CN103947320A - Tree planting method and tree planting structure in coastal saline and alkaline area - Google Patents

Tree planting method and tree planting structure in coastal saline and alkaline area Download PDF

Info

Publication number
CN103947320A
CN103947320A CN201410154690.6A CN201410154690A CN103947320A CN 103947320 A CN103947320 A CN 103947320A CN 201410154690 A CN201410154690 A CN 201410154690A CN 103947320 A CN103947320 A CN 103947320A
Authority
CN
China
Prior art keywords
layer
planting
soil
plantation hole
straw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410154690.6A
Other languages
Chinese (zh)
Other versions
CN103947320B (en
Inventor
王霞
王晓慧
李刚
李雪
薛春营
刘光生
刘英君
韩鹏龙
张泉利
姜新刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongsheng ecological Polytron Technologies Inc
Original Assignee
SHANDONG WEIFANG DONGSHENG GARDENING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG WEIFANG DONGSHENG GARDENING CO Ltd filed Critical SHANDONG WEIFANG DONGSHENG GARDENING CO Ltd
Priority to CN201410154690.6A priority Critical patent/CN103947320B/en
Publication of CN103947320A publication Critical patent/CN103947320A/en
Application granted granted Critical
Publication of CN103947320B publication Critical patent/CN103947320B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The invention discloses a tree planting method and a tree planting structure in a coastal saline and alkaline area. The tree planting method comprises the steps of building a cofferdam, arranging a lifting layer, carrying out salt pressing and alkali discharging on the lifting layer, digging planting holes, paving waterproof geotechnical cloth, paving a broken stone water filter layer, paving a straw curtain water filter layer, backfilling planting soil and planting trees. According to the tree planting method disclosed by the invention, after the steps and measures are comprehensively adopted, the salt returning period of saline and alkali soil can be slowed down, good conditions are created for the surviving and the growth of the trees due to the soil fertility of the planting soil, and a greenery landscape can be easily formed after the trees are planted; since the terrain is lifted, saline and alkaline original soil is relatively reduced, alkali discharging pipes are not needed to be paved in specific construction, the period of salt discharging and alkali controlling is reduced, and the cost is reduced. The tree planting method and the tree planting structure, disclosed by the invention, are suitable for being popularized and applied in a greening process of the coastal saline and alkaline area.

Description

A kind of beach saline land tree planting method and planting of plants structure
Technical field
The present invention relates to beach saline land and administer technical field, relate in particular to a kind of beach saline land tree planting method and planting of plants structure.
Background technology
Beach saline land causes soil comparatively barren because salt alkali content is high, originally landforms only have the growth of minority Salt And Alkali Tolerance grass, and mostly be self-sow, manual inseminating trees are less, a small amount of trees of original Salt And Alkali Tolerance grass and manual inseminating are due to weather, soil reason, can not form good Afforestation Landscape, landscape structure is comparatively single, and ornamental value is lower.And the river course of coastal region often silts up seriously, weedy, water is seriously polluted, and soil property is poor, and general ornamental trees and shrubs are difficult to normal growth.
At present, improving the conventional method of this present situation mainly contains raised fields and changes that alkali, hidden pipe row alkali, french drain row alkali, zanjon bar field change alkali, water pumping of the wind-force changes alkali etc., but these several Saline-alkali Field Control method ubiquity costs are higher, and operation is loaded down with trivial details, need expend the problem of a large amount of human and material resources.
Summary of the invention
A technical problem to be solved by this invention is: a kind of beach saline land tree planting method is provided, to solve traditional problem that the salt discharge solodization existing cycle of mode is long, cost is high, and improves the survival rate of trees.
Another technical problem to be solved by this invention is: a kind of beach saline land planting of plants structure is provided.
For solving the above-mentioned technical problem about beach saline land tree planting method, technical scheme of the present invention is: a kind of beach saline land tree planting method, comprises the following steps:
A. build cofferdam: on saline land, build cofferdam;
B. arrange and raise layer: with slush pump, from the river bed of outside, described cofferdam, extract mud, and by the sludge pumping extracting the saline and alkaline original soil surface to inside, described cofferdam, through airing, shakeout, raise layer described in formation;
C. press salt row alkali: the described layer of raising is pressed to salt row alkaline treatment;
D. excavate plantation hole: in described cofferdam inner excavated plantation hole;
E. lay waterproof geotextiles: on the internal perisporium in described plantation hole, lay waterproof geotextiles, it is suitable for reading concordant that at least cheat with described plantation the top of described waterproof geotextiles, concordant at the bottom of the hole in the following and described plantation hole of described waterproof geotextiles;
F. lay rubble drainage layer: rubble drainage layer is laid in the bottom in described plantation hole;
G. lay straw curtain drainage layer: above described rubble drainage layer, lay straw curtain drainage layer, described straw curtain is setting up and down has the straw of at least two-layer, adjacent two-layer straw curtain to be cross-shaped;
H. backfill planting soil: to backfill planting soil in described plantation hole, the salt content of described planting soil is less than 2.5%, and pH value is not higher than 8.5; Described planting soil is puddled and is formed by the weight ratio of 6:3-6:4 by sand loam and humus soil;
I. the trees of planting: the trees of planting in described planting soil.
In technique scheme, preferably, also comprise and build retaining ridge step, after described step I, trees, corresponding to the position of upper in described plantation hole, build overhead retaining ridge around.
In technique scheme, preferably, the particle diameter of described rubble drainage layer is 2-4cm.
In technique scheme, preferably, in described step g, described straw curtain is setting up and down three layers, and the straw of every adjacent two-layer straw curtain is cross-shaped.
In technique scheme, preferably, the big up and small down trapezoidal shape in vertical section in described plantation hole.
For solving the above-mentioned technical problem about beach saline land planting of plants structure, technical scheme of the present invention is: a kind of beach saline land planting of plants structure, comprise: the layer of raising that is arranged on saline and alkaline original soil surface, described raise layer or raise on layer and saline and alkaline original soil, be provided with plantation and cheat, on the internal perisporium in described plantation hole, be equipped with waterproof geotextiles, it is suitable for reading concordant that at least cheat with described plantation the top of described waterproof geotextiles, concordant at the bottom of the hole in the following and described plantation hole of described waterproof geotextiles; Bottom in described plantation hole is equipped with rubble drainage layer; Above described rubble drainage layer, be equipped with straw curtain drainage layer, described straw curtain is setting up and down has the straw of at least two-layer, adjacent two-layer straw curtain to be cross-shaped; The top backfill of described straw curtain drainage layer is useful on the planting soil of the trees of planting.
In technique scheme, preferably, corresponding to the position of upper in described plantation hole, built overhead retaining ridge.
In technique scheme, preferably, the particle diameter of described rubble drainage layer is 2-4cm.
In technique scheme, preferably, described straw curtain is setting up and down three layers, and the straw of every adjacent two-layer straw curtain is cross-shaped.
In technique scheme, preferably, the big up and small down trapezoidal shape in vertical section in described plantation hole.
Owing to having adopted technique scheme, beach saline land tree planting method of the present invention, comprise build cofferdam, arrange raise layer, to raising lamination salt row alkali, excavate plantation hole, lay waterproof geotextiles, lay rubble drainage layer, laying straw curtain drainage layer, backfill planting soil and the trees step of planting; Raise the setting of layer and raised the physical features in cofferdam, saline and alkaline original soil is reduced relatively, raise layer because having passed through airing and having pressed salt row alkaline treatment, salt alkali content significantly reduces, and is convenient to trees survival and growth; Plantation is laid waterproof geotextiles in hole, plays the saline and alkaline effect of isolation, can prevent that the saline and alkaline horizontal infiltration in the salt affected soil of outside, plantation hole from entering in plantation hole; The rubble drainage layer arranging and straw curtain drainage layer play and on vertical, prevent from below plantation hole returning the effect in plantation hole on saline and alkaline in salt affected soil, while is convenient to again water or rainwater precipitation passes through to infiltrate and plant soil below hole under rubble drainage layer and straw curtain drainage layer, prevent because of the excessive formation damage caused by waterlogging of the water yield, the straw of adjacent two-layer straw curtain is cross-shaped layout can also improve its bearing capacity, better the planting soil of carrying top; The planting soil of trees of planting is puddled and is formed by the weight ratio of 6:3-6:4 by sand loam and humus soil, the planting soil of this component and proportioning had not only improved the fertilizer of soil but also had strengthened the permeability of soil, the salt content of planting soil is less than 2.5% simultaneously, pH value, not higher than 8.5, is all suitable for surviving and growing of trees.The present invention comprehensively takes after above-mentioned steps measure, the accumulation of salt in the surface soil cycle of the salt affected soil that slowed down, the soil fertility of planting soil in addition, surviving and growing and created good condition for trees; Because physical features is raised, saline and alkaline original soil reduces relatively, during Specific construction, needn't re-lay Pipe for draining alkali, has both reduced the cycle of salt discharge solodization, has reduced again cost.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further non-limitingly described.
Fig. 1 is the cross-sectional schematic that adopts the structure of planting obtaining after the beach saline land tree planting method of the embodiment of the present invention;
In figure: the saline and alkaline original soil of 1-; 2-raises layer; 3-waterproof geotextiles; 4-planting soil; 5-trees; 6-straw curtain drainage layer; 7-rubble drainage layer; 8-retaining ridge.
Embodiment
Shown in figure 1, the beach saline land tree planting method of the embodiment of the present invention, comprises the following steps:
A. build cofferdam: on saline land, the first selected trees region of wanting to plant, then according to the cofferdam method of building of routine, build cofferdam in the surrounding in the trees region of wanting to plant.
B. arrange and raise layer: utilize slush pump to extract mud from the river bed of outside, cofferdam, and by the sludge pumping extracting the surface to the saline and alkaline original soil 1 of inside, cofferdam, by fully airing, shakeout, form and raise layer 2.Raise the setting of layer 2 and raised the physical features in cofferdam, thereby saline and alkaline original soil 1 is reduced relatively, raise layer 2 because having passed through abundant airing, the contained saline and alkaline major part of mud is discharged with drop liquid, therefore the salt alkali content of raising layer 2 significantly reduces, and is conducive to the survival and growth after planting of plants.The concrete thickness of raising layer 2 can be according to different types of trees of planting and different, and generally, arbor species should raise, and shrub can be lower; The seeds that are afraid of saline and alkaline waterlogging should be high, and the seeds of Salt And Alkali Tolerance waterlogging can be lower.
C. press salt row alkali: adopt and initiatively water or routine such as rainfall snowfall presses salt row alkali method to press salt row alkaline treatment to raising layer 2, further discharge raise layers 2 interior contained saline and alkaline.
D. excavate plantation hole: in cofferdam inner excavated plantation hole, size and the degree of depth in plantation hole, according to different types of trees and different.The thicker locust tree of the trunk diameter of a cross-section of a tree trunk 1.3 meters above the ground of take is below excavated plantation hole as example, and the vertical section in plantation hole is preferably up big and down small trapezoidal shape, and the suitable for reading of plantation hole is of a size of 5 meters * 5 meters, and the end, hole is of a size of 3 meters * 3 meters, cheats dark 1.7 meters.The plantation hole of trapezoidal shape can increase follow-up waterproof geotextiles and the contact area of planting hole, and the space that increases plant pit, is convenient to fill more planting soil, is conducive to the survival and growth after planting of plants.
E. lay waterproof geotextiles: on the internal perisporium in plantation hole, lay waterproof geotextiles 3, what wherein the top of waterproof geotextiles 3 at least will be cheated with plantation is suitable for reading concordant, preferably leaves remaining limit, concordant at the bottom of the hole in the following and plantation hole of waterproof geotextiles 3.In the present embodiment, the specification of the waterproof geotextiles 3 of employing: grammes per square metre 500g/ ㎡, 2 meters of fabric widths.Waterproof geotextiles is to using plastic film as antiseepage base material, with the non-woven fabric compounded geotechnological impervious material forming, the erosion of have good effect in acid, alkali, salt, can prevent that the saline and alkaline horizontal infiltration in the salt affected soil of outside, plantation hole from entering in plantation hole, plays the saline and alkaline effect of good isolation.
F. lay rubble drainage layer: lay waterproof geotextiles 3 on the internal perisporium in plantation hole after, in the bottom in plantation hole, lay rubble drainage layer 7, in the present embodiment, preferably the particle diameter of rubble drainage layer 7 is 2-4cm, and thickness is 50cm.Rubble drainage layer 7 plays and on vertical, prevents from below plantation hole returning the effect in plantation hole on saline and alkaline in salt affected soil, is convenient to again water or rainwater precipitation infiltrates below, plantation hole soil for 7 times by rubble drainage layer simultaneously, prevents because of the excessive formation damage caused by waterlogging of the water yield.
G. lay straw curtain drainage layer: above rubble drainage layer 7, lay straw curtain drainage layer 6, this straw curtain drainage layer 6 at least comprises two-layer straw curtain setting up and down, in the present embodiment, be preferably three layers, the straw of every adjacent two-layer straw curtain is cross-shaped, the straw that is bottom and intermediate layer, intermediate layer and top layer is cross-shaped, in the present embodiment, by every laying 1 ㎡, the consumption of three layers of straw curtain is that 4kg calculates total consumption.Straw curtain drainage layer 6 plays and on vertical, prevents from below plantation hole returning the effect in plantation hole on saline and alkaline in salt affected soil, while is convenient to again water or rainwater precipitation passes through rubble drainage layer 7 and straw curtain drainage layer infiltrates soil below plantation hole for 6 times, prevent because of the excessive formation damage caused by waterlogging of the water yield, the straw of adjacent two-layer straw curtain is cross-shaped layout can also improve its bearing capacity, better the planting soil of carrying top.
H. backfill planting soil: after laying straw curtain drainage layer 6, to backfill planting soil 4 in plantation hole, require the salt content of planting soil to be less than 2.5%, pH value is not higher than 8.5; Wherein, planting soil 4 is to be puddled and form by the weight ratio of 6:3-6:4 by sand loam and humus soil.The characteristic of sand loam: though sand content is still quite a lot of, because also containing Shao Liang Silt grain and clay, there is the associativity between grogs, when dry, can become piece, but easily broken, when wet, can feel viscosity, clay component approximately 40%.Humus soil is that the residual leaf of the deadwood of topsoil trees in forest is through forming after putrid fermentation over a long time.The permeability that had not only improved the fertilizer of soil but also strengthened soil by the planting soil of these two kinds of components preparations of sand loam and humus soil.
I. the trees of planting: the Salt And Alkali Tolerance trees 5 such as locust tree, Chinese wax, black pine of planting in planting soil.Also can corresponding to the position of upper in plantation hole, build overhead retaining ridge 8 in the surrounding of trees 5, while building retaining ridge 8, can utilize in passing retaining ridge 8 to push down the remaining limit of waterproof geotextiles 3.The setting on retaining ridge 8, is convenient to the trees after planting to water.
After planting of plants, according to actual conditions, the later stage can be by cofferdam demolition.
Beach saline land tree planting method of the present invention is comprehensively taked after above-mentioned steps measure, slowed down accumulation of salt in the surface soil cycle of salt affected soil, in addition the soil fertility of planting soil, is the surviving and grow and created good condition of trees, is easy to form Afforestation Landscape after planting; Because physical features is raised, saline and alkaline original soil reduces relatively, during Specific construction, needn't re-lay Pipe for draining alkali, has both reduced the cycle of salt discharge solodization, has reduced again cost.
After having implemented the beach saline land tree planting method of the embodiment of the present invention, obtain the beach saline land planting of plants structure shown in Fig. 1, this beach saline land planting of plants structure comprises: be arranged on saline and alkaline original soil 1 surface raise layer 2, on layer 2 and saline and alkaline original soil 1, be provided with plantation hole (when plantation hole is more shallow, plantation hole is positioned at raises layer 2 raising layer 2 or raise; When plantation hole is deeply a little, plantation hole is dug to saline and alkaline former soil layer), on the internal perisporium in this plantation hole, be equipped with waterproof geotextiles 3, suitable for reading concordant (preferably the leaving remaining limit) that wherein at least cheat with plantation the top of waterproof geotextiles 3, concordant at the bottom of the hole in the following and plantation hole of waterproof geotextiles 3; Bottom in plantation hole is equipped with rubble drainage layer 7; Above rubble drainage layer 7, be equipped with straw curtain drainage layer 6, straw curtain is setting up and down has the straw of at least two-layer, adjacent two-layer straw curtain to be cross-shaped; Above straw curtain drainage layer 6, backfill is useful on the planting soil 4 of the trees 5 of planting.
And to the further optimal design of this beach saline land planting of plants structure: the big up and small down trapezoidal shape in vertical section in plantation hole; The particle diameter of rubble drainage layer 7 is 2-4cm; Straw curtain is setting up and down three layers, and the straw of every adjacent two-layer straw curtain is cross-shaped; Corresponding to the position of upper in plantation hole, building overhead retaining ridge 8.
The above is only giving an example of better embodiment of the present invention, and the part of wherein not addressing is in detail those of ordinary skills' common practise.Protection scope of the present invention is as the criterion with the content of claim, and any equivalent transformation carrying out based on technology enlightenment of the present invention, also within protection scope of the present invention.

Claims (10)

1. a beach saline land tree planting method, is characterized in that, comprises the following steps:
A. build cofferdam: on saline land, build cofferdam;
B. arrange and raise layer: with slush pump, from the river bed of outside, described cofferdam, extract mud, and by the sludge pumping extracting the saline and alkaline original soil surface to inside, described cofferdam, through airing, shakeout, raise layer described in formation;
C. press salt row alkali: the described layer of raising is pressed to salt row alkaline treatment;
D. excavate plantation hole: in described cofferdam inner excavated plantation hole;
E. lay waterproof geotextiles: on the internal perisporium in described plantation hole, lay waterproof geotextiles, it is suitable for reading concordant that at least cheat with described plantation the top of described waterproof geotextiles, concordant at the bottom of the hole in the following and described plantation hole of described waterproof geotextiles;
F. lay rubble drainage layer: rubble drainage layer is laid in the bottom in described plantation hole;
G. lay straw curtain drainage layer: above described rubble drainage layer, lay straw curtain drainage layer, described straw curtain is setting up and down has the straw of at least two-layer, adjacent two-layer straw curtain to be cross-shaped;
H. backfill planting soil: to backfill planting soil in described plantation hole, the salt content of described planting soil is less than 2.5%, and pH value is not higher than 8.5; Described planting soil is puddled and is formed by the weight ratio of 6:3-6:4 by sand loam and humus soil;
I. the trees of planting: the trees of planting in described planting soil.
2. beach saline land tree planting method as claimed in claim 1, is characterized in that: also comprise and build retaining ridge step, after described step I, trees, build overhead retaining ridge around corresponding to the position of upper in described plantation hole.
3. beach saline land tree planting method as claimed in claim 1 or 2, is characterized in that: the particle diameter of described rubble drainage layer is 2-4cm.
4. beach saline land tree planting method as claimed in claim 3, is characterized in that: in described step g, described straw curtain is setting up and down three layers, and the straw of every adjacent two-layer straw curtain is cross-shaped.
5. beach saline land tree planting method as claimed in claim 4, is characterized in that: the big up and small down trapezoidal shape in vertical section in described plantation hole.
6. a beach saline land planting of plants structure, it is characterized in that, comprise: the layer of raising that is arranged on saline and alkaline original soil surface, described raise layer or raise on layer and saline and alkaline original soil, be provided with plantation and cheat, on the internal perisporium in described plantation hole, be equipped with waterproof geotextiles, it is suitable for reading concordant that at least cheat with described plantation the top of described waterproof geotextiles, concordant at the bottom of the hole in the following and described plantation hole of described waterproof geotextiles; Bottom in described plantation hole is equipped with rubble drainage layer; Above described rubble drainage layer, be equipped with straw curtain drainage layer, described straw curtain is setting up and down has the straw of at least two-layer, adjacent two-layer straw curtain to be cross-shaped; The top backfill of described straw curtain drainage layer is useful on the planting soil of the trees of planting.
7. beach saline land planting of plants structure as claimed in claim 6, is characterized in that, corresponding to the position of upper in described plantation hole, has built overhead retaining ridge.
8. the beach saline land planting of plants structure as described in claim 6 or 7, is characterized in that, the particle diameter of described rubble drainage layer is 2-4cm.
9. beach saline land planting of plants structure as claimed in claim 8, is characterized in that, described straw curtain is setting up and down three layers, and the straw of every adjacent two-layer straw curtain is cross-shaped.
10. beach saline land planting of plants structure as claimed in claim 9, is characterized in that, the big up and small down trapezoidal shape in vertical section in described plantation hole.
CN201410154690.6A 2014-04-17 2014-04-17 A kind of beach saline land tree planting method and planting of plants structure Active CN103947320B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410154690.6A CN103947320B (en) 2014-04-17 2014-04-17 A kind of beach saline land tree planting method and planting of plants structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410154690.6A CN103947320B (en) 2014-04-17 2014-04-17 A kind of beach saline land tree planting method and planting of plants structure

Publications (2)

Publication Number Publication Date
CN103947320A true CN103947320A (en) 2014-07-30
CN103947320B CN103947320B (en) 2016-05-04

Family

ID=51324798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410154690.6A Active CN103947320B (en) 2014-04-17 2014-04-17 A kind of beach saline land tree planting method and planting of plants structure

Country Status (1)

Country Link
CN (1) CN103947320B (en)

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104106325A (en) * 2014-08-01 2014-10-22 上海市园林科学研究所 Plant root system micro domain environment system for urban landscaping soil improvement
CN104488531A (en) * 2014-12-26 2015-04-08 中国科学院华南植物园 Method for constructing close-to-nature vegetations in southern coastal sandy land
CN105144895A (en) * 2015-07-10 2015-12-16 河海大学 Method for quickly desalinizing mud flat saline and alkaline land by laying sludge on surface layer
CN105830843A (en) * 2016-04-01 2016-08-10 贵州飞水利荣科技有限公司 Planting method of kiwi seedlings
CN105850646A (en) * 2016-05-12 2016-08-17 天津泰达绿化集团有限公司 Method for planting catalpa ovata in coastal saline-alkali soil
CN105900766A (en) * 2016-04-15 2016-08-31 天津泰达绿化集团有限公司 Coast saline land Quercus wutaishansea Mary planting method
CN105900765A (en) * 2016-04-15 2016-08-31 天津泰达绿化集团有限公司 Coast saline land Quercus palustris planting method
CN106954404A (en) * 2017-04-25 2017-07-18 广东四季景山园林建设有限公司 A kind of saline soil area is locally isolated device
CN107182333A (en) * 2017-07-04 2017-09-22 上海市园林工程有限公司 A kind of salt-soda soil is every salt salt discharge structure and its method
CN108207160A (en) * 2018-01-03 2018-06-29 南京农业大学 A kind of method for preventing saline-alkali soil earth's surface salification
CN105230416B (en) * 2015-09-01 2018-08-10 福建省春天生态科技股份有限公司 A kind of Coastal Sandy Land arbor implantation methods
CN109463061A (en) * 2018-09-21 2019-03-15 江苏城中园林股份有限公司 A kind of salt-soda soil plant setting method
CN109821866A (en) * 2019-01-16 2019-05-31 安徽工程大学 Repair structure and its restorative procedure in salt-soda soil based on river bottom mud resource utilization
CN110199826A (en) * 2019-04-04 2019-09-06 中国科学院植物研究所 A method of the Degraded Grasslands ecosystem is restored by planting sheep's hay
CN110419284A (en) * 2019-08-08 2019-11-08 上海园林绿化建设有限公司 A kind of strand greenery patches salt discharge alkali construction technology
CN110972788A (en) * 2019-12-13 2020-04-10 四川云辰园林科技有限公司 Micro-domain improvement method for tree pocket waterlogging in urban garden land
CN111557213A (en) * 2020-06-05 2020-08-21 中交天津航道局有限公司 Construction method of soil leaching protection structure suitable for sand reclamation by blowing and filling
CN111937713A (en) * 2020-06-05 2020-11-17 中交天航环保工程有限公司 Method for constructing water-retaining and fertilizer-retaining composite soil structure for tropical barren soil
CN112166931A (en) * 2020-10-30 2021-01-05 东盛生态科技股份有限公司 Method for planting sea buckthorn in saline-alkali soil
CN112166932A (en) * 2020-10-30 2021-01-05 东盛生态科技股份有限公司 Method for cultivating pomegranate and red snow fruit in saline-alkali soil
CN112544156A (en) * 2020-12-03 2021-03-26 四川云辰园林科技有限公司 Method for breaking rock and improving soil in barren land
CN112690060A (en) * 2020-12-25 2021-04-23 浙江省围海建设集团股份有限公司 Greening improvement control method on saline-alkali soil
CN112858140A (en) * 2021-03-23 2021-05-28 长江岩土工程总公司(武汉) Method for accurately testing water rise height of soil capillary
CN113016475A (en) * 2021-03-04 2021-06-25 西安建工园林工程有限公司 Tree planting method in soil moisture saturation area
CN115104398A (en) * 2022-06-28 2022-09-27 重庆地质矿产研究院 Construction process of anti-side-seepage field ridge

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1155371A (en) * 1996-01-26 1997-07-30 天津经济技术开发区总公司园林绿化公司 Method for converting sea-silt into planation soil
CN102150547A (en) * 2010-12-30 2011-08-17 天津泰达园林建设有限公司 Method for planting poplar trees in coastal saline-alkali soil
CN102498837A (en) * 2011-09-30 2012-06-20 山东胜伟园林科技有限公司 Seedling planting method in alkaline land
CN203167652U (en) * 2013-01-25 2013-09-04 天津滨海新区物源环境科技有限公司 Greening and planting system for saline and alkaline land
CN203896685U (en) * 2014-04-17 2014-10-29 山东潍坊东盛园艺有限公司 Tree planting structure in coastal saline-alkali land

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1231067A1 (en) * 1983-09-01 1986-05-15 Южный научно-исследовательский институт гидротехники и мелиорации Melioration agent for saline soils

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1155371A (en) * 1996-01-26 1997-07-30 天津经济技术开发区总公司园林绿化公司 Method for converting sea-silt into planation soil
CN102150547A (en) * 2010-12-30 2011-08-17 天津泰达园林建设有限公司 Method for planting poplar trees in coastal saline-alkali soil
CN102498837A (en) * 2011-09-30 2012-06-20 山东胜伟园林科技有限公司 Seedling planting method in alkaline land
CN203167652U (en) * 2013-01-25 2013-09-04 天津滨海新区物源环境科技有限公司 Greening and planting system for saline and alkaline land
CN203896685U (en) * 2014-04-17 2014-10-29 山东潍坊东盛园艺有限公司 Tree planting structure in coastal saline-alkali land

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104106325A (en) * 2014-08-01 2014-10-22 上海市园林科学研究所 Plant root system micro domain environment system for urban landscaping soil improvement
CN104488531A (en) * 2014-12-26 2015-04-08 中国科学院华南植物园 Method for constructing close-to-nature vegetations in southern coastal sandy land
CN105144895A (en) * 2015-07-10 2015-12-16 河海大学 Method for quickly desalinizing mud flat saline and alkaline land by laying sludge on surface layer
CN105230416B (en) * 2015-09-01 2018-08-10 福建省春天生态科技股份有限公司 A kind of Coastal Sandy Land arbor implantation methods
CN105830843A (en) * 2016-04-01 2016-08-10 贵州飞水利荣科技有限公司 Planting method of kiwi seedlings
CN105900766A (en) * 2016-04-15 2016-08-31 天津泰达绿化集团有限公司 Coast saline land Quercus wutaishansea Mary planting method
CN105900765A (en) * 2016-04-15 2016-08-31 天津泰达绿化集团有限公司 Coast saline land Quercus palustris planting method
CN105850646A (en) * 2016-05-12 2016-08-17 天津泰达绿化集团有限公司 Method for planting catalpa ovata in coastal saline-alkali soil
CN106954404A (en) * 2017-04-25 2017-07-18 广东四季景山园林建设有限公司 A kind of saline soil area is locally isolated device
CN106954404B (en) * 2017-04-25 2022-12-02 广东四季景山园林建设有限公司 Local isolating device in saline soil area
CN107182333A (en) * 2017-07-04 2017-09-22 上海市园林工程有限公司 A kind of salt-soda soil is every salt salt discharge structure and its method
CN108207160A (en) * 2018-01-03 2018-06-29 南京农业大学 A kind of method for preventing saline-alkali soil earth's surface salification
CN109463061A (en) * 2018-09-21 2019-03-15 江苏城中园林股份有限公司 A kind of salt-soda soil plant setting method
CN109821866A (en) * 2019-01-16 2019-05-31 安徽工程大学 Repair structure and its restorative procedure in salt-soda soil based on river bottom mud resource utilization
CN110199826A (en) * 2019-04-04 2019-09-06 中国科学院植物研究所 A method of the Degraded Grasslands ecosystem is restored by planting sheep's hay
CN110199826B (en) * 2019-04-04 2022-01-28 中国科学院植物研究所 Method for restoring degraded grassland ecosystem by planting leymus chinensis
CN110419284A (en) * 2019-08-08 2019-11-08 上海园林绿化建设有限公司 A kind of strand greenery patches salt discharge alkali construction technology
CN110972788A (en) * 2019-12-13 2020-04-10 四川云辰园林科技有限公司 Micro-domain improvement method for tree pocket waterlogging in urban garden land
CN111937713A (en) * 2020-06-05 2020-11-17 中交天航环保工程有限公司 Method for constructing water-retaining and fertilizer-retaining composite soil structure for tropical barren soil
CN111557213A (en) * 2020-06-05 2020-08-21 中交天津航道局有限公司 Construction method of soil leaching protection structure suitable for sand reclamation by blowing and filling
CN112166931B (en) * 2020-10-30 2022-04-15 东盛生态科技股份有限公司 Method for planting sea buckthorn in saline-alkali soil
CN112166931A (en) * 2020-10-30 2021-01-05 东盛生态科技股份有限公司 Method for planting sea buckthorn in saline-alkali soil
CN112166932A (en) * 2020-10-30 2021-01-05 东盛生态科技股份有限公司 Method for cultivating pomegranate and red snow fruit in saline-alkali soil
CN112544156A (en) * 2020-12-03 2021-03-26 四川云辰园林科技有限公司 Method for breaking rock and improving soil in barren land
CN112690060A (en) * 2020-12-25 2021-04-23 浙江省围海建设集团股份有限公司 Greening improvement control method on saline-alkali soil
CN113016475A (en) * 2021-03-04 2021-06-25 西安建工园林工程有限公司 Tree planting method in soil moisture saturation area
CN113016475B (en) * 2021-03-04 2023-09-22 蒲恒恒 Tree planting method in soil moisture saturation area
CN112858140A (en) * 2021-03-23 2021-05-28 长江岩土工程总公司(武汉) Method for accurately testing water rise height of soil capillary
CN112858140B (en) * 2021-03-23 2024-06-04 长江岩土工程总公司(武汉) Method for accurately testing water elevation of soil capillary
CN115104398A (en) * 2022-06-28 2022-09-27 重庆地质矿产研究院 Construction process of anti-side-seepage field ridge

Also Published As

Publication number Publication date
CN103947320B (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN103947320B (en) A kind of beach saline land tree planting method and planting of plants structure
CN203896685U (en) Tree planting structure in coastal saline-alkali land
CN106900342B (en) Integrated semi-lithologic high slope vegetation reconstruction protection method
CN101322470B (en) Coast saline-alkali soil forestation method
CN101849454B (en) Biological synthesis improvement method of salt-alkali shoaly land
CN105230323B (en) A kind of growth-promoting binary stereoscopic configurations pattern against corrosion suitable for feldspathic sandstone small watershed
CN102067753B (en) Long-term governance method for converting saline-alkali soil into fertile farmland
CN106818164A (en) A kind of salt-soda soil arbor implantation methods
CN103262689A (en) Coastal saline-alkali soil terrace type afforesting method for improvement of dredger fill
CN101946573A (en) Method for ameliorating saline and alkaline land
CN102138491B (en) Soil and ecological control method for coastal beaches
CN102422735A (en) Ecological integrated improved facility and improving method for saline and alkaline land
Chen et al. Chinese rose (Rosa chinensis) cultivation in Bohai Bay, China, using an improved drip irrigation method to reclaim heavy coastal saline soils
CN102392453B (en) Terrace bank construction method for changing slope farmland into level terrace in reservoir area of Three Gorges
CN103718686B (en) The afflux anatonosis of a kind of local presses down alkaline land improving system and the improvement method of evaporation
CN102150547A (en) Method for planting poplar trees in coastal saline-alkali soil
CN104686285A (en) Survival promoting method for planting big tree in saline and alkaline land
CN101843204A (en) Shiny-leaved yellowhorn non-irrigation culture method
CN105706555B (en) Saline land greening engineering original soil structure-improved and its construction method
CN102550160A (en) Rainwater-harvesting permeability-enhancing and evaporation-inhibiting method for improving saline and alkaline lands locally
CN109041626A (en) Newly-built citrus orchard soil improvement and fertilizer application method
CN106688800B (en) Water-retaining and fertilizer-retaining land reclamation method for tailing pond
CN106818280A (en) A kind of salt-soda soil arbor planting bed
CN102498758B (en) A kind of water-saving cultivation method and growing structures
CN102144523A (en) Sidewalk-frozen tree planting method for coastal saline-salt soil

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 261061 No. 3567 North East Street, Gaoxin District, Shandong, Weifang

Applicant after: SHANDONG DONGSHENG GARDEN ENGINEERING CO., LTD.

Address before: 261061 No. 3567 North East Street, Gaoxin District, Shandong, Weifang

Applicant before: Shandong Weifang Dongsheng Gardening Co., Ltd.

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 261061 No. 3567 North East Street, Gaoxin District, Shandong, Weifang

Patentee after: Dongsheng ecological Polytron Technologies Inc

Address before: 261061 No. 3567 North East Street, Gaoxin District, Shandong, Weifang

Patentee before: SHANDONG DONGSHENG GARDEN ENGINEERING CO., LTD.