CN106760285A - The technique coated to indoor wall using putty in furniture factory building - Google Patents

The technique coated to indoor wall using putty in furniture factory building Download PDF

Info

Publication number
CN106760285A
CN106760285A CN201610994699.7A CN201610994699A CN106760285A CN 106760285 A CN106760285 A CN 106760285A CN 201610994699 A CN201610994699 A CN 201610994699A CN 106760285 A CN106760285 A CN 106760285A
Authority
CN
China
Prior art keywords
putty
coating
scraped
brush
metope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610994699.7A
Other languages
Chinese (zh)
Inventor
曾成富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610994699.7A priority Critical patent/CN106760285A/en
Publication of CN106760285A publication Critical patent/CN106760285A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention discloses the technique coated to indoor wall using putty in a kind of furniture factory building, comprise the following steps:Base treatment, repair, scrape first pass putty and polish, scrape second time putty and polish, under-coating varnish, again mend putty, polish, second coating, polish, the 3rd road coating.The step of technique, is simple, shorten construction period, specification operation, the flatness of metope can be improved, resource is saved, it is low to solve existing putty coating processes efficiency, is constructed according to the experience of workman oneself, the experience of each workman is different, cause quality different so that the flatness of metope is affected, and causes to do over again, waste of resource, extends the problem of duration.

Description

The technique coated to indoor wall using putty in furniture factory building
Technical field
The present invention relates to a kind of technique, more particularly, to the work coated to indoor wall using putty in a kind of furniture factory building Skill.
Background technology
Powder of lacquer putty for use on is one kind of building and ornament materials, and main component is talcum powder and glue.The rough house table just purchased One layer of white --- the putty in face, the whiteness of usual putty more than 90 fineness more than 330.Putty is looked for for wall-surface patching A kind of flat base material, is next step decoration(Brush paint wallpaper)Lay a good foundation.Putty is divided into two kinds of interior wall and exterior wall, Exterior wall putty will be resisted exposes to the weather so colloidality is big, intensity is high, and environmentally friendly index is slightly lower.Inner wall putty composite index preferably, is good for Kang Huanbao, so interior wall not external application, the not interior use of exterior wall.Usual putty is gypsum or cement base, and such rough surface compares Easily bonding is firm.But a bed boundary Ji Lai sealing basic unit is still brushed in basic unit while improving wall when construction The adhesive force in face, putty preferably can be bonded on basal plane.Putty(Filler)It is a kind of decoration type of smooth surface of wall Material, is a kind of thick slurry coating material, is a kind of product essential before coating is painted.Painting is imposed on priming paint or directly applied and imposes on On object, it is used to remove rugged defect on coated article surface.Using a small amount of paint base, auxiliary agent, mass filler and appropriate Coloring pigment is formulated, and pigment used is mainly iron oxide red, carbon black, chrome yellow etc..Filler is mainly calcium bicarbonate, talcum powder etc.. Part can be filled up the working surface of depression, can also be struck off in all surfaces, typically after prime coat is parched, is applied over priming paint Layer surface.It is required that tack is good, do not crack in baking process.Existing putty coating processes efficiency is low, is all according to work The experience of people oneself is constructed, and the experience of each workman is different, causes quality different so that the flatness of metope is subject to shadow Ring, cause to do over again, waste of resource extends the duration.
The content of the invention
All it is the experience according to workman oneself it is an object of the invention to overcome above-mentioned existing putty coating processes efficiency low Constructed, the experience of each workman is different, cause quality different so that the flatness of metope is affected, and causes to do over again, wave Take resource, extend the problem of duration, devise the technique coated to indoor wall using putty in a kind of furniture factory building, the work The step of skill, is simple, shorten construction period, specification operation, it is possible to increase the flatness of metope, has saved resource, solves Existing putty coating processes efficiency is low, is constructed according to the experience of workman oneself, and the experience of each workman is different, causes Quality is different so that the flatness of metope is affected, and causes to do over again, and waste of resource extends the problem of duration.
The purpose of the present invention is achieved through the following technical solutions:The work coated to indoor wall using putty in furniture factory building Skill, comprises the following steps:
(1)Base treatment:By peeling in wall basic unit, loosen and chipping is removed at bulge position, by the dust in basic unit, dirt, The debris such as splash and mortar current mark are cleaned up, and the iron wire steel bar end of surface of wall is polished, outside brush antirust paint treatment;
(2)Repairing:With water gypsum by the hole collided with the basic units such as metope is recessed, gap etc. it is levelling respectively, with No. 1 sand paper after drying Protrusion is polished, and will be drifted along etc. and be cleaned out;
(3)Scrape first pass putty and polish:After the larger gap in application face fills up smooth, latex is completely scraped using batch embedding instrument greasy Son one time, all small sand holes and contraction fissure are both needed to completely scrape, and are neatly degree with closely knit, smooth, line angle seamed edge, meanwhile, Ying Yi Scrape down one to be scraped along metope is horizontal with scraping, minimal thickness 1-2mm is scraped as far as possible, must not leak and scrape, joint must not stay raft, be careful not to stain door Window and other object planes, after putty is parched, smooth small plank are wrapped up in No. 1 sand paper, and putty slag and the place of being uneven are polished flat, Note firmly uniform, protect corner angle, criticize clean clearly with palm broom after mill, first pass scraper plate is laterally completely scraped, and a scraper plate connects one and scrapes Plate, joint must not stay raft, and each scraper plate is agile when finally receiving;
(4)Scrape second time putty and polish:Second time full putty method requires that this is scraped all over putty with preceding time to head time putty Smear direction orthogonal, i.e., should be scraped along metope is perpendicular, metope is further scraped it is full and polish flat it is smooth, smooth untill, second All over vertically completely being scraped with scraper plate, a scraper plate connects a scraper plate, and joint must not stay raft, and each scraper plate is agile when finally receiving;
(5)Under-coating varnish:Substrate surface must be cleaned up before first pass coating application, clean floating ash, brush appropriate to the occasion use spread pen, Brushing order is usually from top to bottom, from left to right, first to be erected after horizontal stroke, and first sideline, corner angle, facet, rear big face must not have at inner corner trim Residual coating, must not wrap up in rib at external corner, such as wall once brush can not from it is upper on earth when, should operation simultaneously up and down at many levels, mutually match Close cooperation, it is to avoid connect raft, brush overlapping phenomenon, every time application of independent face is once completed with a collection of coating;
(6)Putty is mended again:After first pass coating is parched, general inspection one time is answered, paint render one locally should be again mended Ru defective Time, and scraped with ox horn and smear, in order to avoid damage coating paint film;
(7)Polish:After benefit putty is parched again, cunning is polished flat by charge level is applied using fine sandpaper, notes firmly answering light and even, and must not Worn out paint film, cleans up surface after mill;
(8)Second coating:Substrate surface must be cleaned up before first pass coating application, clean floating ash, brush appropriate to the occasion use Spread pen, brushing order is usually from top to bottom, from left to right, first to be erected after horizontal stroke, first sideline, corner angle, facet, rear big face, at inner corner trim Must not have residual coating, must not wrap up in rib at external corner, such as wall once brush can not from it is upper on earth when, should operation simultaneously up and down at many levels, Work in coordination cooperation, it is to avoid connect raft, brush overlapping phenomenon, independent face it is every all over application with a collection of coating, and once complete;
(9)Polish:After benefit putty is parched again, cunning is polished flat by charge level is applied using fine sandpaper, notes firmly answering light and even, and must not Worn out paint film, cleans up surface after mill;
(10)3rd road coating:Using spraying, spray gun uses No. 1 spray gun, spray gun pressure regulation 0.3-0.5N/ to 3rd time coating mm2With facing into an angle of 90 degrees, distance is advisable nozzle for 40-50cm, answers specking uniform during spraying, and displacement is all moderate, spray It is general during painting gradually to be moved in proper order to other end since inconspicuous one, to unobtrusively brush is received at place, must not occur connecing Raft, after terminating, whole surface is bright and clean consistent, round and smooth exquisiteness, without stream pendant film color phenomenon, during spraying, by all other decorations of metope Face all with newspaper cover it is tight, in order to avoid occur pollution, before swabbing should by the dust in substrate surface, dirt, splash and smear and mortar Current mark removes clean, the coating of extemporaneous preparation, it is necessary to mix bonding agent, and coating thickness is uniform, flat smooth, not sagging, do not leak Bottom, scrapes spot putting the 3rd time with scraper plate, and metope is struck off after light dries, and polishing is polished with fine sandpaper, be careful not to Lou to grind or Putty is worn out, brush emulsion paint three times.
In sum, the beneficial effects of the invention are as follows:The step of technique, is simple, shorten construction period, specification behaviour Make, it is possible to increase the flatness of metope, saved resource, it is low to solve existing putty coating processes efficiency, is all according to workman The experience of oneself is constructed, and the experience of each workman is different, causes quality different so that the flatness of metope is affected, Cause to do over again, waste of resource extends the problem of duration.
Specific embodiment
With reference to embodiment, the present invention is described in further detail, but embodiments of the present invention are not limited only to This.
Embodiment:
The technique coated to indoor wall using putty in furniture factory building, is comprised the following steps:
(1)Base treatment:By peeling in wall basic unit, loosen and chipping is removed at bulge position, by the dust in basic unit, dirt, The debris such as splash and mortar current mark are cleaned up, and the iron wire steel bar end of surface of wall is polished, outside brush antirust paint treatment;
(2)Repairing:With water gypsum by the hole collided with the basic units such as metope is recessed, gap etc. it is levelling respectively, with No. 1 sand paper after drying Protrusion is polished, and will be drifted along etc. and be cleaned out;
(3)Scrape first pass putty and polish:After the larger gap in application face fills up smooth, latex is completely scraped using batch embedding instrument greasy Son one time, all small sand holes and contraction fissure are both needed to completely scrape, and are neatly degree with closely knit, smooth, line angle seamed edge, meanwhile, Ying Yi Scrape down one to be scraped along metope is horizontal with scraping, minimal thickness 1-2mm is scraped as far as possible, must not leak and scrape, joint must not stay raft, be careful not to stain door Window and other object planes, after putty is parched, smooth small plank are wrapped up in No. 1 sand paper, and putty slag and the place of being uneven are polished flat, Note firmly uniform, protect corner angle, criticize clean clearly with palm broom after mill, first pass scraper plate is laterally completely scraped, and a scraper plate connects one and scrapes Plate, joint must not stay raft, and each scraper plate is agile when finally receiving;
(4)Scrape second time putty and polish:Second time full putty method requires that this is scraped all over putty with preceding time to head time putty Smear direction orthogonal, i.e., should be scraped along metope is perpendicular, metope is further scraped it is full and polish flat it is smooth, smooth untill, second All over vertically completely being scraped with scraper plate, a scraper plate connects a scraper plate, and joint must not stay raft, and each scraper plate is agile when finally receiving;
(5)Under-coating varnish:Substrate surface must be cleaned up before first pass coating application, clean floating ash, brush appropriate to the occasion use spread pen, Brushing order is usually from top to bottom, from left to right, first to be erected after horizontal stroke, and first sideline, corner angle, facet, rear big face must not have at inner corner trim Residual coating, must not wrap up in rib at external corner, such as wall once brush can not from it is upper on earth when, should operation simultaneously up and down at many levels, mutually match Close cooperation, it is to avoid connect raft, brush overlapping phenomenon, every time application of independent face is once completed with a collection of coating;
(6)Putty is mended again:After first pass coating is parched, general inspection one time is answered, paint render one locally should be again mended Ru defective Time, and scraped with ox horn and smear, in order to avoid damage coating paint film;
(7)Polish:After benefit putty is parched again, cunning is polished flat by charge level is applied using fine sandpaper, notes firmly answering light and even, and must not Worn out paint film, cleans up surface after mill;
(8)Second coating:Substrate surface must be cleaned up before first pass coating application, clean floating ash, brush appropriate to the occasion use Spread pen, brushing order is usually from top to bottom, from left to right, first to be erected after horizontal stroke, first sideline, corner angle, facet, rear big face, at inner corner trim Must not have residual coating, must not wrap up in rib at external corner, such as wall once brush can not from it is upper on earth when, should operation simultaneously up and down at many levels, Work in coordination cooperation, it is to avoid connect raft, brush overlapping phenomenon, independent face it is every all over application with a collection of coating, and once complete;
(9)Polish:After benefit putty is parched again, cunning is polished flat by charge level is applied using fine sandpaper, notes firmly answering light and even, and must not Worn out paint film, cleans up surface after mill;
(10)3rd road coating:Using spraying, spray gun uses No. 1 spray gun, spray gun pressure regulation 0.3-0.5N/ to 3rd time coating mm2With facing into an angle of 90 degrees, distance is advisable nozzle for 40-50cm, answers specking uniform during spraying, and displacement is all moderate, spray It is general during painting gradually to be moved in proper order to other end since inconspicuous one, to unobtrusively brush is received at place, must not occur connecing Raft, after terminating, whole surface is bright and clean consistent, round and smooth exquisiteness, without stream pendant film color phenomenon, during spraying, by all other decorations of metope Face all with newspaper cover it is tight, in order to avoid occur pollution, before swabbing should by the dust in substrate surface, dirt, splash and smear and mortar Current mark removes clean, the coating of extemporaneous preparation, it is necessary to mix bonding agent, and coating thickness is uniform, flat smooth, not sagging, do not leak Bottom, scrapes spot putting the 3rd time with scraper plate, and metope is struck off after light dries, and polishing is polished with fine sandpaper, be careful not to Lou to grind or Putty is worn out, brush emulsion paint three times.
The step of technique, is simple, shorten construction period, specification operation, it is possible to increase the flatness of metope, saves Resource, it is low to solve existing putty coating processes efficiency, is all constructed according to the experience of workman oneself, each workman's Experience is different, causes quality different so that the flatness of metope is affected, and causes to do over again, and waste of resource extends the duration Problem.
The above, is only presently preferred embodiments of the present invention, not does any formal limitation to the present invention, it is every according to According to any simple modification, equivalent variations that technology of the invention, method are substantially made to above example, the present invention is each fallen within Protection domain within.

Claims (1)

1. the technique for being coated to indoor wall using putty in furniture factory building, it is characterised in that comprise the following steps:
(1)Base treatment:By peeling in wall basic unit, loosen and chipping is removed at bulge position, by the dust in basic unit, dirt, The debris such as splash and mortar current mark are cleaned up, and the iron wire steel bar end of surface of wall is polished, outside brush antirust paint treatment;
(2)Repairing:With water gypsum by the hole collided with the basic units such as metope is recessed, gap etc. it is levelling respectively, with No. 1 sand paper after drying Protrusion is polished, and will be drifted along etc. and be cleaned out;
(3)Scrape first pass putty and polish:After the larger gap in application face fills up smooth, latex is completely scraped using batch embedding instrument greasy Son one time, all small sand holes and contraction fissure are both needed to completely scrape, and are neatly degree with closely knit, smooth, line angle seamed edge, meanwhile, Ying Yi Scrape down one to be scraped along metope is horizontal with scraping, minimal thickness 1-2mm is scraped as far as possible, must not leak and scrape, joint must not stay raft, be careful not to stain door Window and other object planes, after putty is parched, smooth small plank are wrapped up in No. 1 sand paper, and putty slag and the place of being uneven are polished flat, Note firmly uniform, protect corner angle, criticize clean clearly with palm broom after mill, first pass scraper plate is laterally completely scraped, and a scraper plate connects one and scrapes Plate, joint must not stay raft, and each scraper plate is agile when finally receiving;
(4)Scrape second time putty and polish:Second time full putty method requires that this is scraped all over putty with preceding time to head time putty Smear direction orthogonal, i.e., should be scraped along metope is perpendicular, metope is further scraped it is full and polish flat it is smooth, smooth untill, second All over vertically completely being scraped with scraper plate, a scraper plate connects a scraper plate, and joint must not stay raft, and each scraper plate is agile when finally receiving;
(5)Under-coating varnish:Substrate surface must be cleaned up before first pass coating application, clean floating ash, brush appropriate to the occasion use spread pen, Brushing order is usually from top to bottom, from left to right, first to be erected after horizontal stroke, and first sideline, corner angle, facet, rear big face must not have at inner corner trim Residual coating, must not wrap up in rib at external corner, such as wall once brush can not from it is upper on earth when, should operation simultaneously up and down at many levels, mutually match Close cooperation, it is to avoid connect raft, brush overlapping phenomenon, every time application of independent face is once completed with a collection of coating;
(6)Putty is mended again:After first pass coating is parched, general inspection one time is answered, paint render one locally should be again mended Ru defective Time, and scraped with ox horn and smear, in order to avoid damage coating paint film;
(7)Polish:After benefit putty is parched again, cunning is polished flat by charge level is applied using fine sandpaper, notes firmly answering light and even, and must not Worn out paint film, cleans up surface after mill;
(8)Second coating:Substrate surface must be cleaned up before first pass coating application, clean floating ash, brush appropriate to the occasion use Spread pen, brushing order is usually from top to bottom, from left to right, first to be erected after horizontal stroke, first sideline, corner angle, facet, rear big face, at inner corner trim Must not have residual coating, must not wrap up in rib at external corner, such as wall once brush can not from it is upper on earth when, should operation simultaneously up and down at many levels, Work in coordination cooperation, it is to avoid connect raft, brush overlapping phenomenon, independent face it is every all over application with a collection of coating, and once complete;
(9)Polish:After benefit putty is parched again, cunning is polished flat by charge level is applied using fine sandpaper, notes firmly answering light and even, and must not Worn out paint film, cleans up surface after mill;
(10)3rd road coating:Using spraying, spray gun uses No. 1 spray gun, spray gun pressure regulation 0.3-0.5N/mm to 3rd time coating2 With facing into an angle of 90 degrees, distance is advisable nozzle for 40-50cm, answers specking uniform during spraying, and displacement is all moderate, during spraying It is general gradually to be moved in proper order to other end since inconspicuous one, to unobtrusively brush is received at place, must not occur connecing raft, After end, whole surface is bright and clean consistent, round and smooth exquisiteness, during spraying, all other facing of metope is complete without stream pendant film color phenomenon Portion with newspaper cover it is tight, in order to avoid occur pollution, before swabbing should by the dust in substrate surface, dirt, splash and smear and mortar current mark Remove clean, the coating of extemporaneous preparation, it is necessary to mix bonding agent, coating thickness is uniform, flat smooth, not sagging, non-bottom drain, the Spot putting is scraped with scraper plate three times, metope is struck off after light dries, and polishing is polished with fine sandpaper, be careful not to Lou to grind or by putty It is worn out, brush emulsion paint three times.
CN201610994699.7A 2016-11-11 2016-11-11 The technique coated to indoor wall using putty in furniture factory building Withdrawn CN106760285A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610994699.7A CN106760285A (en) 2016-11-11 2016-11-11 The technique coated to indoor wall using putty in furniture factory building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610994699.7A CN106760285A (en) 2016-11-11 2016-11-11 The technique coated to indoor wall using putty in furniture factory building

Publications (1)

Publication Number Publication Date
CN106760285A true CN106760285A (en) 2017-05-31

Family

ID=58973344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610994699.7A Withdrawn CN106760285A (en) 2016-11-11 2016-11-11 The technique coated to indoor wall using putty in furniture factory building

Country Status (1)

Country Link
CN (1) CN106760285A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107044196A (en) * 2017-06-09 2017-08-15 北京广佳建筑装饰股份有限公司 A kind of concrete is plastered face emulsion paint brushing technique
CN107401256A (en) * 2017-09-21 2017-11-28 苏州振振好新型建材科技有限公司 It is a kind of to strengthen durable putty construction method
CN109235909A (en) * 2018-09-21 2019-01-18 中冶成都勘察研究总院有限公司 A kind of moisture-proof vapor barrier layer base treatment technique of freezer
CN109555316A (en) * 2018-11-14 2019-04-02 冠恒建设工程有限公司 Environment protection architecture construction method
CN109736518A (en) * 2018-12-30 2019-05-10 中铁十四局集团有限公司 Interior decoration construction method
CN114352055A (en) * 2021-12-23 2022-04-15 上海建工集团股份有限公司 Construction process for renovating paint on old wall

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107044196A (en) * 2017-06-09 2017-08-15 北京广佳建筑装饰股份有限公司 A kind of concrete is plastered face emulsion paint brushing technique
CN107401256A (en) * 2017-09-21 2017-11-28 苏州振振好新型建材科技有限公司 It is a kind of to strengthen durable putty construction method
CN109235909A (en) * 2018-09-21 2019-01-18 中冶成都勘察研究总院有限公司 A kind of moisture-proof vapor barrier layer base treatment technique of freezer
CN109555316A (en) * 2018-11-14 2019-04-02 冠恒建设工程有限公司 Environment protection architecture construction method
CN109736518A (en) * 2018-12-30 2019-05-10 中铁十四局集团有限公司 Interior decoration construction method
CN114352055A (en) * 2021-12-23 2022-04-15 上海建工集团股份有限公司 Construction process for renovating paint on old wall

Similar Documents

Publication Publication Date Title
CN106760285A (en) The technique coated to indoor wall using putty in furniture factory building
CN109424135A (en) The technique that the putty of metope in building is coated
CN101832015B (en) Construction process for outer wall metal fluorocarbon coating
CN107044196A (en) A kind of concrete is plastered face emulsion paint brushing technique
CN101864843B (en) Method for repairing floriation and linellae of granitic plaster on historical building
CN109098370A (en) A kind of construction techniques
CN101956463B (en) GRC (Glass-fiber Reinforced Composite) plate surface plain finish concrete coating technology
CN109797920A (en) A kind of interior covering with paint construction method
CN107989299A (en) A kind of coating application method of Assembled wall panels
CN107489247A (en) A kind of true mineral varnish spray-finishing construction method
CN102744190A (en) Coating method for imitating marble effect
CN111677280A (en) Construction method of exterior wall coating
CN104386950A (en) Exterior wall brick-imitating elastic texture coating and application process thereof
CN107620434A (en) The technique coated in furniture factory building using putty to indoor wall
CN107386681A (en) Puttying and the construction technology of brush emulsion paint
KR100906565B1 (en) The remodeling method of structure with tiles
CN104453131A (en) Building external wall heat insulation coating construction process
CN110359651A (en) A kind of metope brushing latex lacquer craftwork
CN104453133A (en) Real stone paint construction technology
CN1608744A (en) Method of repairing local damaged coating on metal surface
CN106401145A (en) Construction technology of ground glue
CN114352055A (en) Construction process for renovating paint on old wall
CN109610833B (en) Construction technology of building coating
CN105598011A (en) Method for rapidly repairing defect on outer surface of automobile through weathered stone
KR100956841B1 (en) Paint coating and new paint coating method after removing old paint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20170531

WW01 Invention patent application withdrawn after publication