CN106592899A - Construction method of inner wall - Google Patents
Construction method of inner wall Download PDFInfo
- Publication number
- CN106592899A CN106592899A CN201611113601.9A CN201611113601A CN106592899A CN 106592899 A CN106592899 A CN 106592899A CN 201611113601 A CN201611113601 A CN 201611113601A CN 106592899 A CN106592899 A CN 106592899A
- Authority
- CN
- China
- Prior art keywords
- wall surface
- putty
- metope
- mortar
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/02—Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09D—COATING COMPOSITIONS, e.g. PAINTS, VARNISHES OR LACQUERS; FILLING PASTES; CHEMICAL PAINT OR INK REMOVERS; INKS; CORRECTING FLUIDS; WOODSTAINS; PASTES OR SOLIDS FOR COLOURING OR PRINTING; USE OF MATERIALS THEREFOR
- C09D5/00—Coating compositions, e.g. paints, varnishes or lacquers, characterised by their physical nature or the effects produced; Filling pastes
- C09D5/34—Filling pastes
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/02—Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
- E04F13/04—Bases for plaster
Abstract
The invention discloses a construction method of an inner wall. The method comprises the following specific steps that (1), tools are prepared before construction; (3), the surface of a basement layer is completely washed; (4), bottom layer mortar is plastered; (6), surface mortar is plastered on the wall surface; (7), the inner wall surface is treated; (10), the wall surface is checked; (11), glue or varnish is brushed (sprayed) on the inner wall surface for bottom sealing ; (12), putty is painted on the inner wall surface for the first time; (13), after the wall surface is completely dried, the wall surface is polished to be smooth, and putty is brushed for the second time; (14), when the gypsum putty is dried by about 60-70%, pressing polishing and surface trimming are conducted; and (15), coating is sprayed. According to the construction method of the inner wall surface, an undersurface is treated repeatedly, seams of the undersurface are avoided, the overall flatness of the undersurface is ensured, the whole inner wall surface is stable by conducting gypsum putty brushing and coating spraying twice, an aesthetic feeling of cleanliness and brightness is achieved for people, and adhesives are added in the coating so that the coating can be attached to the wall surface.
Description
Technical field
The present invention relates to technical field of buildings, specially a kind of construction techniques of inner wall surface.
Background technology
The surface finish of wall body, is divided into indoor wall and outdoor wall surface.Wall surfacing is the part of architectural design.It is existing
For room fashion metope inner wall surface with color, texture change beautifying indoor environment, adjust illumination, select various with easily clear
The material of clean and good physical behavior, to meet many use functions.
The existing method built for inner wall surface, it is impossible to effectively process inner wall surface is right in process of construction
The rendering effect of inner wall surface is poor.
The content of the invention
It is an object of the invention to provide a kind of construction techniques of inner wall surface, to solve above-mentioned background technology in propose
Effectively inner wall surface can not be processed, the problem in process of construction, to the rendering effect of inner wall surface difference.
For achieving the above object, the present invention provides following technical scheme:A kind of construction techniques of inner wall surface, the skill
The step of art, includes:
1), construct before instrument prepare, including degumming agent, scraper plate, sand paper, bandage, guiding ruler, clearance gauge, angle grinder, land plaster,
Latax, cellulose aqueous solution etc.;
2), according to the smooth vertical case of substrate surface, carry out hanging vertical, set side and look for rule;
3), substrate surface is thoroughly scrubbed, after washing, clear water is spilt and is kept moistening 2 hours or more;
4), to scrubbing after basic unit carry out smearing bedding mortar, bottom adopts 1:1:4 cement mixing mortar is uniformly plated in,
With ruler alignment and scrape rough hair face;
5), to step 4) process after metope make corner protector, corner protector uses 1:2 cement mortar, mortar slightly receive it is dry after with smoothing out with the fingers angle device
Small round corner is smeared into, per side width 5cm is not less than;
6), to step 5) process after metope float coat mortar, surface layer mortar adopts 1:1:6 cement mortar are laid, and are laid
Afterwards with trowel, gently trowel smears out the surface of flat smooth;
7), inner wall surface is processed, will be levelling at gap and uneven with gypsum putty, putty is tamped it is floating,
And unnecessary putty is received net, polished with sand paper or angle grinder after putty is dry, and floating dust swept only in time, such as also uneven
Place, uses putty filling-in again, and gypsum putty match ratio is land plaster:Latax:Cellulose aqueous solution=100:45:60;
8), to step 7) process after gap at paste one layer of glass grid cloth or silk bar, cloth is bonded at emulsion is split
Sew on, cloth should be stretched during stick, paste flat;
9), to step 8) process after inner wall surface further processed, to applying degumming agent at the greasy dirt that adhering to
Thoroughly remove, it is then clean with scour without sediment motion;
10), to step 9) in metope check, it is ensured that metope substantially dry, basic unit's moisture content cannot be greater than 10%;
11), to step 10) in inner wall surface first brush (spray) one glue or varnish back cover, should uniformly during brush (spray), must not
There is omission, latex water mixing ratio by weight is clear water:Latex=5:1;
12), using step 7) in gypsum putty to step 11) process after inner wall surface carry out paint first pass putty,
Constructed successively parallel to wall edge direction, thickness is:4~5mm, such as wall once brush can not from it is upper on earth when, should be multi-level
Operation simultaneously up and down, cooperation of working in coordination, it is to avoid connect raft, brush overlapping phenomenon;
13), after step 12) process after metope be completely dried after, inner wall surface is polished flat, then painted
Second time putty, granted full is carried out parallel to room short side direction with big plate, and thickness is:3~4mm,
14), whne step 13) in 6~7 one-tenth of gypsum putty it is dry when, press polish is carried out to inner cavity surface with rubber flap and is had a shave, make
Inner wall surface surface layer is smooth bright and clean, and lines is straight, color uniformity, firmly answers light and even, and must not worn out paint film, by table after mill
Face cleans up;
15), to step 14) process after metope carry out sprayed coating, spray gun pressure is:0.3~0.5N/mm2, nozzle
In 90 ° with facing, distance is:40~1250px, specking is uniform during spraying, and displacement is all moderate, from unobtrusively during spraying
One beginning, gradually move in proper order to other end, to unobtrusively place receive brush, must not occur connecing raft, after terminating, whole table
Face is bright and clean consistent, round and smooth exquisiteness, without stream pendant film color phenomenon.
Preferably, the step 7) in, cellulose aqueous solution concentration is 3.5%.
Preferably, the step 12) in, rendering process can not stay raft, and receiving head must be neat and tidy, must not have at inner corner trim residual
Coating, must not wrap up in rib at external corner.
Preferably, the step 15) in, mixed with bonding agent in coating.
Preferably, the step 15) in, it is during spraying that all other facing of metope is all tight with newspaper covering.
Compared with prior art, the invention has the beneficial effects as follows:The construction techniques of the inner wall surface, is first carried out to bottom surface
Repeatedly process, can effectively ensure the seamless and overall flatness in bottom surface, by gypsum putty twice and sprayed coating, can
Inner wall surface Integral decoration Stability Analysis of Structures is made, it is pure white plain, pure lucid and lively aesthetic feeling is given, operating procedure is simple, and materials
Few, cost is relatively low, mixed with bonding agent in coating, coating can be made preferably to be attached on metope, prevents coating from not having viscosity and arriving
Place's trickling.
Specific embodiment
The technical scheme in the embodiment of the present invention is clearly and completely described below, it is clear that described embodiment
Only a part of embodiment of the invention, rather than the embodiment of whole.Based on the embodiment in the present invention, the common skill in this area
The every other embodiment that art personnel are obtained under the premise of creative work is not made, belongs to the model of present invention protection
Enclose.
The present invention provides a kind of technical scheme:A kind of construction techniques of inner wall surface, comprises the following steps:
1), construct before instrument prepare, including degumming agent, scraper plate, sand paper, bandage, guiding ruler, clearance gauge, angle grinder, land plaster,
Latax, cellulose aqueous solution etc.;
2), according to the smooth vertical case of substrate surface, carry out hanging vertical, set side and look for rule;
3), substrate surface is thoroughly scrubbed, after washing, clear water is spilt and is kept moistening 2 hours or more;
4), to scrubbing after basic unit carry out smearing bedding mortar, bottom adopts 1:1:4 cement mixing mortar is uniformly plated in,
With ruler alignment and rough hair face is scraped, can effectively strengthen the effect of combination;
5), to step 4) process after metope make corner protector, corner protector uses 1:2 cement mortar, mortar slightly receive it is dry after with smoothing out with the fingers angle device
Small round corner is smeared into, per side width 5cm is not less than;
6), to step 5) process after metope float coat mortar, surface layer mortar adopts 1:1:6 cement mortar are laid, and are laid
Afterwards with trowel, gently trowel smears out the surface of flat smooth;
7), inner wall surface is processed, will be levelling at gap and uneven with gypsum putty, putty is tamped it is floating,
And unnecessary putty is received net, polished with sand paper or angle grinder after putty is dry, and floating dust swept only in time, such as also uneven
Place, uses putty filling-in again, and gypsum putty match ratio is land plaster:Latax:Cellulose aqueous solution=100:45:60;
8), to step 7) process after gap at paste one layer of glass grid cloth or silk bar, cloth is bonded at emulsion is split
Sew on, cloth should be stretched during stick, paste flat;
9), to step 8) process after inner wall surface further processed, to applying degumming agent at the greasy dirt that adhering to
Thoroughly remove, it is then clean with scour without sediment motion, can prevent that the bed material of subsequent step can be caused to come off at the greasy dirt of bottom;
10), to step 9) in metope check, it is ensured that metope substantially dry, basic unit's moisture content cannot be greater than 10%;
11), to step 10) in inner wall surface first brush (spray) one glue or varnish back cover, should uniformly during brush (spray), must not
There is omission, latex water mixing ratio by weight is clear water:Latex=5:1;
12), using step 7) in gypsum putty to step 11) process after inner wall surface carry out paint first pass putty,
Constructed successively parallel to wall edge direction, thickness is:4~5mm, such as wall once brush can not from it is upper on earth when, should be multi-level
Operation simultaneously up and down, cooperation of working in coordination, it is to avoid connect raft, brush overlapping phenomenon;
13), after step 12) process after metope be completely dried after, inner wall surface is polished flat, then carry out powder
Second time putty of brush, granted full is carried out parallel to room short side direction with big plate, and thickness is:3~4mm,
14), whne step 13) in 6~7 one-tenth of gypsum putty it is dry when, press polish is carried out to inner cavity surface with rubber flap and is had a shave, make
Inner wall surface surface layer is smooth bright and clean, and lines is straight, color uniformity, firmly answers light and even, and must not worn out paint film, by table after mill
Face cleans up;
15), to step 14) process after metope carry out sprayed coating, spray gun pressure is:0.3~0.5N/mm2, nozzle with
Facing is in 90 °, and distance is:40~1250px, specking is uniform during spraying, and displacement is all moderate, from inconspicuous during spraying
One beginning, gradually moves in proper order to other end, to unobtrusively brush is received at place, must not occur connecing raft, after terminating, whole surface
It is bright and clean consistent, round and smooth exquisiteness, without stream pendant film color phenomenon.
In above-described embodiment, specifically, the step 7) in, cellulose aqueous solution concentration is 3.5%.
In above-described embodiment, specifically, the step 12) in, rendering process can not stay raft, and receiving head must be neat and tidy,
There must not be residual coating at inner corner trim, rib must not be wrapped up at external corner, can effectively prevent first pass putty out-of-flatness, can be greasy to upper second time
When son and sprayed coating, overall metope is caused to be uneven.
In above-described embodiment, specifically, the step 15) in, mixed with bonding agent in coating, in spraying process, can apply
Material is preferably attached on metope, prevents coating from not having viscosity and trickling, and affects the overall appearance of metope.
In above-described embodiment, specifically, the step 15) in, by all other facing of metope all with report during spraying
Paper covering is tight, prevents coating in lower spraying process to be sprayed on other positions, and other positions are polluted, and affects the whole of body of wall
Body effect.
First bottom surface is repeatedly processed, can effectively be ensured the seamless and overall flatness in bottom surface, by twice
Gypsum putty and sprayed coating, can make inner wall surface Integral decoration Stability Analysis of Structures, pure white plain, give pure lucid and lively aesthetic feeling,
Operating procedure is simple, and materials are few, and cost is relatively low, mixed with bonding agent in coating, coating can be made preferably to be attached on metope,
Prevent coating from there is no viscosity and trickling everywhere.
Although being described in detail to the present invention with reference to the foregoing embodiments, for a person skilled in the art,
It still can modify to the technical scheme described in foregoing embodiments, or which part technical characteristic is carried out etc.
With replacing, all any modification, equivalent substitution and improvements within the spirit and principles in the present invention, made etc. should be included in this
Within the protection domain of invention.
Claims (5)
1. a kind of construction techniques of inner wall surface, it is characterised in that:Comprise the following steps:
1) instrument prepares before, constructing, including degumming agent, scraper plate, sand paper, bandage, guiding ruler, clearance gauge, angle grinder, land plaster, latex
Liquid, cellulose aqueous solution etc.;
2), according to the smooth vertical case of substrate surface, carry out hanging vertical, set side and look for rule;
3), substrate surface is thoroughly scrubbed, after washing, clear water is spilt and is kept moistening 2 hours or more;
4), to scrubbing after basic unit carry out smearing bedding mortar, bottom adopts 1:1:4 cement mixing mortar is uniformly plated in, with directly
Chi alignment simultaneously scrapes rough hair face;
5), to step 4) process after metope make corner protector, corner protector uses 1:2 cement mortar, mortar slightly receive it is dry after smeared into smoothing out with the fingers angle device
Small round corner, per side width 5cm is not less than;
6), to step 5) process after metope float coat mortar, surface layer mortar adopts 1:1:6 cement mortar are laid, and are used after laying
Gently trowel smears out the surface of flat smooth to trowel;
7), inner wall surface is processed, will be levelling at gap and uneven with gypsum putty, putty is tamped floating, and handle
Unnecessary putty receives net, is polished with sand paper or angle grinder after putty is dry, and floating dust swept only in time, as at also uneven,
Again putty filling-in is used, gypsum putty match ratio is land plaster:Latax:Cellulose aqueous solution=100:45:60;
8), to step 7) process after gap at paste one layer of glass grid cloth or silk bar, cloth is bonded on crack with emulsion,
Cloth should be stretched during stick, paste flat;
9), to step 8) process after inner wall surface further processed, to thorough using degumming agent at the greasy dirt that adhering to
Remove, it is then clean with scour without sediment motion;
10), to step 9) in metope check, it is ensured that metope substantially dry, basic unit's moisture content cannot be greater than 10%;
11), to step 10) in inner wall surface first brush (spray) one glue or varnish back cover, uniformly should must not have something lost during brush (spray)
Leakage, latex water mixing ratio by weight is clear water:Latex=5:1;
12), using step 7) in gypsum putty to step 11) process after inner wall surface carry out paint first pass putty, it is parallel
Constructed successively in wall edge direction, thickness is:4~5mm, such as wall once brush can not from it is upper on earth when, should be upper and lower at many levels
Operation simultaneously, cooperation of working in coordination, it is to avoid connect raft, brush overlapping phenomenon;
13), after step 12) process after metope be completely dried after, inner wall surface is polished flat, then carry out rendering second
All over putty, granted full is carried out with big plate parallel to room short side direction, thickness is:3~4mm,
14), whne step 13) in 6~7 one-tenth of gypsum putty it is dry when, press polish is carried out to inner cavity surface with rubber flap and is had a shave, make interior wall
Face surface layer is smooth bright and clean, and lines is straight, color uniformity, firmly answers light and even, and must not worn out paint film, it is after mill that surface is clear
Sweep clean;
15), to step 14) process after metope carry out sprayed coating, spray gun pressure is:0.3~0.5N/mm2, nozzle and facing
In 90 °, distance is:40~1250px, specking is uniform during spraying, and displacement is all moderate, from inconspicuous one during spraying
Start, gradually move in proper order to other end, to unobtrusively brush is received at place, must not occur connecing raft, after terminating, whole surface is bright and clean
Unanimously, round and smooth exquisiteness, without stream pendant film color phenomenon.
2. the construction techniques of a kind of inner wall surface according to claim 1, it is characterised in that:The step 7) in, it is fine
The plain concentration of aqueous solution of dimension is 3.5%.
3. the construction techniques of a kind of inner wall surface according to claim 1, it is characterised in that:The step 12) in, powder
Swiped through journey can not stay raft, and receiving head must be neat and tidy, must not there is residual coating at inner corner trim, and rib must not be wrapped up at external corner.
4. the construction techniques of a kind of inner wall surface according to claim 1, it is characterised in that:The step 15) in, apply
Mixed with bonding agent in material.
5. the construction techniques of a kind of inner wall surface according to claim 1-4, it is characterised in that:The step 15) in,
It is during spraying that all other facing of metope is all tight with newspaper covering.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611113601.9A CN106592899A (en) | 2016-12-07 | 2016-12-07 | Construction method of inner wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611113601.9A CN106592899A (en) | 2016-12-07 | 2016-12-07 | Construction method of inner wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106592899A true CN106592899A (en) | 2017-04-26 |
Family
ID=58596457
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611113601.9A Pending CN106592899A (en) | 2016-12-07 | 2016-12-07 | Construction method of inner wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106592899A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107044196A (en) * | 2017-06-09 | 2017-08-15 | 北京广佳建筑装饰股份有限公司 | A kind of concrete is plastered face emulsion paint brushing technique |
CN107642237A (en) * | 2017-09-29 | 2018-01-30 | 中国十七冶集团有限公司 | A kind of construction method of light partition wall base treatment |
CN108952164A (en) * | 2018-08-27 | 2018-12-07 | 金陵科技学院 | A kind of concrete structure, lightweight wall interior wall exempt from plastering construction method |
CN109025109A (en) * | 2018-08-17 | 2018-12-18 | 徽都建设有限公司 | A kind of construction technology coating inner wall of building face |
CN109555316A (en) * | 2018-11-14 | 2019-04-02 | 冠恒建设工程有限公司 | Environment protection architecture construction method |
CN110185217A (en) * | 2019-05-28 | 2019-08-30 | 广州市设计院工程建设总承包公司 | A kind of internal wall finishing method |
CN115405101A (en) * | 2022-10-15 | 2022-11-29 | 吴岩峰 | Construction method for inner wall surface |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060075717A1 (en) * | 2004-10-08 | 2006-04-13 | Wolfgang Braungardt | Process for the construction of a building |
CN101134859A (en) * | 2006-08-30 | 2008-03-05 | 北京阔达建筑装饰工程有限责任公司 | Inner wall special-purpose chromatic powdery waterproof putty and construction method |
-
2016
- 2016-12-07 CN CN201611113601.9A patent/CN106592899A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060075717A1 (en) * | 2004-10-08 | 2006-04-13 | Wolfgang Braungardt | Process for the construction of a building |
CN101134859A (en) * | 2006-08-30 | 2008-03-05 | 北京阔达建筑装饰工程有限责任公司 | Inner wall special-purpose chromatic powdery waterproof putty and construction method |
Non-Patent Citations (4)
Title |
---|
无: "《乳胶漆喷涂》", 《豆丁网》 * |
无: "《内墙刮腻子安全技术交底》", 《百度文库》 * |
无: "《内墙面装饰施工方法》", 《房地产E网》 * |
王小漳: "《建筑装饰装修施工技术实训》", 30 April 2014, 厦门大学出版社 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107044196A (en) * | 2017-06-09 | 2017-08-15 | 北京广佳建筑装饰股份有限公司 | A kind of concrete is plastered face emulsion paint brushing technique |
CN107642237A (en) * | 2017-09-29 | 2018-01-30 | 中国十七冶集团有限公司 | A kind of construction method of light partition wall base treatment |
CN109025109A (en) * | 2018-08-17 | 2018-12-18 | 徽都建设有限公司 | A kind of construction technology coating inner wall of building face |
CN108952164A (en) * | 2018-08-27 | 2018-12-07 | 金陵科技学院 | A kind of concrete structure, lightweight wall interior wall exempt from plastering construction method |
CN109555316A (en) * | 2018-11-14 | 2019-04-02 | 冠恒建设工程有限公司 | Environment protection architecture construction method |
CN110185217A (en) * | 2019-05-28 | 2019-08-30 | 广州市设计院工程建设总承包公司 | A kind of internal wall finishing method |
CN115405101A (en) * | 2022-10-15 | 2022-11-29 | 吴岩峰 | Construction method for inner wall surface |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106592899A (en) | Construction method of inner wall | |
CN103952052A (en) | Travertine-like elastic texture coating and preparation method thereof | |
CN107044196A (en) | A kind of concrete is plastered face emulsion paint brushing technique | |
CN109797920A (en) | A kind of interior covering with paint construction method | |
CN101168988A (en) | Construction method for water-based texture wallpaper paint and special-purpose tool for the same | |
CN103375000A (en) | Process for constructing waterborne fluorocarbon metal paint on elastic floating-coat nap surface | |
CN104449169A (en) | Preparation method of natural slice paint | |
CN109424135A (en) | The technique that the putty of metope in building is coated | |
CN107859260A (en) | A kind of wall surface spraying technique | |
CN104386950A (en) | Exterior wall brick-imitating elastic texture coating and application process thereof | |
CN112681643A (en) | Construction method for washing stone on outer wall surface | |
CN101024750A (en) | Marble paint for building, its preparing method and construction process | |
CN101613570A (en) | Colored gorgeous texture floor coating and construction technology | |
Ochilova | Technology of painting works in construction | |
CN104120860A (en) | Construction method for cement mortar ground leveling | |
CN107386681A (en) | Puttying and the construction technology of brush emulsion paint | |
CN104453131A (en) | Building external wall heat insulation coating construction process | |
CN106869428A (en) | A kind of heat insulating reflecting colored mortar construction technology | |
CN109555316A (en) | Environment protection architecture construction method | |
CN109025109A (en) | A kind of construction technology coating inner wall of building face | |
CN104891856A (en) | Diatom mud and construction method thereof | |
JP3191039B2 (en) | Repainting method of tile and tile-like finish coating | |
CN110409725A (en) | A kind of interior decoration method | |
CN102259085A (en) | Application of water-based metal paint in sgraffito coating process | |
CN103254697B (en) | Water-based texture wall film paint and constructional method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170426 |