CN104088665A - 暗挖车站钢管柱施工工艺 - Google Patents

暗挖车站钢管柱施工工艺 Download PDF

Info

Publication number
CN104088665A
CN104088665A CN201310648785.9A CN201310648785A CN104088665A CN 104088665 A CN104088665 A CN 104088665A CN 201310648785 A CN201310648785 A CN 201310648785A CN 104088665 A CN104088665 A CN 104088665A
Authority
CN
China
Prior art keywords
steel pipe
pipe column
lifting
section
adopt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310648785.9A
Other languages
English (en)
Inventor
曲建生
唐璇
宋战平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 13th Bureau Group Co Ltd
Original Assignee
China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 13th Bureau Group Co Ltd filed Critical China Railway 13th Bureau Group Co Ltd
Priority to CN201310648785.9A priority Critical patent/CN104088665A/zh
Publication of CN104088665A publication Critical patent/CN104088665A/zh
Pending legal-status Critical Current

Links

Abstract

一种暗挖车站钢管柱施工工艺,包括如下步骤:1.将钢管柱分割成若干节;2.采用汽车吊将钢管柱吊至竖井井口,然后采用提升架将钢管柱吊至竖井上横通道平台位置,洞内采用叉车将钢管柱由通道平台运输至工作面;3.在导洞拱顶两侧凿出格栅主筋,安装吊钩,采用电葫芦进行钢管柱吊装;4.先将第一节钢管柱垂直吊装至井内,直接落底至底纵梁预埋法兰上固定;然后进行第二节钢管柱吊装至井内,采用人工将两节钢管柱拼装;拼装完成后,进行第三节钢管柱吊装,第三节、第四节钢管柱连接均由人工在井内完成。本发明施工简单、效率高,可有效地解决钢管柱在狭窄空间内运输及有限空间内的安装等难题。

Description

暗挖车站钢管柱施工工艺
技术领域:
本发明属于一种市政建设施工方法,特别涉及一种暗挖车站钢管柱施工工艺。
背景技术:
目前中国各大城市均加快了建设城市轨道交通系统的步伐,但城市中心建筑物密集、城市道路错综复杂,因此,暗挖地铁车站在城市地铁中越来越体现出其独特的优势。由于暗挖车站工序转换复杂,工作空间狭窄,钢管柱的运输、安装比较困难。
发明内容:
本发明的目的就在于克服上述现有技术中存在的不足,而提供一种暗挖车站钢管柱施工工艺,该工艺施工简单、效率高,可有效地解决钢管柱在狭窄空间内运输及有限空间内的安装等难题。
如上构思,本发明的技术方案是:一种暗挖车站钢管柱施工工艺,其特征在于:包括如下步骤:
(1)将钢管柱分割成若干节;
(2)采用汽车吊将钢管柱吊至竖井井口,然后采用提升架将钢管柱吊至竖井上横通道平台位置,洞内采用叉车将钢管柱由通道平台运输至工作面;
(3)在导洞拱顶两侧凿出格栅主筋,安装吊钩,采用电葫芦进行钢管柱吊装;
(4)先将第一节钢管柱垂直吊装至井内,直接落底至底纵梁预埋法兰上固定;然后进行第二节钢管柱吊装至井内,采用人工将两节钢管柱拼装;拼装完成后,进行第三节钢管柱吊装,第三节、第四节钢管柱连接均由人工在井内完成。
本发明钢管柱采用叉车运输,有效地解决了洞内有水运输困难的问题。钢管柱采用人工在洞内连接,有效解决了洞内空间狭窄钢管柱在井口垂直连接困难的问题,并且提高了劳动生产效率,充分地保证了施工工期。
附图说明:
图1是本发明的钢管柱分节图。
具体实施方式:
一种暗挖车站钢管柱施工工艺,包括如下步骤:
1、钢管柱地面吊装前,先将总长11.5m的钢管柱分成四节、编号,进行试拼装,单节长为3.4m和2.7m两种规格。
2、采用汽车吊将钢管柱吊至竖井井口、采用提升架将钢管柱吊至竖井上横通道平台位置,洞内采用叉车将钢管柱由通道平台运输至工作面。各图中1至4为第一节至第四节钢管柱,5为10t吊钩。
3、在导洞拱顶两侧凿出格栅主筋,安装2个10t吊钩5,采用电葫芦进行钢管柱吊装。
4、小导洞净高为4.5m,先将第一节钢管柱(2.7m)垂直吊装至井内,直接落底至底纵梁预埋法兰上固定;然后进行第二节钢管柱(2.7m)吊装至井内,采用人工将两节钢管柱拼装;拼装完成后,进行第三节钢管柱(3.4m)吊装,第三节、第四节钢管柱连接均由人工在井内完成。

Claims (1)

1.一种暗挖车站钢管柱施工工艺,其特征在于:包括如下步骤:
(1)将钢管柱分割成若干节;
(2)采用汽车吊将钢管柱吊至竖井井口,然后采用提升架将钢管柱吊至竖井上横通道平台位置,洞内采用叉车将钢管柱由通道平台运输至工作面;
(3)在导洞拱顶两侧凿出格栅主筋,安装吊钩,采用电葫芦进行钢管柱吊装;
(4)先将第一节钢管柱垂直吊装至井内,直接落底至底纵梁预埋法兰上固定;然后进行第二节钢管柱吊装至井内,采用人工将两节钢管柱拼装;拼装完成后,进行第三节钢管柱吊装,第三节、第四节钢管柱连接均由人工在井内完成。
CN201310648785.9A 2013-12-03 2013-12-03 暗挖车站钢管柱施工工艺 Pending CN104088665A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310648785.9A CN104088665A (zh) 2013-12-03 2013-12-03 暗挖车站钢管柱施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310648785.9A CN104088665A (zh) 2013-12-03 2013-12-03 暗挖车站钢管柱施工工艺

Publications (1)

Publication Number Publication Date
CN104088665A true CN104088665A (zh) 2014-10-08

Family

ID=51636410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310648785.9A Pending CN104088665A (zh) 2013-12-03 2013-12-03 暗挖车站钢管柱施工工艺

Country Status (1)

Country Link
CN (1) CN104088665A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111676947A (zh) * 2020-06-23 2020-09-18 中国铁路设计集团有限公司 一种隧道仰拱地基加固组件及施工方法
CN113738414A (zh) * 2021-09-23 2021-12-03 北京市政建设集团有限责任公司 一种降低盾构掘进扰动的暗挖地铁车站钢管柱加固方法
CN114016546A (zh) * 2021-10-29 2022-02-08 中铁十九局集团第五工程有限公司 洞桩法车站钢管柱吊装固定装置及施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008007169A1 (de) * 2008-02-01 2009-08-06 Höricht, Rolf Bergwerk zur Wasserspeicherung und Energiegewinnung
CN201546174U (zh) * 2009-10-27 2010-08-11 中国第一冶金建设有限责任公司 桥梁边跨合龙段施工落地钢管柱支架整体移动装置
CN102561330A (zh) * 2011-12-29 2012-07-11 中铁十六局集团北京轨道交通工程建设有限公司 人工挖孔桩与钢管混凝土柱一体化的施工方法
CN103161469A (zh) * 2011-12-08 2013-06-19 上海市基础工程有限公司 开挖竖井地下修复顶管工具管的方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008007169A1 (de) * 2008-02-01 2009-08-06 Höricht, Rolf Bergwerk zur Wasserspeicherung und Energiegewinnung
CN201546174U (zh) * 2009-10-27 2010-08-11 中国第一冶金建设有限责任公司 桥梁边跨合龙段施工落地钢管柱支架整体移动装置
CN103161469A (zh) * 2011-12-08 2013-06-19 上海市基础工程有限公司 开挖竖井地下修复顶管工具管的方法
CN102561330A (zh) * 2011-12-29 2012-07-11 中铁十六局集团北京轨道交通工程建设有限公司 人工挖孔桩与钢管混凝土柱一体化的施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
房德云: "地铁暗挖车站钢管柱施工技术", 《科技创业家》, no. 3, 29 February 2012 (2012-02-29) *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111676947A (zh) * 2020-06-23 2020-09-18 中国铁路设计集团有限公司 一种隧道仰拱地基加固组件及施工方法
CN111676947B (zh) * 2020-06-23 2022-02-01 中国铁路设计集团有限公司 一种隧道仰拱地基加固组件及施工方法
CN113738414A (zh) * 2021-09-23 2021-12-03 北京市政建设集团有限责任公司 一种降低盾构掘进扰动的暗挖地铁车站钢管柱加固方法
CN114016546A (zh) * 2021-10-29 2022-02-08 中铁十九局集团第五工程有限公司 洞桩法车站钢管柱吊装固定装置及施工方法

Similar Documents

Publication Publication Date Title
CN104097253B (zh) 跨座式单轨交通环保型活动式预制轨道梁模板系统
CN109184189B (zh) 一种大直径筒仓锥壳仓顶结构施工方法
CN104775825A (zh) 盾构机单井整体始发施工方法
CN204151823U (zh) 盖挖逆作结构板下顺筑侧墙单侧悬臂液压模板台车
CN104088665A (zh) 暗挖车站钢管柱施工工艺
CN104179121B (zh) 一种移动模架托架四提升自拼装方法
CN201330609Y (zh) 浅埋暗挖大洞室洞内钢支撑机械化吊运装置
CN102777186A (zh) 立井砌壁全液压自移式模板装置
CN107587885B (zh) 一种隧道标准断面内二衬台车结构及拼装方法
CN203035204U (zh) 一种大断面隧道二衬分组模板台车
CN104120701A (zh) 一种垂直升船机重大件吊装的施工方法及装置
CN204457786U (zh) 一种b管片拆除后的扩挖大直径盾构隧道建造地铁车站
CN201972095U (zh) 桥梁薄壁空心墩手拉葫芦提升作业平台
CN103967332B (zh) 一种建筑工地围挡的施工方法
CN207293981U (zh) 一种砂砾石隧洞内二衬台车的吊装装置
CN103803394B (zh) 混凝土井塔外套装竖立大型箱型钢结构井架的起吊方法
CN202899639U (zh) 一种混凝土柱结构
CN105625732A (zh) 超高悬挑钢结构桁架无支撑施工方法
CN206092014U (zh) 一种适用于多导洞开挖的临时支撑体系转换台车
CN112627882B (zh) 大型盾构隧道中隔墙的转运机具及安装方法
CN108644471B (zh) 一种大面积水域上的管道滑移运输结构系统及其施工方法
CN208684247U (zh) 一种预制节段用吊装装置
CN201128882Y (zh) 桥梁拱肋吊运及支撑支架一体化施工装置
CN210134442U (zh) 一种钢围堰连续下放系统
CN210152663U (zh) 一种组合式矩形顶铁结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141008