CN1043182A - 一种使用桁架建造的建筑结构 - Google Patents

一种使用桁架建造的建筑结构 Download PDF

Info

Publication number
CN1043182A
CN1043182A CN89109033A CN89109033A CN1043182A CN 1043182 A CN1043182 A CN 1043182A CN 89109033 A CN89109033 A CN 89109033A CN 89109033 A CN89109033 A CN 89109033A CN 1043182 A CN1043182 A CN 1043182A
Authority
CN
China
Prior art keywords
truss
fixed
chord
building structure
mid portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN89109033A
Other languages
English (en)
Other versions
CN1017173B (zh
Inventor
布鲁诺·乔治·加茨卡
克里斯托弗·约翰·奥尔森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
STRARCH INDUSTRIES PTY Ltd
Original Assignee
STRARCH INDUSTRIES PTY Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STRARCH INDUSTRIES PTY Ltd filed Critical STRARCH INDUSTRIES PTY Ltd
Publication of CN1043182A publication Critical patent/CN1043182A/zh
Publication of CN1017173B publication Critical patent/CN1017173B/zh
Expired legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/38Arched girders or portal frames
    • E04C3/40Arched girders or portal frames of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/342Structures covering a large free area, whether open-sided or not, e.g. hangars, halls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C3/08Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with apertured web, e.g. with a web consisting of bar-like components; Honeycomb girders

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

本发明有关一种使用桁架的建筑结构,该桁架具有一个挠性中间部分和两个刚性端部。桁架由上、下弦杆组成,中间部分的下弦杆有若干管段,套在拉张缆索上滑动。拉紧缆索时桁架向上弯曲,形成一个拱形桁架。而该等桁架通过用多个固定在每一中间部分上弦杆上的横向檩条,多个固定在每一端部的上弦杆上的横向围梁,和固定在该桁架,和/或围梁,和/或檩条上的覆盖板形成该结构的顶面。

Description

本发明有关桁架,使用这种桁架的结构,和建造这种结构的方法。
形成本发明的基础的桁架,在澳大利亚专利说明书第505,679和535,636号中已有揭示。把这种桁架用于制造一个结构时,与传统的建筑结构方法相比能以低得多的成本提供大的复盖面积。这两个专利提出的结构的局限性,在于其所能达到的最大高度有限制。在这方面,主要的局限因素,是在桁架上只能作出相对浅的拱弧。
此外,在把第505,679号中的结构升高时,很不方便,因为必须使用吊车和气袋(airbags),从而增加了成本和劳动力。第535,636号中的建造方法成本低,使用比较方便。把桁架的一端销定,而在另一端上拉伸,使不销定端向里移动,提高桁架的弯度。
因此,本发明的目的,是提出一种桁架,可用以做成较上文所述的桁架为高的结构,而且桁架建造时不需使用吊车或气袋。
本发明还有一个目的,是提出一种经济地利用上述桁架建造的建筑结构。
基于上述目的,本发明提出一种具有多个平行排列桁架的建筑结构,上述衍架具有至少一个上弦杆和至少一个下弦杆,所述的至少一个上弦杆和至少一个下弦杆互相用斜腹杆连接,所述的至少一个下引杆的至少一部分包括有若干个可滑动地套在至少一根有高抗拉强度的缆索上的管段,当缩短桁架长度将所述缆索拉紧时,所述的至少一个下弦杆的至少一部分从向下作弓形弯曲的状态移动并缩短,从而所述桁架的所述至少一部分向上弯曲移动到一个竖立状态,在该状态下所述管段相互搭接和/或贴靠,本发明改进之处在于,所述桁架包括一个中间部分和两个刚性端部,所述的至少一个下弦杆的至少一部分就是所述桁架的所述中间部分,而该等桁架通过用多个固定在每一中间部分上弦杆上的横向檩条,多个固定在每一端部的上弦杆上的横向围梁,和固定在该桁架,和/或围梁,和/或檩条上的覆盖板形成该结构的顶面。在实施例中,该围梁放在该端部该上弦杆的上方,该檩条放在该中间部分的上弦杆的下方和里面;该结构具有外拉索对该结构予加载荷,抵抗侧向的超载荷;每一个桁架的预定位置上,有拉杆固定在相邻的桁架之间,该拉杆与该斜腹杆处在同一平面内。
本发明的一个实施方案,将参照用附图作说明的一个非制约性举例,在下文中予以叙述,附图内容如下:
图1为按本发明原理建造的一个建筑物的俯视图;
图2为形成图1所示建筑物建造前一部分的桁架沿箭头2-2方向的侧视图;
图3为图2所示桁架一个端部的侧视图;
图4为图2所示桁架中间段部分的侧视图;
图5为图4中划圈部分“5”的放大图;
图6为沿图5中箭头6-6方向的一个剖视图,
图7为沿图3中箭头“7”方向的视图;
图8为与图6相似的视图,表示对桁架所作的侧向压曲限制;
图9为与图2相似的视图,表示局部装配的桁架;
图10为用拉紧外缆索装配完成的桁架。
附图中示出用若干桁架12做成的一个建筑物10。每一个桁架12有两个端部14和一个中间部16。端部14为刚性,构成完成的建筑物的壁。每一个端部上由一个上弦杆18和一个下弦杆20构成。用“之”形的斜腹杆件22把上下弦杆18及20互相隔开。在这实施例中,上弦杆用一对刚性管18A,18B构成,下弦杆用一个槽形部分构成,构成上下弦杆的部分的数目和形状,可以按要求变化。
端部14的每一端有触地点24,26,其固定方法在下文中叙述。触地点在三角形构架28的端部形成,三角形构架28有下弦杆20的倾斜延长部30,支撑件32和斜腹杆22。又附加加强支撑34,便是完全的三角形构架。
中间部包括一个上弦杆36和一个下弦杆38。上弦杆36是端部14的上弦杆18的延续,而如上文所述,上弦杆是由一对管件36A及36B构成。管36A,36B的每一个由腹板39连接以形成整体结构。下弦杆38由两根不连贯的管38A,38B形成,它们通过直径较小的端部40可作伸缩式的插接。虽然本实施例是用两根管38A,38B,但管子的数目可以根据需要变化。增加用管的数目提高抗拉能力和整个建筑物的跨度。通过插入固定在斜腹杆44上的矩形连接件42,把管38A,38B和上弦杆36相互间隔。为了组成了完全的中间部分,把有高抗拉能力的缆索46,48分别从管38A及38B中穿过。
从图2及图4中可见,下弦杆38按照组装好的状态作向上的弓形弯曲。缆索46及48通过在A点从中间部分16中穿出(见图3),并伸进跨在端部14的上下弦杆18及20之间的管50及52中,维持向上弓形弯曲的形状。拉伸锚定点54,56,设在端部14的端部附近,用于在完成拉伸时把缆索46及48在上面固定。
为了当把桁架连接形成建筑物时,取得桁架52的侧向稳定性,可以在中间部分16和/或端部14上,在选定的位置设置支承杆58。图8表示在中间部分16上提供侧向稳定性的一个推荐实施例。两个桁架12上各有一个加劲条60在上面固定,在相邻的加劲条之间用紧固件64把檩条62固定(见图8)。檩条62位于上弦杆36上表面的下方,使覆盖板66在不受力状态下放在檩条的上面。覆盖板66用紧固件68固定在管36A,36B上(见图6)。有一个悬空拉杆70,一端固定在下弦杆38上,另一端和檩条62固定。拉杆72及74连接在上下弦杆36及38之间,与斜腹杆44在同一平面内,因而如装配时下弦杆缩短,桁架的深度(与上弦杆垂直)可以相应减小。拉杆72及74的自由端76及78,和相邻的桁架连接(图中未示)。
覆盖板66用围梁80固定在端部14上(图3及7),围梁80固定在上弦杆18的加劲条82上。围梁80在上弦杆18上表面的上方,有利于使用传统的壁支撑作加劲。在这区域里,覆盖板66不受力。这种安排和前文叙述檩条62的位置相反,前文中的檩条在上弦杆的下方,并在上弦杆中,理想的位置是在上弦杆36的中和轴上或其附近。这使中间部分的覆盖板的位置处于在装配过程中被在轴向上压紧。轴向压缩的弧形覆盖板,当适当固定在檩条和桁架上以后,在装配过程中。对屋顶加强刚性抵抗一般的不稳定性,倾向于自行支撑,并把桁架的部分重量转移到立柱上去,从而减少桁架系统上的载荷,并在桁架的使用期限内,把在与桁架平面垂直方向上施加的裁荷分散。
下文中将叙述利用本发明的桁架建造的建筑物的装配方法。桁架12在现场组装,并互相平行放置,如图1及2中所示。管38A,38B互相作可伸缩的插接,缆索46,48从管中穿过,其一端终止于拉伸锚定点54,56上。在图示的实施例中,终点在2中的右侧。覆盖板66和支承杆58共同固定在桁匆架上,位置如图2所示。本发明相当大的一个优点,是组装在地面上进行,从而可减少高空作业中的2伤事故。电器安装作业也可以同时进行,从而可以有相当大的时间节约。在图1中的左侧,接地点26,以可旋转的方式销定在固定地基板上(图中未示)。
桁架通过一个向上的力和刚性外端部14的向外旋转的共同作用,把它向上举升。向上的力通过拉紧向下弯的张紧索46,48,施加在中间部分16上;刚性端的向外旋转,是通过用与地面平,或略高于地面的临时水平缆索84(图9),把桁架的端部拉紧到一起,使之旋转。不旋转的接点沿地面滑动,便把桁架举升到图9所示的位置上去。中间部分16的继续升高,是通过上弦杆36的有控制的向上压曲,而同时受到向上弯曲的拉紧缆索46,48,在桁架施加的向下的力的限制,并且通过水平缆索84把触地点26拉到一起,产生端部14的连续向外旋转。管38A,38B由于其伸缩装置而缩短,直到达到桁架的最终形状(见图10),这时管38A,38B贴靠邻近的管件。然后中间部分16的刚性增高,不能继续弯曲。图1中的虚线表示建筑物的最后宽度。在高强度缆索46,48上增加拉力,对下弦管38A,38B加预压力,便使中间部分进一步加劲。把所有的触地点在静止地基板上固定,缆索46,48在拉紧锚定点54,56上锚定。图10还示出可以利用钢丝绳拉索86,在建筑物10上预加载荷,抵抗向超载荷。
在实践中,本发明可供至少有十层楼就度适宜作飞机和飞船的停放库用的建筑物。鉴于本发明所取得的大覆盖面积,和成本的降低,本发明可用于覆盖过去认为不能实现低成本的大面积。
发明人认为根据以上的叙述,便可对本发明及其许多伴随的优点有所了解,很明显在形式,结构和部件安排上还可以作各作各种变化。而对上文所述的桁架在形式,结构和安排上作变化并不脱离本发明的精神和范围,或损害其全部物质上的优点,因为以上所述,仅为本发明的一个推荐实施例。

Claims (5)

1、一种具有多个平行排列桁架的建筑结构,上述桁架具有至少一个上弦杆和至少一个下弦杆,所述的至少一个上弦杆和至少一个下弦杆互相用斜腹杆连接,所述的至少一个下引杆的至少一部分包括有若干个可滑动地套在至少一根有高拉强度的缆索上的管段,当缩短衍架长度将所述缆索拉紧时,所述的至少一个下弦杆的至少一部分从向下作弓形弯曲的状态移动并被缩短,从而所述桁架的所述至少一部分向上弯曲移动到一个竖立状态,在该状态下所述管段相互搭接和/或贴靠,其特征在于,所述衍架包括一个中间部分和两个刚性端部,所述的至少一个下弦杆的至少一部分就是所述桁架的所述中间部分,而该等桁架通过用多个固定在每一中间部分上弦杆上的横向檩条,多个固定在每一端部的上弦杆上的横向围梁,和固定在该桁架,和/或围梁,和/或檩条上的覆盖板形成该结构的顶面。
2、如权利要求1所述之建筑结构,其特征在于,该围梁放在该端部该上弦杆的上方,该檩条放在该中间部分的上弦杆的下方和里面;
3、如权利要求1所述之建筑结构,其特征在于,具有外拉索对该结构予加载荷,抵抗侧向的超载荷。
4、如权利要求2所述之建筑结构,其特征在于,具有外拉索对该结构予加载荷,抵抗侧向的超载荷。
5、如权利要求1至4中任何一项所述之建筑结构,其特征在于,每一个桁架的预定位置上,有拉杆固定在相邻的桁架之间,该拉杆与该斜腹杆处在同一平面内。
CN89109033A 1986-03-13 1989-11-28 一种使用桁架建造的建筑结构 Expired CN1017173B (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AUPH502286 1986-03-13
AUPH5022 1986-03-13

Related Parent Applications (2)

Application Number Title Priority Date Filing Date
CN86104405A Division CN1011807B (zh) 1986-03-13 1986-06-25 桁架及其装配方法
CN86104405 Division 1986-06-25

Publications (2)

Publication Number Publication Date
CN1043182A true CN1043182A (zh) 1990-06-20
CN1017173B CN1017173B (zh) 1992-06-24

Family

ID=3771515

Family Applications (2)

Application Number Title Priority Date Filing Date
CN86104405A Expired CN1011807B (zh) 1986-03-13 1986-06-25 桁架及其装配方法
CN89109033A Expired CN1017173B (zh) 1986-03-13 1989-11-28 一种使用桁架建造的建筑结构

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN86104405A Expired CN1011807B (zh) 1986-03-13 1986-06-25 桁架及其装配方法

Country Status (9)

Country Link
US (1) US4890429A (zh)
EP (1) EP0237667B1 (zh)
JP (1) JPH0637790B2 (zh)
KR (1) KR910008081B1 (zh)
CN (2) CN1011807B (zh)
AT (1) ATE60390T1 (zh)
CA (1) CA1287729C (zh)
DE (1) DE3677198D1 (zh)
NZ (1) NZ218222A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100422468C (zh) * 2006-07-07 2008-10-01 贵州大学 大跨度大柱距拟肋型楼盖式预应力钢网格屋盖结构
CN108625530A (zh) * 2018-06-26 2018-10-09 上海天华建筑设计有限公司 张弦梁结构及其施工方法

Families Citing this family (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU588421B2 (en) * 1986-01-31 1989-09-14 Strarch Industries Pty. Ltd. Structures
JPH03295941A (ja) * 1990-04-13 1991-12-26 Ohbayashi Corp アーチ型構造物及びその構築方法
GB2281572A (en) * 1991-05-31 1995-03-08 Alfred Alphonse Yee Truss for e.g. bridges
JP2798819B2 (ja) * 1991-06-14 1998-09-17 飛島建設株式会社 ドームの構築工法
JP2798820B2 (ja) * 1991-06-18 1998-09-17 飛島建設株式会社 トラスの製作方法およびトラスによるドームの構築工法
DE4432251A1 (de) * 1994-09-10 1996-05-30 Dietmar Dipl Ing Dip Kallinich Verfahren zum Errichten eines gekrümmten Tragwerkes
US5701713A (en) * 1996-03-29 1997-12-30 Silver; Daniel J. Adjustable truss
DE19837883C2 (de) * 1998-08-20 2003-03-20 Konrad Lehrhuber Trägervorrichtung für Baukonstruktionen und Verfahren zum Herstellen einer Trägervorrichtung
GB0002519D0 (en) * 2000-02-03 2000-03-29 Univ Dundee Cantilever support and erectable structures
AT411472B (de) * 2001-09-05 2004-01-26 Poestinger Christian Ing Tragwerk
AUPS171302A0 (en) * 2002-04-12 2002-05-16 Blazley, Wade Hylton Roof structure
US6892502B1 (en) * 2003-03-26 2005-05-17 David A. Hubbell Space frame support structure employing weld-free, single-cast structural connectors for highway signs
FR2857038B1 (fr) * 2003-07-03 2007-03-30 Marc Edouard Irigoyen Systeme d'accrochage de poutre
US20070289228A1 (en) * 2004-03-31 2007-12-20 Peter Key Modular Structures
WO2006007659A1 (en) 2004-07-21 2006-01-26 S2 Holdings Pty Limited Building methods
US20080092481A1 (en) 2004-07-21 2008-04-24 Murray Ellen Building Methods
US8065762B1 (en) * 2004-09-28 2011-11-29 Jay Ewing Hammock arch
WO2007104147A1 (en) * 2006-03-13 2007-09-20 Look North Products Inc. Panel building component and building shelter
US20080307718A1 (en) * 2007-06-13 2008-12-18 Murray Ellen Domed steel roof frame
US20080307719A1 (en) * 2007-06-13 2008-12-18 Murray Ellen Domed non-steel roof frame
CN101280613B (zh) * 2008-03-13 2010-06-09 边海波 桁架组装套件及其桁架和桁架支撑系统
AU2011232748B2 (en) * 2011-10-05 2016-05-26 Danpal Australia Pty Limited Truss System
CN102733546A (zh) * 2012-07-06 2012-10-17 苏州工业园区设计研究院股份有限公司 大跨度拱形桁架结构
CN103174258B (zh) * 2013-02-28 2015-04-29 华南理工大学建筑设计研究院 一种张弦梁撑杆的抗滑装置
CN103114672B (zh) * 2013-03-08 2015-12-16 中铁五局(集团)有限公司 一种用于高寒多年冻土隧道洞口的钢桁架弧棚
CN105064505B (zh) * 2015-08-06 2017-08-08 中国华西企业股份有限公司 一种倒三角管桁架及其施工方法
CN105569187A (zh) * 2016-01-18 2016-05-11 江苏沪宁钢机股份有限公司 一种大跨度钢结构反拱张弦梁屋盖及其施工方法
CN107974917B (zh) * 2017-11-15 2019-04-16 中铁大桥勘测设计院集团有限公司 一种弯折节点、曲线连续钢桁梁桥及其设计方法
CN110104203B (zh) * 2019-05-16 2024-03-26 新誉集团有限公司 飞艇用碳纤维桁架的装配定位装置及装配方法
CN112523357B (zh) * 2020-09-04 2022-06-17 浙大城市学院 一种立面弧形大开洞的钢支撑筒-下挂式桁架体系及应用
CN112523358B (zh) * 2020-09-04 2022-06-17 浙大城市学院 一种双向斜交组合的轮辐式张拉索桁架体系及应用
CN112681521A (zh) * 2020-12-25 2021-04-20 海南大学 一种大跨摇摆自复位结构
CN113775053A (zh) * 2021-09-27 2021-12-10 青岛新华友建工集团股份有限公司 一种大跨度预应力混凝土框架梁铰连接节点结构
CN114000712A (zh) * 2021-11-24 2022-02-01 上海宝冶工程技术有限公司 大跨度管桁架结构下挠变形空中滑轨系统
CN114263276A (zh) * 2021-12-24 2022-04-01 中核华辰工程管理有限公司 一种大跨度建筑钢结构及其施工方法

Family Cites Families (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE516495A (zh) *
US2415461A (en) * 1947-02-11 Scaffolding
GB190902508A (en) * 1908-02-11 1909-04-08 Melvin Vaniman Improvements in Shelters for Housing Dirigible Balloons.
US1915424A (en) * 1928-03-14 1933-06-27 Mcclintic Marshall Company Metallic joist
US1985599A (en) * 1931-11-19 1934-12-25 Summerbell Truss Co Roof construction
US2021480A (en) * 1931-12-14 1935-11-19 Davidson Louis Arch construction
US2415240A (en) * 1944-03-10 1947-02-04 Michael A Fouhy Process of erecting large span buildings
US2578465A (en) * 1946-10-07 1951-12-11 Davisbilt Steel Joist Inc Metal joist
US2636457A (en) * 1950-08-22 1953-04-28 Boeing Co Collapsible truss structure
US2793720A (en) * 1951-12-24 1957-05-28 Kwikform Ltd Scaffolding and other structural elements
US2693195A (en) * 1952-07-03 1954-11-02 Frieder Portable shelter
US3091313A (en) * 1958-03-13 1963-05-28 Dan L Colbath Long span deck member
CH378519A (de) * 1960-04-21 1964-06-15 Eggstein Julius Zelthallenkonstruktion
US3377637A (en) * 1965-06-10 1968-04-16 Zamorano Luis Ramirez Pre-stressed truss
FR1445189A (fr) * 1965-08-23 1966-07-08 Esslingen Maschf Procédé pour l'édification de charpentes destinées à soutenir des halles, tentes, ou analogues et appareillage pour la mise en oeuvre de ce procédé
GB1202706A (en) * 1967-05-09 1970-08-19 Edwin Jacques Cohen Arched building members
US3530622A (en) * 1966-05-23 1970-09-29 Edwin Jacques Cohen Building apparatus and method
US3708944A (en) * 1969-10-31 1973-01-09 M Miyake Method of making an arch
US3826057A (en) * 1972-01-03 1974-07-30 J Franklin Truss system
DE2342049A1 (de) * 1973-08-20 1975-03-13 Huurne Johannes Gerhardus Anto Baukonstruktion mit vorgespannten elementen
AU505679B2 (en) * 1975-02-13 1979-11-29 Elspan International Ltd. Roof structure
US4275537A (en) * 1977-05-26 1981-06-30 Tension Structures, Inc. Tension members
JPS5539513A (en) * 1978-09-10 1980-03-19 Yoshihiro Yonahara Simply assembled structure
US4259825A (en) * 1979-02-23 1981-04-07 Nasa Foldable beam
GB2051919B (en) * 1979-06-02 1983-01-19 Gleeson M Stiffened elongate support member
US4393637A (en) * 1980-10-10 1983-07-19 Mosier Leo D Wood roof truss construction
AU535636B2 (en) * 1982-03-15 1984-03-29 Strarch Industries Pty. Ltd. Trussed support for roof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100422468C (zh) * 2006-07-07 2008-10-01 贵州大学 大跨度大柱距拟肋型楼盖式预应力钢网格屋盖结构
CN108625530A (zh) * 2018-06-26 2018-10-09 上海天华建筑设计有限公司 张弦梁结构及其施工方法
CN108625530B (zh) * 2018-06-26 2024-01-19 上海天华建筑设计有限公司 张弦梁结构及其施工方法

Also Published As

Publication number Publication date
KR870009088A (ko) 1987-10-23
CN1017173B (zh) 1992-06-24
EP0237667B1 (en) 1991-01-23
CA1287729C (en) 1991-08-20
KR910008081B1 (ko) 1991-10-07
CN86104405A (zh) 1987-10-28
CN1011807B (zh) 1991-02-27
ATE60390T1 (de) 1991-02-15
JPS62220636A (ja) 1987-09-28
DE3677198D1 (de) 1991-02-28
JPH0637790B2 (ja) 1994-05-18
EP0237667A2 (en) 1987-09-23
US4890429A (en) 1990-01-02
EP0237667A3 (en) 1988-02-03
NZ218222A (en) 1989-08-29

Similar Documents

Publication Publication Date Title
CN1043182A (zh) 一种使用桁架建造的建筑结构
CN1046986C (zh) 带有升高顶篷的改进型折叠式帐篷
US4697397A (en) Trussed girder, roof framing using the trussed girder and method of constructing the roof framing of a building using the trussed girder
CN85108226A (zh) 建造和安装后加拉力桁架
CN114458001A (zh) 一种高空室外连廊装饰施工用的可移动吊篮悬挂系统
CN115977407A (zh) 一种预应力大跨度张弦桁架滑移施工体系及其施工方法
KR920002118B1 (ko) 지붕 구조물
US2622546A (en) Long span structure
CN2697188Y (zh) 马鞍型索网点支玻璃采光顶
CN111646101B (zh) 一种用于圆管输送机的折叠式桥架装置及其安装方法
CN111101600B (zh) 施工空间受限的双斜拱承双曲抛物面索网结构施工方法
JP3409265B2 (ja) 膜構造大型ドームとその構築方法
CN107938515A (zh) 适用于抢险救灾时大跨度轻量化应急桥梁的架设方法
CN2898154Y (zh) 辐射型体内张拉成形空间网格结构
CN1405415A (zh) 一种可快速重复拆装的骨架及其屋顶
CN101709565A (zh) 刚性悬索加劲的双层连续钢桁梁桥
CN215758853U (zh) 一种用于渠道遮盖的大跨度装配式索桁架结构
CN209941902U (zh) 篷房桁架和篷房
CN216141987U (zh) 一种用于渠道遮盖的多跨配重式索桁架结构
CN220150063U (zh) 一种预应力绳梯结构
CN117713643B (zh) 一种适应陡坡起伏地形的悬索式光伏支架系统
CN1164841C (zh) 超大跨度空间结构
AU594056B2 (en) Building truss
CN216843395U (zh) 一种管架
JP3378286B2 (ja) アウトケーブル張弦梁を使用した鉄骨屋根の建方工法

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C13 Decision
GR02 Examined patent application
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CX01 Expiry of patent term