CN104775575B - Real stone paint construction process - Google Patents
Real stone paint construction process Download PDFInfo
- Publication number
- CN104775575B CN104775575B CN201510079711.7A CN201510079711A CN104775575B CN 104775575 B CN104775575 B CN 104775575B CN 201510079711 A CN201510079711 A CN 201510079711A CN 104775575 B CN104775575 B CN 104775575B
- Authority
- CN
- China
- Prior art keywords
- spray
- metope
- spraying
- stricture
- painted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Building Environments (AREA)
- Application Of Or Painting With Fluid Materials (AREA)
Abstract
The invention discloses a real stone paint construction process; and the process comprises the steps of cleaning of a base layer, repair of pot holes in a wall surface to be painted, spraying of alkali-resistant primer, elastic mesh division and bonding of beautiful pattern papers, first spraying of real stone paint, second spraying of real stone paint, uncovering of the beautiful pattern papers and pointing, spraying of finish-coat paint, spraying of finish-coat varnish after total drying of the real stone paint and formation of a real stone paint layer on the wall surface to be painted. The real stone paint construction process is simple in process, easy in operation and low in cost; the real stone paint is an environment-friendly wall paint, and has the effects of energy conservation and environmental protection; and the real stone paint construction process can prevent the formation of chromatic aberration and improve the beauty of exterior wall surfaces to a greater extent, prevents the formation of such defects as cracks and bumps inside, prevents the falling of paint layers, and prolongs the service life of paint surfaces to be matched with the service life of buildings.
Description
Technical field
The present invention relates to a kind of architectural engineering construction technique field, particularly a kind of by true mineral varnish brushing in building surface
Construction method on (body of wall).
Background technology
True mineral varnish (another name: artificial granite paint, sliver paint) is a kind of coating of building surface, is that a kind of decorative effect is cruel
Chrysodor, the coating of granite;Mainly it is formulated using the natural stone-powder of shades of colour.Building after true mineral varnish finishing
Thing, has natural real natural colour, gives elegance, harmony, serious aesthetic feeling, is suitable for the indoor and outdoor of all kinds of buildings
Finishing, has a kind of effect of back to nature.True mineral varnish has fire prevention, waterproof, acid and alkali-resistance, anti-pollution, nontoxic, tasteless, bonding force
By force, the features such as will never fade, can effectively stop extraneous adverse circumstances that building is corroded, extend the life-span of building, due to
True mineral varnish possesses good adhesive force and freeze-thaw resistance property, is therefore particularly suitable for using in cold district.Brush true mineral varnish just like
Lower fundamental importance, (1) erection of doors and windows finishes (if partial trim, being also easy to produce aberration);
(2) paint smooth firm, free from flaw, linea angulata is straight;(3) the no floating ash of metope, not dusting, no rust staining, mildew, not general
Alkali;(4) metope moisture content≤9%, ph value 7~9.
But, the true mineral varnish construction method of prior art, it is relatively easy to form aberration, be internally formed crack and hollowing etc., especially
It is in the construction of big plane body of wall it is easier to form aberration, the aesthetics of impact wall face;It is internally formed crack and hollowing etc.
Defect, makes enamelled coating easily come off, and reduces the service life of lacquer painting it is impossible to mate it is difficult to meet with the service life of building
The needs of owner;And, whole construction method, comparatively laborious, inconvenient operation.
Content of the invention
It is an object of the invention to provide a kind of true mineral varnish construction technique, solve complex process, operation in prior art
Inconvenience, high cost, easily formation aberration, the problem of the aesthetics of impact wall face.
To achieve these goals, the true mineral varnish construction method designed by the present invention, comprises the steps:
(1) clear up basic unit: the purpose of cleaning basic unit is to remove the various attachments of metope to be painted, so that metope to be painted is done
Only clean and tidy, it is easy to coating application, increase the adhesion firmness of coating;
(2) repair at metope hollow to be painted;Repaired at the obvious uneven of metope to be painted with flexible waterproof putty, make
It is basically identical with big degree of plainness for wall surface;
(3) repair metope to be painted: on metope to be painted, whole metopes all smear flexible waterproof putty, form 2
The flexible waterproof putty layer of 2.5mm thickness;Make metope basic unit to be painted smooth, to be dried after use sand papering;
(4) spray alkali-resistant primer: after the polishing of flexible waterproof putty layer is qualified on inspection, use spray gun spraying alkali-resistant primer,
Spraying uniformly, forms the alkali-resistant primer layer of 0.01mm 0.15mm thickness;
(5) lattice, T-me stricture of vagina paper are played: according to the lattice scheme of technological requirement, lattice, bullet ink are carried out on alkali-resistant primer face
Line, it is desirable to the line of ink marker must be smooth vertical and horizontal, draws segmentation line color along the line of ink marker, and then T-me stricture of vagina paper is it is desirable to U.S. stricture of vagina paper width is consistent,
When pasting U.S. stricture of vagina paper, should first paste horizontal direction, then paste vertical direction;
(6) spray the true mineral varnish of first pass: with the true mineral varnish of spray gun spraying first pass, spray uniformly, drain spray and mistake must not occur
Spray phenomenon, large area spraying before should first carry out examination spray, with model contrast errorless after can large area spraying;
(7) after the true mineral varnish of first pass is dried, spray second time true mineral varnish, spraying uniformly, drain spray must not and cross spray
Phenomenon;
(8) tear-off U.S. stricture of vagina paper, jointing: after second time true mineral varnish spraying finishes and be dried, tear U.S. stricture of vagina paper off;Tear-off U.S. stricture of vagina paper
When, should first take off vertically U.S. stricture of vagina paper perpendicular to metope, after take off level U.S. stricture of vagina paper, should be excised every a bit of;
(9) spray finish: after true mineral varnish parches completely, spray finishing varnish;Formed very on metope surface to be painted
Mineral varnish layer.
Further feature is to be, after all metope all smears flexible waterproof putty in step (3), smears flexibility again
Water proof putty, forms the flexible waterproof putty layer of 0.2 1.2 mm thickness;Use sand papering smooth, by metope dust after drying
Clean out to meet the requirement of spray-applied primer.
New spray true mineral varnish when will with the enamelled coating overlapping edges above having sprayed, the width of overlap joint 1/3 1/2, and
Have a common boundary width to be consistent, make film thickness consistent.
Compared with prior art, the true mineral varnish construction method that the present invention obtains, has the advantage that
1st, simple production process, processing ease, low cost;
2nd, it is a kind of environmental-friendly walling coating, there is energy-saving and environmental protection effect;
3rd, applicable surface width, can be used for multiple basal plane such as brick wall, foam, Gypsum Fibrosum, aluminium sheet, glass and can be with building
Any application of moulding;
4th, formation aberration can be largely avoided, improve the aesthetics of wall face;
5th, avoid being internally formed the defects such as crack and hollowing, prevent enamelled coating from coming off, extend lacquer painting service life, can with build
Build the service life coupling of thing.
Specific embodiment
With reference to embodiment, the present invention is further described.
The true mineral varnish construction method of the present invention, its summary step is as follows:
Cleaning basic unit's first pass flexible waterproof putty the 3rd time flexibility of second time flexible waterproof putty (polishing) is resistance to
Water putty (polishing) roller coating special alkali-resistant primer snap the line lattice, T-me stricture of vagina paper spraying first pass true mineral varnish spraying the
The stricture of vagina paper spraying finish finishing of two times true mineral varnish tear-off U.S.s is checked and accepted;
1st, clear up basic unit: the purpose of cleaning basic unit is to remove the various attachments of metope to be painted, so that metope to be painted is done
Only clean and tidy, it is easy to coating application, increase the adhesion firmness of coating.Check that whether straight main body degree of plainness for wall surface and lines are clear
Clear it is desirable to substrate surface is smooth, (cement sand pulp should maintain more than 15 day) is dried, the spot such as no floating ash, and ph < 10, aqueous
Rate < 10%.Concrete surface should scalp floating layer it is ensured that substrate firmly, is removed the dregs of metope, to Porous, rough base, carried out
Repair, then polished with emery wheel;
2nd, repair at metope hollow to be painted;Repaired at the obvious uneven of metope to be painted with flexible waterproof putty, make
It is basically identical with big degree of plainness for wall surface;Flexible waterproof putty selects the product of prior art, does not describe in detail;
3 repair metope to be painted: on metope to be painted, whole metopes all smear (brush) flexible waterproof putty, form 2
The flexible waterproof putty layer of 2.5mm thickness;Make metope basic unit to be painted smooth, to be dried after use sand papering;Flexible waterproof is greasy
The thickness of sublayer determines according to the flatness of metope, material etc., specifically can choose 2 mm, 2.05 mm, 2.10 mm, 2.15
Mm, 2.20 mm, 2.2 5 mm, 2.30 mm, 2.35 mm, 2.40 mm, 2.45 mm, 2.5mm etc., can meet need of the present invention
Will;
According to construction requirement, (brush) flexible waterproof putty can also be smeared for the 3rd time: all metope all smears (brush) flexibility
Water proof putty, forms the flexible waterproof putty layer of 0.2 1.2 mm thickness;Use sand papering smooth, by metope dust after drying
Clean out to meet the requirement of spray-applied primer;The thickness of flexible waterproof putty layer determines according to the flatness of metope, material etc.,
Specifically can choose 0.2 mm, 0.3 mm, 0.4 mm, 0.5 mm, 0.6 mm, 0.7mm, 0.8 mm, 0.9mm, 1.60mm,
1.1mm, 1.2 mm etc., can meet needs of the present invention;Smear (brush) flexible waterproof putty 3rd time, optimal putting down can be obtained
Whole degree and surface smoothness, and cohesive force can be significantly improved;
4th, spray alkali-resistant primer: after the polishing of flexible waterproof putty layer is qualified on inspection, use spray gun spraying alkali-resistant primer,
Ask spraying uniformly, form the alkali-resistant primer layer of 0.01mm 0.15mm thickness it is ensured that alkali-resistant primer layer is completely covered by basic unit's (flexibility
Water proof putty layer);Alkali-resistant primer is the priming paint matching with flexible waterproof putty, true mineral varnish to be sprayed, selects prior art
Product, do not describe in detail;
5th, lattice, T-me stricture of vagina paper are played: according to the lattice scheme of technological requirement, lattice, bullet ink are carried out on alkali-resistant primer face
Line, it is desirable to the line of ink marker must be smooth vertical and horizontal, draws segmentation line color along the line of ink marker, and then T-me stricture of vagina paper is it is desirable to U.S. stricture of vagina paper width is consistent,
When pasting U.S. stricture of vagina paper, should first paste horizontal direction, then paste vertical direction;U.S. stricture of vagina paper is also and true mineral varnish phase to be sprayed
The U.S. stricture of vagina paper of adapted, selects the product of prior art, does not describe in detail;Play the concrete length of lattice, the width dimensions that the line of ink marker is formed, press
Carry out according to technological requirement;
6th, spray the true mineral varnish of first pass: after lattice U.S. stricture of vagina paper has pasted check errorless after, with the true stone of spray gun spraying first pass
Paint, is sprayed in strict accordance with technological requirement, and spraying uniformly, drain spray and the phenomenon crossing spray must not, answer before large area spraying
First carry out examination spray, with model contrast errorless after can large area spraying;Due to having pasted the metope at U.S. stricture of vagina paper position, spraying true
Mineral varnish is blocked by U.S. stricture of vagina paper, is not really sprayed onto on the metope at these positions, and after U.S. stricture of vagina paper tear-off, this part does not spray to
The metope of true mineral varnish, forms dividing joint, and the dividing joint on metope forms horizontal, longitudinally staggered grid;
7th, after the true mineral varnish of first pass is dried, typically need the drying time of 4 ~ 6 hours, second time true mineral varnish of spraying is it is desirable to spray
Apply uniformly, the phenomenon that drain spray must not occur and cross spray;
8th, tear-off U.S. stricture of vagina paper, jointing: after second time true mineral varnish spraying finishes, wait to be dried after, after about 2 ~ 3 hours,
Tear U.S. stricture of vagina paper off, during tear-off U.S. stricture of vagina paper, should first take off vertically U.S. stricture of vagina paper perpendicular to metope, after take off level U.S. stricture of vagina paper, every a bit of
Should be excised, prevent from destroying the face of dividing joint or sliver paint;
9th, spray finish: after true mineral varnish parches completely, finishing varnish can be sprayed, it should be noted that keeping cover during construction
The bond degree of varnish, should spray uniformly, can not drain spray, notes that prevention stream falls phenomenon;Finish is also and true mineral varnish to be sprayed
Match, select the product of prior art, do not describe in detail.After spraying finish, form true mineral varnish layer on metope surface to be painted.
On view picture, the exterior wall of big plane, spray the true mineral varnish of view picture, if technique grasps bad, easily formation aberration,
The aesthetics of impact wall face, or even do not reach construction technical standard, therefore aberration will be especially prevented in constructing operation;Color
Difference Producing reason mainly has: a, not bulk purchase raw material;
B, apply uneven generation surface shaded and cause aberration;C, base course wall are untreated smooth.Anti- for aberration
Control measure, except before engineering raw material is purchased by the gross, is constructed again inspection it is ensured that in addition to color and luster unanimously prevents aberration, in operation, needing
In advance technical training is carried out to workman so as to skillfully grasp spray gun using method, in work progress, spray gun is mobile will be uniformly;And
And, in large-area construction, the process problem with the enamelled coating having sprayed when being such as related to newly spray, will in the true mineral varnish of new spray
With the enamelled coating overlapping edges above having sprayed, the width of overlap joint is 1/3 1/2, and has a common boundary width and be consistent it is ensured that film
Thickness is consistent;
On view picture, the exterior wall of big plane, spray the true mineral varnish of view picture, if technique grasp bad, easily formed hollowing,
Crack, the aesthetics of impact wall face, and so that enamelled coating is easily come off, reduce service life, or even do not reach construction technology mark
Accurate;Hollowing, crack Producing reason are as follows: a. base treatment is bad;B. Air Temperature Difference changes greatly;C. construction metope is too dry
The dry and hollowing that causes.Hollowing, crack Prevention Measures: a. is implemented and removes the work of basal plane dust foreign body, metope is cleaned out
;B. monitor in real time is carried out to weather condition, select the consistent weather of temperature, humidity to be constructed as far as possible, and use little nozzle
Spray gun, thin spray multilamellar, control every layer of rate of drying;C. before constructing, the moisture content of same day construction metope is tested, sternly
Lattice are constructed to body of wall humidity requirement according to product construction.
True mineral varnish simple production process, low cost, excellent performance, with scientific technological advance, environment-friendly type, high resiliency, no
The development and application of binding dust series, wide to more high-grade DEVELOPMENT PROSPECT, therefore market prospect is very good.
Finally it should be noted that above example is only in order to illustrate technical scheme rather than restriction technologies side
Case, although applicant has been described in detail to the present invention with reference to preferred embodiment, those of ordinary skill in the art should manage
Solution, those are modified to technical scheme or equivalent, the objective without deviating from the technical program and scope,
All should cover in the middle of scope of the presently claimed invention.
Claims (1)
1. a kind of true mineral varnish construction technique is it is characterised in that comprise the steps,
(1) clear up basic unit: the purpose of cleaning basic unit is to remove the various attachments of metope to be painted, and makes metope to be painted totally whole
Clean, it is easy to coating application, increase the adhesion firmness of coating;
(2) repair at metope hollow to be painted;Repaired at the obvious uneven of metope to be painted with flexible waterproof putty so as to
Big degree of plainness for wall surface is basically identical;
(3) repair metope to be painted: on metope to be painted, whole metopes all smear flexible waterproof putty, form 2 2.5mm
The flexible waterproof putty layer of thickness;Make metope basic unit to be painted smooth, to be dried after use sand papering;
Smear flexible waterproof putty again, form the flexible waterproof putty layer of 0.2 1.2 mm thickness;Sand papering is used after drying
Smooth, metope dust is cleaned out to meet the requirement of spray-applied primer;
(4) spray alkali-resistant primer: after the polishing of flexible waterproof putty layer is qualified on inspection, use spray gun spraying alkali-resistant primer, spraying
Uniformly, form the alkali-resistant primer layer of 0.01mm 0.15mm thickness;
(5) lattice, T-me stricture of vagina paper are played: according to the lattice scheme of technological requirement, lattice is carried out on alkali-resistant primer face, plays the line of ink marker,
The line of ink marker must be smooth vertical and horizontal, draws segmentation line color along the line of ink marker, and then T-me stricture of vagina paper, it is desirable to U.S. stricture of vagina paper width is consistent, is pasted beautiful
During stricture of vagina paper, should first paste horizontal direction, then paste vertical direction;
(6) spray the true mineral varnish of first pass: with the true mineral varnish of spray gun spraying first pass, spray uniformly, drain spray must not occur and cross spray
Phenomenon, large area spraying before should first carry out examination spray, with model contrast errorless after carry out large area spraying;
(7) after the true mineral varnish of first pass is dried, spray second time true mineral varnish, spraying is uniformly;In new second time paint of spray will with above
The enamelled coating overlapping edges having sprayed, the width of overlap joint is 1/3 1/2, and has a common boundary width and be consistent, and makes film thickness one
Cause;
(8) tear-off U.S. stricture of vagina paper, jointing: after second time true mineral varnish spraying finishes and be dried, tear U.S. stricture of vagina paper off;During tear-off U.S. stricture of vagina paper,
Vertically U.S. stricture of vagina paper should first be taken off perpendicular to metope, after take off level U.S. stricture of vagina paper, should be excised every a bit of;
(9) spray finish: after true mineral varnish parches, spray finishing varnish;Form true mineral varnish layer on metope surface to be painted.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510079711.7A CN104775575B (en) | 2015-02-13 | 2015-02-13 | Real stone paint construction process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510079711.7A CN104775575B (en) | 2015-02-13 | 2015-02-13 | Real stone paint construction process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104775575A CN104775575A (en) | 2015-07-15 |
CN104775575B true CN104775575B (en) | 2017-02-01 |
Family
ID=53617309
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510079711.7A Active CN104775575B (en) | 2015-02-13 | 2015-02-13 | Real stone paint construction process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104775575B (en) |
Families Citing this family (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105298045B (en) * | 2015-10-13 | 2017-12-15 | 北京艺高世纪科技股份有限公司 | A kind of interior wall diatom ooze coating and its painting method |
CN105201166B (en) * | 2015-10-23 | 2018-07-20 | 北京艺高世纪科技股份有限公司 | A kind of Thick Elastic matter parian coating and its brush coating process |
CN105272131A (en) * | 2015-11-20 | 2016-01-27 | 南京福臻再生资源科技股份有限公司 | Dry powder type really stone paint and preparation method and using method thereof |
CN106988494A (en) * | 2017-03-24 | 2017-07-28 | 中华制漆(深圳)有限公司 | The slurry coating process of full water-based simulated natural granite face effect |
CN107083827B (en) * | 2017-04-27 | 2019-01-01 | 霸州市瑞硕盈装饰装修工程有限公司 | Lacquer coating application technique |
CN108930374A (en) * | 2017-05-26 | 2018-12-04 | 五冶集团上海有限公司 | A kind of environment-friendly type lacquer external wall construction method with heat insulating reflecting function |
CN107268906B (en) * | 2017-07-11 | 2019-03-15 | 彭水县绿忆环保科技有限公司 | The construction technology of liquid granite coating |
CN108797921B (en) * | 2018-06-15 | 2020-03-27 | 兰舍硅藻新材料有限公司 | Construction method of wall paint imitating three-dimensional wall bricks |
CN109281472A (en) * | 2018-09-13 | 2019-01-29 | 肖霞 | A kind for the treatment of process in paint spraying construction to coating base |
CN109057253A (en) * | 2018-09-13 | 2018-12-21 | 重庆三原色节能建筑工程有限公司 | The processing method of coating and other material members intersections |
CN108952167A (en) * | 2018-09-13 | 2018-12-07 | 肖霞 | Imitative stone is painted on the simulation process method of system terminal |
CN108979154A (en) * | 2018-09-13 | 2018-12-11 | 肖霞 | The dividing joint of imitative stone coating and the processing method of yin-yang angle seam |
CN109610833B (en) * | 2019-01-22 | 2021-04-23 | 邓绍富 | Construction technology of building coating |
CN110453860A (en) * | 2019-05-09 | 2019-11-15 | 郑州市永威置业有限公司 | It criticizes and scrapes brick construction technology |
CN110629959A (en) * | 2019-09-25 | 2019-12-31 | 西安翔远装饰工程有限责任公司 | Dry-hanging spraying artistic concrete and construction process thereof |
CN111270820B (en) * | 2020-03-06 | 2021-06-29 | 浙江华德新材料有限公司 | Limestone deep seam construction process method |
CN111779313A (en) * | 2020-08-17 | 2020-10-16 | 宁波威士伯汉华装饰工程有限公司 | Fired surface repairing structure and construction process |
CN112267649B (en) * | 2020-10-28 | 2021-09-21 | 重庆联筑装饰工程有限公司 | Wall surface stone-like coating construction device and construction process thereof |
CN113152814A (en) * | 2021-04-19 | 2021-07-23 | 安徽开源路桥有限责任公司 | Construction method for spraying stone-like paint on outer wall |
CN113863599A (en) * | 2021-09-27 | 2021-12-31 | 上海宝冶建筑装饰有限公司 | Indoor paint construction method based on theme park |
CN114934644A (en) * | 2022-06-10 | 2022-08-23 | 徐州腾美建筑装饰工程有限公司 | 5M construction process for building exterior wall decorative coating |
CN115288384A (en) * | 2022-08-30 | 2022-11-04 | 龙牌涂料(北京)有限公司 | Real stone paint scraping process and device for three-dimensional jigsaw puzzle process |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2282521A1 (en) * | 1974-08-23 | 1976-03-19 | Coudert Maurice | Casting of imitation stone surfaces - by using removable mouldings forming areas for surface worked mortar |
JP2001164728A (en) * | 1999-12-13 | 2001-06-19 | Aica Kogyo Co Ltd | Wall-surface finishing structure |
CN1607304A (en) * | 2003-10-13 | 2005-04-20 | 王光胜 | Stone paint construction process |
CN101319552A (en) * | 2008-07-23 | 2008-12-10 | 勾希杰 | Construction method of ture mineral varnish face brick-imitation construction exterior wall |
CN101899899A (en) * | 2009-05-26 | 2010-12-01 | 内蒙古兴泰建筑有限责任公司 | Construction method of external wall simulation stone-type paint surface layer |
CN103233574A (en) * | 2013-05-08 | 2013-08-07 | 内蒙古兴泰建筑有限责任公司 | Construction method for simulation stone paint surface layer of external wall |
-
2015
- 2015-02-13 CN CN201510079711.7A patent/CN104775575B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2282521A1 (en) * | 1974-08-23 | 1976-03-19 | Coudert Maurice | Casting of imitation stone surfaces - by using removable mouldings forming areas for surface worked mortar |
JP2001164728A (en) * | 1999-12-13 | 2001-06-19 | Aica Kogyo Co Ltd | Wall-surface finishing structure |
CN1607304A (en) * | 2003-10-13 | 2005-04-20 | 王光胜 | Stone paint construction process |
CN101319552A (en) * | 2008-07-23 | 2008-12-10 | 勾希杰 | Construction method of ture mineral varnish face brick-imitation construction exterior wall |
CN101899899A (en) * | 2009-05-26 | 2010-12-01 | 内蒙古兴泰建筑有限责任公司 | Construction method of external wall simulation stone-type paint surface layer |
CN103233574A (en) * | 2013-05-08 | 2013-08-07 | 内蒙古兴泰建筑有限责任公司 | Construction method for simulation stone paint surface layer of external wall |
Also Published As
Publication number | Publication date |
---|---|
CN104775575A (en) | 2015-07-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104775575B (en) | Real stone paint construction process | |
CN103572845B (en) | A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof | |
CN102425284B (en) | Manufacturing method of building inner and outer wall decorating plate | |
CN109025356A (en) | A kind of exterior wall retrofit coating process | |
CN102704635B (en) | Paint brushing construction method | |
CN107044196A (en) | A kind of concrete is plastered face emulsion paint brushing technique | |
CN103952052A (en) | Travertine-like elastic texture coating and preparation method thereof | |
CN103375000A (en) | Process for constructing waterborne fluorocarbon metal paint on elastic floating-coat nap surface | |
CN102409824B (en) | Production method of dry-bonded color sand veneer | |
CN101886463B (en) | High water-resistant stone-like coating building inner and outer wall construction method | |
CN105298045B (en) | A kind of interior wall diatom ooze coating and its painting method | |
CN113152814A (en) | Construction method for spraying stone-like paint on outer wall | |
CN111677280A (en) | Construction method of exterior wall coating | |
CN101899899A (en) | Construction method of external wall simulation stone-type paint surface layer | |
CN104088415A (en) | Construction method for finish concrete surface repair protective agent | |
CN106869428A (en) | A kind of heat insulating reflecting colored mortar construction technology | |
CN106284890A (en) | A kind of construction method of art colored stone paint | |
CN108930374A (en) | A kind of environment-friendly type lacquer external wall construction method with heat insulating reflecting function | |
CN114352055A (en) | Construction process for renovating paint on old wall | |
CN205777208U (en) | Flexible texture coating body of wall | |
CN109138480B (en) | Antique-finishing method for wall surface painted by water-brushed stone on outer wall of historical building | |
CN113417417A (en) | Old-imitation red brick veneer structure and construction process thereof | |
CN207211573U (en) | A kind of super-hydrophobic heat insulation decoration integrated plate | |
CN108407537A (en) | A kind of construction method of ink process wall | |
CN219343615U (en) | Putty composite heat-insulating outer wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |