CN104264692A - Ecological restoration method of slope - Google Patents

Ecological restoration method of slope Download PDF

Info

Publication number
CN104264692A
CN104264692A CN201410470268.1A CN201410470268A CN104264692A CN 104264692 A CN104264692 A CN 104264692A CN 201410470268 A CN201410470268 A CN 201410470268A CN 104264692 A CN104264692 A CN 104264692A
Authority
CN
China
Prior art keywords
slope
side slope
tape planting
laid
pricker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410470268.1A
Other languages
Chinese (zh)
Other versions
CN104264692B (en
Inventor
孙晨旭
蒋青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Gan Shidai Environmental Resource Science And Technology Ltd
Original Assignee
Wuhan Gan Shidai Environmental Resource Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Gan Shidai Environmental Resource Science And Technology Ltd filed Critical Wuhan Gan Shidai Environmental Resource Science And Technology Ltd
Priority to CN201410470268.1A priority Critical patent/CN104264692B/en
Publication of CN104264692A publication Critical patent/CN104264692A/en
Application granted granted Critical
Publication of CN104264692B publication Critical patent/CN104264692B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01CPLANTING; SOWING; FERTILISING
    • A01C1/00Apparatus, or methods of use thereof, for testing or treating seed, roots, or the like, prior to sowing or planting
    • A01C1/04Arranging seed on carriers, e.g. on tapes, on cords ; Carrier compositions
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/202Securing of slopes or inclines with flexible securing means

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental Sciences (AREA)
  • Soil Sciences (AREA)
  • Cultivation Of Plants (AREA)
  • Pretreatment Of Seeds And Plants (AREA)

Abstract

The invention provides an ecological restoration method of a slope. The ecological restoration method of the slope comprises the steps of smoothing the slope surface, paving geotechnical cloth on the smoothed slope surface and fixing the geotechnical cloth by use of an anchor rod, paving a honeycomb restraint system on the geotechnical cloth and fixing the honeycomb restraint system by use of an anchor rod, filling a plant growth substrate, paving a lawn nursery strip on the honeycomb restraint system, and nursing plants after paving is completed, wherein the honeycomb restraint system is composed of cells and reinforced belts passing through the cells; the lawn nursery strip comprises a geonet, setting paper, grass seeds, a slow release fertilizer and the setting paper, all of which are orderly paved from top to bottom; the ecological restoration method of the slope has the advantages that as the honeycomb restraint system is paved on the slope, the service life of the work can be greatly increased, the maintenance cost is reduced and the construction period is shortened, and the honeycomb restraint system is good in water permeability and moisture retention property, and capable of protecting soil from erosion by rainwater, and conserving and retaining soil; the method is short in construction period, convenient for maintenance, low in cost, capable of reinforcing the slope while restoring the ecology of the slope, and suitable for the soft foundation slopes of various gradients.

Description

A kind of side slope ecological renovation method
Technical field
The present invention relates to a kind of side slope ecological renovation method, be specifically related to a kind of honeycomb constrained system combines construction method with tape planting, belong to ecological restoration technical field.
Background technology
High ferro, speedway build with river regulation process in all relate to the Stability Analysis of Structures of side slope and the problem of restoration of the ecosystem.These side slopes are the important component parts in high ferro, speedway and river course, deal with improperly, can occur broken fall, cave in, slump even comes down, have a strong impact on environmental beauty, cause soil erosion, even cause interruption of communication, channel filling, accidents caused, cause huge economic loss and personal safety.
Slope stabilization and restoration of the ecosystem become the important content of highway, railway, Channel slope improvement, how according to actual conditions, suit measures to local conditions, treat because of slope, rapidly and efficiently to realize edge slope structure firm for low cost, view is graceful, combines together become various countries' question of common concern with periphery natural environment.
The method that current slope stabilization and restoration of the ecosystem are commonly used is eco-concrete, stone masonry or laid dry stone, cast-in-situ concrete, precast concrete segment, gabion net, ecology bag, ecological blanket, the methods such as alien earth sparging, these bank protecting methods or construction costs is high or construction maintenance work difficulty is larger, and Part Methods is only from the stability of side slope and the safety of river course flood, do not consider environment and ecological impact, rarely has method safety and firmness and ecological benefits perfect adaptation can got up, for the side slope of the gradient >=60 °, because the gradient is larger, easy generation landslide even comes down, make the restoration of the ecosystem on abrupt slope more difficult.
Summary of the invention
The object of the invention is to solve the deficiencies in the prior art a kind of side slope ecological renovation method is provided, can realize fast stablizing the slope greening on side slope and even abrupt slope and edge slope structure.
Realizing the technical solution adopted in the present invention is that a kind of side slope ecological renovation method, comprises the steps:
(1) slope leveling: will need domaticly cleaning out of regulation, removes the loose stone on domatic surface and foreign material and by domatic compacting, leveling;
(2) geotextiles is laid: lay geotextiles along the direction being parallel to river course, fix geotextiles with anchor pole, anchor spacing is 1 ~ 2m;
(3) honeycomb constrained system is laid: in geotextiles, lay honeycomb constrained system, and by the anchor pricker in honeycomb constrained system honeycomb constrained system is fixed on domatic on, the nest room of described honeycomb constrained system by shape, size adjustable and the reinforced bands through nest room are formed, the nest wall of nest room is provided with through hole, described anchor pricker is arranged in nest room, and anchor pricker top is connected with reinforced bands;
(4) filling plant growth substrate: filling plant growth substrate in the nest room fixed, smooth and compacting plant growth medium, described plant growth medium comprises nutrient matrix and moisture retaining groundmass, and nutrient matrix is laid on above moisture retaining groundmass;
(5) tape planting is laid: the plant growth medium after smooth lays tape planting, in tape planting, insert fixed bar fix tape planting, described tape planting comprises the biodegradation material laid successively from top to bottom and weaves the geonet obtained, shape paper, grass seeds, slow-release fertilizer and sizing paper, and geonet, sizing paper, grass seeds, slow-release fertilizer and sizing paper form tape planting by cementing agent bonding;
(6) plant maintenance: tape planting is sprinkled water after having laid first, watering has water droplet to ooze out to tape planting, subsequently the tape planting laid is carried out to the plant maintenance of 7 ~ 14 days, except the rainy day, every day sprinkles water 1 ~ 2 time on tape planting, ensures domatic moistening.
Lap length between described geotextiles is 5 ~ 10cm.
Described nutrient matrix is common plantation earth.
Described moisture retaining groundmass is a kind of or both the above moisture retaining groundmass mixed by any mass ratio in leca, cinder, building waste residue.
Described fixed bar is wooden pricker, bamboo pricker, crooked chisel, ABS pricker or plastics pricker.
The spacing of described fixed bar is 0.5 ~ 0.8m.
Described sizing paper is for meeting the degradable lining paper of water.
Described grass seeds is the grass seeds of paspalum notatum, alfalfa, dewdrop grass, Manila grass, Korea lawn grass or Bermuda grass.
Described cementing agent is chemical paste, 107 glue, 801 glue, Wall paper adhesive or cellulose gum.
As shown from the above technical solution, first side slope ecological renovation method provided by the invention carries out slope leveling, smooth good domatic on lay geotextiles and fix with anchor pole, geotextiles can reduce domatic soil erosion, anchor pole stretches in the body of slope can carry out main body reinforcing to slope body through geotextiles, improves slope body intensity; Geotextiles is laid honeycomb constrained system and fixes with anchor pricker, anchor pricker stretches into slope body and fixes honeycomb constrained system, fill in the nest room of honeycomb constrained system and lay by moisture retaining groundmass and nutrient matrix the plant growth medium formed successively, honeycomb constrained system lay tape planting and fixes with fixed bar, finally plant maintenance being carried out to tape planting.
The shape and size of honeycomb constrained system nest room are adjustable, reinforced bands through nest wall strengthens the switching performance nest room, anchor pricker is provided with in nest room, anchor pricker top is connected with reinforced bands, and bottom is stretched in the body of slope, and honeycomb constrained system is flexible structure, the internal stress of the plant growth medium being filled in nest indoor can be reduced, and for plant growth medium provides tensile energy, be firmly filled in the plant growth medium in nest room, improve domatic static load supporting capacity; Anchor pricker honeycomb constrained system is fixed on domatic on, prevent honeycomb constrained system from gliding; The nest wall of honeycomb constrained system is provided with through hole, guarantees ventilative, the permeability performance of plant growth medium.
Plant growth medium is made up of lower floor's moisture retaining groundmass and upper strata nutrient matrix, and the moisture retaining groundmass water-holding capacity of lower floor is strong, and water suction is fast, can keep soil moisture, the nutrient matrix short texture on upper strata, and ventilation, water conservation, fertilizer-preserving ability by force, can be plant and provide nutrient.
Honeycomb constrained system lays tape planting, tape planting lower floor is the grass seeds wrapped up in of two-layer sizing paper bag and slow-release fertilizer, upper strata is work out by biodegradation material the geonet obtained, this tape planting is lightweight, and be easy to carrying and construction, easy construction is simple, speed of application is fast, grass seeds and slow-release fertilizer are fixed in sizing paper, can guarantee that grass seeds is evenly distributed, after germinateing, growing way is consistent; Water degradable in 7-10 days met by sizing paper, can not affect grass seeds and germinate; Tape planting uses upper strata geonet solidification, improve tape planting hot strength and erosion resistance, geonet can the flow velocity of resistance to 3m/s indeformable, plant do not cover completely domatic before, slow down heavy rain or current to the erosion damage of plant, geonet can be degradable through microorganism in 3 ~ 5 years, can not produce secondary pollution.
Compared with prior art, beneficial effect of the present invention is, the method lays honeycomb constrained system in side slope, engineering material consumption and engineering quantity can be reduced, significantly improve engineering application life, reduce maintenance cost, save the duration, honeycomb constrained system nonwatertight moisture keeping is good, and rainwater can be avoided soil washing, the solid soil of soil conservation; The method short construction period, maintenance is convenient, and cost is low, while repairing slope ecological, certain reinforcement effect is played to slope body, be applicable to the soft foundation side slope of the various gradient, the slope structure of reparation is firm and can combine together with around ecoscape, has good aesthetic of landscape benefit.
Accompanying drawing explanation
Fig. 1 is that side slope ecological renovation method provided by the invention implements structural representation.
Fig. 2 is honeycomb constrained system structural representation.
Fig. 3 is tape planting structural representation.
Fig. 4 is plant growth medium structural representation.
Wherein, 1-geotextiles, 2-anchor pricker, 3-anchor pole, 4-plant growth medium, 41-nutrient matrix, 42-moisture retaining groundmass, 5-fixed bar, 6-reinforced bands, 7-honeycomb constrained system, 8-tape planting, 9-nest room, 10-nest wall, 11-geonet, 12-shapes paper, 13-grass seeds, 14-slow-release fertilizer.
Detailed description of the invention
Below in conjunction with accompanying drawing and embodiment the present invention done and illustrate in detail.
Implement schematic diagram as shown in Figure 1, will domaticly cleaning out of regulation be needed, artificial remove domatic surface loose stone and foreign material by domatic compacting, leveling; From toe, upwards lay geotextiles 1 along the direction being parallel to river course, the lap length between geotextiles is 10cm, and insert anchor pole 3 at the geotextiles edge laid and lap-joint and fix geotextiles, the spacing between anchor pole is 1m; Geotextiles is laid honeycomb constrained system 7, the nest room 9 of honeycomb constrained system is launched, nest room width to be quite advisable with nest room height, and suitably can adjust according to actual conditions, and the structure of honeycomb constrained system as shown in Figure 2, reinforced bands 6 is through nest room 9, reinforced bands is connected with anchor pricker 2 and is used for fixing honeycomb constrained system, and the nest wall 10 of nest room is provided with through hole, for the ventilative of plant growth medium and infiltration, by in the body of anchor pricker wedging slope, fixing honeycomb constrained system; Filling plant growth substrate 4 in the nest room fixed, as shown in Figure 4, plant growth medium comprises nutrient matrix 41 and moisture retaining groundmass 42, nutrient matrix is common plantation earth, be laid on the top of moisture retaining groundmass, moisture retaining groundmass is leca, smooth and compacting plant growth medium; Plant growth medium after smooth closely lays tape planting 8 along the direction being parallel to river course, and in tape planting, insert fixed bar 5 fix tape planting, fixed bar is wooden pricker, and fixed bar spacing is 50cm.
The structure of tape planting as shown in Figure 3, comprise upper strata geonet 11 and lower floor's Seed Layer, Seed Layer is the structure that upper and lower two-layer sizing paper 12 wraps up grass seeds 13 and slow-release fertilizer 14, geonet, sizing paper, grass seeds, slow-release fertilizer are sticked with into by cellulose gum and are integrated, and grass seeds is the grass seeds of Bermuda grass.
The grass seeds broadcasted sowing in tape planting is the grass seeds of Bermuda grass, tape planting is sprinkled water after having laid first, watering has water droplet to ooze out to tape planting, subsequently the tape planting laid is carried out to the plant maintenance of 2 weeks, except the rainy day, every day sprinkles water 1 time on tape planting, if summer, then noon every day and dusk respectively sprinkled water once, ensure domatic moistening, sizing paper is for meeting the degradable lining paper of water, can be degradable after Bermuda grass grows stolon, geonet is degradable after 5 years, can not cause secondary pollution to the side slope of administering.

Claims (9)

1. a side slope ecological renovation method, is characterized in that comprising the steps:
(1) slope leveling: will need domaticly cleaning out of regulation, removes the loose stone on domatic surface and foreign material and by domatic compacting, leveling;
(2) geotextiles is laid: lay geotextiles along the direction being parallel to river course, fix geotextiles with anchor pole, anchor spacing is 1 ~ 2m;
(3) honeycomb constrained system is laid: in geotextiles, lay honeycomb constrained system, and by the anchor pricker in honeycomb constrained system honeycomb constrained system is fixed on domatic on, the nest room of described honeycomb constrained system by shape, size adjustable and the reinforced bands through nest room are formed, the nest wall of nest room is provided with through hole, described anchor pricker is arranged in nest room, and anchor pricker top is connected with reinforced bands;
(4) filling plant growth substrate: filling plant growth substrate in the nest room fixed, smooth and compacting plant growth medium, described plant growth medium comprises nutrient matrix and moisture retaining groundmass, and nutrient matrix is laid on above moisture retaining groundmass;
(5) tape planting is laid: the plant growth medium after smooth lays tape planting, in tape planting, insert fixed bar fix tape planting, described tape planting comprises the biodegradation material laid successively from top to bottom and weaves the geonet obtained, shape paper, grass seeds, slow-release fertilizer and sizing paper, and geonet, sizing paper, grass seeds, slow-release fertilizer and sizing paper form tape planting by cementing agent bonding;
(6) plant maintenance: tape planting is sprinkled water after having laid first, watering has water droplet to ooze out to tape planting, subsequently the tape planting laid is carried out to the plant maintenance of 7 ~ 14 days, except the rainy day, every day sprinkles water 1 ~ 2 time on tape planting, ensures domatic moistening.
2. side slope ecological renovation method according to claim 1, is characterized in that: the lap length between described geotextiles is 5 ~ 10cm.
3. side slope ecological renovation method according to claim 1, is characterized in that: described nutrient matrix is common plantation earth.
4. side slope ecological renovation method according to claim 1, is characterized in that: described moisture retaining groundmass is a kind of or both the above moisture retaining groundmass mixed by any mass ratio in leca, cinder, building waste residue.
5. side slope ecological renovation method according to claim 1, is characterized in that: described fixed bar is wooden pricker, bamboo pricker, crooked chisel, ABS pricker or plastics pricker.
6. side slope ecological renovation method according to claim 1, is characterized in that: the spacing of described fixed bar is 0.5 ~ 0.8m.
7. side slope ecological renovation method according to claim 1, is characterized in that: described sizing paper is for meeting water and degradable lining paper.
8. side slope ecological renovation method according to claim 1, is characterized in that: described grass seeds is the grass seeds of paspalum notatum, alfalfa, dewdrop grass, Manila grass, Korea lawn grass or Bermuda grass.
9. side slope ecological renovation method according to claim 1, is characterized in that: described cementing agent is chemical paste, 107 glue, 801 glue, Wall paper adhesive or cellulose gum.
CN201410470268.1A 2014-09-15 2014-09-15 A kind of side slope ecological renovation method Expired - Fee Related CN104264692B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410470268.1A CN104264692B (en) 2014-09-15 2014-09-15 A kind of side slope ecological renovation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410470268.1A CN104264692B (en) 2014-09-15 2014-09-15 A kind of side slope ecological renovation method

Publications (2)

Publication Number Publication Date
CN104264692A true CN104264692A (en) 2015-01-07
CN104264692B CN104264692B (en) 2016-05-11

Family

ID=52156256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410470268.1A Expired - Fee Related CN104264692B (en) 2014-09-15 2014-09-15 A kind of side slope ecological renovation method

Country Status (1)

Country Link
CN (1) CN104264692B (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105684778A (en) * 2016-01-27 2016-06-22 宏大国源(芜湖)资源环境治理有限公司 High-and-steep-slope vegetation recovery system and method thereof
CN105862887A (en) * 2016-04-18 2016-08-17 江西理工大学 Ecological slope protection structure for ion rare earth mine
CN105940805A (en) * 2016-05-10 2016-09-21 广宁县奥茵环境工程科技有限公司 Large slope land vegetation recovery method and organoclay formula
CN106576800A (en) * 2016-12-06 2017-04-26 安徽星美秸秆循环利用科技有限公司 Method for performing mine repairing and greening by applying straw grass blanket
CN106609510A (en) * 2015-10-22 2017-05-03 郑伟 A flexible slope protection device
CN107371468A (en) * 2017-08-31 2017-11-24 大连格宾环境技术有限公司 Water protects plant-growth carpet
CN107513983A (en) * 2017-10-09 2017-12-26 杨勇 A kind of honeycomb cell compartment type is used for dykes and dams ecological management and rainwater purification system and its construction method
CN108243932A (en) * 2018-03-21 2018-07-06 合肥雪立歆农业科技有限公司 A kind of Chinese herbaceous peony and the slope planting technique method of black eye flower
CN108468309A (en) * 2018-05-18 2018-08-31 江苏绿之源生态建设有限公司 For the geotechnological raft pad of river and lake library revetment and the means of defence of river and lake library revetment
CN109680650A (en) * 2019-01-16 2019-04-26 中国科学院武汉植物园 Channel slope ecological safeguard structure system and its construction method
CN109763497A (en) * 2018-12-28 2019-05-17 北京顺景园林有限公司 A kind of flexibility slope ecological guard system and its construction method
CN110089303A (en) * 2019-04-16 2019-08-06 大连地拓环境科技有限公司 One kind moving spliced mining junkyard and temporarily plants raw repair module and its construction method
CN110984189A (en) * 2019-12-13 2020-04-10 深圳贵人生态建设有限公司 Slope ecological restoration system and method
CN111456046A (en) * 2020-05-13 2020-07-28 岭南生态文旅股份有限公司 Light ecological slope restoration structure and restoration method
CN112160330A (en) * 2020-09-30 2021-01-01 六安市金源园林景观建设有限责任公司 Garden construction slope restoration method
CN113152490A (en) * 2021-04-14 2021-07-23 中交四航工程研究院有限公司 Side slope ecological slope protection construction method with unified water retention and drainage
CN113229050A (en) * 2021-05-07 2021-08-10 湖北绿洲园林工程有限公司 Ecological protection construction method for long-bag vegetation zone
CN113261444A (en) * 2021-04-22 2021-08-17 国家地质实验测试中心 Composite honeycomb grid chamber for loose slope ecological management and vegetation recovery method
CN113412765A (en) * 2021-05-26 2021-09-21 浙江同济科技职业学院 Ecological restoration method for bank hydro-fluctuation belt
CN114190236A (en) * 2021-12-09 2022-03-18 杨莹 Vegetation restoration method for northern ecological fragile area

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058424A (en) * 2019-11-29 2020-04-24 湖北锦天禹建设工程有限公司 Quick construction method for constraint grids of encrypted bamboo stick honeycomb system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS559924A (en) * 1978-07-03 1980-01-24 Utarou Tsujimoto Slope face reinforcing device
CN1152177C (en) * 2001-10-09 2004-06-02 邹胜文 Method for consolidating soil, protecting slope and planting vegetation on rock slope
CN1936185A (en) * 2005-09-19 2007-03-28 王宏韬 Road foundation
CN201103124Y (en) * 2007-09-13 2008-08-20 苏学孟 Combined building grillage
CN103718905A (en) * 2014-01-17 2014-04-16 曾炳威 Grass protection device and lawn grass planting method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS559924A (en) * 1978-07-03 1980-01-24 Utarou Tsujimoto Slope face reinforcing device
CN1152177C (en) * 2001-10-09 2004-06-02 邹胜文 Method for consolidating soil, protecting slope and planting vegetation on rock slope
CN1936185A (en) * 2005-09-19 2007-03-28 王宏韬 Road foundation
CN201103124Y (en) * 2007-09-13 2008-08-20 苏学孟 Combined building grillage
CN103718905A (en) * 2014-01-17 2014-04-16 曾炳威 Grass protection device and lawn grass planting method

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106609510A (en) * 2015-10-22 2017-05-03 郑伟 A flexible slope protection device
CN105684778A (en) * 2016-01-27 2016-06-22 宏大国源(芜湖)资源环境治理有限公司 High-and-steep-slope vegetation recovery system and method thereof
CN105862887A (en) * 2016-04-18 2016-08-17 江西理工大学 Ecological slope protection structure for ion rare earth mine
CN105862887B (en) * 2016-04-18 2017-12-15 江西理工大学 A kind of ion type rareearth mine ecological slope protection structure
CN105940805A (en) * 2016-05-10 2016-09-21 广宁县奥茵环境工程科技有限公司 Large slope land vegetation recovery method and organoclay formula
CN106576800A (en) * 2016-12-06 2017-04-26 安徽星美秸秆循环利用科技有限公司 Method for performing mine repairing and greening by applying straw grass blanket
CN107371468A (en) * 2017-08-31 2017-11-24 大连格宾环境技术有限公司 Water protects plant-growth carpet
CN107513983A (en) * 2017-10-09 2017-12-26 杨勇 A kind of honeycomb cell compartment type is used for dykes and dams ecological management and rainwater purification system and its construction method
CN108243932A (en) * 2018-03-21 2018-07-06 合肥雪立歆农业科技有限公司 A kind of Chinese herbaceous peony and the slope planting technique method of black eye flower
CN108468309A (en) * 2018-05-18 2018-08-31 江苏绿之源生态建设有限公司 For the geotechnological raft pad of river and lake library revetment and the means of defence of river and lake library revetment
CN109763497A (en) * 2018-12-28 2019-05-17 北京顺景园林有限公司 A kind of flexibility slope ecological guard system and its construction method
CN109680650A (en) * 2019-01-16 2019-04-26 中国科学院武汉植物园 Channel slope ecological safeguard structure system and its construction method
CN110089303A (en) * 2019-04-16 2019-08-06 大连地拓环境科技有限公司 One kind moving spliced mining junkyard and temporarily plants raw repair module and its construction method
CN110984189A (en) * 2019-12-13 2020-04-10 深圳贵人生态建设有限公司 Slope ecological restoration system and method
CN111456046A (en) * 2020-05-13 2020-07-28 岭南生态文旅股份有限公司 Light ecological slope restoration structure and restoration method
CN112160330A (en) * 2020-09-30 2021-01-01 六安市金源园林景观建设有限责任公司 Garden construction slope restoration method
CN112160330B (en) * 2020-09-30 2021-11-30 六安市金源园林景观建设有限责任公司 Garden construction slope restoration method
CN113152490A (en) * 2021-04-14 2021-07-23 中交四航工程研究院有限公司 Side slope ecological slope protection construction method with unified water retention and drainage
CN113261444A (en) * 2021-04-22 2021-08-17 国家地质实验测试中心 Composite honeycomb grid chamber for loose slope ecological management and vegetation recovery method
CN113229050A (en) * 2021-05-07 2021-08-10 湖北绿洲园林工程有限公司 Ecological protection construction method for long-bag vegetation zone
CN113412765A (en) * 2021-05-26 2021-09-21 浙江同济科技职业学院 Ecological restoration method for bank hydro-fluctuation belt
CN114190236A (en) * 2021-12-09 2022-03-18 杨莹 Vegetation restoration method for northern ecological fragile area

Also Published As

Publication number Publication date
CN104264692B (en) 2016-05-11

Similar Documents

Publication Publication Date Title
CN104264692A (en) Ecological restoration method of slope
CN105484275B (en) A kind of high steep waste side slope reinforcement anchoring Ecosystem restoration system of mountain area wind power plant
CN106900342B (en) Integrated semi-lithologic high slope vegetation reconstruction protection method
CN101949147B (en) Desert soil moisture conservation method and application
CN107893422B (en) A kind of reinforcement type ecological slope protection structure and its construction method
CN101818499A (en) Revegetation system on steep rocky slopes and implementing method thereof
CN108093729A (en) Side-slope greening and protection method
CN208266847U (en) Quickly repair structure in Gullied suitable for Canal in Loess Area
CN108901648A (en) Ecological grass mat and its construction method protected for soil-slope
CN110219310B (en) Frame-type vegetation cement soil slope protection method and facility of water storage and drainage pipe combined multifunctional water drawing reinforced belt
CN112136408B (en) Greening method suitable for sand abrupt slope in high-altitude area
CN112616580A (en) Spray-seeding repair method for loose stone side slope
CN204825784U (en) Slope ecological protection system
CN201972156U (en) Slope protection system with stereoscopic afforestation vegetation cushions
CN203530993U (en) Steel-bar mesh planting hole
CN205475264U (en) High sediment side slope of abandoning suddenly in mountain area wind -powered electricity generation field adds muscle anchor ecological remediation structure
CN207714637U (en) A kind of water storage kind plant roof
CN114032927B (en) Construction method for recovering vegetation with water-retaining soil-fixing function on side slope wound surface
CN105684591A (en) Ecological protection structure suitable for south rack slope drainage waterlogging prevention
CN111484278A (en) Ecological concrete, ecological protection slope and construction method of ecological protection slope
CN219395680U (en) Ecological slope protection structure and slope protection blanket
CN207047873U (en) A kind of road soil-slope quick bio protector of high and cold arid area
CN110409465A (en) A kind of Soft Rock Slope novel ecological environmental-protection construction method
CN206189418U (en) Short silk adds muscle ecological grass and irritates blanket bank protection
CN202090355U (en) Plant-growing side slope ecological protection structure capable of preventing rain wash

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160511

Termination date: 20190915