CN106760285A - The technique coated to indoor wall using putty in furniture factory building - Google Patents
The technique coated to indoor wall using putty in furniture factory building Download PDFInfo
- Publication number
- CN106760285A CN106760285A CN201610994699.7A CN201610994699A CN106760285A CN 106760285 A CN106760285 A CN 106760285A CN 201610994699 A CN201610994699 A CN 201610994699A CN 106760285 A CN106760285 A CN 106760285A
- Authority
- CN
- China
- Prior art keywords
- putty
- coating
- scraped
- brush
- metope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/02—Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Application Of Or Painting With Fluid Materials (AREA)
Abstract
The invention discloses the technique coated to indoor wall using putty in a kind of furniture factory building, comprise the following steps:Base treatment, repair, scrape first pass putty and polish, scrape second time putty and polish, under-coating varnish, again mend putty, polish, second coating, polish, the 3rd road coating.The step of technique, is simple, shorten construction period, specification operation, the flatness of metope can be improved, resource is saved, it is low to solve existing putty coating processes efficiency, is constructed according to the experience of workman oneself, the experience of each workman is different, cause quality different so that the flatness of metope is affected, and causes to do over again, waste of resource, extends the problem of duration.
Description
Technical field
The present invention relates to a kind of technique, more particularly, to the work coated to indoor wall using putty in a kind of furniture factory building
Skill.
Background technology
Powder of lacquer putty for use on is one kind of building and ornament materials, and main component is talcum powder and glue.The rough house table just purchased
One layer of white --- the putty in face, the whiteness of usual putty more than 90 fineness more than 330.Putty is looked for for wall-surface patching
A kind of flat base material, is next step decoration(Brush paint wallpaper)Lay a good foundation.Putty is divided into two kinds of interior wall and exterior wall,
Exterior wall putty will be resisted exposes to the weather so colloidality is big, intensity is high, and environmentally friendly index is slightly lower.Inner wall putty composite index preferably, is good for
Kang Huanbao, so interior wall not external application, the not interior use of exterior wall.Usual putty is gypsum or cement base, and such rough surface compares
Easily bonding is firm.But a bed boundary Ji Lai sealing basic unit is still brushed in basic unit while improving wall when construction
The adhesive force in face, putty preferably can be bonded on basal plane.Putty(Filler)It is a kind of decoration type of smooth surface of wall
Material, is a kind of thick slurry coating material, is a kind of product essential before coating is painted.Painting is imposed on priming paint or directly applied and imposes on
On object, it is used to remove rugged defect on coated article surface.Using a small amount of paint base, auxiliary agent, mass filler and appropriate
Coloring pigment is formulated, and pigment used is mainly iron oxide red, carbon black, chrome yellow etc..Filler is mainly calcium bicarbonate, talcum powder etc..
Part can be filled up the working surface of depression, can also be struck off in all surfaces, typically after prime coat is parched, is applied over priming paint
Layer surface.It is required that tack is good, do not crack in baking process.Existing putty coating processes efficiency is low, is all according to work
The experience of people oneself is constructed, and the experience of each workman is different, causes quality different so that the flatness of metope is subject to shadow
Ring, cause to do over again, waste of resource extends the duration.
The content of the invention
All it is the experience according to workman oneself it is an object of the invention to overcome above-mentioned existing putty coating processes efficiency low
Constructed, the experience of each workman is different, cause quality different so that the flatness of metope is affected, and causes to do over again, wave
Take resource, extend the problem of duration, devise the technique coated to indoor wall using putty in a kind of furniture factory building, the work
The step of skill, is simple, shorten construction period, specification operation, it is possible to increase the flatness of metope, has saved resource, solves
Existing putty coating processes efficiency is low, is constructed according to the experience of workman oneself, and the experience of each workman is different, causes
Quality is different so that the flatness of metope is affected, and causes to do over again, and waste of resource extends the problem of duration.
The purpose of the present invention is achieved through the following technical solutions:The work coated to indoor wall using putty in furniture factory building
Skill, comprises the following steps:
(1)Base treatment:By peeling in wall basic unit, loosen and chipping is removed at bulge position, by the dust in basic unit, dirt,
The debris such as splash and mortar current mark are cleaned up, and the iron wire steel bar end of surface of wall is polished, outside brush antirust paint treatment;
(2)Repairing:With water gypsum by the hole collided with the basic units such as metope is recessed, gap etc. it is levelling respectively, with No. 1 sand paper after drying
Protrusion is polished, and will be drifted along etc. and be cleaned out;
(3)Scrape first pass putty and polish:After the larger gap in application face fills up smooth, latex is completely scraped using batch embedding instrument greasy
Son one time, all small sand holes and contraction fissure are both needed to completely scrape, and are neatly degree with closely knit, smooth, line angle seamed edge, meanwhile, Ying Yi
Scrape down one to be scraped along metope is horizontal with scraping, minimal thickness 1-2mm is scraped as far as possible, must not leak and scrape, joint must not stay raft, be careful not to stain door
Window and other object planes, after putty is parched, smooth small plank are wrapped up in No. 1 sand paper, and putty slag and the place of being uneven are polished flat,
Note firmly uniform, protect corner angle, criticize clean clearly with palm broom after mill, first pass scraper plate is laterally completely scraped, and a scraper plate connects one and scrapes
Plate, joint must not stay raft, and each scraper plate is agile when finally receiving;
(4)Scrape second time putty and polish:Second time full putty method requires that this is scraped all over putty with preceding time to head time putty
Smear direction orthogonal, i.e., should be scraped along metope is perpendicular, metope is further scraped it is full and polish flat it is smooth, smooth untill, second
All over vertically completely being scraped with scraper plate, a scraper plate connects a scraper plate, and joint must not stay raft, and each scraper plate is agile when finally receiving;
(5)Under-coating varnish:Substrate surface must be cleaned up before first pass coating application, clean floating ash, brush appropriate to the occasion use spread pen,
Brushing order is usually from top to bottom, from left to right, first to be erected after horizontal stroke, and first sideline, corner angle, facet, rear big face must not have at inner corner trim
Residual coating, must not wrap up in rib at external corner, such as wall once brush can not from it is upper on earth when, should operation simultaneously up and down at many levels, mutually match
Close cooperation, it is to avoid connect raft, brush overlapping phenomenon, every time application of independent face is once completed with a collection of coating;
(6)Putty is mended again:After first pass coating is parched, general inspection one time is answered, paint render one locally should be again mended Ru defective
Time, and scraped with ox horn and smear, in order to avoid damage coating paint film;
(7)Polish:After benefit putty is parched again, cunning is polished flat by charge level is applied using fine sandpaper, notes firmly answering light and even, and must not
Worn out paint film, cleans up surface after mill;
(8)Second coating:Substrate surface must be cleaned up before first pass coating application, clean floating ash, brush appropriate to the occasion use
Spread pen, brushing order is usually from top to bottom, from left to right, first to be erected after horizontal stroke, first sideline, corner angle, facet, rear big face, at inner corner trim
Must not have residual coating, must not wrap up in rib at external corner, such as wall once brush can not from it is upper on earth when, should operation simultaneously up and down at many levels,
Work in coordination cooperation, it is to avoid connect raft, brush overlapping phenomenon, independent face it is every all over application with a collection of coating, and once complete;
(9)Polish:After benefit putty is parched again, cunning is polished flat by charge level is applied using fine sandpaper, notes firmly answering light and even, and must not
Worn out paint film, cleans up surface after mill;
(10)3rd road coating:Using spraying, spray gun uses No. 1 spray gun, spray gun pressure regulation 0.3-0.5N/ to 3rd time coating
mm2With facing into an angle of 90 degrees, distance is advisable nozzle for 40-50cm, answers specking uniform during spraying, and displacement is all moderate, spray
It is general during painting gradually to be moved in proper order to other end since inconspicuous one, to unobtrusively brush is received at place, must not occur connecing
Raft, after terminating, whole surface is bright and clean consistent, round and smooth exquisiteness, without stream pendant film color phenomenon, during spraying, by all other decorations of metope
Face all with newspaper cover it is tight, in order to avoid occur pollution, before swabbing should by the dust in substrate surface, dirt, splash and smear and mortar
Current mark removes clean, the coating of extemporaneous preparation, it is necessary to mix bonding agent, and coating thickness is uniform, flat smooth, not sagging, do not leak
Bottom, scrapes spot putting the 3rd time with scraper plate, and metope is struck off after light dries, and polishing is polished with fine sandpaper, be careful not to Lou to grind or
Putty is worn out, brush emulsion paint three times.
In sum, the beneficial effects of the invention are as follows:The step of technique, is simple, shorten construction period, specification behaviour
Make, it is possible to increase the flatness of metope, saved resource, it is low to solve existing putty coating processes efficiency, is all according to workman
The experience of oneself is constructed, and the experience of each workman is different, causes quality different so that the flatness of metope is affected,
Cause to do over again, waste of resource extends the problem of duration.
Specific embodiment
With reference to embodiment, the present invention is described in further detail, but embodiments of the present invention are not limited only to
This.
Embodiment:
The technique coated to indoor wall using putty in furniture factory building, is comprised the following steps:
(1)Base treatment:By peeling in wall basic unit, loosen and chipping is removed at bulge position, by the dust in basic unit, dirt,
The debris such as splash and mortar current mark are cleaned up, and the iron wire steel bar end of surface of wall is polished, outside brush antirust paint treatment;
(2)Repairing:With water gypsum by the hole collided with the basic units such as metope is recessed, gap etc. it is levelling respectively, with No. 1 sand paper after drying
Protrusion is polished, and will be drifted along etc. and be cleaned out;
(3)Scrape first pass putty and polish:After the larger gap in application face fills up smooth, latex is completely scraped using batch embedding instrument greasy
Son one time, all small sand holes and contraction fissure are both needed to completely scrape, and are neatly degree with closely knit, smooth, line angle seamed edge, meanwhile, Ying Yi
Scrape down one to be scraped along metope is horizontal with scraping, minimal thickness 1-2mm is scraped as far as possible, must not leak and scrape, joint must not stay raft, be careful not to stain door
Window and other object planes, after putty is parched, smooth small plank are wrapped up in No. 1 sand paper, and putty slag and the place of being uneven are polished flat,
Note firmly uniform, protect corner angle, criticize clean clearly with palm broom after mill, first pass scraper plate is laterally completely scraped, and a scraper plate connects one and scrapes
Plate, joint must not stay raft, and each scraper plate is agile when finally receiving;
(4)Scrape second time putty and polish:Second time full putty method requires that this is scraped all over putty with preceding time to head time putty
Smear direction orthogonal, i.e., should be scraped along metope is perpendicular, metope is further scraped it is full and polish flat it is smooth, smooth untill, second
All over vertically completely being scraped with scraper plate, a scraper plate connects a scraper plate, and joint must not stay raft, and each scraper plate is agile when finally receiving;
(5)Under-coating varnish:Substrate surface must be cleaned up before first pass coating application, clean floating ash, brush appropriate to the occasion use spread pen,
Brushing order is usually from top to bottom, from left to right, first to be erected after horizontal stroke, and first sideline, corner angle, facet, rear big face must not have at inner corner trim
Residual coating, must not wrap up in rib at external corner, such as wall once brush can not from it is upper on earth when, should operation simultaneously up and down at many levels, mutually match
Close cooperation, it is to avoid connect raft, brush overlapping phenomenon, every time application of independent face is once completed with a collection of coating;
(6)Putty is mended again:After first pass coating is parched, general inspection one time is answered, paint render one locally should be again mended Ru defective
Time, and scraped with ox horn and smear, in order to avoid damage coating paint film;
(7)Polish:After benefit putty is parched again, cunning is polished flat by charge level is applied using fine sandpaper, notes firmly answering light and even, and must not
Worn out paint film, cleans up surface after mill;
(8)Second coating:Substrate surface must be cleaned up before first pass coating application, clean floating ash, brush appropriate to the occasion use
Spread pen, brushing order is usually from top to bottom, from left to right, first to be erected after horizontal stroke, first sideline, corner angle, facet, rear big face, at inner corner trim
Must not have residual coating, must not wrap up in rib at external corner, such as wall once brush can not from it is upper on earth when, should operation simultaneously up and down at many levels,
Work in coordination cooperation, it is to avoid connect raft, brush overlapping phenomenon, independent face it is every all over application with a collection of coating, and once complete;
(9)Polish:After benefit putty is parched again, cunning is polished flat by charge level is applied using fine sandpaper, notes firmly answering light and even, and must not
Worn out paint film, cleans up surface after mill;
(10)3rd road coating:Using spraying, spray gun uses No. 1 spray gun, spray gun pressure regulation 0.3-0.5N/ to 3rd time coating
mm2With facing into an angle of 90 degrees, distance is advisable nozzle for 40-50cm, answers specking uniform during spraying, and displacement is all moderate, spray
It is general during painting gradually to be moved in proper order to other end since inconspicuous one, to unobtrusively brush is received at place, must not occur connecing
Raft, after terminating, whole surface is bright and clean consistent, round and smooth exquisiteness, without stream pendant film color phenomenon, during spraying, by all other decorations of metope
Face all with newspaper cover it is tight, in order to avoid occur pollution, before swabbing should by the dust in substrate surface, dirt, splash and smear and mortar
Current mark removes clean, the coating of extemporaneous preparation, it is necessary to mix bonding agent, and coating thickness is uniform, flat smooth, not sagging, do not leak
Bottom, scrapes spot putting the 3rd time with scraper plate, and metope is struck off after light dries, and polishing is polished with fine sandpaper, be careful not to Lou to grind or
Putty is worn out, brush emulsion paint three times.
The step of technique, is simple, shorten construction period, specification operation, it is possible to increase the flatness of metope, saves
Resource, it is low to solve existing putty coating processes efficiency, is all constructed according to the experience of workman oneself, each workman's
Experience is different, causes quality different so that the flatness of metope is affected, and causes to do over again, and waste of resource extends the duration
Problem.
The above, is only presently preferred embodiments of the present invention, not does any formal limitation to the present invention, it is every according to
According to any simple modification, equivalent variations that technology of the invention, method are substantially made to above example, the present invention is each fallen within
Protection domain within.
Claims (1)
1. the technique for being coated to indoor wall using putty in furniture factory building, it is characterised in that comprise the following steps:
(1)Base treatment:By peeling in wall basic unit, loosen and chipping is removed at bulge position, by the dust in basic unit, dirt,
The debris such as splash and mortar current mark are cleaned up, and the iron wire steel bar end of surface of wall is polished, outside brush antirust paint treatment;
(2)Repairing:With water gypsum by the hole collided with the basic units such as metope is recessed, gap etc. it is levelling respectively, with No. 1 sand paper after drying
Protrusion is polished, and will be drifted along etc. and be cleaned out;
(3)Scrape first pass putty and polish:After the larger gap in application face fills up smooth, latex is completely scraped using batch embedding instrument greasy
Son one time, all small sand holes and contraction fissure are both needed to completely scrape, and are neatly degree with closely knit, smooth, line angle seamed edge, meanwhile, Ying Yi
Scrape down one to be scraped along metope is horizontal with scraping, minimal thickness 1-2mm is scraped as far as possible, must not leak and scrape, joint must not stay raft, be careful not to stain door
Window and other object planes, after putty is parched, smooth small plank are wrapped up in No. 1 sand paper, and putty slag and the place of being uneven are polished flat,
Note firmly uniform, protect corner angle, criticize clean clearly with palm broom after mill, first pass scraper plate is laterally completely scraped, and a scraper plate connects one and scrapes
Plate, joint must not stay raft, and each scraper plate is agile when finally receiving;
(4)Scrape second time putty and polish:Second time full putty method requires that this is scraped all over putty with preceding time to head time putty
Smear direction orthogonal, i.e., should be scraped along metope is perpendicular, metope is further scraped it is full and polish flat it is smooth, smooth untill, second
All over vertically completely being scraped with scraper plate, a scraper plate connects a scraper plate, and joint must not stay raft, and each scraper plate is agile when finally receiving;
(5)Under-coating varnish:Substrate surface must be cleaned up before first pass coating application, clean floating ash, brush appropriate to the occasion use spread pen,
Brushing order is usually from top to bottom, from left to right, first to be erected after horizontal stroke, and first sideline, corner angle, facet, rear big face must not have at inner corner trim
Residual coating, must not wrap up in rib at external corner, such as wall once brush can not from it is upper on earth when, should operation simultaneously up and down at many levels, mutually match
Close cooperation, it is to avoid connect raft, brush overlapping phenomenon, every time application of independent face is once completed with a collection of coating;
(6)Putty is mended again:After first pass coating is parched, general inspection one time is answered, paint render one locally should be again mended Ru defective
Time, and scraped with ox horn and smear, in order to avoid damage coating paint film;
(7)Polish:After benefit putty is parched again, cunning is polished flat by charge level is applied using fine sandpaper, notes firmly answering light and even, and must not
Worn out paint film, cleans up surface after mill;
(8)Second coating:Substrate surface must be cleaned up before first pass coating application, clean floating ash, brush appropriate to the occasion use
Spread pen, brushing order is usually from top to bottom, from left to right, first to be erected after horizontal stroke, first sideline, corner angle, facet, rear big face, at inner corner trim
Must not have residual coating, must not wrap up in rib at external corner, such as wall once brush can not from it is upper on earth when, should operation simultaneously up and down at many levels,
Work in coordination cooperation, it is to avoid connect raft, brush overlapping phenomenon, independent face it is every all over application with a collection of coating, and once complete;
(9)Polish:After benefit putty is parched again, cunning is polished flat by charge level is applied using fine sandpaper, notes firmly answering light and even, and must not
Worn out paint film, cleans up surface after mill;
(10)3rd road coating:Using spraying, spray gun uses No. 1 spray gun, spray gun pressure regulation 0.3-0.5N/mm to 3rd time coating2
With facing into an angle of 90 degrees, distance is advisable nozzle for 40-50cm, answers specking uniform during spraying, and displacement is all moderate, during spraying
It is general gradually to be moved in proper order to other end since inconspicuous one, to unobtrusively brush is received at place, must not occur connecing raft,
After end, whole surface is bright and clean consistent, round and smooth exquisiteness, during spraying, all other facing of metope is complete without stream pendant film color phenomenon
Portion with newspaper cover it is tight, in order to avoid occur pollution, before swabbing should by the dust in substrate surface, dirt, splash and smear and mortar current mark
Remove clean, the coating of extemporaneous preparation, it is necessary to mix bonding agent, coating thickness is uniform, flat smooth, not sagging, non-bottom drain, the
Spot putting is scraped with scraper plate three times, metope is struck off after light dries, and polishing is polished with fine sandpaper, be careful not to Lou to grind or by putty
It is worn out, brush emulsion paint three times.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610994699.7A CN106760285A (en) | 2016-11-11 | 2016-11-11 | The technique coated to indoor wall using putty in furniture factory building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610994699.7A CN106760285A (en) | 2016-11-11 | 2016-11-11 | The technique coated to indoor wall using putty in furniture factory building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106760285A true CN106760285A (en) | 2017-05-31 |
Family
ID=58973344
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610994699.7A Withdrawn CN106760285A (en) | 2016-11-11 | 2016-11-11 | The technique coated to indoor wall using putty in furniture factory building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106760285A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107044196A (en) * | 2017-06-09 | 2017-08-15 | 北京广佳建筑装饰股份有限公司 | A kind of concrete is plastered face emulsion paint brushing technique |
CN107401256A (en) * | 2017-09-21 | 2017-11-28 | 苏州振振好新型建材科技有限公司 | It is a kind of to strengthen durable putty construction method |
CN109235909A (en) * | 2018-09-21 | 2019-01-18 | 中冶成都勘察研究总院有限公司 | A kind of moisture-proof vapor barrier layer base treatment technique of freezer |
CN109555316A (en) * | 2018-11-14 | 2019-04-02 | 冠恒建设工程有限公司 | Environment protection architecture construction method |
CN109736518A (en) * | 2018-12-30 | 2019-05-10 | 中铁十四局集团有限公司 | Interior decoration construction method |
CN114352055A (en) * | 2021-12-23 | 2022-04-15 | 上海建工集团股份有限公司 | Construction process for renovating paint on old wall |
-
2016
- 2016-11-11 CN CN201610994699.7A patent/CN106760285A/en not_active Withdrawn
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107044196A (en) * | 2017-06-09 | 2017-08-15 | 北京广佳建筑装饰股份有限公司 | A kind of concrete is plastered face emulsion paint brushing technique |
CN107401256A (en) * | 2017-09-21 | 2017-11-28 | 苏州振振好新型建材科技有限公司 | It is a kind of to strengthen durable putty construction method |
CN109235909A (en) * | 2018-09-21 | 2019-01-18 | 中冶成都勘察研究总院有限公司 | A kind of moisture-proof vapor barrier layer base treatment technique of freezer |
CN109555316A (en) * | 2018-11-14 | 2019-04-02 | 冠恒建设工程有限公司 | Environment protection architecture construction method |
CN109736518A (en) * | 2018-12-30 | 2019-05-10 | 中铁十四局集团有限公司 | Interior decoration construction method |
CN114352055A (en) * | 2021-12-23 | 2022-04-15 | 上海建工集团股份有限公司 | Construction process for renovating paint on old wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106760285A (en) | The technique coated to indoor wall using putty in furniture factory building | |
CN109424135A (en) | The technique that the putty of metope in building is coated | |
CN101832015B (en) | Construction process for outer wall metal fluorocarbon coating | |
CN107044196A (en) | A kind of concrete is plastered face emulsion paint brushing technique | |
CN101864843B (en) | Method for repairing floriation and linellae of granitic plaster on historical building | |
CN109098370A (en) | A kind of construction techniques | |
CN101956463B (en) | GRC (Glass-fiber Reinforced Composite) plate surface plain finish concrete coating technology | |
CN109797920A (en) | A kind of interior covering with paint construction method | |
CN107989299A (en) | A kind of coating application method of Assembled wall panels | |
CN107489247A (en) | A kind of true mineral varnish spray-finishing construction method | |
CN102744190A (en) | Coating method for imitating marble effect | |
CN111677280A (en) | Construction method of exterior wall coating | |
CN104386950A (en) | Exterior wall brick-imitating elastic texture coating and application process thereof | |
CN107620434A (en) | The technique coated in furniture factory building using putty to indoor wall | |
CN107386681A (en) | Puttying and the construction technology of brush emulsion paint | |
KR100906565B1 (en) | The remodeling method of structure with tiles | |
CN104453131A (en) | Building external wall heat insulation coating construction process | |
CN110359651A (en) | A kind of metope brushing latex lacquer craftwork | |
CN104453133A (en) | Real stone paint construction technology | |
CN1608744A (en) | Method of repairing local damaged coating on metal surface | |
CN106401145A (en) | Construction technology of ground glue | |
CN114352055A (en) | Construction process for renovating paint on old wall | |
CN109610833B (en) | Construction technology of building coating | |
CN105598011A (en) | Method for rapidly repairing defect on outer surface of automobile through weathered stone | |
KR100956841B1 (en) | Paint coating and new paint coating method after removing old paint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20170531 |
|
WW01 | Invention patent application withdrawn after publication |