CN102777186A - 立井砌壁全液压自移式模板装置 - Google Patents

立井砌壁全液压自移式模板装置 Download PDF

Info

Publication number
CN102777186A
CN102777186A CN2012102752102A CN201210275210A CN102777186A CN 102777186 A CN102777186 A CN 102777186A CN 2012102752102 A CN2012102752102 A CN 2012102752102A CN 201210275210 A CN201210275210 A CN 201210275210A CN 102777186 A CN102777186 A CN 102777186A
Authority
CN
China
Prior art keywords
template
cylinder
moving
vertical
braced structures
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102752102A
Other languages
English (en)
Other versions
CN102777186B (zh
Inventor
徐辉东
温富城
武杰
秦晓光
高运强
刘林林
刘宁
方体利
张宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA COAL MINE CONSTRUCTION GROUP Co Ltd
Original Assignee
CHINA COAL MINE CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA COAL MINE CONSTRUCTION GROUP Co Ltd filed Critical CHINA COAL MINE CONSTRUCTION GROUP Co Ltd
Priority to CN201210275210.2A priority Critical patent/CN102777186B/zh
Publication of CN102777186A publication Critical patent/CN102777186A/zh
Application granted granted Critical
Publication of CN102777186B publication Critical patent/CN102777186B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明公开了一种立井砌壁全液压自移式模板装置,其包括:悬吊于立井中的吊盘以及设置在吊盘上的液压站;与液压站通过管路连接的竖向油缸,设于吊盘下方的支撑结构及移动模板,支撑结构与移动模板分别和竖向油缸及其活塞杆连接;支撑结构上设有与液压站通过管路连接的第一水平油缸,其对支撑结构进行扩张或收缩,在扩张时因摩擦力固定于立井内壁上并为移动模板提供悬吊支撑;移动模板呈不封闭的圆筒形,在移动模板的开口处设有第二水平油缸,其缸体连接于开口处一侧的模板上,活塞杆连接于开口处另一侧的模板上;还包括对移动模板的开口进行封闭的封口模板。本发明解决了无稳车钢丝绳悬吊模板问题,实现了掘进与混凝土井壁支护的同步进行。

Description

立井砌壁全液压自移式模板装置
技术领域:
本发明涉及一种立井砌壁全液压自移式模板装置,属于矿井建设技术领域。
背景技术:
在矿山立井砌壁快速施工中,国内目前采用的模板主要有三种。第一种采用地面稳车悬吊技术,该种方法占用大量稳车和钢丝绳等设备材料,随着井深不断加深,设备型号越来越大,使用钢丝绳直径和数量越来越大,随着悬吊负荷的不断增大,对井架技术要求越来越高,各种技术已接近极限,技术难度越来越大。
第二种是很少使用的迈步式液压滑模技术,该技术在每次都要在永久井壁和岩石井壁上预埋固定装置,同时设有浇筑混凝土工作平台,绑扎钢筋施工和拆装下支腿工作平台,操作模板等三个平台,系统复杂,操作繁琐,模板向上滑升过程中,易造成井壁混凝土拉升出现裂缝,而且容易出现偏斜、卡模板等现象,现场一般很少使用。
第三种,目前尚未使用的迈步式液压操作整体金属模板,该技术在所有井壁上每隔3~4米必须预留4个深度大于300×300mm断面的梁窝,对整个井壁的完整性和防水性能、强度都有不同程度的影响,而且在不同水平面分别设置迈步环、悬吊环、导向环三个环,垂直方向设有钢丝悬吊系统,又有液压系统,工序复杂,不便操作,工作效率低。
发明内容:
为克服现有技术的缺陷,本发明的目的在于提供一种立井砌壁全液压自移式模板装置,利用支撑结构与已砌筑好的井壁之间的摩擦阻力来悬吊移动模板,支撑结构与移动模板之间利用油缸实现模板的自行移动,解决了无稳车钢丝绳悬吊模板问题,实现了掘进与混凝土井壁支护的同步进行。
本发明解决技术问题采用如下技术方案:
立井砌壁全液压自移式模板装置,其包括:
悬吊于所述立井中的吊盘以及设置在所述吊盘上的液压站;
与所述液压站通过管路连接并由所述液压站提供动力的竖向油缸,设于所述吊盘下方的支撑结构及移动模板,所述支撑结构与所述竖向油缸连接、所述移动模板与所述竖向油缸的活塞杆连接;
所述支撑结构上设有与所述液压站通过管路连接的第一水平油缸,所述第一水平油缸对所述支撑结构进行扩张或收缩,所述支撑结构在扩张时因摩擦力固定于立井内壁上并为所述移动模板提供悬吊支撑;
所述移动模板呈不封闭的圆筒形,在所述移动模板的开口处设有与所述液压站通过管路连接的第二水平油缸,所述第二水平油缸的缸体连接于开口处一侧的模板上,第二水平油缸的活塞杆连接于开口处另一侧的模板上;
所述自移式模板装置还包括对所述移动模板的开口进行封闭的封口模板。
所述支撑结构呈不封闭的圆筒形,沿所述支撑结构的轴线方向设有一道或多道开口,每个开口处设有第一水平油缸,所述第一水平油缸的缸体及活塞杆分别连接在所述支撑结构的开口两侧。
所述竖向油缸设置有四个,沿所述支撑结构及移动模板的周向等分设置。所述移动模板上设有多个浇注口,多个浇注口在移动模板的周向等分设置。
与已有技术相比,本发明的有益效果体现在:
通过支撑结构上的第一水平液压油缸的伸缩,增加支撑结构与砌筑井壁的摩擦力,实现与井壁的围抱固定,达到悬吊移动模板的目的。由于支撑结构、移动模板之间通过竖向油缸连接,既可实现对移动模板的悬吊,也可实现移动模板的下移。
实现了无稳车、无钢丝绳悬吊模板的难题,达到了掘进与混凝土井壁支护同步进行,结构简单,操作方便。
附图说明:
图1为本发明的俯视结构示意图;图2为本发明的局部立体图;图3为图1的A向剖视图;图4-9为本发明的工作过程示意图。
图中标号:1吊盘,2液压站,3管路,4竖向油缸,5支撑结构,6移动模板,7第二水平油缸,8封口模板,9井壁,10浇注口,11第一水平油缸。
以下通过具体实施方式,并结合附图对本发明作进一步说明。
具体实施方式:
实施例:结合图1-3,本实施例的立井砌壁全液压自移式模板装置,其包括:
悬吊于立井中的吊盘1以及设置在吊盘1上的液压站2,液压站为工作室,通过高压管路3与竖向油缸4、第一水平油缸11及第二水平油缸7联接,通过操作手柄即可实现集中控制,也可单独控制,而且设有闭锁结构,保持足够大的压力,确保支撑结构5与井壁的摩擦阻力围抱井壁,悬吊移动模板6。
具体设置中,支撑结构5及移动模板6设置于吊盘的下方,支撑结构5与竖向油缸4连接,移动模板6与竖向油缸的活塞杆连接。
支撑结构上设有与液压站通过管路连接的第一水平油缸11,第一水平油缸对支撑结构进行扩张或收缩,支撑结构在扩张时因摩擦力固定于立井内壁上并为移动模板提供悬吊支撑;支撑结构呈不封闭的圆筒形,沿支撑结构的轴线方向设有一道或多道开口,每个开口处设有第一水平油缸,第一水平油缸的缸体及活塞杆分别连接在所述支撑结构的开口两侧。
所述移动模板呈不封闭的圆筒形,在移动模板的开口处设有与液压站通过管路连接的第二水平油缸7,第二水平油缸的缸体连接于开口处一侧的模板上,活塞杆连接于开口处另一侧的模板上;移动模板的底部一圈设为45度的刃角,留作与下段混凝土接茬口,保证井壁的完整性。
参见图4、5,井壁9已砌筑完成一段,钻眼放炮,准备出矸,工作面出矸到一个模板段高,取下移动模板上的封口模板8。参见图6、7,工作人员在工作吊盘上操作液压站,移动模板6上的第二水平油缸活塞杆回缩使得移动模板与井壁分离,竖向油缸4的活塞杆伸出,将移动模板6向下推行(推行距离为移动模板的高度),然后通过调节移动模板上所设第二水平油缸将移动模板扩放到位,操平找正。参见图7,将移动模板的封口模板8安装在移动模板的开口处,使得移动模板成为整体封闭的圆筒形,再通过移动模板的浇注口10浇筑砼,待砼达到规定强度后,参见图8、9,通过支撑结构上连接的第一水平油缸的活塞杆收缩,使支撑结构与井壁分离,竖向液压油缸通过液压换向装置,在支撑结构的自重力作用下,将支撑结构下移至移动模板处,扩放到位,完成一个浇筑循环,开始下一个循环的钻眼、放炮、清矸工作。

Claims (2)

1.立井砌壁全液压自移式模板装置,其特征在于包括:
悬吊于所述立井中的吊盘(1)以及设置在所述吊盘上的液压站(2);
与所述液压站通过管路(3)连接并由所述液压站提供动力的竖向油缸(4),设于所述吊盘下方的支撑结构(5)及移动模板(6),所述支撑结构与所述竖向油缸连接、所述移动模板与所述竖向油缸的活塞杆连接;
所述支撑结构上设有与所述液压站通过管路连接的第一水平油缸(11),所述第一水平油缸(11)对所述支撑结构进行扩张或收缩,所述支撑结构在扩张时因摩擦力固定于立井内壁上并为所述移动模板提供悬吊支撑;
所述移动模板呈不封闭的圆筒形,在所述移动模板的开口处设有与所述液压站通过管路连接的第二水平油缸(7),所述第二水平油缸的缸体连接于开口处一侧的模板上,第二水平油缸的活塞杆连接于开口处另一侧的模板上;
所述自移式模板装置还包括对所述移动模板的开口进行封闭的封口模板(8)。
2.根据权利要求1所述的立井砌壁全液压自移式模板装置,其特征在于,所述支撑结构(5)呈不封闭的圆筒形,沿所述支撑结构(5)的轴线方向设有一道或多道开口,每个开口处设有第一水平油缸(11),所述第一水平油缸(11)的缸体及活塞杆分别连接在所述支撑结构的开口两侧。
CN201210275210.2A 2012-08-03 2012-08-03 立井砌壁全液压自移式模板装置 Expired - Fee Related CN102777186B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210275210.2A CN102777186B (zh) 2012-08-03 2012-08-03 立井砌壁全液压自移式模板装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210275210.2A CN102777186B (zh) 2012-08-03 2012-08-03 立井砌壁全液压自移式模板装置

Publications (2)

Publication Number Publication Date
CN102777186A true CN102777186A (zh) 2012-11-14
CN102777186B CN102777186B (zh) 2014-08-20

Family

ID=47122275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210275210.2A Expired - Fee Related CN102777186B (zh) 2012-08-03 2012-08-03 立井砌壁全液压自移式模板装置

Country Status (1)

Country Link
CN (1) CN102777186B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628883A (zh) * 2013-12-18 2014-03-12 中铁隧道集团二处有限公司 深窄竖井无支架超长钢筋绑扎移动模筑的方法
CN103850686A (zh) * 2014-03-21 2014-06-11 中煤矿山建设集团有限责任公司 立井套壁整体液压模板
CN105156136A (zh) * 2015-08-28 2015-12-16 中铁十九局集团有限公司 水管一次性浇筑成型模板及成型方法
CN106351673A (zh) * 2016-09-27 2017-01-25 中国矿业大学 一种适用于立井智能化施工的砌壁模板
CN107083976A (zh) * 2017-06-14 2017-08-22 中煤第五建设有限公司 立井无悬吊分段迈步下行式整体金属模板
CN112855634A (zh) * 2020-12-18 2021-05-28 中国矿业大学 基于液压驱动的立井施工迈步式模板系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU757715A1 (ru) * 1978-09-18 1980-08-23 Vnii Org Mekh Shakht Способ улавливания воды со стен вертикальных стволов при бетонировании крепи и устройство • для его осуществления 1
US4270876A (en) * 1979-12-27 1981-06-02 The United States Of America As Represented By The United States Department Of Energy Method of lining a vertical mine shaft with concrete
CN1078016A (zh) * 1993-01-15 1993-11-03 山西矿业学院 立井井壁环周支承式凿井设备及其施工方法
CN201121413Y (zh) * 2007-11-05 2008-09-24 江苏南通三建集团有限公司 筒式电动爬升模板
CN202055516U (zh) * 2011-04-22 2011-11-30 中国葛洲坝集团股份有限公司 竖井整体提升模板系统
CN202707067U (zh) * 2012-08-03 2013-01-30 中煤矿山建设集团有限责任公司 立井砌壁全液压自移式模板装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU757715A1 (ru) * 1978-09-18 1980-08-23 Vnii Org Mekh Shakht Способ улавливания воды со стен вертикальных стволов при бетонировании крепи и устройство • для его осуществления 1
US4270876A (en) * 1979-12-27 1981-06-02 The United States Of America As Represented By The United States Department Of Energy Method of lining a vertical mine shaft with concrete
CN1078016A (zh) * 1993-01-15 1993-11-03 山西矿业学院 立井井壁环周支承式凿井设备及其施工方法
CN201121413Y (zh) * 2007-11-05 2008-09-24 江苏南通三建集团有限公司 筒式电动爬升模板
CN202055516U (zh) * 2011-04-22 2011-11-30 中国葛洲坝集团股份有限公司 竖井整体提升模板系统
CN202707067U (zh) * 2012-08-03 2013-01-30 中煤矿山建设集团有限责任公司 立井砌壁全液压自移式模板装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
于淼: "MJY整体下移模板设计探讨", 《矿山建设工程新进展-2007全国矿山建设学术会议文集》 *
张淑敏: "伸缩式模板台车的设计及在竖井工程中的应用", 《世界隧道》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628883A (zh) * 2013-12-18 2014-03-12 中铁隧道集团二处有限公司 深窄竖井无支架超长钢筋绑扎移动模筑的方法
CN103628883B (zh) * 2013-12-18 2015-10-14 中铁隧道集团二处有限公司 深窄竖井无支架超长钢筋绑扎移动模筑的方法
CN103850686A (zh) * 2014-03-21 2014-06-11 中煤矿山建设集团有限责任公司 立井套壁整体液压模板
CN105156136A (zh) * 2015-08-28 2015-12-16 中铁十九局集团有限公司 水管一次性浇筑成型模板及成型方法
CN105156136B (zh) * 2015-08-28 2019-10-18 中铁十九局集团有限公司 水管一次性浇筑成型模板及成型方法
CN106351673A (zh) * 2016-09-27 2017-01-25 中国矿业大学 一种适用于立井智能化施工的砌壁模板
CN107083976A (zh) * 2017-06-14 2017-08-22 中煤第五建设有限公司 立井无悬吊分段迈步下行式整体金属模板
CN107083976B (zh) * 2017-06-14 2023-07-11 中煤第五建设有限公司 立井无悬吊分段迈步下行式整体金属模板
CN112855634A (zh) * 2020-12-18 2021-05-28 中国矿业大学 基于液压驱动的立井施工迈步式模板系统

Also Published As

Publication number Publication date
CN102777186B (zh) 2014-08-20

Similar Documents

Publication Publication Date Title
CN102777186B (zh) 立井砌壁全液压自移式模板装置
CN104632251A (zh) 一体浇筑式模板台车和地下通道混凝土浇筑的施工方法
CN204457802U (zh) 一体浇筑式模板台车
CN103867215B (zh) 一种高速公路隧道沟槽整体衬砌台车
CN210086295U (zh) 一种复合装配式地下结构
CN103726421A (zh) 地铁施工用高度及跨度可调式轨道铺设机
CN101363224A (zh) 移动式基坑支撑系统及施工方法
CN103850686A (zh) 立井套壁整体液压模板
CN207176713U (zh) 一种减小侧摩阻力的桩基结构
CN104727545A (zh) 大型水塔筒身液压滑模垂直运输系统及方法
CN103982200A (zh) 全断面内滑轨移动钢模台车
CN107587885B (zh) 一种隧道标准断面内二衬台车结构及拼装方法
CN203702178U (zh) 底端增压型小高度隧道衬砌台车
CN202707067U (zh) 立井砌壁全液压自移式模板装置
CN203035204U (zh) 一种大断面隧道二衬分组模板台车
CN203878979U (zh) 螺栓对拉式轨道滑动模板
CN105927252B (zh) 一种利用矩形顶管开挖大断面地下空间结构体系转换方法
CN102747725B (zh) 一种钻孔灌注桩微扰动施工方法
CN204608611U (zh) 适用于大型混凝土预制构件的活动底模台车系统
CN208684247U (zh) 一种预制节段用吊装装置
CN109026141B (zh) 基于充填治理空区预留功能通道的方法
CN207513159U (zh) 一种单侧墙模板台车
CN107288640A (zh) 一种无稳绳自支撑模块化竖井掘砌施工装置
CN115749822A (zh) 一种微型盾构始发与接收的施工系统及施工方法
CN104088665A (zh) 暗挖车站钢管柱施工工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Xu Huidong

Inventor after: Wen Fucheng

Inventor after: Wu Jie

Inventor after: Qin Xiaoguang

Inventor after: Gao Yunqiang

Inventor after: Liu Linlin

Inventor after: Liu Ning

Inventor after: Fang Tili

Inventor after: Zhang Yu

Inventor before: Xu Huidong

Inventor before: Wen Fucheng

Inventor before: Wu Jie

Inventor before: Qin Xiaoguang

Inventor before: Gao Yunqiang

Inventor before: Liu Linlin

Inventor before: Liu Ning

Inventor before: Fang Tili

Inventor before: Zhang Yu

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140820

Termination date: 20170803