CN104775575A - Real stone paint construction process - Google Patents
Real stone paint construction process Download PDFInfo
- Publication number
- CN104775575A CN104775575A CN201510079711.7A CN201510079711A CN104775575A CN 104775575 A CN104775575 A CN 104775575A CN 201510079711 A CN201510079711 A CN 201510079711A CN 104775575 A CN104775575 A CN 104775575A
- Authority
- CN
- China
- Prior art keywords
- metope
- spraying
- true mineral
- mineral varnish
- whitewashed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Application Of Or Painting With Fluid Materials (AREA)
- Building Environments (AREA)
Abstract
The invention discloses a real stone paint construction process; and the process comprises the steps of cleaning of a base layer, repair of pot holes in a wall surface to be painted, spraying of alkali-resistant primer, elastic mesh division and bonding of beautiful pattern papers, first spraying of real stone paint, second spraying of real stone paint, uncovering of the beautiful pattern papers and pointing, spraying of finish-coat paint, spraying of finish-coat varnish after total drying of the real stone paint and formation of a real stone paint layer on the wall surface to be painted. The real stone paint construction process is simple in process, easy in operation and low in cost; the real stone paint is an environment-friendly wall paint, and has the effects of energy conservation and environmental protection; and the real stone paint construction process can prevent the formation of chromatic aberration and improve the beauty of exterior wall surfaces to a greater extent, prevents the formation of such defects as cracks and bumps inside, prevents the falling of paint layers, and prolongs the service life of paint surfaces to be matched with the service life of buildings.
Description
Technical field
The present invention relates to a kind of architectural engineering construction technique field, particularly a kind of by the construction method of true mineral varnish brushing on building surface (body of wall).
Background technology
True mineral varnish (another name: artificial granite paint, sliver paint) is a kind of coating of building surface, is the coating that a kind of decorative effect exactly likes marble, granite; The natural stone-powder of main employing shades of colour is formulated.Building after true mineral varnish finishing, has natural real natural colour, gives elegance, harmony, serious aesthetic feeling, be suitable for the indoor and outdoor decoration of all kinds of building, have a kind of effect of back to nature.True mineral varnish has fire prevention, waterproof, acid and alkali-resistance, anti-pollution, nontoxic, tasteless, bonding force is strong, the feature such as will never fade, extraneous adverse circumstances can be effectively stoped to corrode building, extend the life-span of building, because true mineral varnish possesses good adhesive power and freeze-thaw resistance property, be therefore particularly suitable for using in cold district.Brush true mineral varnish and have following fundamental importance, (1) erection of doors and windows complete (if partial trim, easily producing aberration);
(2) whitewash firmly smooth, free from flaw, linea angulata is straight; (3) metope without floating ash, not dusting, without rust staining, mildew, the not accumulation of salt in the surface soil; (4) metope moisture content≤9%, pH value 7 ~ 9.
But the true mineral varnish construction method of prior art, is easier to form aberration, inner formation crack and hollowing etc., especially in the construction of large plane body of wall, more easily forms aberration, affect the aesthetics of wall face; Inner defect such as formation crack and hollowing etc., makes enamelled coating easily come off, reduces the application life of lacquer painting, can not mate, be difficult to the needs meeting owner with the application life of building; And, whole construction method, more loaded down with trivial details, inconvenient operation.
Summary of the invention
The object of this invention is to provide a kind of true mineral varnish construction technique, the problem solve complex process in prior art, operation is inconvenient, cost is high, easily forming aberration, affect the aesthetics of wall face.
To achieve these goals, the true mineral varnish construction method designed by the present invention, comprises the steps:
(1) basic unit is cleared up: the object of cleaning basic unit removes the various attachments of metope to be whitewashed, and makes metope neat and tidy to be whitewashed, be convenient to coating application, increases the adhesion firmness of coating;
(2) metope hollow place to be whitewashed is repaired; Repair the obvious uneven place of metope to be whitewashed with flexible waterproof putty, make itself and large degree of plainness for wall surface basically identical;
(3) repair metope to be whitewashed: on metope to be whitewashed, whole metope all smears flexible waterproof putty, forms the flexible waterproof putty layer of 2-2.5mm thickness; Make metope basic unit to be whitewashed smooth, rear sand papering to be dried;
(4) alkali-resistant primer is sprayed: after the polishing of flexible waterproof putty layer is qualified on inspection, use spray gun spraying alkali-resistant primer, spraying evenly, forms the alkali-resistant primer layer of 0.01mm-0.15mm thickness;
(5) lattice, T-me line paper is played: according to the lattice scheme of technological requirement, alkali-resistant primer face is carried out lattice, plays the line of ink marker, require that the line of ink marker must be smooth vertical and horizontal, cut-off rule color is drawn along the line of ink marker, then T-me line paper, requires that U.S. line paper width is consistent, when pasting U.S. line paper, first should to paste horizontal direction, then paste vertical direction;
(6) spraying first pass true mineral varnish: with the true mineral varnish of spray gun spraying first pass, evenly, must not there is drain spray and cross the phenomenon of spray, first should carry out examination and spray before large area spraying in spraying, with model contrast errorless after can large area spray;
(7) after the true mineral varnish drying of first pass, spraying second time true mineral varnish, evenly, must not there is drain spray and cross the phenomenon of spraying in spraying;
(8) the U.S. line paper of tear-off, jointing: after second time true mineral varnish sprays complete drying, tear U.S. line paper off; During the U.S. line paper of tear-off, perpendicular to metope, should first take off vertical U.S. line paper, after take off the U.S. line paper of level, should excise every a bit of;
(9) coating hood finish paint: after true mineral varnish parches completely, spraying finishing varnish; True mineral varnish layer is formed on metope surface to be whitewashed.
Further feature is, after all metope all smears flexible waterproof putty in step (3), again smears flexible waterproof putty, form the flexible waterproof putty layer of 0.2-1.2 mm thickness; Dry rear sand papering is smooth, and metope dust is cleaned out the requirement meeting spray-applied primer.
Will with the enamelled coating overlapping edges sprayed above when the true mineral varnish of new spray, the width of overlap joint 1/3-1/2, and is had a common boundary width and is consistent, and makes film thickness consistent.
Compared with prior art, the true mineral varnish construction method that the present invention obtains, tool has the following advantages:
1, simple, the processing ease of production technology, cost is low;
2, be a kind of environmental-friendly walling coating, there is energy-saving and environmental protection effect;
3, be suitable for face width, can be used for the multiple basal planes such as brick wall, foam, gypsum, aluminium sheet, glass and can with any application of the moulding of building;
4, aberration can be avoided the formation of to a great extent, improve the aesthetics of wall face;
5, avoid inner defect such as formation crack and hollowing etc., prevent enamelled coating from coming off, extend the application life of lacquer painting, can mate with the application life of building.
Detailed description of the invention
Below in conjunction with embodiment, the present invention is further described.
True mineral varnish construction method of the present invention, its summary step is as follows:
Cleaning basic unit-first pass flexible waterproof putty-the second time flexible waterproof putty (polishing)-3rd time flexible waterproof putty (polishing)-roller coating special alkali-resistant primer-snap the line lattice, the U.S. line paper-coating hood finish paint-finishing of the true mineral varnish-spraying of T-me line paper-spraying first pass second time true mineral varnish-tear-off are checked and accepted;
1, basic unit is cleared up: the object of cleaning basic unit removes the various attachments of metope to be whitewashed, and makes metope neat and tidy to be whitewashed, be convenient to coating application, increases the adhesion firmness of coating.Check main body wall surface evenness and lines whether straight clear, require substrate surface smooth, dry (cement sand pulp should maintain more than 15 days), without spots such as floating ashes, and PH < 10, moisture content < 10%.Concrete surface should scalp floating layer, guarantees that substrate is firm, removes the dregs of metope, to Porous, rough base, repair, then polish with emery wheel;
2, metope hollow place to be whitewashed is repaired; Repair the obvious uneven place of metope to be whitewashed with flexible waterproof putty, make itself and large degree of plainness for wall surface basically identical; Flexible waterproof putty selects the product of prior art, does not describe in detail;
3 repair metope to be whitewashed: on metope to be whitewashed, and whole metope all smears (brush) flexible waterproof putty, form the flexible waterproof putty layer of 2-2.5mm thickness; Make metope basic unit to be whitewashed smooth, rear sand papering to be dried; The thickness of flexible waterproof putty layer is determined according to the planeness, material etc. of metope, specifically can choose 2 mm, 2.05 mm, 2.10 mm, 2.15 mm, 2.20 mm, 2.2 5 mm, 2.30 mm, 2.35 mm, 2.40 mm, 2.45 mm, 2.5mm etc., needs of the present invention can be met;
According to construction requirement, (brush) flexible waterproof putty can also be smeared the 3rd time: all metope all smears (brush) flexible waterproof putty, form the flexible waterproof putty layer of 0.2-1.2 mm thickness; Dry rear sand papering is smooth, and metope dust is cleaned out the requirement meeting spray-applied primer; The thickness of flexible waterproof putty layer is determined according to the planeness, material etc. of metope, specifically can choose 0.2 mm, 0.3 mm, 0.4 mm, 0.5 mm, 0.6 mm, 0.7mm, 0.8 mm, 0.9mm, 1.60mm, 1.1mm, 1.2 mm etc., needs of the present invention can be met; Smear (brush) flexible waterproof putty 3rd time, best planeness and finish can be obtained, and can adhesion stress be significantly improved;
4, alkali-resistant primer is sprayed: after the polishing of flexible waterproof putty layer is qualified on inspection, use spray gun spraying alkali-resistant primer, require that spraying evenly, forms the alkali-resistant primer layer of 0.01mm-0.15mm thickness, guarantee that alkali-resistant primer layer hides basic unit's (flexible waterproof putty layer) completely; Alkali-resistant primer is the priming paint matched with flexible waterproof putty, true mineral varnish to be sprayed, selects the product of prior art, does not describe in detail;
5, lattice, T-me line paper is played: according to the lattice scheme of technological requirement, alkali-resistant primer face is carried out lattice, plays the line of ink marker, require that the line of ink marker must be smooth vertical and horizontal, cut-off rule color is drawn along the line of ink marker, then T-me line paper, requires that U.S. line paper width is consistent, when pasting U.S. line paper, first should to paste horizontal direction, then paste vertical direction; U.S. line paper is also the U.S. line paper matched with true mineral varnish to be sprayed, selects the product of prior art, does not describe in detail; Play concrete length, the width dimensions of the lattice that the line of ink marker is formed, carry out according to technological requirement;
6, spray first pass true mineral varnish: until the U.S. line paper of lattice pasted inspection errorless after, with the true mineral varnish of spray gun spraying first pass, spray in strict accordance with technological requirement, spraying evenly, drain spray must not be there is and cross the phenomenon of spraying, large area spraying before should first carry out examination spray, with model contrast errorless after can large area spray; Due to the metope pasting U.S. line paper position, the true mineral varnish of spraying is blocked by U.S. line paper, is not really sprayed onto on the metope at these positions, after U.S. line paper tear-off, this part does not spray to the metope of true mineral varnish, forms dividing joint, and the dividing joint on metope is formed laterally, longitudinally staggered grid;
7, after the true mineral varnish drying of first pass, generally need the drying time of 4 ~ 6 hours, spray second time true mineral varnish, require that spraying evenly, drain spray and the phenomenon crossing spray must not be occurred;
8, the U.S. line paper of tear-off, jointing: after treating second time true mineral varnish spraying, after to be dried, after about 2 ~ 3 hours, tear U.S. line paper off, during tear-off U.S. line paper, should perpendicular to metope, first take off vertical U.S. line paper, after take off the U.S. line paper of level, should excise every a bit of, prevent the face destroying dividing joint or sliver paint;
9, coating hood finish paint: after true mineral varnish parches completely, can spray finishing varnish, should note keeping the bond degree of finishing varnish during construction, should spray evenly, can not drain spray, notes prevention stream pendant phenomenon; Finish is also match with true mineral varnish to be sprayed, selects the product of prior art, does not describe in detail.After coating hood finish paint, form true mineral varnish layer on metope surface to be whitewashed.
On the exterior wall of view picture, large plane, the true mineral varnish of spraying view picture, if technique is grasped bad, easily forms aberration, affects the aesthetics of wall face, even do not reach construction technical standard, therefore will prevent aberration especially when constructing operation; Aberration Producing reason mainly contains: a, not bulk purchase raw material;
B, Spray are coated with uneven generation surface shaded and cause aberration; C, base course wall are untreated smooth.For the prophylactico-therapeutic measures of aberration, except engineering raw material purchase by the gross, construct before again check, guarantee that color and luster is unanimously stopped outside aberration, when operating, need to carry out technical training to workman in advance, make it skillfully grasp spray gun using method, in work progress, spray gun moves and wants evenly; And, when large-area construction, such as relate to the process problem with the enamelled coating sprayed when newly spraying, will with the enamelled coating overlapping edges sprayed above when the true mineral varnish of new spray, the width of overlap joint 1/3-1/2, and is had a common boundary width and is consistent, and ensures that film thickness is consistent;
On the exterior wall of view picture, large plane, the true mineral varnish of spraying view picture, if technique is grasped bad, easily forms hollowing, crack, affects the aesthetics of wall face, and enamelled coating is easily come off, and reduces application life, does not even reach construction technical standard; Hollowing, crack Producing reason are as follows: a. base treatment is bad; B. Air Temperature Difference change greatly; C. to construct metope overdrying and the hollowing that causes.Hollowing, crack Prevention Measures: a. is implemented and removes the work of basal plane dust foreign matter, metope is cleaned out; B. monitor in real time weather condition, as far as possible selective temperature, weather that humidity is consistent are constructed, and use small nozzle spray gun, thin spray multilayer, control the rate of drying of every layer well; C. before construction, the moisture content of metope of constructing the same day is tested, in strict accordance with product construction, body of wall humidity requirement is constructed.
True mineral varnish production technology is simple, cost is low, excellent performance, and along with scientific technological advance, the development and application of environment-friendly type, high resiliency, not binding dust series, wide to more high-grade DEVELOPMENT PROSPECT, therefore market prospects are very good.
Finally it should be noted that, above embodiment is only in order to illustrate technical scheme of the present invention but not restriction technologies scheme, although applicant's reference preferred embodiment is to invention has been detailed description, those of ordinary skill in the art is to be understood that, those are modified to technical scheme of the present invention or equivalent replacement, and do not depart from aim and the scope of the technical program, all should be encompassed in the middle of right of the present invention.
Claims (3)
1. a true mineral varnish construction technique, is characterized in that comprising the steps,
(1) basic unit is cleared up: the object of cleaning basic unit removes the various attachments of metope to be whitewashed, and makes metope neat and tidy to be whitewashed, be convenient to coating application, increases the adhesion firmness of coating;
(2) metope hollow place to be whitewashed is repaired; Repair the obvious uneven place of metope to be whitewashed with flexible waterproof putty, make itself and large degree of plainness for wall surface basically identical;
(3) repair metope to be whitewashed: on metope to be whitewashed, whole metope all smears flexible waterproof putty, forms the flexible waterproof putty layer of 2-2.5mm thickness; Make metope basic unit to be whitewashed smooth, rear sand papering to be dried;
(4) alkali-resistant primer is sprayed: after the polishing of flexible waterproof putty layer is qualified on inspection, use spray gun spraying alkali-resistant primer, spraying evenly, forms the alkali-resistant primer layer of 0.01mm-0.15mm thickness;
(5) lattice, T-me line paper is played: according to the lattice scheme of technological requirement, alkali-resistant primer face is carried out lattice, plays the line of ink marker, the line of ink marker must be smooth vertical and horizontal, cut-off rule color is drawn along the line of ink marker, then T-me line paper, requires that U.S. line paper width is consistent, when pasting U.S. line paper, first should to paste horizontal direction, then paste vertical direction;
(6) spraying first pass true mineral varnish: with the true mineral varnish of spray gun spraying first pass, evenly, must not there is drain spray and cross the phenomenon of spray, first should carry out examination and spray before large area spraying in spraying, with model contrast errorless after carry out large area spraying;
(7) after the true mineral varnish drying of first pass, spray second time true mineral varnish, spraying evenly;
(8) the U.S. line paper of tear-off, jointing: after second time true mineral varnish sprays complete drying, tear U.S. line paper off; During the U.S. line paper of tear-off, perpendicular to metope, should first take off vertical U.S. line paper, after take off the U.S. line paper of level, should excise every a bit of;
(9) coating hood finish paint: after true mineral varnish parches, spraying finishing varnish; True mineral varnish layer is formed on metope surface to be whitewashed.
2. true mineral varnish construction technique according to claim 1, is characterized in that, after all metope all smears flexible waterproof putty in step (3), again smears flexible waterproof putty, forms the flexible waterproof putty layer of 0.2-1.2 mm thickness; Dry rear sand papering is smooth, and metope dust is cleaned out the requirement meeting spray-applied primer.
3. true mineral varnish construction technique according to claim 1 and 2, is characterized in that, the enamelled coating overlapping edges sprayed before the Shi Yaoyu that newly sprays paint, and the width of overlap joint 1/3-1/2, and is had a common boundary width and is consistent, and makes film thickness consistent.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510079711.7A CN104775575B (en) | 2015-02-13 | 2015-02-13 | Real stone paint construction process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510079711.7A CN104775575B (en) | 2015-02-13 | 2015-02-13 | Real stone paint construction process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104775575A true CN104775575A (en) | 2015-07-15 |
CN104775575B CN104775575B (en) | 2017-02-01 |
Family
ID=53617309
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510079711.7A Active CN104775575B (en) | 2015-02-13 | 2015-02-13 | Real stone paint construction process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104775575B (en) |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105201166A (en) * | 2015-10-23 | 2015-12-30 | 北京艺高世纪科技股份有限公司 | Elastic thick marble-imitated coating and brushing process thereof |
CN105272131A (en) * | 2015-11-20 | 2016-01-27 | 南京福臻再生资源科技股份有限公司 | Dry powder type really stone paint and preparation method and using method thereof |
CN105298045A (en) * | 2015-10-13 | 2016-02-03 | 北京艺高世纪科技股份有限公司 | Interior wall diatom mud coating and coating method |
CN106988494A (en) * | 2017-03-24 | 2017-07-28 | 中华制漆(深圳)有限公司 | The slurry coating process of full water-based simulated natural granite face effect |
CN107083827A (en) * | 2017-04-27 | 2017-08-22 | 霸州市瑞硕盈装饰装修工程有限公司 | True mineral varnish coating application technique |
CN107268906A (en) * | 2017-07-11 | 2017-10-20 | 霸州市瑞硕盈装饰装修工程有限公司 | A kind of construction technology of liquid granite coating |
CN108797921A (en) * | 2018-06-15 | 2018-11-13 | 兰舍硅藻新材料有限公司 | A kind of wall covering construction method of stereo imitating wall brick |
CN108930374A (en) * | 2017-05-26 | 2018-12-04 | 五冶集团上海有限公司 | A kind of environment-friendly type lacquer external wall construction method with heat insulating reflecting function |
CN108952167A (en) * | 2018-09-13 | 2018-12-07 | 肖霞 | Imitative stone is painted on the simulation process method of system terminal |
CN108979154A (en) * | 2018-09-13 | 2018-12-11 | 肖霞 | The dividing joint of imitative stone coating and the processing method of yin-yang angle seam |
CN109057253A (en) * | 2018-09-13 | 2018-12-21 | 重庆三原色节能建筑工程有限公司 | The processing method of coating and other material members intersections |
CN109281472A (en) * | 2018-09-13 | 2019-01-29 | 肖霞 | A kind for the treatment of process in paint spraying construction to coating base |
CN109610833A (en) * | 2019-01-22 | 2019-04-12 | 邓绍富 | Building coating construction technology |
CN110453860A (en) * | 2019-05-09 | 2019-11-15 | 郑州市永威置业有限公司 | It criticizes and scrapes brick construction technology |
CN110629959A (en) * | 2019-09-25 | 2019-12-31 | 西安翔远装饰工程有限责任公司 | Dry-hanging spraying artistic concrete and construction process thereof |
CN111270820A (en) * | 2020-03-06 | 2020-06-12 | 浙江华德新材料有限公司 | Limestone deep seam construction process method |
CN111779313A (en) * | 2020-08-17 | 2020-10-16 | 宁波威士伯汉华装饰工程有限公司 | Fired surface repairing structure and construction process |
CN112267649A (en) * | 2020-10-28 | 2021-01-26 | 重庆联筑装饰工程有限公司 | Wall surface stone-like coating construction device and construction process thereof |
CN113152814A (en) * | 2021-04-19 | 2021-07-23 | 安徽开源路桥有限责任公司 | Construction method for spraying stone-like paint on outer wall |
CN113863599A (en) * | 2021-09-27 | 2021-12-31 | 上海宝冶建筑装饰有限公司 | Indoor paint construction method based on theme park |
CN114934644A (en) * | 2022-06-10 | 2022-08-23 | 徐州腾美建筑装饰工程有限公司 | 5M construction process for building exterior wall decorative coating |
CN115288384A (en) * | 2022-08-30 | 2022-11-04 | 龙牌涂料(北京)有限公司 | Real stone paint scraping process and device for three-dimensional jigsaw puzzle process |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2282521A1 (en) * | 1974-08-23 | 1976-03-19 | Coudert Maurice | Casting of imitation stone surfaces - by using removable mouldings forming areas for surface worked mortar |
JP2001164728A (en) * | 1999-12-13 | 2001-06-19 | Aica Kogyo Co Ltd | Wall-surface finishing structure |
CN1607304A (en) * | 2003-10-13 | 2005-04-20 | 王光胜 | Stone paint construction process |
CN101319552A (en) * | 2008-07-23 | 2008-12-10 | 勾希杰 | Construction method of ture mineral varnish face brick-imitation construction exterior wall |
CN101899899A (en) * | 2009-05-26 | 2010-12-01 | 内蒙古兴泰建筑有限责任公司 | Construction method of external wall simulation stone-type paint surface layer |
CN103233574A (en) * | 2013-05-08 | 2013-08-07 | 内蒙古兴泰建筑有限责任公司 | Construction method for simulation stone paint surface layer of external wall |
-
2015
- 2015-02-13 CN CN201510079711.7A patent/CN104775575B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2282521A1 (en) * | 1974-08-23 | 1976-03-19 | Coudert Maurice | Casting of imitation stone surfaces - by using removable mouldings forming areas for surface worked mortar |
JP2001164728A (en) * | 1999-12-13 | 2001-06-19 | Aica Kogyo Co Ltd | Wall-surface finishing structure |
CN1607304A (en) * | 2003-10-13 | 2005-04-20 | 王光胜 | Stone paint construction process |
CN101319552A (en) * | 2008-07-23 | 2008-12-10 | 勾希杰 | Construction method of ture mineral varnish face brick-imitation construction exterior wall |
CN101899899A (en) * | 2009-05-26 | 2010-12-01 | 内蒙古兴泰建筑有限责任公司 | Construction method of external wall simulation stone-type paint surface layer |
CN103233574A (en) * | 2013-05-08 | 2013-08-07 | 内蒙古兴泰建筑有限责任公司 | Construction method for simulation stone paint surface layer of external wall |
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105298045A (en) * | 2015-10-13 | 2016-02-03 | 北京艺高世纪科技股份有限公司 | Interior wall diatom mud coating and coating method |
CN105298045B (en) * | 2015-10-13 | 2017-12-15 | 北京艺高世纪科技股份有限公司 | A kind of interior wall diatom ooze coating and its painting method |
CN105201166A (en) * | 2015-10-23 | 2015-12-30 | 北京艺高世纪科技股份有限公司 | Elastic thick marble-imitated coating and brushing process thereof |
CN105272131A (en) * | 2015-11-20 | 2016-01-27 | 南京福臻再生资源科技股份有限公司 | Dry powder type really stone paint and preparation method and using method thereof |
CN106988494A (en) * | 2017-03-24 | 2017-07-28 | 中华制漆(深圳)有限公司 | The slurry coating process of full water-based simulated natural granite face effect |
CN107083827A (en) * | 2017-04-27 | 2017-08-22 | 霸州市瑞硕盈装饰装修工程有限公司 | True mineral varnish coating application technique |
CN108930374A (en) * | 2017-05-26 | 2018-12-04 | 五冶集团上海有限公司 | A kind of environment-friendly type lacquer external wall construction method with heat insulating reflecting function |
CN107268906A (en) * | 2017-07-11 | 2017-10-20 | 霸州市瑞硕盈装饰装修工程有限公司 | A kind of construction technology of liquid granite coating |
CN108797921A (en) * | 2018-06-15 | 2018-11-13 | 兰舍硅藻新材料有限公司 | A kind of wall covering construction method of stereo imitating wall brick |
CN109281472A (en) * | 2018-09-13 | 2019-01-29 | 肖霞 | A kind for the treatment of process in paint spraying construction to coating base |
CN109057253A (en) * | 2018-09-13 | 2018-12-21 | 重庆三原色节能建筑工程有限公司 | The processing method of coating and other material members intersections |
CN108952167A (en) * | 2018-09-13 | 2018-12-07 | 肖霞 | Imitative stone is painted on the simulation process method of system terminal |
CN108979154A (en) * | 2018-09-13 | 2018-12-11 | 肖霞 | The dividing joint of imitative stone coating and the processing method of yin-yang angle seam |
CN109610833A (en) * | 2019-01-22 | 2019-04-12 | 邓绍富 | Building coating construction technology |
CN109610833B (en) * | 2019-01-22 | 2021-04-23 | 邓绍富 | Construction technology of building coating |
CN110453860A (en) * | 2019-05-09 | 2019-11-15 | 郑州市永威置业有限公司 | It criticizes and scrapes brick construction technology |
CN110629959A (en) * | 2019-09-25 | 2019-12-31 | 西安翔远装饰工程有限责任公司 | Dry-hanging spraying artistic concrete and construction process thereof |
CN111270820B (en) * | 2020-03-06 | 2021-06-29 | 浙江华德新材料有限公司 | Limestone deep seam construction process method |
CN111270820A (en) * | 2020-03-06 | 2020-06-12 | 浙江华德新材料有限公司 | Limestone deep seam construction process method |
CN111779313A (en) * | 2020-08-17 | 2020-10-16 | 宁波威士伯汉华装饰工程有限公司 | Fired surface repairing structure and construction process |
CN112267649A (en) * | 2020-10-28 | 2021-01-26 | 重庆联筑装饰工程有限公司 | Wall surface stone-like coating construction device and construction process thereof |
CN112267649B (en) * | 2020-10-28 | 2021-09-21 | 重庆联筑装饰工程有限公司 | Wall surface stone-like coating construction device and construction process thereof |
CN113152814A (en) * | 2021-04-19 | 2021-07-23 | 安徽开源路桥有限责任公司 | Construction method for spraying stone-like paint on outer wall |
CN113863599A (en) * | 2021-09-27 | 2021-12-31 | 上海宝冶建筑装饰有限公司 | Indoor paint construction method based on theme park |
CN114934644A (en) * | 2022-06-10 | 2022-08-23 | 徐州腾美建筑装饰工程有限公司 | 5M construction process for building exterior wall decorative coating |
CN115288384A (en) * | 2022-08-30 | 2022-11-04 | 龙牌涂料(北京)有限公司 | Real stone paint scraping process and device for three-dimensional jigsaw puzzle process |
Also Published As
Publication number | Publication date |
---|---|
CN104775575B (en) | 2017-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104775575B (en) | Real stone paint construction process | |
CN103572845B (en) | A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof | |
CN109025356A (en) | A kind of exterior wall retrofit coating process | |
CN102704635B (en) | Paint brushing construction method | |
CN103375000A (en) | Process for constructing waterborne fluorocarbon metal paint on elastic floating-coat nap surface | |
CN102409824B (en) | Production method of dry-bonded color sand veneer | |
CN107489247A (en) | A kind of true mineral varnish spray-finishing construction method | |
CN101886463B (en) | High water-resistant stone-like coating building inner and outer wall construction method | |
CN100560667C (en) | Marble paint for building, making method and construction technology thereof | |
CN105298045B (en) | A kind of interior wall diatom ooze coating and its painting method | |
CN113152814A (en) | Construction method for spraying stone-like paint on outer wall | |
CN111677280A (en) | Construction method of exterior wall coating | |
CN104088415A (en) | Construction method for finish concrete surface repair protective agent | |
CN106869428A (en) | A kind of heat insulating reflecting colored mortar construction technology | |
CN106284890A (en) | A kind of construction method of art colored stone paint | |
CN104453133A (en) | Real stone paint construction technology | |
CN108517990A (en) | A kind of construction method that wood grain effect coating can be imitated in wall curtain aluminum veneer exposed parts | |
CN1766255A (en) | Marble imitating construction process with high elasticity coating | |
CN205777261U (en) | A kind of flexbile base half glue wallpaper barbola work structure | |
CN108930374A (en) | A kind of environment-friendly type lacquer external wall construction method with heat insulating reflecting function | |
CN114352055A (en) | Construction process for renovating paint on old wall | |
CN105220890A (en) | The method of decoration emulsion paint cracking of wall surface | |
CN109162417A (en) | A kind of imitative stone polychrome finish and preparation method thereof | |
CN113417417A (en) | Old-imitation red brick veneer structure and construction process thereof | |
CN113062544A (en) | Stone-like paint groove construction process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |