CN104120701A - 一种垂直升船机重大件吊装的施工方法及装置 - Google Patents
一种垂直升船机重大件吊装的施工方法及装置 Download PDFInfo
- Publication number
- CN104120701A CN104120701A CN201310149810.9A CN201310149810A CN104120701A CN 104120701 A CN104120701 A CN 104120701A CN 201310149810 A CN201310149810 A CN 201310149810A CN 104120701 A CN104120701 A CN 104120701A
- Authority
- CN
- China
- Prior art keywords
- ship
- reception chamber
- bridge erector
- platform
- suspension hook
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种垂直升船机重大件吊装的施工方法及装置,该方法及装置是在垂直升船机的上游过坝渠道(12)两侧顶高程设有用于平板拖车(2)搬运的转运平台(1),在过坝渠道(12)两侧及本体段(6)两侧的墙体结构上设有行走轨道(5),在行走轨道(5)上设有用于转运所述承船厢(8)的架桥机,通过转运平台(1)将承船厢(8)转运至架桥机底部,通过架桥机将承船厢(8)吊运至承船厢工装平台(11)上。避免了在本体段两侧的墙体上埋设电动葫芦并对墙体进行临时加固的措施,同时也避免了承船厢纵梁或横梁在空中的接力运输,达到了节约投资,节省工期、安全施工的目的,减少了对本体段永久建筑物的结构影响。
Description
技术领域
本发明涉及一种垂直升船机重大件吊装的施工方法及装置,属于水利水电航运技术领域。
背景技术
目前,垂直升船机在水利水电领域被广泛应用,组成垂直升船机的重大件,如承船厢的现场拼接运输及吊装技术在实施中存在较多的困难,如面临现场组装场地狭窄、吊装设备无法布置、交通桥设计荷载偏小等问题。因此,如何能够在狭小的场地进行承船厢主要结构(如纵梁或横梁)的吊装及拼接,是我们急需解决的问题。目前,很多工程实施的吊装方案,是采用升船机本身的桥机和在本体段两侧边墙上的电动葫芦的组合吊装方案。该方案为一种简易的吊装方案,但施工过程中需对埋设电动葫芦的边墙进行临时加固,同时该方案在吊装过程中需经过多次空中接力,吊装难度较大,吊装时间较长,吊装安全隐患大。
发明内容
本发明的目的在于在于提供一种简单、易行、安全、快捷的垂直升船机重大件吊装的施工方法及装置,可同时满足承船厢的纵梁或横梁在搬运过程中的左右、前后以及上下运输的需要,以克服现有吊装方案的不足。
本发明是这样实现的:
本发明的垂直升船机重大件吊装的施工方法包括如下步骤:
1)在垂直升船机的上游过坝渠道两侧顶高程布置用于平板拖车搬运的转运平台;
2)在过坝渠道两侧及本体段两侧形成一条可以布置行走轨道的墙体结构,行走轨道布置高程与转运平台相同;
3)在所述行走轨道上安装具有起吊、搬运能力的架桥机,该架桥机的底部设有两个吊钩;
4)将待吊装的重大件组成的承船厢由平板拖车通过转运平台安放置在架桥机底部;
5)使架桥机的第一个吊钩固定在承船厢的前端一个临时吊点上;
6)启动架桥机将第一个吊钩提升并往前牵引,带动承船厢的从平板拖车上的滚轴上往前移动;
7)当承船厢的后端临时吊点到达架桥机第二个吊钩位置时,将第二个吊钩固定在该后端临时吊点上;
8)启动架桥机第二个吊钩的提升设备,待第二个吊钩与第一个吊钩保持水平时,沿行走轨道同步移动架桥机,将承船厢移动至本体段上部;
9)同步下放架桥机的第一个吊钩和第二个吊钩,最终将承船厢摆放至本体段的承船厢工装平台上。
为了实现上面的方法,本发明采用了这样的升船机承船厢转运吊装装置,该装置是用于将承船厢由过坝渠道顶部转运吊装至本体段的承船厢工装平台,其中它包括至少一台垂直升船机,在所述垂直升船机的上游过坝渠道两侧顶高程设有用于平板拖车搬运的转运平台,在过坝渠道两侧及本体段两侧的墙体结构上设有行走轨道,在所述行走轨道上设有用于转运所述承船厢的架桥机。这样通过设置行走轨道及转运平台,避免对墙体进行临时加固,减少工作量。
所述行走轨道布置高程与转运平台相同。
在所述架桥机的上游端并排设有两个架桥机一号柱,在所述架桥机的下游端并排设有两个架桥机二号柱。
所述架桥机的上游端和下游端各设有至少一个吊钩。
所述吊钩设有提升及下放的装置。
所述吊钩还设有水平牵引装置。
所述平板拖车上设有滚轴。
由于采用了本发明的技术方案,避免了在本体段两侧的墙体上埋设电动葫芦并对墙体进行临时加固的措施,同时也避免了承船厢纵梁或横梁在空中的接力运输,达到了节约投资,节省工期、安全施工的目的,减少了对本体段永久建筑物的结构影响。
附图说明
图1是本发明的安装平面示意图;
图2是本发明的安装程序示意图一;
图3是本发明的安装程序示意图二;
图4是本发明的安装程序示意图三。
附图标记说明:1-转运平台,2-平板拖车,3-架桥机一号柱,4-架桥机二号柱,5-行走轨道,6-本体段,7-下闸首,8-承船厢,9-下游工作闸门,11-承船厢工装平台,12-过坝渠道。
具体实施方式
下面结合附图和实施例对本发明作进一步的详细说明。
看图1,并结合图2,本发明是用于将承船厢8由过坝渠道12顶部转运吊装至本体段6的承船厢工装平台11上,承船厢8通常设有纵梁或横梁,过坝渠道12位于挡水建筑物上游面部分,而承船厢工装平台11位于挡水建筑物下游面本体段6的底部,二者之间存在一个水位差,无法直接通航,因此要通过垂直升船机实现在二者之间的重大件吊装转运。从图中可以看到,承船厢工装平台11位于下游工作闸门9的后方,即上游面,而下游工作闸门9的下游面设有下闸首7。本发明在垂直升船机的上游过坝渠道12两侧顶高程设有用于平板拖车2搬运的转运平台1,在过坝渠道12两侧及本体段6两侧的墙体结构上设有行走轨道5,在所述行走轨道5上设有用于转运承船厢8的架桥机。行走轨道5布置高程与转运平台1相同,便于承船厢8顺利转运至架桥机下方。在架桥机的上游端并排设有两个架桥机一号柱3,在架桥机的下游端并排设有两个架桥机二号柱4,作为架桥机的支撑结构,并承担架桥机在提升或下放承船厢8时的荷载。架桥机的上游端和下游端各设有至少一个吊钩,用于吊装承船厢8的纵梁或横梁。并且吊钩设有提升及下放的装置和水平牵引装置,该提升及下放的装置和水平牵引装置是常规的提升装置或吊运装置。平板拖车2上设有滚轴,用于承船厢8在平板拖车2上水平移动。
本发明的垂直升船机重大件吊装的施工方法包括如下步骤:
1)在垂直升船机的上游过坝渠道12两侧顶高程布置用于平板拖车2搬运的转运平台1。
2)在过坝渠道12两侧及本体段6两侧形成一条可以布置行走轨道5的墙体结构,行走轨道5布置高程与转运平台1相同。
3)在所述行走轨道5上安装具有起吊、搬运能力的架桥机,该架桥机的底部设有两个吊钩。
4)将待吊装的重大件组成的承船厢8由平板拖车2通过转运平台1安放置在架桥机底部。
5)使架桥机的第一个吊钩固定在承船厢8的前端一个临时吊点上(如图2所示)。
6)启动架桥机将第一个吊钩提升并往前牵引,带动承船厢8从平板拖车2上的滚轴上往前移动。
7)当承船厢8的后端临时吊点到达架桥机第二个吊钩位置时,将第二个吊钩固定在该后端临时吊点上(如图3所示)。
8)启动架桥机第二个吊钩的提升设备,待第二个吊钩与第一个吊钩保持水平时,沿行走轨道5同步移动架桥机,将承船厢8移动至本体段6上部;
9)同步下放架桥机的第一个吊钩和第二个吊钩,最终将承船厢8摆放至本体段6的承船厢工装平台11上(如图4所示)。
当然,以上只是本发明的具体应用范例,本发明还有其他的实施方式,凡采用等同替换或等效变换形成的技术方案,均落在本发明所要求的保护范围之内。
Claims (8)
1.一种垂直升船机重大件吊装的施工方法,其特征是该方法包括如下步骤:
1)在垂直升船机的上游过坝渠道(12)两侧顶高程布置用于平板拖车(2)搬运的转运平台(1);
2)在过坝渠道(12)两侧及本体段(6)两侧形成一条可以布置行走轨道(5)的墙体结构,行走轨道(5)布置高程与转运平台(1)相同;
3)在所述行走轨道(5)上安装具有起吊、搬运能力的架桥机,该架桥机的底部设有两个吊钩;
4)将待吊装的重大件组成的承船厢(8)由平板拖车(2)通过转运平台(1)安放置在架桥机底部;
5)使架桥机的第一个吊钩固定在承船厢(8)的前端一个临时吊点上;
6)启动架桥机将第一个吊钩提升并往前牵引,带动承船厢(8)从平板拖车(2)上的滚轴上往前移动;
7)当承船厢(8)的后端临时吊点到达架桥机第二个吊钩位置时,将第二个吊钩固定在该后端临时吊点上;
8)启动架桥机第二个吊钩的提升设备,待第二个吊钩与第一个吊钩保持水平时,沿行走轨道(5)同步移动架桥机,将承船厢(8)移动至本体段(6)上部;
9)同步下放架桥机的第一个吊钩和第二个吊钩,最终将承船厢(8)摆放至本体段(6)的承船厢工装平台(11)上。
2.一种实现权利要求1的方法的升船机承船厢转运吊装装置,该装置是用于将承船厢(8)由过坝渠道(12)顶部转运吊装至本体段(6)的承船厢工装平台(11),其特征在于:它包括至少一台垂直升船机,在所述垂直升船机的上游过坝渠道(12)两侧顶高程设有用于平板拖车(2)搬运的转运平台(1),在过坝渠道(12)两侧及本体段(6)两侧的墙体结构上设有行走轨道(5),在所述行走轨道(5)上设有用于转运所述承船厢(8)的架桥机。
3.根据权利要求2所述的升船机承船厢转运吊装装置,其特征在于:所述行走轨道(5)布置高程与转运平台(1)相同。
4.根据权利要求2所述的升船机承船厢转运吊装装置,其特征在于:在所述架桥机的上游端并排设有两个架桥机一号柱(3),在所述架桥机的下游端并排设有两个架桥机二号柱(4)。
5.根据权利要求4所述的升船机承船厢转运吊装装置,其特征在于:所述架桥机的上游端和下游端各设有至少一个吊钩。
6.根据权利要求5所述的升船机承船厢转运吊装装置,其特征在于:所述吊钩设有提升及下放的装置。
7.根据权利要求6所述的升船机承船厢转运吊装装置,其特征在于:所述吊钩还设有水平牵引装置。
8.根据权利要求2所述的升船机承船厢转运吊装装置,其特征在于:所述平板拖车(2)上设有滚轴。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310149810.9A CN104120701B (zh) | 2013-04-26 | 2013-04-26 | 一种垂直升船机重大件吊装的施工方法及装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310149810.9A CN104120701B (zh) | 2013-04-26 | 2013-04-26 | 一种垂直升船机重大件吊装的施工方法及装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104120701A true CN104120701A (zh) | 2014-10-29 |
CN104120701B CN104120701B (zh) | 2016-02-24 |
Family
ID=51766318
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310149810.9A Active CN104120701B (zh) | 2013-04-26 | 2013-04-26 | 一种垂直升船机重大件吊装的施工方法及装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104120701B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105317031A (zh) * | 2015-07-03 | 2016-02-10 | 杭州国电机械设计研究院有限公司 | 一种升船机主机房桥机主梁吊装方法 |
CN106087934A (zh) * | 2016-08-26 | 2016-11-09 | 中国葛洲坝集团机电建设有限公司 | 一种用于水力浮动式垂直升船机竖井钢衬安装的同轴度测量装置及检测方法 |
WO2016192646A1 (zh) * | 2015-06-03 | 2016-12-08 | 中国葛洲坝集团机电建设有限公司 | 垂直升船机大型承船厢安装方法及安装定位辅助工装装置 |
CN107119655A (zh) * | 2017-06-14 | 2017-09-01 | 中国葛洲坝集团机电建设有限公司 | 突扩体减震水箱钢结构组拼平台及突扩体组拼方法 |
CN109930579A (zh) * | 2019-04-25 | 2019-06-25 | 黄河勘测规划设计研究院有限公司 | 航道运行时跨越与航道交叉河流的下挂桥渡方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1754603A1 (ru) * | 1990-05-24 | 1992-08-15 | Ю.Б.Кашеваров | Транспортный комплекс Кашеварова Ю.Б. дл транспортировки груза через плотину |
CN101008176A (zh) * | 2007-01-18 | 2007-08-01 | 国营武昌造船厂 | 一种大型升船机承船厢的制造安装方法 |
-
2013
- 2013-04-26 CN CN201310149810.9A patent/CN104120701B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1754603A1 (ru) * | 1990-05-24 | 1992-08-15 | Ю.Б.Кашеваров | Транспортный комплекс Кашеварова Ю.Б. дл транспортировки груза через плотину |
CN101008176A (zh) * | 2007-01-18 | 2007-08-01 | 国营武昌造船厂 | 一种大型升船机承船厢的制造安装方法 |
Non-Patent Citations (2)
Title |
---|
吴启煌: "高坝洲升船机承船厢结构件的吊装", 《湖北水力发电》 * |
杨联东 等: "300t升船机大件吊装方案优化及实施", 《水利水电施工》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016192646A1 (zh) * | 2015-06-03 | 2016-12-08 | 中国葛洲坝集团机电建设有限公司 | 垂直升船机大型承船厢安装方法及安装定位辅助工装装置 |
CN105317031A (zh) * | 2015-07-03 | 2016-02-10 | 杭州国电机械设计研究院有限公司 | 一种升船机主机房桥机主梁吊装方法 |
CN106087934A (zh) * | 2016-08-26 | 2016-11-09 | 中国葛洲坝集团机电建设有限公司 | 一种用于水力浮动式垂直升船机竖井钢衬安装的同轴度测量装置及检测方法 |
CN106087934B (zh) * | 2016-08-26 | 2018-07-31 | 中国葛洲坝集团机电建设有限公司 | 一种用于水力浮动式垂直升船机竖井钢衬安装的同轴度测量装置及检测方法 |
CN107119655A (zh) * | 2017-06-14 | 2017-09-01 | 中国葛洲坝集团机电建设有限公司 | 突扩体减震水箱钢结构组拼平台及突扩体组拼方法 |
CN109930579A (zh) * | 2019-04-25 | 2019-06-25 | 黄河勘测规划设计研究院有限公司 | 航道运行时跨越与航道交叉河流的下挂桥渡方法 |
CN109930579B (zh) * | 2019-04-25 | 2021-06-25 | 黄河勘测规划设计研究院有限公司 | 航道运行时跨越与航道交叉河流的下挂桥渡方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104120701B (zh) | 2016-02-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
LU102302B1 (en) | Steel reinforcement cage for use in ventilation shaft diaphragm wall, and usage method | |
CN103669216A (zh) | 一种钢箱梁散拼滑移装置及安装方法 | |
CN104120701A (zh) | 一种垂直升船机重大件吊装的施工方法及装置 | |
CN203383148U (zh) | 一种预制小箱梁跨内起梁装置 | |
CN104310165A (zh) | 一种导轨式附着方式施工升降机及其施工方法 | |
CN104695337A (zh) | 自提升滑翻施工系统及施工方法 | |
CN104060830B (zh) | 一种地下核电站大件吊装运输方法 | |
CN103194977B (zh) | 运架一体式架桥机架设首孔箱梁前导梁机就位方法 | |
CN202055516U (zh) | 竖井整体提升模板系统 | |
CN105019664A (zh) | 箱房式电气室的高空滑移安装法 | |
CN202689016U (zh) | 深水桥墩双壁钢围堰施工用围堰拼装及提升平台 | |
CN201330609Y (zh) | 浅埋暗挖大洞室洞内钢支撑机械化吊运装置 | |
CN203213090U (zh) | 一种升船机承船厢转运吊装装置 | |
CN202658590U (zh) | 整体装配式钻孔平台 | |
CN204626998U (zh) | 一种附着升降脚手架用卸料台 | |
CN103964300B (zh) | 顶升式加高设备 | |
CN106400700A (zh) | 双线悬臂式架桥机 | |
CN205241086U (zh) | 模板吊装和安拆用炮车 | |
CN209353734U (zh) | 用于安装幕墙的双轨道装置 | |
CN107724247B (zh) | 一种箱型桥梁隧道口换装工艺 | |
CN202688882U (zh) | 深水桥墩双壁钢围堰施工用围堰下放定位平台 | |
CN107988909B (zh) | 一种铁路便梁快速运输架设用拖车 | |
CN103803394B (zh) | 混凝土井塔外套装竖立大型箱型钢结构井架的起吊方法 | |
CN202337945U (zh) | 外侧就地提升梁体的装置 | |
CN104088665A (zh) | 暗挖车站钢管柱施工工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |