bottom is uniformly plated in using cement mixed mortar, simultaneously with ruler alignment
Scrape rough hair face;
Step 2, wall surface leveling:
A. to step 1 treated metope does corner protector, corner protector 1:2 cement mortar, mortar slightly receive it is dry after smear into circle with smoothing out with the fingers angle device
Angle;
B. to step 1 treated metope float coat mortar, surface layer mortar is laid using 1:2:4 cement mortar, then uses trowel
Gently trowel smears out flat and smooth surface;
C. inner wall surface is handled, will be filled and led up at gap and uneven with gypsum putty, and tamp floating with putty, to greasy
It is polished after son is dry with sand paper or angle grinder, and floating dust is swept only in time, as used putty filling-in again there are also at uneven;
Step 3, metope cleans:
A. to one layer of glass grid cloth or silk item is pasted at step 2 treated gap, cloth is sticked on crack with lotion, is glued
When cloth should be straightened, paste it is flat;
B. to step 2, treated that inner wall surface is further handled, and applies degumming agent thoroughly clear at the greasy dirt adhered to
It removes, it is then clean with scour without sediment motion;
C. the metope in step 2 is checked, it is ensured that metope substantially dry;
Step 4, wall plaster:
A. one of glue or varnish back cover first sprayed to the inner wall surface in step 3, when spray uniformly must not should have omission, glue weight
Match ratio is clear water: latex=3:1, and then using the gypsum putty in step 3, to step 3, treated that inner wall surface is painted
First pass putty;
B. after step 3, treated after metope is completely dried, and polishes flat to inner wall surface, then carry out painting second time it is greasy
Son is parallel to room short side direction with big plate and carries out granted full, thickness are as follows: 3~4mm, it is dry to 6~7 one-tenth of gypsum putty in step 3
When, press polish is carried out to inner cavity surface with rubber flap and is had a shave, keeps inner wall surface surface layer smooth bright and clean, lines is straight, color uniformity,
Firmly answer it is light and even, and must not worn out paint film, surface is cleaned up after mill;
Step 5, wall surface spraying;
Sprayed coating carried out with spray gun to step 4 treated metope, specking is uniform when spraying, and moving distance is all moderate, spray
It when painting since inconspicuous one, is gradually moved in proper order to other end, until unobtrusively brush is received at place, there is not allowed that connecing raft.
2. environment protection architecture construction method according to claim 1, which is characterized in that in the step 1, washed to substrate surface
After brush, and spills clear water and keep 1 hour or more wet.
3. environment protection architecture construction method according to claim 1, which is characterized in that cement mixed mortar in the step 1
Ratio be 1:2:3.
4. environment protection architecture construction method according to claim 1, which is characterized in that the every side width of fillet in the step 2
Not less than 7cm.
5. environment protection architecture construction method according to claim 1, which is characterized in that described, gypsum putty matches in step 2
For land plaster: latex solution: cellulose aqueous solution=80:55:70.
6. environment protection architecture construction method according to claim 1, which is characterized in that in the step 3, base's moisture content is not
It obtains and is greater than 5%.
7. environment protection architecture construction method according to claim 1, which is characterized in that in the step 4, painting first pass is greasy
The period of the day from 11 p.m. to 1 a.m should be parallel to wall edge direction and successively construct, thickness are as follows: 6~7mm, as wall once brush cannot from it is upper on earth when, answer
Operation simultaneously up and down at many levels.
8. environment protection architecture construction method according to claim 1, which is characterized in that in the step 5, the pressure of spray gun
Are as follows: 0.6~0.7N/mm2, and nozzle and facing are in 90 °, distance are as follows: 850px.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811351202.5A CN109555316A (en) | 2018-11-14 | 2018-11-14 | Environment protection architecture construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811351202.5A CN109555316A (en) | 2018-11-14 | 2018-11-14 | Environment protection architecture construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109555316A true CN109555316A (en) | 2019-04-02 |
Family
ID=65866389
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811351202.5A Pending CN109555316A (en) | 2018-11-14 | 2018-11-14 | Environment protection architecture construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109555316A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110644700A (en) * | 2019-09-05 | 2020-01-03 | 金鹏建筑产业有限公司 | Construction method for inner wall surface |
CN115405101A (en) * | 2022-10-15 | 2022-11-29 | 吴岩峰 | Construction method for inner wall surface |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101363269A (en) * | 2008-08-13 | 2009-02-11 | 中建五局第三建设有限公司 | Construction method of anti-plastering putty for concrete structure wall |
CN106592899A (en) * | 2016-12-07 | 2017-04-26 | 兴润建设集团有限公司 | Construction method of inner wall |
CN106760285A (en) * | 2016-11-11 | 2017-05-31 | 曾成富 | The technique coated to indoor wall using putty in furniture factory building |
CN107044196A (en) * | 2017-06-09 | 2017-08-15 | 北京广佳建筑装饰股份有限公司 | A kind of concrete is plastered face emulsion paint brushing technique |
CN107386681A (en) * | 2017-08-11 | 2017-11-24 | 江苏山水双盛实业有限公司 | Puttying and the construction technology of brush emulsion paint |
CN107435420A (en) * | 2017-08-11 | 2017-12-05 | 江苏山水双盛实业有限公司 | A kind of inner and external wall putty construction technology |
-
2018
- 2018-11-14 CN CN201811351202.5A patent/CN109555316A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101363269A (en) * | 2008-08-13 | 2009-02-11 | 中建五局第三建设有限公司 | Construction method of anti-plastering putty for concrete structure wall |
CN106760285A (en) * | 2016-11-11 | 2017-05-31 | 曾成富 | The technique coated to indoor wall using putty in furniture factory building |
CN106592899A (en) * | 2016-12-07 | 2017-04-26 | 兴润建设集团有限公司 | Construction method of inner wall |
CN107044196A (en) * | 2017-06-09 | 2017-08-15 | 北京广佳建筑装饰股份有限公司 | A kind of concrete is plastered face emulsion paint brushing technique |
CN107386681A (en) * | 2017-08-11 | 2017-11-24 | 江苏山水双盛实业有限公司 | Puttying and the construction technology of brush emulsion paint |
CN107435420A (en) * | 2017-08-11 | 2017-12-05 | 江苏山水双盛实业有限公司 | A kind of inner and external wall putty construction technology |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110644700A (en) * | 2019-09-05 | 2020-01-03 | 金鹏建筑产业有限公司 | Construction method for inner wall surface |
CN115405101A (en) * | 2022-10-15 | 2022-11-29 | 吴岩峰 | Construction method for inner wall surface |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106592899A (en) | Construction method of inner wall | |
CN101575899B (en) | Construction process for internal wall surface of building wall body | |
CN103952052A (en) | Travertine-like elastic texture coating and preparation method thereof | |
CN107044196A (en) | A kind of concrete is plastered face emulsion paint brushing technique | |
CN103938656A (en) | Building wall surface underground waterproof construction method | |
CN103821296A (en) | Wall plastering technique for aerated concrete block filler wall | |
CN103291027B (en) | The construction method of water-repellent paint is smeared before cement final set | |
CN109797920A (en) | A kind of interior covering with paint construction method | |
CN109555316A (en) | Environment protection architecture construction method | |
CN109868954A (en) | A kind of house top plate interior decoration method | |
CN107989299A (en) | A kind of coating application method of Assembled wall panels | |
CN101024750A (en) | Marble paint for building, its preparing method and construction process | |
CN104120860A (en) | Construction method for cement mortar ground leveling | |
CN113152814A (en) | Construction method for spraying stone-like paint on outer wall | |
CN107489251A (en) | A kind of insulation and fire-proof paint exterior wall and its construction method | |
CN103306384A (en) | Construction method of smearing waterproof sealant before final setting of concrete | |
CN103291024A (en) | Novel cement-based plastering mortar construction method | |
CN116378335A (en) | Construction method for painting house building wall surface | |
CN109025109A (en) | A kind of construction technology coating inner wall of building face | |
CN107476448A (en) | A kind of construction method for waterproof at toilet doorway | |
CN111305592A (en) | Composition layer structure and application thereof in renovation of old ceramic tile wall surface | |
CN107989329A (en) | A kind of method of toilet and kitchen waterproof construction | |
CN109853888A (en) | A kind of historical building plucking wall surface construction technology | |
CN110409725A (en) | A kind of interior decoration method | |
CN105689243A (en) | Thin coating type steel structure fireproof coating construction process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190402 |
|
RJ01 | Rejection of invention patent application after publication |